CN210345742U - Ventilation system for tire production workshop - Google Patents

Ventilation system for tire production workshop Download PDF

Info

Publication number
CN210345742U
CN210345742U CN201921066141.8U CN201921066141U CN210345742U CN 210345742 U CN210345742 U CN 210345742U CN 201921066141 U CN201921066141 U CN 201921066141U CN 210345742 U CN210345742 U CN 210345742U
Authority
CN
China
Prior art keywords
pipe
fixed mounting
install bin
water pump
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921066141.8U
Other languages
Chinese (zh)
Inventor
王铁伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiongying tire (Qingzhou) Co.,Ltd.
Original Assignee
Shandong Sheng Shi Tai Lai Rubber Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Sheng Shi Tai Lai Rubber Technology Co ltd filed Critical Shandong Sheng Shi Tai Lai Rubber Technology Co ltd
Priority to CN201921066141.8U priority Critical patent/CN210345742U/en
Application granted granted Critical
Publication of CN210345742U publication Critical patent/CN210345742U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of tire production, especially, be a ventilation system for tire workshop, including the install bin, fixed mounting has the circulating pipe in the install bin, one side fixed mounting of install bin has the forced draught blower, one side of install bin is equipped with circulation tank, circulation tank's top fixed mounting has the connecting pipe, circulation tank's one end and circulating pipe fixed connection are kept away from to the connecting pipe, one side fixed mounting of install bin has first water pump, the connecting pipe is kept away from to the circulating pipe one end and first water pump fixed connection, the top fixed mounting of install bin has air cleaner, air cleaner's top fixed mounting has the intake pipe, one side fixed mounting of install bin has the draught fan. The utility model discloses simple structure is convenient for ventilate, cool down in the workshop, and the convenience is handled the workshop combustion gas simultaneously, protects ecological environment, is favorable to the environmental protection.

Description

Ventilation system for tire production workshop
Technical Field
The utility model relates to a tire production technical field especially relates to a ventilation system for tire workshop.
Background
In a production plant, a ventilation system is generally provided in a tire, and air polluted by a production process in a room is refreshed by fresh air outside the room by means of ventilation dilution or ventilation removal, so that the cleanliness of the air in the room is maintained, and the temperature in the room is kept in a relatively stable range.
However, in the prior art, because the tire production process is a high-temperature environment, the indoor temperature is very high in summer, the production environment is severe and is not favorable for the physical health of workers, pollutants such as gas and dust harmful to the human health exist in a workshop, the direct discharge easily pollutes the environment, and the ventilation system is not favorable for environmental protection.
SUMMERY OF THE UTILITY MODEL
The purpose of the utility model is to solve the shortcoming that exists among the prior art, and the ventilation system who provides for tire production workshop.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a ventilation system for a tire production workshop comprises an installation box, wherein a circulating pipe is fixedly installed in the installation box, an air feeder is fixedly installed on one side of the installation box, a circulating water tank is arranged on one side of the installation box, a connecting pipe is fixedly installed at the top end of the circulating water tank, one end, far away from the circulating water tank, of the connecting pipe is fixedly connected with the circulating pipe, a first water pump is fixedly installed on one side of the installation box, one end, far away from the connecting pipe, of the circulating pipe is fixedly connected with the first water pump, an air filter is fixedly installed at the top of the installation box, an air inlet pipe is fixedly installed at the top of the air filter, an induced draft fan is fixedly installed on one side of the installation box, an exhaust pipe is fixedly installed on one side of the installation box, one end, far away from the, one side fixed mounting that the rose box kept away from the install bin has the second water pump, fixed mounting has the installation pipe on the water pump, fixed mounting has the branch pipe in the rose box, the one end that the second water pump was kept away from to the installation pipe runs through the rose box and with branch pipe fixed connection.
Preferably, a plurality of spray heads are arranged on the branch pipes, first filter screens are fixedly mounted on the inner walls of the top and the bottom of the filter box, and a water filling port is formed in one side of the filter box.
Preferably, a first pipeline is installed on the first water pump, and one end of the first pipeline is fixedly connected with the circulating water tank.
Preferably, the top of the filter box is provided with a mounting hole, and a second filter screen is fixedly mounted in the mounting hole.
Preferably, a second pipeline is fixedly installed on the second water pump and fixedly connected with the filter box.
Preferably, an air inlet hole is formed in one side of the installation box, and an air outlet hole is formed in the top of the installation box.
Compared with the prior art, the beneficial effects of the utility model are that: firstly, the device comprises an installation box, a circulating pipe, a blower, a circulating water tank, a connecting pipe, a first water pump, an air filter, an air inlet pipe, an induced draft fan, an exhaust pipe, a filter box, a second water pump, an installation pipe, a branch pipe, a nozzle and a first filter screen, wherein the blower is turned on when the device is used, air enters the installation box through the blower and is discharged through the air filter, the air filter filters the air, the filtered air is discharged to a workshop from the air inlet pipe, when the temperature in the workshop needs to be reduced, the first water pump is turned on, the first water pump pumps out water in the circulating water tank, the air in the installation box exchanges heat through the circulating pipe and is cooled, the water flows to the connecting pipe through the pipe in a circulating manner, the purpose of water circulation is achieved, the air is continuously cooled, the workshop is cooled, the induced draft fan is started, air in the workshop is taken out to the induced air machine, in blast pipe to the rose box, water in the rose box filters the air, starts the second water pump, and the water in the rose box is taken out to the second water pump, and in the installation pipe reachd the branch pipe, a plurality of shower nozzles blowout on the branch pipe, further filter the air, and the air is through the second filter screen at rose box top, and the filtration to the air of once more, the harmless gas of discharge has protected ecological environment, is favorable to the environmental protection.
The utility model discloses simple structure is convenient for ventilate, cool down in the workshop, and the convenience is handled the workshop combustion gas simultaneously, protects ecological environment, is favorable to the environmental protection.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is an enlarged schematic view of a portion a in fig. 1.
In the figure: 1. installing a box; 2. a circulation pipe; 3. a blower; 4. a circulating water tank; 5. a connecting pipe; 6. a first water pump; 7. an air filter; 8. an air inlet pipe; 9. an induced draft fan; 10. an exhaust pipe; 11. a filter box; 12. a second water pump; 13. installing a pipe; 14. a branch pipe; 15. a spray head; 16. a first filter.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: a ventilation system for a tire production workshop comprises an installation box 1, wherein a circulating pipe 2 is fixedly installed in the installation box 1, an air feeder 3 is fixedly installed on one side of the installation box 1, a circulating water tank 4 is arranged on one side of the installation box 1, a connecting pipe 5 is fixedly installed at the top end of the circulating water tank 4, one end, far away from the circulating water tank 4, of the connecting pipe 5 is fixedly connected with the circulating pipe 2, a first water pump 6 is fixedly installed on one side of the installation box 1, one end, far away from the connecting pipe 5, of the circulating pipe 2 is fixedly connected with the first water pump 6, an air filter 7 is fixedly installed at the top of the installation box 1, an air inlet pipe 8 is fixedly installed at the top of the air filter 7, an induced draft fan 9 is fixedly installed on one side of the installation box 1, an exhaust pipe 10 is fixedly installed on the induced draft fan 9, a filter box 11, a second water pump 12 is fixedly installed on one side, far away from the installation box 1, of the filter box 11, an installation pipe 13 is fixedly installed on the water pump 12, a branch pipe 14 is fixedly installed in the filter box 11, and one end, far away from the second water pump 12, of the installation pipe 13 penetrates through the filter box 11 and is fixedly connected with the branch pipe 14;
the branch pipe 14 is provided with a plurality of spray heads 15, the top inner wall and the bottom inner wall of the filter box 11 are fixedly provided with a first filter screen 16, one side of the filter box 11 is provided with a water filling port, the first filter screen 16 filters water, thereby realizing the purpose of recycling, and realizing the energy-saving effect, a first pipeline is arranged on the first water pump 6, one end of the first pipeline is fixedly connected with the circulating water tank 4, the top of the filter box 11 is provided with a mounting hole, a second filter screen is fixedly arranged in the mounting hole and further filters air, so that the discharge of harmless gas is ensured, a second pipeline is fixedly arranged on the second water pump 12 and fixedly connected with the filter box 11, one side of the mounting box 1 is provided with an air inlet, the top of the mounting box 1 is provided with an air outlet, and the device 1, the mounting box 1, the circulating pipe 2, the air feeder 3, the circulating water tank 4, the water, The air circulation system comprises a connecting pipe 5, a first water pump 6, an air filter 7, an air inlet pipe 8, an induced draft fan 9, an exhaust pipe 10, a filter box 11, a second water pump 12, a mounting pipe 13, a branch pipe 14, a spray head 15 and a first filter screen 16 which are matched, when the air circulation system is used, an air feeder 3 is turned on, air enters the mounting box 1 through the air feeder 3 and is discharged through the air filter 7, the air filter 7 filters air, the filtered air is discharged to a workshop from the air inlet pipe 8, when the temperature in the workshop needs to be reduced, the first water pump 6 is turned on, the water in a circulation water tank 4 is pumped out by the first water pump 6, the air in the installation box 1 exchanges heat through a circulation pipe 2, the air is cooled, the water flows to the connecting pipe 5 through the circulation pipe 2 and reaches the circulation water tank 4, the purpose of water circulation is achieved, the air is continuously cooled, draught fan 9 takes the air in the workshop out, in blast pipe 10 to rose box 11, water in the rose box 11 filters the air, start second water pump 12, second water pump 12 takes the water in the rose box 11 out, installation pipe 13 reachs in the branch pipe 14, the 15 blowout of a plurality of shower nozzles on the branch pipe 14, further filter the air, the air is through the second filter screen at rose box 11 top, the filtration to the air of going back again, discharge harmless gas, ecological environment has been protected, be favorable to the environmental protection, the utility model discloses simple structure, be convenient for ventilate in the workshop, the cooling, conveniently handle the workshop combustion gas simultaneously, protect ecological environment, be favorable to the environmental protection.
The working principle is as follows: the model of the air filter 7 is 17805G, one of the filter boxes 11 is provided with a water filling port, the air inlet pipe 8 and the draught fan 9 are both communicated with a workshop, when the air cooling device is used, the air blower 3 is turned on, air enters the installation box 1 through the air blower 3 and is discharged through the air filter 7, the air filter 7 filters air, the filtered air is discharged to the workshop through the air inlet pipe 8, when the temperature in the workshop needs to be reduced, the first water pump 6 is turned on, the first water pump 6 pumps out water in the circulating water tank 4 through the first installation pipe, heat exchange is carried out between the circulating pipe 2 and the air in the installation box 1, the air is cooled, then the water flows to the connecting pipe 5 through the circulating pipe 2 and finally reaches the circulating water tank 4, the purpose of water circulation is achieved, the air is continuously cooled, the workshop is cooled, meanwhile, the draught fan 9 is started, and the air in the workshop is pumped out, through blast pipe 10 to rose box 11 in, water through in the rose box 11 filters the air, then start second water pump 12, water through second water pump 12 in the rose box 11 is taken out, reach in the branch pipe 14 through installation pipe 13, through a plurality of shower nozzles 15 blowout on the branch pipe 14, further filter the air, then the air passes through the second filter screen at rose box 11 top, the filtration to the air once more, thereby discharge harmless gas, the ecological environment has been protected, be favorable to the environmental protection.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. A ventilation system for a tyre production plant, comprising an installation box (1), characterized in that: fixed mounting has circulating pipe (2) in install bin (1), one side fixed mounting of install bin (1) has forced draught blower (3), one side of install bin (1) is equipped with circulation tank (4), the top fixed mounting of circulation tank (4) has connecting pipe (5), the one end and circulating pipe (2) fixed connection of circulation tank (4) are kept away from in connecting pipe (5), one side fixed mounting of install bin (1) has first water pump (6), the one end and first water pump (6) fixed connection of connecting pipe (5) are kept away from in circulation pipe (2), the top fixed mounting of install bin (1) has air cleaner (7), the top fixed mounting of air cleaner (7) has intake pipe (8), one side fixed mounting of install bin (1) has draught fan (9), fixed mounting has blast pipe (10) on draught fan (9), one side of install bin (1) is equipped with rose box (11), the one end that draught fan (9) were kept away from in blast pipe (10) runs through rose box (11) and extends to rose box (11), one side fixed mounting that install bin (1) was kept away from in rose box (11) has second water pump (12), fixed mounting has installation pipe (13) on water pump (12), fixed mounting has branch pipe (14) in rose box (11), the one end that second water pump (12) were kept away from in installation pipe (13) runs through rose box (11) and with branch pipe (14) fixed connection.
2. A ventilation system for a tyre production plant as claimed in claim 1, characterized in that: the spray head type filter is characterized in that a plurality of spray heads (15) are arranged on the branch pipe (14), a first filter screen (16) is fixedly mounted on the inner wall of the top and the inner wall of the bottom of the filter box (11), and a water filling port is arranged on one side of the filter box (11).
3. A ventilation system for a tyre production plant as claimed in claim 1, characterized in that: a first pipeline is installed on the first water pump (6), and one end of the first pipeline is fixedly connected with the circulating water tank (4).
4. A ventilation system for a tyre production plant as claimed in claim 1, characterized in that: the top of the filter box (11) is provided with a mounting hole, and a second filter screen is fixedly mounted in the mounting hole.
5. A ventilation system for a tyre production plant as claimed in claim 1, characterized in that: and a second pipeline is fixedly installed on the second water pump (12), and the second pipeline is fixedly connected with the filter box (11).
6. A ventilation system for a tyre production plant as claimed in claim 1, characterized in that: an air inlet hole is formed in one side of the installation box (1), and an air outlet hole is formed in the top of the installation box (1).
CN201921066141.8U 2019-07-09 2019-07-09 Ventilation system for tire production workshop Active CN210345742U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921066141.8U CN210345742U (en) 2019-07-09 2019-07-09 Ventilation system for tire production workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921066141.8U CN210345742U (en) 2019-07-09 2019-07-09 Ventilation system for tire production workshop

Publications (1)

Publication Number Publication Date
CN210345742U true CN210345742U (en) 2020-04-17

Family

ID=70193418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921066141.8U Active CN210345742U (en) 2019-07-09 2019-07-09 Ventilation system for tire production workshop

Country Status (1)

Country Link
CN (1) CN210345742U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111757622A (en) * 2020-05-29 2020-10-09 贵州浅层地温能开发有限公司 High-efficient ventilation unit of electromechanical device computer lab

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111757622A (en) * 2020-05-29 2020-10-09 贵州浅层地温能开发有限公司 High-efficient ventilation unit of electromechanical device computer lab
CN111757622B (en) * 2020-05-29 2021-04-09 贵州浅层地温能开发有限公司 High-efficient ventilation unit of electromechanical device computer lab

Similar Documents

Publication Publication Date Title
CN204841295U (en) Portable inner loop air cleaner
CN206276180U (en) A kind of air cleaning facility for job shop
CN210345742U (en) Ventilation system for tire production workshop
CN202546966U (en) Non-fan cold air intake clerestory device with direct evaporative cooler
CN207065797U (en) A kind of ventilating system for engineering shop
CN203274094U (en) Water/electric double-fan closed negative pressure evaporation cooling chiller
CN101967893A (en) Purification workshop
CN106196418B (en) A kind of multifunctional energy recycling fresh air purifier
CN203374298U (en) Efficient heat-exchange air cooler for mine
CN205878395U (en) Many return air inlets indoor air purifying device
CN105042735B (en) Folded plate type indirect fluid power spray room composite evaporation cooling air conditioning unit
CN105240946A (en) Air suction and supply integrated machine for smoke purification
CN212215022U (en) Smelting pot cooling environmental protection dust collecting equipment
CN107747778A (en) Modular board tubular indirect evaporative cooling air conditioning group
CN210689263U (en) Glass fiber reinforced plastic cooling tower
CN205154565U (en) A air compressor for injection water production line
CN202769848U (en) High pressure air jet and tube type indirect evaporative cooler composite type evaporative cooling air conditioning unit
CN107029490A (en) A kind of Weaving device air filter
CN203771588U (en) Smaze intelligent purifying system during welding of large industrial building
CN203711144U (en) Jacket type ultrasonic electrostatic filter
CN206556183U (en) A kind of wind pushing mechanism of spray-painting production line
CN217378105U (en) Novel crystal furnace cooling water circulation system
CN215523592U (en) Sanitary wares workshop is with environmental protection air conditioner circulation system
CN204982388U (en) Circulating device for tentering setting machine
CN205185796U (en) Car humidification system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210825

Address after: 262500 No. 7777, Linglongshan North Road, Qingzhou Economic Development Zone, Weifang City, Shandong Province

Patentee after: Pilot tire (Qingzhou) Co.,Ltd.

Address before: 262500 No. 7777, Linglongshan North Road, Qingzhou City, Weifang City, Shandong Province

Patentee before: SHANDONG SHENG SHI TAI LAI RUBBER TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 262500 No. 7777, Linglongshan North Road, Qingzhou Economic Development Zone, Weifang City, Shandong Province

Patentee after: Xiongying tire (Qingzhou) Co.,Ltd.

Address before: 262500 No. 7777, Linglongshan North Road, Qingzhou Economic Development Zone, Weifang City, Shandong Province

Patentee before: Pilot tire (Qingzhou) Co.,Ltd.