CN210343394U - Tunnel anchor rod backing plate - Google Patents

Tunnel anchor rod backing plate Download PDF

Info

Publication number
CN210343394U
CN210343394U CN201920990065.3U CN201920990065U CN210343394U CN 210343394 U CN210343394 U CN 210343394U CN 201920990065 U CN201920990065 U CN 201920990065U CN 210343394 U CN210343394 U CN 210343394U
Authority
CN
China
Prior art keywords
anchor
tunnel
box
anchor rod
primary support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920990065.3U
Other languages
Chinese (zh)
Inventor
陈阳
郭宏
刘涛
周亮
孙茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Traffic Engineering Branch of China Railway Sixth Group Co Ltd
Original Assignee
Traffic Engineering Branch of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Traffic Engineering Branch of China Railway Sixth Group Co Ltd filed Critical Traffic Engineering Branch of China Railway Sixth Group Co Ltd
Priority to CN201920990065.3U priority Critical patent/CN210343394U/en
Application granted granted Critical
Publication of CN210343394U publication Critical patent/CN210343394U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a tunnel anchor rod backing plate, which comprises an anchor box and a PVC cap; the anchor box is an integrally punched box-shaped component, the height of the anchor box is consistent with the re-spraying thickness, and the bottom of the anchor box is provided with an anchor hole for an anchor rod to pass through; the PVC cap covers the top of the anchor box. The utility model can embed the anchor backing plate into the primary support, thereby ensuring that the anchor backing plate does not leak, reducing labor cost for cutting the anchor rod head and wrapping mortar, avoiding lining void and local thickness deficiency, ensuring the operation of tunnel lining structure thickness and water-proof and drainage system, and reducing the risk hidden trouble caused by unsmooth drainage in later tunnel operation; the construction time of the primary support anchor rod of the tunnel is advanced to the time after primary spraying of the tunnel, and the primary support anchor rod construction time and the primary support procedure of the tunnel are synchronously implemented, so that the construction cross influence formed by the construction anchor rod after the subsequent primary support is finished is reduced, and the anchoring effect of the anchor rod and the surrounding rock deformation control effect in the early stage are fully exerted.

Description

Tunnel anchor rod backing plate
Technical Field
The utility model relates to a tunnel engineering construction technical field specifically is a tunnel stock backing plate.
Background
According to related data, the anchor backing plate for the anchor rod construction of the tunnel engineering in China is basically of a flat plate structure, the anchor backing plate is arranged between an anchor rod bolt and a primary support surface, the anchor rod and the anchor backing plate are installed by drilling after primary support and secondary concrete spraying are finished, the bolt is fastened after the strength of anchor rod grouting slurry meets design requirements, and surrounding rock radial reinforcement stress is carried out.
From present stock job site, there are a lot of problems:
1) the anchor backing plate is located the primary surface outside, need to wrap up outer hourglass anchor backing plate adoption mortar before laying and hanging the waterproof board to prevent that the anchor pole head from impaling the waterproof board. In actual construction, the anchor backing plate is not wrapped by mortar or is not wrapped completely frequently, so that the waterproof plate is pierced, the whole waterproof system of the tunnel engineering is damaged, and potential safety hazards are buried in later-stage tunnel operation.
2) Need the outer stock that leaks outside the excision stock bolt before waterproof sheet is laid and is hung, have the outer stock of stock fastening bolt basically all to be amputated, the stock bolt is easily not hard up, influences the fastening effect of stock.
3) After the anchor rod leaks outside the primary support surface part and is wrapped by mortar, the tunnel lining is locally insufficient in thickness, and the overall structure of the tunnel lining is affected.
4) After the part of the anchor rod leaking outside the primary support surface is wrapped by mortar, the waterproof plate cannot be closely attached to the primary support surface, and the primary support of the anchor rod and the waterproof plate are separated in the pouring process of lining concrete. The later stage generally adopts the slip casting to remedy, and the slip casting drilling can impale the tunnel waterproof board to the slip casting thick liquid can block up the vertical drainage pipe way in tunnel hunch foot lower part, causes serious influence to the whole drainage system of preventing of tunnel.
5) The adoption of the cutting anchor rod head and the mortar wrapping consumes labor, and the construction quality is not easy to control.
6) At present, after the primary support of a tunnel is integrally completed, the strength of primary support concrete reaches the design requirement, drilling is carried out, and an anchor rod is installed, at the moment, tunnel surrounding rock begins to deform, and the anchor rod cannot practically play a due role.
SUMMERY OF THE UTILITY MODEL
In view of the above problem, an object of the present invention is to provide a tunnel anchor plate which can ensure the stress structure of the anchor and avoid the damage and influence to the tunnel lining and the waterproof drainage system. The technical scheme is as follows:
a tunnel anchor rod base plate comprises an anchor box and a PVC cover cap; the anchor box is an integrally punched box-shaped component, the height of the anchor box is consistent with the re-spraying thickness, and the bottom of the anchor box is provided with an anchor hole for an anchor rod to pass through; the PVC cap covers the top of the anchor box.
Further, the bottom of the anchor box is provided with an upper concave part, and the anchor hole is located in the center of the upper concave part.
Further, the inner diameter of the anchor hole is determined according to the diameter of the anchor rod.
The utility model has the advantages that: the utility model can embed the anchor backing plate into the primary support, thereby ensuring that the anchor backing plate does not leak, reducing labor cost for cutting the anchor rod head and wrapping mortar, avoiding lining void and local thickness deficiency, ensuring the operation of tunnel lining structure thickness and water-proof and drainage system, and reducing the risk hidden trouble caused by unsmooth drainage in later tunnel operation; the construction time of the primary support anchor rod of the tunnel is advanced to the time after primary spraying of the tunnel, and the primary support anchor rod construction time and the primary support procedure of the tunnel are synchronously implemented, so that the construction cross influence formed by the construction anchor rod after the subsequent primary support is finished is reduced, and the anchoring effect of the anchor rod and the surrounding rock deformation control effect in the early stage are fully exerted.
Drawings
Fig. 1 is the structural schematic diagram of the tunnel anchor plate of the present invention.
In the figure: 1-anchor box, 2-PVC cover cap; 3-primary spraying of a concrete surface layer; 4-surrounding rock surface layer; 5-anchor rod; 6-anchor hole.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments. As shown in fig. 1, the tunnel anchor plate comprises an anchor box 1 and a PVC cap 2; the anchor box 1 is an integrally punched box-shaped component, the height of the anchor box is consistent with the re-spraying thickness, and the bottom of the anchor box is provided with an anchor hole 6 for an anchor rod 5 to pass through; the PVC cap 2 covers the top of the anchor box 1. The bottom of the anchor box 1 is provided with an upper concave part, and the anchor hole 6 is positioned in the center of the upper concave part.
Can process adjustment anchor box 1 size according to tunnel just props up compound concrete thickness that spouts, anchor backing plate internal diameter, the internal diameter of anchor eye 6 can be according to the stock diameter processing adjustment promptly, satisfies different diameter stock demands.
The material and the plane size of the anchor backing plate are determined according to relevant national and industrial standard specifications, and the height is processed and customized according to different tunnel primary support thicknesses designed by different tunnels. The anchor hole 6 in the anchor box 1 is used for the stock, and the trompil size is processed the customization according to different stock diameters. The upper part of the anchor box 1 is covered with a PVC cover cap 2.
After the initial concrete spraying is completed in the tunnel excavation, the anchor rod is lofted, the anchor rod is drilled and grouted, the anchor rod 5 is installed, and the anchor box 1 is installed after the anchor rod 5 is installed and is temporarily fastened by bolts. And after fastening, covering a PVC cover cap 2 on the upper part, and spraying primary concrete again. After the primary concrete is sprayed again, after the strength of anchor rod anchoring slurry reaches the design and standard requirements, the upper PVC cap 2 is opened, the anchor rod bolt is fastened to the design and standard required torque by adopting a torque wrench, and mortar is filled in the anchor box 1.

Claims (3)

1. A tunnel anchor rod base plate is characterized by comprising an anchor box (1) and a PVC (polyvinyl chloride) cap (2); the anchor box (1) is an integrally punched box-shaped component, the height of the anchor box is consistent with the re-spraying thickness, and the bottom of the anchor box is provided with an anchor hole (6) for an anchor rod (5) to pass through; the PVC cap (2) covers the top of the anchor box (1).
2. The tunnel anchor tie plate of claim 1, characterized in that the bottom of the anchor box (1) is provided with an upper recess, the anchor hole (6) being located centrally in the upper recess.
3. The tunnel anchor plate according to claim 1, characterized in that the inner diameter of the anchor hole (6) is determined according to the diameter of the anchor rod (5).
CN201920990065.3U 2019-06-27 2019-06-27 Tunnel anchor rod backing plate Expired - Fee Related CN210343394U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920990065.3U CN210343394U (en) 2019-06-27 2019-06-27 Tunnel anchor rod backing plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920990065.3U CN210343394U (en) 2019-06-27 2019-06-27 Tunnel anchor rod backing plate

Publications (1)

Publication Number Publication Date
CN210343394U true CN210343394U (en) 2020-04-17

Family

ID=70191491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920990065.3U Expired - Fee Related CN210343394U (en) 2019-06-27 2019-06-27 Tunnel anchor rod backing plate

Country Status (1)

Country Link
CN (1) CN210343394U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622791A (en) * 2020-06-10 2020-09-04 中铁十二局集团第七工程有限公司 Method for mounting rear-mounted anchor rod for tunnel anchor-spraying support and tunnel anchor-spraying support
CN111927512A (en) * 2020-08-14 2020-11-13 贵州省公路工程集团有限公司 Construction method of tunnel primary support anchor rod
CN112523790A (en) * 2020-12-24 2021-03-19 中铁二十局集团第一工程有限公司 Anchor box and construction method of primary support anchor rod of tunnel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622791A (en) * 2020-06-10 2020-09-04 中铁十二局集团第七工程有限公司 Method for mounting rear-mounted anchor rod for tunnel anchor-spraying support and tunnel anchor-spraying support
CN111927512A (en) * 2020-08-14 2020-11-13 贵州省公路工程集团有限公司 Construction method of tunnel primary support anchor rod
CN112523790A (en) * 2020-12-24 2021-03-19 中铁二十局集团第一工程有限公司 Anchor box and construction method of primary support anchor rod of tunnel

Similar Documents

Publication Publication Date Title
CN210343394U (en) Tunnel anchor rod backing plate
CN105239563B (en) A kind of supporting rotary drilling rig dry method pore-creating filling pile structure of grouting behind shaft or drift lining and construction method
CN102966114B (en) Tower crane foundation structure and construction method thereof
CN101761237B (en) Method for constructing isolation pile for shield tunnel to go through deformation control of buildings and structures at short distance
CN101718092A (en) Environment micro-turbulence static pressing pile construction technology under low-headroom condition
CN109386293B (en) Sealing type receiving construction method for rectangular jacking pipe with super-large section
CN203222815U (en) Composite basement-structure exterior wall construction formed by utilizing underground diaphragm wall
CN204959735U (en) Drilling bored concrete pile harmless clad steel of installing and removing in profundal zone protects section of thick bamboo crowd structure
CN109989406B (en) Foundation pit support replacing construction method
CN108570983A (en) The pile base construction method and its casing of non-filler large size solution cavity
CN109404012A (en) IV~VI grade of country rock is backbreak Tunnel method
CN101806073B (en) Resistance-free load test device and method for upper extension section of foundation pile
CN105002890A (en) Abyssal region cast-in-situ bored pile nondestructive assembly and disassembly double-layer steel casing group structure and construction method
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN104358252A (en) Structure for preventing perforation and slurry leakage of cast-in-situ bored pile in water and construction method of structure
CN106593483B (en) A kind of construction method of the long anchor pole of Support System in Soft Rock Tunnels inverted arch
CN208966022U (en) A kind of template poured for large-scale beam column
CN107288141B (en) A kind of seamless flexible water construction technology of contrary sequence method
CN110644489A (en) Construction method for pile head anchoring section of intercepted pile body
CN104018499B (en) A kind of grouting method saving prestress anchorage cable stretch-draw section grouting amount
CN212079326U (en) Embedded grouting pipe for tunnel door ring beam of subway station
CN103422499B (en) Casing construction method inside and outside a kind of permafrost region pile foundation
CN202925543U (en) Concentric steel-made double sleeve pipe
CN202108045U (en) Sleeve pipe with anchor rod penetrating through underground continuous wall
CN109056857B (en) Device and method for eliminating side friction resistance of test pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200417

Termination date: 20210627

CF01 Termination of patent right due to non-payment of annual fee