CN210342865U - Single miniature coffin chamber building - Google Patents

Single miniature coffin chamber building Download PDF

Info

Publication number
CN210342865U
CN210342865U CN201920436174.0U CN201920436174U CN210342865U CN 210342865 U CN210342865 U CN 210342865U CN 201920436174 U CN201920436174 U CN 201920436174U CN 210342865 U CN210342865 U CN 210342865U
Authority
CN
China
Prior art keywords
coffin chamber
coffin
building
fixing
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920436174.0U
Other languages
Chinese (zh)
Inventor
曲国荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920436174.0U priority Critical patent/CN210342865U/en
Application granted granted Critical
Publication of CN210342865U publication Critical patent/CN210342865U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model relates to a single miniature coffin chamber building, which comprises a plurality of miniature coffin chambers which are stacked up and down, wherein four corners of the top of each coffin chamber are provided with fixed tenons, and the corresponding positions of four corners of the bottom of each coffin chamber are provided with fixed mortises which are matched with the fixed tenons, so that the coffin chamber on the upper layer is fixed to the coffin chamber on the lower layer; the coffin chamber is internally provided with a partition board and miniature furniture, and the partition board divides the coffin chamber into a living room and at least one bedroom. The utility model discloses a technical problem that will solve is that current multilayer coffin chamber structure is simple and crude, and the fixed structure, can't carry out the later stage and reform transform.

Description

Single miniature coffin chamber building
Technical Field
The utility model relates to a funeral field, more specifically, the utility model relates to a free miniature coffin chamber building.
Background
With the progress of urbanization in China and the continuous increase of population, the traditional cemetery can not meet the social requirements more and more, land-saving cemetery which is popularized by the country before and has the form similar to 'wall burial', and the like, but the cemetery does not accord with the traditional concept of 'land as earth' of people, so that multi-level underground cemetery rooms can be produced.
The multi-layer coffin chamber in the prior art is of a prefabricated cement or stone slab structure, and cinerary urns of casualties are placed on the stone slabs on each layer and buried by soil or directly placed in an open underground/overground coffin chamber for people to enjoy pursuit. This approach has the following problems: 1. the structure and the arrangement are very simple and crude, and the traditional concept that Chinese people live and die without great accidents is not met; 2. the tomb position is fixed, so that a new tomb position cannot be added at a later stage, and particularly for family tombs, a new tomb position cannot be newly built above the tomb position; 3. for governments, the cemetery built in the early stage cannot be replanned in the later stage, new land is continuously invested in the later stage to be used as a cemetery, the land is absolutely occupied for a long time, the negative influence as a funeral land lasts for a long time, and a large amount of capital is invested in the cities with small and large margins.
Therefore, a new coffin chamber structure is needed to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model discloses an aim at solves current multilayer coffin chamber structure simple and crude, and the later stage of being not convenient for increase or the problem of replanning.
According to one aspect of the utility model, a single miniature coffin chamber building is provided, which comprises a plurality of miniature coffin chambers which are stacked up and down and arranged in a left-right manner, wherein fixing tenons are arranged at four corners of the top of each coffin chamber, fixing mortises are arranged at corresponding positions of four corners of the bottom of each coffin chamber, and the fixing mortises are matched with the fixing tenons to fix the coffin chambers at the upper layer to the lower layer; the coffin chamber is internally provided with a partition board and miniature furniture, and the partition board divides the coffin chamber into a living room and at least one bedroom.
By the scheme, the coffin chamber can be randomly arranged by utilizing the partition plates and the miniature furniture, so that the coffin chamber looks more warm; the coffin chamber building can increase the number of layers according to the needs so as to enlarge the scale of the cemetery at the later stage; each coffin chamber can be divided into a plurality of coffin chambers, a plurality of cinerary urns can be placed in the coffin chambers, and the coffin chambers are suitable for family burial; according to the expansion of family scale, the number of layers of the coffin chamber building can be increased in the later period.
Preferably, a plurality of miniature windows are arranged on the periphery of the coffin chamber, and the bottom of the front face of the coffin chamber extends outwards to form a miniature balcony.
Through this scheme, make the coffin chamber accord with modern people's traditional concept more, and the setting of balcony can be convenient for place sacrificial offerings such as flower fruit.
Preferably, a miniature tombstone is arranged on the balcony.
Through the scheme, the identity of the tomb owner can be conveniently identified, and the traditional concept of people is met.
Preferably, four corners of the coffin chamber are vertically provided with fixing holes, and the fixing holes are through holes and penetrate through the middles of the fixing tenons and the fixing mortises; and the fixing rod penetrates through the fixing hole to fix the coffin chamber building.
Through this scheme, further strengthen the holistic stability and the fastness of coffin chamber building.
Preferably, the length of the fixing rod is equal to the height of the coffin chamber, a threaded hole is formed in the top of the fixing rod, and a screw rod is arranged at the bottom of the fixing rod, so that the fixing rod can be spliced according to the required length.
Through this scheme, make the length of fixed rod can splice according to the height of coffin chamber building, the later stage of being convenient for is reformed transform.
Preferably, the coffin chamber further comprises a middle building body, hanging plates are arranged on two sides of the middle building body, and the coffin chamber is hung on the hanging plates through a window on the side part, so that the coffin chamber and the middle building body are fixed.
Through this scheme, improve the stability of coffin chamber building to can improve the coffin chamber quantity in the unit area on the basis of according with traditional funeral concept of chinese.
Preferably, the middle building body comprises a plurality of middle layers which are stacked, four corners of each middle layer are provided with the fixing holes which penetrate through the middle layers, and the fixing rods penetrate through the fixing holes to fix the middle building body; the height of the middle layer is equal to that of the coffin chamber.
Through this scheme, make the high height that adapts to the coffin chamber in intermediate level, the later stage of being convenient for is reformed transform.
Preferably, the coffin chamber at the topmost layer is integrally connected with the middle building body through a connecting block, a threaded column is vertically fixed at the bottom of the connecting block, and the threaded column is matched with a threaded hole of the fixing rod for threaded connection; the top cover of the coffin chamber is provided with a roof.
Through this scheme, further fixed middle building body is connected with the coffin chamber, improves the holistic stability of coffin chamber building.
Preferably, embedded parts are fixed at the bottoms of the coffin chamber at the bottommost layer and the middle layer.
Through this scheme, further strengthen the stability of coffin chamber building, prevent that the high increase from influencing coffin chamber building foundation stability.
Preferably, the interior is provided with furnishings such as miniature furniture and electric appliances, and a miniature figure made of bone ash of a deceased person is placed on a miniature bed of a bedroom in the coffin chamber.
By the scheme, the cinerary casket is saved, and the whole weight of the coffin chamber building can be reduced; the material cost is reduced, the volume of the coffin chamber can be further reduced, and the scale of the cemetery is enlarged.
The utility model has the technical effects that the internal structure of the coffin chamber can be randomly arranged as required, so that the coffin chamber is more warm and beautiful; one coffin chamber can be divided into a plurality of bedrooms, which is suitable for family burial and improves the practical efficiency of unit area; the number of layers of the coffin chamber buildings can be covered according to the family size or the later planning of the cemetery, and the using efficiency is improved.
Other features of the present invention and advantages thereof will become apparent from the following detailed description of exemplary embodiments of the invention, which proceeds with reference to the accompanying drawings.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description, serve to explain the principles of the invention.
Fig. 1 is a schematic structural view of a coffin chamber building according to an embodiment of the present invention.
Fig. 2 is a schematic view of a coffin chamber structure according to an embodiment of the present invention.
Fig. 3 is a schematic view of the bottom structure of a coffin chamber of the embodiment of the present invention.
Fig. 4 is a schematic view of the internal structure of a coffin chamber of the embodiment of the present invention.
Fig. 5 is a schematic view of a fixing rod structure in a coffin chamber building of the embodiment of the present invention.
Fig. 6 is a schematic structural view of an intermediate building body according to an embodiment of the present invention.
Fig. 7 is a schematic structural diagram of the bottommost coffin chamber of the embodiment of the present invention.
Fig. 8 is a schematic side view of a connection block in a coffin chamber building of the embodiment of the present invention.
Wherein like parts are designated by like reference numerals throughout the several views; the figures are not drawn to scale.
Detailed Description
Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that: unless specifically stated otherwise, the relative arrangement of the components and steps, the numerical expressions, and numerical values set forth in these embodiments do not limit the scope of the present invention.
The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses.
Techniques and apparatus known to those of ordinary skill in the relevant art may not be discussed in detail, but are intended to be considered a part of the specification where appropriate.
In all examples shown and discussed herein, any particular value should be construed as merely illustrative, and not limiting. Thus, other examples of the exemplary embodiments may have different values.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, further discussion thereof is not required in subsequent figures.
< example >
As shown in fig. 1 to 8, the single micro coffin chamber building in this embodiment includes a plurality of micro coffin chambers 1100 stacked up and down, fixing tenons 1110 are disposed at four corners of a top of each coffin chamber 1100, fixing mortises 1120 are disposed at corresponding positions of four corners of a bottom of each coffin chamber 1100, and the fixing mortises 1120 are matched with the fixing tenons 1110, so that the coffin chamber 1100 at an upper layer is fixed to the coffin chamber 1100 at a lower layer; a partition 1141 and a piece of miniature furniture 1142 are arranged in the coffin chamber 1100, and the partition 1141 divides the coffin chamber 1100 into a living room and at least one bedroom.
By the scheme of the embodiment, the coffin chamber 1100 can be arranged at will by using the partition plate 1141 and the miniature furniture 1142, so that the coffin chamber 1100 looks more warm, for example, the coffin chamber 1100 is arranged according to a room before a tomb owner, and the partition plate 1141 can be provided with a door and a window; the number of layers of the coffin chamber building can be increased as required, and only the new coffin chamber 1100 is required to be arranged above the coffin chamber at the top layer, so that the scale of the cemetery is expanded at the later stage; each coffin chamber 1100 can be divided into a plurality of bedrooms, so that a plurality of cinerary urns can be placed in a single coffin chamber, and the method is suitable for a family burial form; according to the expansion of family scale, the number of layers of the coffin chamber building can be increased in the later period, and the utilization rate is improved. In this embodiment, the coffin chamber 1100 may be of masonry or cement construction or the like.
In this embodiment, a plurality of miniature windows 1143 are disposed around the coffin chamber 1100, and the bottom of the front surface of the coffin chamber 1143 extends outwards to form a miniature balcony 1130. The coffin chamber 1100 is more in line with the traditional concept of modern people, and the balcony 1130 is convenient for placing sacrificial articles such as flowers and fruits.
In this embodiment, a miniature gravestone 1131 is disposed on the balcony 1130. The gravestone 1131 may be made of stone or other materials, and has written information or two-dimensional code information engraved thereon, which can be pasted with photos of the grave owner, so as to identify the identity of the grave owner, and meet the traditional concept of people.
In this embodiment, fixing holes 1111 are vertically formed at four corners of the coffin chamber 1100, and the fixing holes 1111 are through holes penetrating the middle of the fixing tenon 1110 and the fixing mortise 1120; the fixing rod 1400 passes through the fixing hole 1111 to fix the coffin chamber building. Further strengthen the holistic stability and the fastness of coffin chamber building, prevent the slope.
In this embodiment, the length of the fixing rod 1400 is equal to the height of the coffin chamber 1100, and the top of the fixing rod 1400 is provided with a threaded hole 1410 and the bottom is provided with a screw 1420, so that the fixing rod 1400 can be spliced to a desired length. The length of dead lever 1400 can splice according to the height of coffin chamber building, the later stage transformation of being convenient for.
In this embodiment, the building further comprises a middle building body 1200, hanging plates 1211 are disposed on two sides of the middle building body 1200, and the coffin chamber 1100 is hung on the hanging plates 1211 through a side window 1143, so that the coffin chamber 1100 and the middle building body 1200 are fixed. In this embodiment, the scraper 1211 is "L" shaped in cross-section, for example made of angle steel, and is fixed vertically to the middle building 1200 at one end and extends upward at the other end to facilitate the fixation of the coffin 1100. The scheme can improve the stability of the coffin chamber building, and the coffin chambers 1100 can be hung on both sides of the middle building body 1200, so that the compactness of the coffin chambers 1100 can be improved, and the number of the coffin chambers 1100 in unit area can be increased.
In this embodiment, the middle building body 1200 includes a plurality of middle layers 1210 stacked, the four corners of the middle layers 1210 are provided with the fixing holes 1111 penetrating therethrough, and the fixing rods 1400 penetrate through the fixing holes 1111 to fix the middle building body 1200; the height of the middle layer 1210 is equal to the height of the coffin chamber 1100. The height of the middle layer 1210 is adapted to the height of the coffin chamber 1100, so that later reconstruction is facilitated; the middle building 1200 and the fixing hole 1111 of the coffin chamber 1100 have the same specification, so that the fixing rod 1400 can be used universally.
In this embodiment, the coffin chamber 1100 at the top layer is connected with the middle building body 1200 through a connecting block 1500, a threaded column 1510 is vertically fixed at the bottom of the connecting block 1500, and the threaded column 1510 is matched with a threaded hole 1410 of the fixing rod 1400 for threaded connection; the top cover of the coffin chamber building is provided with a roof 1300, so that the connection between the middle building body 1200 and the coffin chamber 1100 is further fixed, and the overall stability of the coffin chamber building is improved.
In this embodiment, embedded parts 1600 are fixed to the bottoms of the coffin chamber 1100 at the bottommost layer and the middle layer 1210 at the bottommost layer, so as to further enhance the stability of the coffin chamber building and prevent the increase in height from affecting the stability of the foundation of the coffin chamber building. The embedded part 1600 can be integrally cast with the bottommost coffin chamber 1100 and the bottommost intermediate layer 1210, or can be installed at a later stage in a welding mode and the like; the embedment 1600 is made of metal.
In other embodiments, only the bottom most intermediate floor 1210 has embedments 1600 secured to it, and the coffin chamber 1100 is secured by hanging to the intermediate building body 1200.
In this embodiment, a furniture such as a miniature furniture or an electric appliance (not shown) is provided therein, and a miniature figure made of ashes of a deceased is placed on a miniature bed of a bedroom in the coffin chamber 1100. The micro figure is formed by the bone ash of the departed person through adhesive joint, has smaller volume than the traditional cinerary casket, and can be fixed on a micro bed by cotton cloth after being placed on the micro bed; the miniature bed of each bedroom can be used for placing two miniature figures, so that the cinerary casket is saved, and the whole weight of the coffin chamber building can be reduced; the material cost is reduced, the volume of the coffin chamber can be further reduced, and the scale of the cemetery is enlarged.
The utility model has the technical effects that the internal structure of the coffin chamber can be randomly arranged as required, so that the coffin chamber is more warm and beautiful; one coffin chamber can be divided into a plurality of bedrooms, which is suitable for family burial and improves the practical efficiency of unit area; the number of layers of the coffin chamber buildings can be covered according to the family size or the later planning of the cemetery, and the using efficiency is improved.
Although some specific embodiments of the present invention have been described in detail by way of illustration, it should be understood by those skilled in the art that the above illustration is only for purposes of illustration and is not intended to limit the scope of the invention. It will be appreciated by those skilled in the art that modifications may be made to the above embodiments without departing from the scope and spirit of the invention. The scope of the invention is defined by the appended claims.

Claims (9)

1. A single miniature coffin chamber building is characterized by comprising a plurality of miniature coffin chambers which are stacked up and down, wherein fixing tenons are arranged at four corners of the top of each coffin chamber, fixing mortises are arranged at corresponding positions of four corners of the bottom of each coffin chamber, and the fixing mortises are matched with the fixing tenons, so that the coffin chambers on the upper layer are fixed to the coffin chambers on the lower layer; the coffin chamber is internally provided with a partition board and miniature furniture, and the partition board divides the coffin chamber into a living room and at least one bedroom.
2. A coffin chamber building as claimed in claim 1, wherein the coffin chamber is provided with a plurality of miniature windows around, and the bottom of the coffin chamber front face extends outwards to form a miniature balcony.
3. A coffin chamber building as claimed in claim 2, wherein the balcony is provided with a miniature tombstone.
4. A coffin chamber building as claimed in claim 2, wherein four corners of said coffin chamber are vertically provided with fixing holes, said fixing holes are through holes, passing through the middle of said fixing tenon and said fixing mortise; and the fixing rod penetrates through the fixing hole to fix the coffin chamber building.
5. A coffin chamber building as claimed in claim 4, wherein the length of said fixing rod is equal to the height of said coffin chamber, the top of said fixing rod is provided with a threaded hole, the bottom is provided with a screw rod, so that said fixing rod can be spliced to a desired length.
6. A coffin chamber building as claimed in claim 5, further comprising a middle building body, hanging plates are provided on both sides of the middle building body, and the coffin chamber is hung on the hanging plates by using side windows, so that the coffin chamber and the middle building body are fixed.
7. A coffin chamber building as claimed in claim 6, wherein the intermediate building body comprises a plurality of intermediate layers stacked together, the four corners of the intermediate layers are provided with the fixing holes therethrough, and the fixing rods pass through the fixing holes to fix the intermediate building body; the height of the middle layer is equal to that of the coffin chamber.
8. A coffin chamber building as claimed in claim 7, wherein the top layer of the coffin chamber is connected with the middle building body through a connecting block, a threaded column is vertically fixed at the bottom of the connecting block, and the threaded column is matched with the threaded hole of the fixing rod for threaded connection; the top cover of the coffin chamber is provided with a roof.
9. A coffin chamber building as claimed in claim 7, wherein the burial fitting is fixed to the bottom of the coffin chamber of the lowest floor and the bottom of the middle floor.
CN201920436174.0U 2019-04-01 2019-04-01 Single miniature coffin chamber building Active CN210342865U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920436174.0U CN210342865U (en) 2019-04-01 2019-04-01 Single miniature coffin chamber building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920436174.0U CN210342865U (en) 2019-04-01 2019-04-01 Single miniature coffin chamber building

Publications (1)

Publication Number Publication Date
CN210342865U true CN210342865U (en) 2020-04-17

Family

ID=70172581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920436174.0U Active CN210342865U (en) 2019-04-01 2019-04-01 Single miniature coffin chamber building

Country Status (1)

Country Link
CN (1) CN210342865U (en)

Similar Documents

Publication Publication Date Title
Van Beek et al. Glorious mud!: Ancient and contemporary earthen design and construction in North Africa, Western Europe, the Near East, and Southwest Asia
CN210342865U (en) Single miniature coffin chamber building
Petruccioli The courtyard house: typological variations over space and time
JP2009235697A (en) Joint grave
JP3184381U (en) Tumulus-type cemetery and underground cemetery
CN204876780U (en) Familial combination tombstone
CN2680789Y (en) Multilayered frame grave
Petruccioli House and fabric in the islamic mediterranean city
CN101781944A (en) Method for increasing grave capacity of cemetery and grave structure
CN203175141U (en) Stereoscopic garden cemetery
DE202009003248U1 (en) Urn burial system
CN212743562U (en) Intelligent holographic wall cabinet type cinerary casket system
CN202441104U (en) Bone ash depositing rack
Mattisson HOMAGE/Museum of rural life in Gothenburg
Steiro The Laboratory building. Transforming concrete heritage
Knoroz Japanese Prewar Housing: Missing Context
CN113982362A (en) Burying method and cemetery based on same
Attema The longue durée of an imperial villa estate in southern Lazio-ELIZABETH FENTRESS, CAROLINE GOODSON, MARCO MAIURO with M. ANDREWS and JA DUFTON (edd.), with S. Bernard, M. Bianchi, D. Booms, R. Cabella, F. Candilio, C. Capelli, S. Carocci, G. Castellano, N. Cavalieri De Pace, B. Cernuta, M. Ciausescu, S. Cox, I. De Luca, A. Di Miceli, C. Fenwick, R. Ferritto, T. Franconi, S. Gatti, G. Gaianigo, G. Giammaria, S. Hay, E. Holt, B. Hoffmann, A. Kuttner, R. Laino, B. Lepri, A. Mariani, M. McNamee, I. Miliaresis, E. Nitsch, M. Piazza, F. Pollari, S. Privitera, G. Rascaglia, R. Ricciardi, C. Rice, DM Totten, R. Veal, K. Williams and J. Young, VILLA MAGNA: AN IMPERIAL ESTATE AND ITS LEGACIES. EXCAVATIONS 2006-10 (Archaeological Monographs of the British School at Rome 23; The British School at Rome, London2016). Pp. xix+ 516, figs. 329, col. pls. 34. ISBN 978-0-904152-74-6.£ 90 (source data and excavation reports available at http://archaeologydata. brown. edu/villamagna)
Wilson Roman Malta: architecture and archaeology-D. Cardona 2021. Roman Architecture in Malta. Heritage Malta Monographs 2. Kalkara, Malta: Heritage Malta Publishing. Pp. 272. ISBN 978-99932-57-86-8 (cloth).
JPH085254Y2 (en) Three-dimensional cemetery
Croaker Lune de Sang Pavilion by CHROFI
LUCIANO Circulation of Christian relics through the Mediterranean sea
Kadakas et al. Archaeological studies in the church and chuchyard of Lüganuse
YILMAZ et al. The Documentation and Restoration Proposal for Zaimzade Kamil Efendi Mansion Located in Eskişehir Province Sivrihisar District
DE818849C (en) Shell construction for residential, commercial, public or similar rooms and buildings

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant