CN210342690U - Large steel mould wall-penetrating bolt with sleeve - Google Patents
Large steel mould wall-penetrating bolt with sleeve Download PDFInfo
- Publication number
- CN210342690U CN210342690U CN201920996721.0U CN201920996721U CN210342690U CN 210342690 U CN210342690 U CN 210342690U CN 201920996721 U CN201920996721 U CN 201920996721U CN 210342690 U CN210342690 U CN 210342690U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- wall
- bolt
- large steel
- lining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
A large steel mould through-wall bolt with a sleeve belongs to the technical field of civil engineering large steel mould construction. The wall-through bolt comprises a sleeve (1), a lining (2) and a wall-through bolt (3), wherein the sleeve (1) is arranged on the wall-through bolt (3), and the inner diameters of the sleeve (1) are consistent and are the diameter of the wall-through bolt (3) plus 8 mm; the sleeve (1) is externally in a round table shape with a large end and a small end, the wall thickness of one side of the large end is 6mm, the wall thickness of one side of the small end is 3mm, the lining (2) is arranged on one side of the large end of the sleeve (1), the width of the lining (2) is 30mm, the thickness of the lining (2) is 3mm, and the whole ring is welded. The method has the advantages of quickly achieving the purposes of leveling and aligning the large steel die and simultaneously achieving the purposes of saving steel bars, reducing labor and energy and reducing consumption.
Description
Technical Field
The utility model belongs to the technical field of civil engineering's big steel mould construction, especially, a take sheathed tube big steel mould through-wall bolt is provided.
Background
In civil engineering, a large steel mould is a wall template process which is commonly used, and the traditional large steel mould process is as follows: welding a top mould rod on the wall body steel bar, positioning the large steel mould, installing a through-wall bolt, fastening and aligning the large steel mould, pouring concrete, and dismantling and transporting the large steel mould. The traditional process has the following problems: a large number of top die rods are used, so that reinforcing steel bar materials are wasted, and the manufacturing and installation cost of the top die rods is increased; the wall penetrating bolt is fastened too tightly, and the top die rod causes pit-shaped damage to the large steel die; when part of the through-wall bolts are bonded with the concrete too tightly, the bolts are generally thrown off to firstly remove other bolts, and finally the through-wall bolts thrown off in the early stage are easy to drop, so that the wall body can be damaged when the large steel mould is hoisted.
Disclosure of Invention
An object of the utility model is to provide a take sheathed tube big steel mould through-wall bolt has avoided the emergence of above-mentioned problem, can be quick reach big steel mould make level, the purpose of alignment, reach simultaneously practice thrift the reinforcing bar, reduce recruitment, energy saving and consumption reduction's purpose.
The utility model comprises a sleeve 1, a lining 2 and a wall-through bolt 3, wherein the sleeve 1 is arranged on the wall-through bolt 3, namely the sleeve 1 is arranged on the large steel mould wall-through bolt 3, the inner diameters of the sleeve 1 are consistent, and the diameter of the sleeve is +8 mm; the sleeve 1 is externally in a round table shape with a large end and a small end, the wall thickness of the large end is 6mm, the wall thickness of the small end is 3mm, and the length of the sleeve 1 is matched with that of a wall body. The inner lining 2 is arranged on one side of the large head of the sleeve 1, the width of the inner lining 2 is 30mm, the thickness of the inner lining 2 is 3mm, and the inner lining is welded in a whole circle.
The sleeve 1 is dismantled and is adopted and demolish member 4, demolish member 4 and adopt the steel pipe preparation, and its external diameter is the same with through-wall bolt diameter, and length is sleeve length +200mm, welds whole circle outer lining 5 in one end, and outer lining 5 thickness 3mm, width 30mm, apart from tip distance 50 mm.
The sleeve of the utility model can be used as a wood jacking rod, thereby saving the raw material of the steel bar and the processing and installation cost of the mould jacking rod; the contact surface of the sleeve and the large steel die is large, and the large steel die is not easy to be damaged in a pit shape; the sleeve and the large steel die have good integrity, the large steel die is not easy to distort and is easy to level and align; the through-wall bolt is fast to dismantle, the time for transporting the large steel mould is saved, and the defect that the through-wall bolt is not easy to dismantle can be avoided; after the wall-through bolt sleeve is dismantled, the wall-through bolt sleeve can be repeatedly utilized in multiple ways, and the purposes of energy conservation and consumption reduction are achieved.
The utility model discloses use work flow to include big steel mould handling, through-wall bolt sleeve pipe installation, the through-wall bolt fastening of taking one's place, concrete placement, the through-wall bolt demolishs, and big steel mould is demolishd, and the through-wall sleeve pipe is demolishd and is work flow.
The utility model discloses a set up the sheathed tube form to big steel mould through-wall bolt, the construction method of big steel mould through-wall bolt has been updated, its beneficial effect is that ① sleeve pipes can be used as the wood rod of top, save the reinforcing bar raw materials, and the processing and the installation expense of top mould rod, ② sleeve pipes are big with big steel mould contact surface, be difficult for making the big steel mould into the pit form destruction, ③ sleeve pipes are good with big steel mould wholeness, big steel mould is difficult for taking place the distortion, easily make level, the alignment, ④ through-wall bolt demolishs swiftly, save big steel mould time of transporting backwards, can avoid the difficult defect of demolishing of through-wall bolt simultaneously, ⑤ through-wall bolt sleeve pipes demolishs, can multiplex ground reuse, reach energy saving and consumption reduction purpose.
The utility model has the advantages that:
1. and (4) economy. The sleeve can be used as a wood jacking rod, so that the raw material of a steel bar and the processing and mounting cost of a jacking rod are saved
2. The protective property to large steel moulds is good. The contact surface of the sleeve and the large steel die is large, and the large steel die is not easy to be damaged in a pit shape;
3. the integrity with the large steel die is good. The sleeve and the large steel die have good integrity, the large steel die is not easy to distort and is easy to level and align;
4. and (5) rapidness. The through-wall bolt is fast to dismantle, the time for transporting the large steel die is saved, and the defect that the through-wall bolt is not easy to dismantle can be avoided
5. Energy conservation and consumption reduction. After the wall-through bolt sleeve is dismantled, the sleeve and the dismantling rod piece can be repeatedly utilized in multiple ways, and the purposes of energy conservation and consumption reduction are achieved.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view of a demolition rod used in construction.
In the figure, a sleeve 1, an inner lining 2, a wall bolt 3, a removable rod 4 and an outer lining 5 are shown.
Detailed Description
The utility model comprises a sleeve 1, a lining 2 and a wall-through bolt 3, wherein the sleeve 1 is arranged on the wall-through bolt 3, namely the sleeve 1 is arranged on the large steel mould wall-through bolt 3, the inner diameters of the sleeve 1 are consistent, and the diameter of the sleeve is +8 mm; the sleeve 1 is externally in a round table shape with a large end and a small end, the wall thickness of the large end is 6mm, the wall thickness of the small end is 3mm, and the length of the sleeve 1 is matched with that of a wall body. The inner lining 2 is arranged on one side of the large head of the sleeve 1, the width of the inner lining 2 is 30mm, the thickness of the inner lining 2 is 3mm, and the inner lining is welded in a whole circle.
In order to make the technical scheme of the present invention be more easily and clearly understood, the following description is made in detail with reference to the accompanying drawings and the embodiment of civil engineering large steel mold construction.
(1) When a large steel mould enters a field, the wall-penetrating bolt sleeve is processed and delivered by a manufacturer;
(2) hoisting the large steel mould to a construction wall by a tower crane;
(3) according to the position of a reserved bolt hole of the large steel mould, preliminarily placing a wall-penetrating bolt sleeve to the corresponding position of a wall body, enabling one side of a large head to face the large steel mould which is in place firstly, and slightly fixing the large steel mould by using binding wires;
(4) after the large steel die on one side is placed in place, a wall-penetrating bolt is firstly penetrated to be half or longer, and a wall-penetrating bolt sleeve is penetrated in the process on the basis of not influencing the positioning of the large steel die on the opposite side;
(5) after the big steel mould of opposite is taken one's place, penetrate the wall bolt and fasten, the effect that the wall bolt sleeve pipe still played the mould rod of reaching this moment can save traditional reinforcing bar and push up wooden rod. When fastening, the two sides are symmetrically fastened until the wall bushing is gradually clamped by the large steel die, so far, the clearance of the large steel die is equal to the thickness of the wall body, and the fastening is finished. This process of fastening because the sleeve pipe is the round platform type, and big steel mould area of contact is great, even the fastening is too tight can not cause too big destruction to big steel mould yet, avoids doing the wooden stick with the reinforcing bar, and the fastening is too tight, causes hole form destruction to big steel mould. In addition, the alignment engineering is very quick, the sleeve is clamped tightly, the contact surface of the sleeve and the large steel die is large, the whole of the sleeve and the large steel die is very good, the large template is not easy to distort, and the phenomenon of unqualified verticality and flatness caused by local screwing of the through-wall bolt is not easy to occur.
(6) After the large steel die is fastened, concrete is poured;
(7) after the concrete pouring is finished, the strength reaches a certain value, the through-wall bolt is directly dismantled, and the large steel die is hoisted. The through-wall bolt is dismantled in the step, so that the method is quick, simple and convenient and is not influenced by the bonding of the concrete and the through-wall bolt. The problems that in some cases, certain through-wall bolts are bonded with concrete too tightly and are not easy to remove, other through-wall bolts are removed in advance, the bolts thrown away in front are forgotten to be removed, and finally the large steel mould is hoisted, so that the hoisting cannot be carried out, and the concrete structure can be damaged by the through-wall bolts which are not removed in forced hoisting;
(8) and after the hoisting of the large steel die is finished, when the strength of the concrete reaches the strength of the easily-detachable sleeve, the sleeve is detached again. The special member for removing the sleeve is inserted into the sleeve from one side of the small end of the member to be clamped with the lining of the sleeve, and the sleeve can be removed by lightly knocking. 3 sets of sleeves are processed to ensure the field transportation and use. After the project is finished, the wall bushing can be recovered for the next project.
Claims (1)
1. The large steel die wall-penetrating bolt with the sleeve is characterized in that the sleeve (1), a lining (2) and a wall-penetrating bolt (3) are arranged, the sleeve (1) is arranged on the wall-penetrating bolt (3), and the inner diameters of the sleeve (1) are consistent and are equal to the diameter of the wall-penetrating bolt (3) plus 8 mm; the sleeve (1) is externally in a round table shape with a large end and a small end, the wall thickness of one side of the large end is 6mm, the wall thickness of one side of the small end is 3mm, the lining (2) is arranged on one side of the large end of the sleeve (1), the width of the lining (2) is 30mm, the thickness of the lining (2) is 3mm, and the whole ring is welded.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920996721.0U CN210342690U (en) | 2019-06-28 | 2019-06-28 | Large steel mould wall-penetrating bolt with sleeve |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920996721.0U CN210342690U (en) | 2019-06-28 | 2019-06-28 | Large steel mould wall-penetrating bolt with sleeve |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210342690U true CN210342690U (en) | 2020-04-17 |
Family
ID=70192202
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920996721.0U Active CN210342690U (en) | 2019-06-28 | 2019-06-28 | Large steel mould wall-penetrating bolt with sleeve |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210342690U (en) |
-
2019
- 2019-06-28 CN CN201920996721.0U patent/CN210342690U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205875736U (en) | Sectional type shear force wall is to drawing sealing screw | |
CN104074352A (en) | Wall body template supporting method in position with narrow space | |
CN110863644A (en) | Novel turnover tool type beam side connecting wall piece fixing device and method | |
CN104047419A (en) | Wall linking method of scaffold and wall-linking member used by scaffold | |
CN210342690U (en) | Large steel mould wall-penetrating bolt with sleeve | |
CN212078667U (en) | Expansion joint shear wall combination template capable of being assembled and disassembled quickly | |
CN210421925U (en) | Positioning and embedding device for water stop joint of building | |
CN110616737A (en) | Method for improving positioning qualification rate of pipe gallery embedded part | |
CN216194911U (en) | A pull rod device for utility tunnel side wall concrete form is fixed | |
CN211341785U (en) | Screw rod for withdrawing splayed harness cord | |
CN107504036B (en) | Internal support device for casing and construction method thereof | |
CN210685368U (en) | Convenient reinforcing complete die set for concrete wall formworks on two sides of deformation joint | |
CN202299427U (en) | Device for connecting and positioning steel molding plate of building | |
CN110792260A (en) | Splayed harness cord withdrawing screw and using method thereof | |
CN103104099A (en) | Method for constructing wall pulling steel bars in frame column and structure thereof | |
CN201714093U (en) | Turn-around tie bolt used in construction of concrete wall form | |
CN212836174U (en) | Laminated slab band plugging device | |
CN212866822U (en) | Tool type wall connecting piece | |
CN102926544A (en) | Method for constructing wall pulling steel bars in frame column and structure thereof | |
CN102720353A (en) | Post-construction one-side shear wall formwork for settlement joint of tower and construction method | |
CN203891449U (en) | Wall connecting piece for wall connection of scaffold | |
CN220927931U (en) | Tubular prefabricated bolt hole die | |
CN202391092U (en) | U-shaped anchor bolt fixing device of overhanging steel beam | |
CN206503377U (en) | A kind of movable railing of steel trestle | |
CN201620601U (en) | Embedded wall penetration body capable of being recycled |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |