CN210342689U - Slotted wood formwork for pool wall - Google Patents

Slotted wood formwork for pool wall Download PDF

Info

Publication number
CN210342689U
CN210342689U CN201920586268.6U CN201920586268U CN210342689U CN 210342689 U CN210342689 U CN 210342689U CN 201920586268 U CN201920586268 U CN 201920586268U CN 210342689 U CN210342689 U CN 210342689U
Authority
CN
China
Prior art keywords
fixing
plank
screw
wood
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920586268.6U
Other languages
Chinese (zh)
Inventor
孙杰
陈用锦
周月军
戴婷婷
徐超
倪胜吉
鲁攀攀
周利静
陈海燕
钱芳芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU XIAOHONG CONSTRUCTION GROUP Ltd
Original Assignee
HANGZHOU XIAOHONG CONSTRUCTION GROUP Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU XIAOHONG CONSTRUCTION GROUP Ltd filed Critical HANGZHOU XIAOHONG CONSTRUCTION GROUP Ltd
Priority to CN201920586268.6U priority Critical patent/CN210342689U/en
Application granted granted Critical
Publication of CN210342689U publication Critical patent/CN210342689U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a slotting wood formwork for pool wall. The slotted wood template for the pool wall of the pool comprises a wood plate; the top ends of the wood boards are symmetrically arranged in the grooves; the fixing mechanism is installed at the top end of the wood board and comprises an installation plate, a fixing block and a split screw, the inside of the groove is connected with the split screw in a sliding mode, the two ends of the split screw are symmetrically provided with the fixing blocks in a circular truncated cone shape, the fixing blocks abut against the side wall of the wood board, and the installation plate is installed at the position where the side wall of the split screw is located; the blocking mechanism is connected with the inside of the fixed block in a sliding mode and abutted against the side wall of the wood board. The utility model provides a pond is fluting plank sheathing for pool wall need not carry out the counter-trompil to the plank.

Description

Slotted wood formwork for pool wall
Technical Field
The utility model relates to a template technical field especially relates to pond pool wall is with fluting plank sheathing.
Background
The template is a model for forming newly cast concrete, and the template system consists of the template, a supporting piece and a fastening piece, and is required to ensure the accurate shape and size of the structure and the member; sufficient strength, rigidity and stability; the assembly and disassembly are convenient and the device can be used repeatedly; the joint is tight and does not leak slurry.
In the process of using the wooden template to construct the water treatment structure, the wooden template needs to be opened and split, and in the construction process, water penetrates into the board through the split holes in the board to cause expansion, degumming and deformation, so that the service life of the template is shortened.
Therefore, there is a need to provide a new slotted wooden form for pool walls to solve the above-mentioned problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem provide a not need carry out the pond pool wall to the trompil to the template and use fluting plank sheathing.
In order to solve the technical problem, the utility model provides a slotting plank sheathing for pond wall of pond includes: a wood board; the top ends of the wood boards are symmetrically arranged in the grooves; the fixing mechanism is installed at the top end of the wood board and comprises an installation plate, a fixing block and a split screw, the inside of the groove is connected with the split screw in a sliding mode, the two ends of the split screw are symmetrically provided with the fixing blocks in a circular truncated cone shape, the fixing blocks abut against the side wall of the wood board, and the installation plate is installed at the position where the side wall of the split screw is located; the blocking mechanism is connected with the inside of the fixed block in a sliding mode and abutted against the side wall of the wood board.
Preferably, the blocking mechanism comprises a fixing ring, a support ring, a rubber pad, a spring and a sliding chute, the sliding chute is arranged inside the fixing block, and the sliding chute is connected with the fixing ring and the rubber pad in a sliding manner; the spring is arranged in the sliding groove, and one end of the spring is connected with the fixing ring; the both ends of cavity columniform the rubber pad install respectively the support ring with gu fixed ring, just the rubber pad with the support ring is contradicted the top of plank.
Preferably, the internal diameter of solid fixed ring is greater than the diameter to the blind screw, gu fixed ring's inside sliding connection to the blind screw, just to the blind screw runs through the spout.
Preferably, a cylindrical fixing plate is installed on the side wall of the opposite-pulling screw rod, and the edge of the side wall of the fixing plate is installed on the inner side wall of the rubber pad in sliding connection.
Preferably, the cross section of the groove is square, and the height of the groove is equal to the diameter of the counter-pulling screw rod.
Preferably, the one end of fixed plate board with the one end of fixed block flushes, the diameter of fixed plate is greater than the height of recess, just the lateral wall of fixed plate is contradicted solid fixed ring.
Preferably, the inner diameter of the support ring is larger than the diameter of the counter screw, and the diameter of the support ring is equal to the inner diameter of the rubber pad.
Compared with the prior art, the utility model provides a pond is fluting plank sheathing for pool wall has following beneficial effect:
the top ends of the wood boards are equidistantly provided with six grooves, the two templates are vertically placed on the ground, the counter-pulling screw penetrates through the grooves of the two wood boards, the fixing blocks are abutted against the grooves and the inner side walls of the wood boards, then the side walls of the wood boards are provided with steel reinforcement frameworks, the steel reinforcement frameworks support the wood boards, and the counter-pulling screw fixes the distance between the two wood boards; placing other two boards on the top ends of the installed boards, fixing the boards by using the counter-pulling screw rods in the same way, binding the boards on a steel bar framework by using iron wires temporarily after the boards are installed in the installation process, fixing vertical seams between the boards by using narrow battens and iron nails, clamping the counter-pulling screw rods layer by transverse seams between the boards, and forming a stable linear straight temporary structure by pulling supports on the boards on each layer; after the wood boards are assembled, grooves are formed at the same time, after the wood boards are installed on site, the abutted seams of the wood boards can be subjected to tight silk joint, and the appearance quality of concrete is guaranteed; and the method of opening the split-draw hole in the wood board is avoided, the probability of expansion, degumming and deformation caused by the fact that water penetrates into the board through the split-draw hole in the wood board is reduced, and the service life of the wood board is prolonged.
Drawings
Fig. 1 is a schematic structural view of a grooved wood form for pool walls according to a preferred embodiment of the present invention;
FIG. 2 is a schematic view of the internal structure of the fixing block shown in FIG. 1;
fig. 3 is a sectional view of the groove and the counter screw shown in fig. 2.
Reference numbers in the figures: 1. plank, 2, groove, 3, fixing mechanism, 31, mounting panel, 32, fixed block, 33, split screw, 4, blocking mechanism, 41, fixed ring, 42, support ring, 43, rubber pad, 44, spring, 45, chute, 5, fixed plate.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
Please refer to fig. 1, fig. 2 and fig. 3, wherein fig. 1 is a schematic structural diagram of a slotted wooden form for pool walls according to a preferred embodiment of the present invention; FIG. 2 is a schematic view of the internal structure of the fixing block shown in FIG. 1; fig. 3 is a sectional view of the groove and the counter screw shown in fig. 2. The pond wall of pond includes with fluting plank sheathing: 1, a wood board; the grooves 2 are symmetrically provided with the top ends of the wood boards 1; the fixing mechanism 3 is characterized in that the fixing mechanism 2 is installed at the top end of the wood board 1, the fixing mechanism 3 comprises an installation plate 31, a fixing block 32 and a counter-pull screw 33, the groove 2 is connected with the counter-pull screw 33 in a sliding mode, the fixing block 32 in a circular truncated cone shape is symmetrically installed at two ends of the counter-pull screw 33, the fixing block 32 abuts against the side wall of the wood board 1, and the installation plate 31 is installed at the position where the side wall of the counter-pull screw 33 is located; blocking mechanism 4, blocking mechanism 4 sliding connection the inside of fixed block 32, just blocking mechanism 4 contradicts the lateral wall of plank 1.
The blocking mechanism 4 comprises a fixed ring 41, a support ring 42, a rubber pad 43, a spring 44 and a sliding chute 45, the sliding chute 45 is arranged inside the fixed block 32, and the inside of the sliding chute 45 is connected with the fixed ring 41 and the rubber pad 43 in a sliding manner; the spring 44 is installed inside the sliding groove 45, and one end of the spring 44 is connected with the fixed ring 41; hollow cylinder shape the both ends of rubber pad 43 are installed respectively the support ring 42 with gu fixed ring 41, just rubber pad 43 with support ring 42 contradicts the top of plank 1, for the convenience fixed block 32 with during the top contact of plank 1, plank 1 extrusion rubber pad 43 makes rubber pad 43 slides in the inside of spout 45, rubber pad 43 extrusion gu fixed ring 41 makes gu fixed ring 41 extrudees gu fixed ring 41 is inside spout 45 spring 44, spring 44 backward extrusion gu fixed ring 41 makes gu fixed ring 41 drives rubber pad 43 hugs closely the lateral wall of plank 1 makes rubber pad 43 will recess 1 seals prevents that the concrete from getting into the inside of spout 45.
The internal diameter of fixed ring 41 is greater than the diameter of split screw 33, the inside sliding connection of fixed ring 41 split screw 33, just split screw 33 runs through spout 45, for convenience fixed ring 41 is in the inside motion of spout 45 avoids fixed ring 41 with split screw 33 is separated, and is convenient fixed ring 41 is in the inside motion of spout 45.
The side wall of the opposite-pulling screw rod 33 is provided with a cylindrical fixing plate 5, the edge of the side wall of the fixing plate 5 is provided with an inner side wall which is connected with the rubber pad 43 in a sliding manner, so that the rubber pad 43 can slide linearly between the fixing plate 5 and the fixing block 32 in order to fix the rubber pad 43 on the fixing plate 5.
The sectional area of the groove 2 is square, the height of the groove 2 is equal to the diameter of the counter-pulling screw 33, and the counter-pulling screw 33 is placed in the groove 2 conveniently and is fixed in the groove 2 through the counter-pulling screw 33.
The one end of fixed plate board 5 with the one end of fixed block 32 flushes, the diameter of fixed plate 5 is greater than recess 2's height, and for convenience fixed plate 5 will recess 2 parcel, just the lateral wall of fixed plate 5 is contradicted fixed ring 41, for convenience fixed plate 5 will fixed ring 41 is fixed the inside of spout 45.
The inner diameter of the support ring 42 is larger than the diameter of the counter-pull screw 33, and the diameter of the support ring 42 is equal to the inner diameter of the rubber pad 43, so that the support ring 43 can slide in the counter-pull screw 33 conveniently, the rubber pad 43 is fixed by the support ring 43, and the rubber pad 43 can be in contact with the top end of the wood board 1 conveniently.
The utility model provides a pond pool wall is with fluting plank sheathing's theory of operation as follows: the six grooves 2 are equidistantly formed in the top end of the wood board 1, then the two templates 2 are vertically placed on the ground, the counter-pull screw 33 penetrates through the two grooves 2 of the wood board 1, the wood board 1 slides to be fixed, the 32 is abutted to the inner side walls of the grooves 2 and the wood board 1, the wood board 1 extrudes the rubber gasket 43, the rubber gasket 43 slides on the side wall of the fixing plate 5 to enter the inner part of the sliding groove 45, the rubber gasket 43 extrudes the fixing ring 41, the fixing ring 41 extrudes the spring 44 in the sliding groove 45, the spring 44 reversely extrudes the fixing ring 41, the fixing ring 41 drives the rubber gasket 43 to be tightly attached to the side wall of the wood board 1, the rubber gasket 43 is fixed by the support ring 42, the rubber gaskets 43 are prevented from being overlapped with each other, and the rubber gasket 43 is tightly attached to the side wall of the, so that the rubber pad 43 closes the recess 1. When two after interval between the plank 1 is fixed the lateral wall of plank 1 sets up framework of steel reinforcement, makes framework of steel reinforcement do plank 1 provides the support, just it is fixed with the interval between two planks 1 to draw screw rod 33. Placing other two boards 1 on the top ends of the installed boards 1, fixing the boards 1 by using the split screws 33, binding the boards 1 on a steel bar framework temporarily by iron wires after installation in the installation process, fixing vertical seams between the boards 1 by using narrow battens and iron nails, clamping the split screws layer by layer in transverse seams between the boards 1, and forming a stable linear straight temporary structure by pulling supports on the boards 1 on each layer; the wood boards 1 are assembled and then simultaneously grooved and formed, after the wood boards are installed on site, the joints of the wood boards 1 can be tightly jointed, and the appearance quality of concrete is guaranteed. After the wood boards 1 are assembled, pipelines are sleeved on the fixing blocks 32 and the counter-pulling screws 33, and concrete is injected between the wood boards 1 to be stored between the wood boards 1 and solidified; during the concrete injection process, the groove 2 is closed by the fixing block 32 and the rubber pad 43, and the concrete is prevented from entering the inner part of the groove 2. In the process of using the wood board 1, the method of opening the split-draw holes in the wood board 1 is avoided, the probability of expansion, degumming and deformation caused by the fact that water penetrates into the board through the split-draw holes in the wood board 1 is reduced, and the service life of the wood board 1 is prolonged.
Compared with the prior art, the utility model provides a pond is fluting plank sheathing for pool wall has following beneficial effect:
the top end of the wood board 1 is equidistantly provided with six grooves 2, then the two templates 2 are vertically placed on the ground, the counter-pulling screw 33 penetrates through the grooves of the two wood boards 1, the fixing block 32 is abutted against the inner side walls of the grooves 2 and the wood boards 1, then the side walls of the wood boards 1 are provided with steel reinforcement frameworks, the steel reinforcement frameworks support the wood boards 1, and the spacing between the two wood boards 1 is fixed by the counter-pulling screw 33; placing other two boards 1 on the top ends of the installed boards 1, fixing the boards 1 by using the split screws 33 in the same way, binding the boards 1 on a steel bar framework temporarily by using iron wires after installation in the installation process, fixing vertical seams among the boards 1 by using narrow battens and iron nails, clamping the split screws 33 layer by layer in transverse seams among the boards 1, and forming a stable linear straight temporary structure by pulling supports on the boards 1 on each layer; after the wood boards 1 are assembled, grooves are formed at the same time, after the wood boards 1 are installed on site, the abutted seams of the wood boards 1 can be tightly jointed, and the appearance quality of concrete is guaranteed; and the method of opening the split-draw hole in the wood board 1 is avoided, the probability of expansion, degumming and deformation caused by the fact that water penetrates into the board through the split-draw hole in the wood board 1 is reduced, and the service life of the wood board 1 is prolonged.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (7)

1. Pool is fluting plank sheathing for wall, its characterized in that includes:
a wood board;
the top ends of the wood boards are symmetrically arranged in the grooves;
the fixing mechanism is installed at the top end of the wood board and comprises an installation plate, a fixing block and a split screw, the inside of the groove is connected with the split screw in a sliding mode, the two ends of the split screw are symmetrically provided with the fixing blocks in a circular truncated cone shape, the fixing blocks abut against the side wall of the wood board, and the installation plate is installed at the position where the side wall of the split screw is located;
the blocking mechanism is connected with the inside of the fixed block in a sliding mode and abutted against the side wall of the wood board.
2. The grooved wood formwork for the pool wall of the pool according to claim 1, wherein the blocking mechanism comprises a fixing ring, a support ring, a rubber pad, a spring and a sliding groove, the sliding groove is arranged inside the fixing block, and the fixing ring and the rubber pad are slidably connected inside the sliding groove; the spring is arranged in the sliding groove, and one end of the spring is connected with the fixing ring; the both ends of cavity columniform the rubber pad install respectively the support ring with gu fixed ring, just the rubber pad with the support ring is contradicted the top of plank.
3. The grooved plank sheathing of claim 2, wherein the inner diameter of the fixing ring is larger than the diameter of the counter screw, the inner part of the fixing ring is slidably connected to the counter screw, and the counter screw penetrates the sliding groove.
4. The grooved plank of claim 2, wherein the side wall of the tie screw is installed with a cylindrical fixing plate, and the edge of the side wall of the fixing plate is installed with an inner side wall sliding connected with the rubber pad.
5. The grooved plank of claim 4, wherein the cross-sectional area of the groove is square and the height of the groove is equal to the diameter of the split screw.
6. The grooved plank sheathing of claim 4, wherein one end of the securing plank is flush with one end of the securing plank, the diameter of the securing plank is larger than the height of the groove, and the sidewall of the securing plank butts against the securing ring.
7. The grooved plank sheathing of claim 4, wherein the support ring has an inner diameter greater than the diameter of the tie screw and the diameter of the support ring is equal to the inner diameter of the rubber mat.
CN201920586268.6U 2019-04-26 2019-04-26 Slotted wood formwork for pool wall Active CN210342689U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920586268.6U CN210342689U (en) 2019-04-26 2019-04-26 Slotted wood formwork for pool wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920586268.6U CN210342689U (en) 2019-04-26 2019-04-26 Slotted wood formwork for pool wall

Publications (1)

Publication Number Publication Date
CN210342689U true CN210342689U (en) 2020-04-17

Family

ID=70180619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920586268.6U Active CN210342689U (en) 2019-04-26 2019-04-26 Slotted wood formwork for pool wall

Country Status (1)

Country Link
CN (1) CN210342689U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115142722A (en) * 2022-06-10 2022-10-04 河南沃克曼建设工程有限公司 Accurate positioning and rapid construction method for circular pool template of large sewage treatment plant

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115142722A (en) * 2022-06-10 2022-10-04 河南沃克曼建设工程有限公司 Accurate positioning and rapid construction method for circular pool template of large sewage treatment plant
CN115142722B (en) * 2022-06-10 2024-04-05 河南沃克曼建设工程有限公司 Precise positioning and rapid construction method for circular pool template of large sewage treatment plant

Similar Documents

Publication Publication Date Title
KR100938821B1 (en) Prefabricated mold structure of waterway and construction method of drainage canal
CN102296812A (en) Building template molding structure, fastening piece and building template construction method
CN210342689U (en) Slotted wood formwork for pool wall
KR101695662B1 (en) Pipe supporter fixing unit for mould
JP5723471B1 (en) Board panel fixed structure
CN205713078U (en) A kind of outer wall of basement vertical post-cast strip side mold device
CN214942388U (en) Frame post template structure
KR100996578B1 (en) Concrete form support waler
KR101550712B1 (en) Construction structure of reinforced concrete building and construction method thereof
CN109339439B (en) Constructional column formwork construction device and process
KR20180125648A (en) The supporter for concrete forms of slab
KR20160120828A (en) A supporter fixing unit for waterprof sill
CN202148687U (en) Building template forming structure and fastening piece
KR20170090536A (en) C type fixture used for wall mold and eco mold incorporating the same
CN108442698B (en) Deformation joint split bolt pvc sleeve plugging method and plugging fixing sleeve
KR101426650B1 (en) Forming Structure of Building Frame
KR101799237B1 (en) Method of manufacturing grounding stone for pillar fixed and grounding stone for pillar fixed produced by the same
KR101825818B1 (en) clip of integrated angle adjustment tie
KR101780410B1 (en) Spacing apparatus for fixing the formwork and formwork structure using the same
JP5697785B1 (en) Concrete reinforced wall construction method
CN219653747U (en) Spliced precast reinforced concrete foundation
CN219343994U (en) Shaping outer windowsill coping slope finding die
CN217175709U (en) Rectangular wall column wood formwork fixing device
CN216109680U (en) Aluminum alloy template assembly
CN220686788U (en) Steel frame for positioning column rib

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant