KR100938821B1 - Prefabricated mold structure of waterway and construction method of drainage canal - Google Patents

Prefabricated mold structure of waterway and construction method of drainage canal Download PDF

Info

Publication number
KR100938821B1
KR100938821B1 KR1020090026351A KR20090026351A KR100938821B1 KR 100938821 B1 KR100938821 B1 KR 100938821B1 KR 1020090026351 A KR1020090026351 A KR 1020090026351A KR 20090026351 A KR20090026351 A KR 20090026351A KR 100938821 B1 KR100938821 B1 KR 100938821B1
Authority
KR
South Korea
Prior art keywords
wall formwork
pair
wall
panels
delete delete
Prior art date
Application number
KR1020090026351A
Other languages
Korean (ko)
Inventor
이윤섭
오봉조
Original Assignee
주식회사 에코로드홀딩스
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 에코로드홀딩스 filed Critical 주식회사 에코로드홀딩스
Priority to KR1020090026351A priority Critical patent/KR100938821B1/en
Application granted granted Critical
Publication of KR100938821B1 publication Critical patent/KR100938821B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • E02B11/02Drainage device- laying apparatus, e.g. drainage ploughs
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/02Making or lining canals

Abstract

PURPOSE: A prefabricated form structure and a construction method of a drainage are provided to execute drainages of various sizes by applying a form fixing frame capable of adjusting the width and height. CONSTITUTION: A prefabricated form structure comprises a pair of inner wall form panels(10), a pair of outer wall form panels(12), and an inner wall form fixing frame(20). The inner wall form panels form both inner walls(3) of a drainage(1). The outer wall form panels form both outer walls(5) of the drainage. The inner wall form fixing frame fixes the inner wall form panels to the predetermined position and comprises a pair of first clamping units(26) and a spacing member(28). The first clamping units are respectively connected to the inner wall form panels. The spacing member adjusts the distance between the first clamping units by corresponding to the distance between the inner wall form panels.

Description

조립식 거푸집 구조 및 배수로 시공방법{Prefabricated mold structure of waterway and construction method of drainage canal}Prefabricated mold structure of waterway and construction method of drainage canal}

본 발명은 조립식 거푸집 구조 및 배수로 시공방법에 관한 것이다.The present invention relates to a prefabricated formwork structure and a drainage construction method.

도로의 신설, 확장, 포장공사, 택지개발 등 각종 건설현장의 토목공사에 과정에서 배수를 위한 수로(水路)로서 배수로를 설치하게 되는데, 배수로는 지상에 노출되어 있는 명거(明渠) 배수로와 지하에 매설된 암거(暗渠) 배수로로 구분되며, 그 시공방법으로서는 현장에서 콘크리트를 타설하여 시공하는 방식, PC(precast concrete)나 합성수지 등으로 제작된 단위 배수로 유닛을 현장에서 연결하는 방식, 현장에서 골조와 측벽 패널을 조립한 후 바닥콘크리트를 타설하여 배수로를 시공하는 방식 등 다양한 공법에 의해 배수로가 설치되고 있다.In the course of civil engineering work at various construction sites such as road construction, extension, pavement, and land development, drainage channels are installed as drainage channels for drainage. It is divided into embedded culvert drainage, and the construction method is to cast concrete at the site, and to connect the unit drainage channel made of PC (precast concrete) or synthetic resin in the field, After assembling the side wall panels, the drainage channel is installed by various methods, such as the method of constructing the drainage channel by laying the floor concrete.

이 중, 현장에서 콘크리트를 타설하여 시공하는 방식의 경우, 종래에는 합판이나 철판 등으로 제작된 거푸집 패널을 각목이나 파이프 등의 가설재를 사용하여 고정시킴으로써 콘크리트가 타설되는 공간을 형성하는 방식으로 공사가 이루어졌다. 즉, 거푸집 패널 및 가설재를 일정한 너비나 길이로 절단하고 각 부재를 짜맞추어 못이나 반생(철끈) 등으로 고정시킴으로써 거푸집을 제작한 후 거푸집에 의 해 형성되는 공간에 콘크리트를 타설, 양생시켜 배수로를 시공하였다.Among them, in the case of construction by pouring concrete in the field, the construction is conventionally formed by fixing the formwork panel made of plywood or steel plate using temporary materials such as wood or pipe to form a space in which concrete is poured. Was done. In other words, formwork by cutting the formwork panel and temporary materials to a certain width or length, and fitting each member with nails or half-strength (iron string), and then pouring concrete into the space formed by the formwork and curing the drainage path. It was constructed.

그러나, 종래의 현장 콘크리트 타설식 배수로 시공법의 경우, 합판과 각목을 일일이 톱질하여 패널과 가설재를 제작하고 가설재를 패널에 못질하여 거푸집을 설치하게 되므로 인력과 시간이 많이 소요되어 공사기간이 오래 걸릴 뿐만 아니라, 콘크리트의 타설, 양생 후 거푸집 해체에 따라 발생하는 합판과 각목 등의 폐자재는 재사용하지 못하고 폐기하게 되므로 공사비의 상승 요인으로 작용하게 된다.However, in the case of the construction method of the conventional concrete pour-in drainage method, it is necessary to saw the plywood and lumber every day to produce panels and temporary materials, and to install the formwork by nailing the temporary materials to the panels, which takes a lot of manpower and time. In addition, waste materials such as plywood and lumber, which are generated by concrete disassembly and formwork dismantling, will not be reused and will be disposed of.

즉, 종래의 배수로 시공법은 복잡한 작업공정으로 인하여 공기가 지연되고 많은 인력 및 공사비가 소모된다는 문제가 있다.That is, the conventional drainage construction method has a problem that the air is delayed and a lot of manpower and construction costs are consumed due to a complicated work process.

전술한 배경기술은 발명자가 본 발명의 도출을 위해 보유하고 있었거나, 본 발명의 도출 과정에서 습득한 기술 정보로서, 반드시 본 발명의 출원 전에 일반 공중에게 공개된 공지기술이라 할 수는 없다.The background art described above is technical information possessed by the inventors for the derivation of the present invention or acquired during the derivation process of the present invention, and is not necessarily a publicly known technique disclosed to the general public before the application of the present invention.

본 발명은 콘크리트를 타설하여 배수로를 시공함에 있어서, 거푸집을 용이하게 신속하게 설치할 수 있고, 시공 후 철거한 거푸집 부재를 재사용할 수 있어, 인력 및 공사비가 절감되는 조립식 거푸집 구조 및 배수로 시공방법을 제공하는 것이다.The present invention provides a prefabricated formwork and drainage construction method that can be quickly and quickly install the formwork in the construction of the drainage by pouring concrete, can reuse the formwork removed after construction, reducing manpower and construction costs It is.

본 발명의 일 측면에 따르면, 요(凹)홈 형상의 단면이 일방향으로 연장되는 소정의 공간을 형성하고 공간에 콘크리트를 타설함으로써, 배수로를 시공하는 데에 사용되는 거푸집 구조로서, 배수로의 양측 내벽을 형성하도록 설치되는 한 쌍의 내벽 거푸집 패널과, 배수로의 양측 외벽을 형성하도록 설치되는 한 쌍의 외벽 거푸집 패널과, 한 쌍의 내벽 거푸집 패널에 결합되어, 한 쌍의 내벽 거푸집 패널을 소정의 위치에 고정시키는 내벽 거푸집 고정틀을 포함하되, 내벽 거푸집 고정틀은, 한 쌍의 내벽 거푸집 패널에 각각 결합되는 한 쌍의 제1 결속부와, 한 쌍의 내벽 거푸집 패널 간의 간격에 상응하여 한 쌍의 제1 결속부 간의 간격을 조절하는 너비 조정간을 포함하는 것을 특징으로 하는 조립식 거푸집 구조가 제공된다.According to an aspect of the present invention, by forming a predetermined space in which the cross-section of the groove groove extends in one direction and pouring concrete into the space, as a formwork structure used to construct a drainage, both inner walls of the drainage A pair of inner wall formwork panels provided to form a plurality of inner wall formwork panels, a pair of outer wall formwork panels provided to form both side outer walls of the drainage channel, and a pair of inner wall formwork panels, to form a pair of inner wall formwork panels An inner wall formwork fixing frame fixed to the inner wall formwork, wherein the inner wall formwork fixing frame comprises: a pair of first binding portions respectively coupled to the pair of inner wall formwork panels, and a pair of first pairs corresponding to a distance between the pair of inner wall formwork panels; A prefabricated formwork structure is provided that includes a width adjustment span for adjusting the spacing between the binding portions.

내벽 거푸집 고정틀은, 배수로의 단면 형상에 상응하여 역사다리꼴 형상으로 조립된 링크부와, 배수로의 상단에 걸쳐지는 가로바(bar)를 포함할 수 있으며, 가로바는 링크부의 일 변을 구성하는 중앙부재와, 중앙부재의 양측에 수납 또는 인출 가능하도록 결합되는 한 쌍의 가동부재를 포함하되, 제1 결속부는 가동부재에 형성되며, 너비 조정간은 중앙부재에 형성될 수 있다. 너비 조정간은 턴버클(turnbuckle)을 포함하며, 가동부재의 단부는 턴버클에 스크류 결합될 수 있다. 가동부재는 중앙부재에 수납 또는 인출되도록 텔레스코픽(telescopic) 결합되며, 중앙부재에는 고정볼트가 결합되어 있어, 고정볼트를 체결함에 따라 가동부재는 중앙부재에 고정될 수 있다.The inner wall formwork fixing frame may include a link portion assembled in an inverted trapezoidal shape corresponding to the cross-sectional shape of the drainage passage, and a horizontal bar extending over the upper end of the drainage passage, and the horizontal bar forms a center forming one side of the link portion. A member and a pair of movable members coupled to both sides of the central member so as to be accommodated or withdrawn, the first binding portion is formed in the movable member, the width adjustment interval may be formed in the central member. The width adjustment section includes a turnbuckle, and the end of the movable member may be screwed to the turnbuckle. The movable member is telescopically coupled (telescopic) to be received or withdrawn from the central member, the fixing member is coupled to the central member, the movable member may be fixed to the central member by fastening the fixing bolt.

가동부재에는 한 쌍의 외벽 거푸집 패널에 각각 결합되는 한 쌍의 제2 결속부가 더 형성될 수 있는데, 제1 결속부는 내벽 거푸집 패널의 단부가 삽입되는 제1 홈을 포함하며, 제2 결속부는 외벽 거푸집 패널의 단부가 삽입되는 제2 홈을 포함할 수 있다.The movable member may further include a pair of second binding parts respectively coupled to the pair of outer wall formwork panels, the first binding part including a first groove into which an end of the inner wall formwork panel is inserted, and the second binding part includes an outer wall. It may comprise a second groove into which the end of the formwork panel is inserted.

외벽 거푸집 패널에 결합되어, 외벽 거푸집 패널을 소정의 위치에 고정시키는 외벽 거푸집 고정틀을 더 포함할 수 있는데, 외벽 거푸집 고정틀은, 외벽 거푸집 패널에 결합되는 제3 결속부와, 외벽 거푸집 패널의 높이에 상응하여 제3 결속부의 높이를 조절하는 높이 조정간을 포함할 수 있다.It may further include an outer wall formwork fixing frame coupled to the outer wall formwork panel to fix the outer wall formwork panel to a predetermined position, wherein the outer wall formwork fixing frame has a third binding portion coupled to the outer wall formwork panel and a height of the outer wall formwork panel. Correspondingly, the height adjustment section for adjusting the height of the third binding portion may be included.

외벽 거푸집 고정틀은, 외벽 거푸집 패널을 지지하는 L자형 프레임과, 프레임에 수납 또는 인출 가능하도록 결합되는 세로바(bar)를 포함할 수 있으며, 제3 결속부는 세로바에 형성되고, 높이 조정간은 프레임에 형성되며, 세로바를 상기 프레임에 수납 또는 인출함에 따라 제3 결속부가 상기 외벽 거푸집 패널에 결합될 수 있다. 프레임에는 고정볼트가 결합되어 있어, 고정볼트를 체결함에 따라 세로바는 프레임에 고정될 수 있으며, 제3 결속부는 외벽 거푸집 패널의 단부가 삽입되는 제3 홈을 포함할 수 있다.The outer wall formwork fixing frame may include an L-shaped frame supporting the outer wall formwork panel, and a vertical bar coupled to the frame so as to be stored or withdrawn, and the third binding portion is formed on the vertical bar, and the height adjustment period is formed on the frame. The third binding part may be coupled to the outer wall formwork panel by storing or drawing a vertical bar in the frame. Since the fixing bolt is coupled to the frame, the vertical bar may be fixed to the frame as the fixing bolt is fastened, and the third binding part may include a third groove into which an end of the outer wall formwork panel is inserted.

한편, 본 발명의 다른 측면에 따르면, 요(凹)홈 형상의 단면이 일방향으로 연장되는 형상의 배수로를 시공하는 방법으로서, (a) 배수로의 양측 내벽을 형성하도록 한 쌍의 내벽 거푸집 패널을, 배수로의 양측 외벽을 형성하도록 한 쌍의 외벽 거푸집 패널을 설치하는 단계, (b) 한 쌍의 내벽 거푸집 패널에 각각 결합되는 한 쌍의 제1 결속부를 포함하는 내벽 거푸집 고정틀을 설치하고, 한 쌍의 내벽 거푸집 패널 간의 간격에 상응하여 한 쌍의 제1 결속부 간의 간격을 조절하여, 한 쌍의 내벽 거푸집 패널을 소정의 위치에 고정시키는 단계, 및 (c) 한 쌍의 내벽 거푸집 패 널 및 한 쌍의 외벽 거푸집 패널에 의해 구획되는 소정의 공간에 콘크리트를 타설하는 단계를 포함하는 배수로 시공방법이 제공된다.On the other hand, according to another aspect of the present invention, as a method for constructing a drainage passage having a shape in which the cross section of the concave groove extends in one direction, (a) a pair of inner wall formwork panels to form both inner walls of the drainage passage, Installing a pair of outer wall formwork panels to form both outer walls of the drainage passage, (b) installing an inner wall formwork holding frame including a pair of first binding portions respectively coupled to the pair of inner wall formwork panels, Fixing the pair of inner wall formwork panels to a predetermined position by adjusting the spacing between the pair of first binding portions corresponding to the spacing between the inner wall formwork panels, and (c) the pair of inner wall formwork panels and the pair Provided is a drainage construction method comprising the step of placing concrete in a predetermined space partitioned by an outer wall formwork panel.

내벽 거푸집 고정틀에는 한 쌍의 외벽 거푸집 패널에 각각 결합되는 한 쌍의 제2 결속부가 더 형성되며, 단계 (b)는 한 쌍의 외벽 거푸집 패널 간의 간격에 상응하여 한 쌍의 제2 결속부 간의 간격을 조절하여, 한 쌍의 외벽 거푸집 패널을 소정의 위치에 고정시키는 단계를 포함할 수 있다.The inner wall formwork fixing frame is further provided with a pair of second binding parts respectively coupled to the pair of outer wall formwork panels, and step (b) is a gap between the pair of second binding parts corresponding to the distance between the pair of outer wall formwork panels. By adjusting the, it may comprise the step of fixing a pair of outer wall formwork panel in a predetermined position.

단계 (b)는, 외벽 거푸집 패널에 결합되는 제3 결속부를 포함하는 외벽 거푸집 고정틀을 설치하고, 외벽 거푸집 패널의 높이에 상응하여 제3 결속부의 높이를 조절하여, 외벽 거푸집 패널을 소정의 위치에 고정시키는 단계를 포함할 수 있다.In step (b), the outer wall formwork fixing frame including the third binding unit coupled to the outer wall formwork panel is installed, and the height of the third binding unit is adjusted to correspond to the height of the outer wall formwork panel to move the outer wall formwork panel to a predetermined position. Fixing may be included.

단계 (c) 이후에, 콘크리트를 양생시키는 단계, 및 내벽 거푸집 고정틀, 외벽 거푸집 고정틀, 한 쌍의 내벽 거푸집 패널 및 한 쌍의 외벽 거푸집 패널을 탈형하여 재사용에 제공하는 단계를 더 포함할 수 있다.After step (c), the method may further include curing the concrete, and demolding the inner wall formwork frame, the outer wall formwork frame, the pair of inner wall formwork panels, and the pair of outer wall formwork panels for reuse.

단계 (a) 이전에, 배수로의 골조를 구성하는 철근을 배근하는 단계를 더 포함하고, 단계 (c)는 배수로의 바닥면에도 콘크리트를 타설하는 단계를 포함할 수 있다.Prior to step (a), the method may further include reinforcing the reinforcing bars forming the framework of the drainage channel, and step (c) may include placing concrete on the bottom surface of the drainage channel.

전술한 것 외의 다른 측면, 특징, 잇점이 이하의 도면, 특허청구범위 및 발명의 상세한 설명으로부터 명확해질 것이다.Other aspects, features, and advantages other than those described above will become apparent from the following drawings, claims, and detailed description of the invention.

본 발명의 바람직한 실시예에 따르면, 현장에서 콘크리트를 타설하여 배수로를 시공하는 공법에 사용되는 거푸집을 미리 제작된 부재를 조립하여 구성할 수 있도록 함으로써 거푸집을 용이하고 신속하게 설치할 수 있어 공기단축 및 인력절감이 가능하다. 또한, 시공이 끝난 후 해체한 거푸집 부재들은 추후 재사용할 수 있도록 함으로써 공사비가 절감된다. 나아가, 거푸집 패널을 고정시키기 위해 너비 및 높이 조절이 가능한 거푸집 고정틀을 사용함으로써 별도의 부재를 사용하지 않고도 다양한 칫수의 배수로 공사의 거푸집 구조로서 용이하게 적용할 수 있다.According to a preferred embodiment of the present invention, the formwork can be easily and quickly installed by assembling the formwork used in the construction method for the construction of the drainage by constructing the drainage in the field can be easily and quickly installed air shortening and manpower Savings are possible. In addition, the formwork members dismantled after construction can be reused later, thereby reducing construction costs. Furthermore, by using the formwork frame which can be adjusted in width and height to fix the formwork panel, it can be easily applied as a formwork structure of the construction of the drainage of various dimensions without using a separate member.

본 발명은 다양한 변환을 가할 수 있고 여러 가지 실시예를 가질 수 있는 바, 특정 실시예들을 도면에 예시하고 상세하게 설명하고자 한다. 그러나, 이는 본 발명을 특정한 실시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변환, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다. 본 발명을 설명함에 있어서 관련된 공지 기술에 대한 구체적인 설명이 본 발명의 요지를 흐릴 수 있다고 판단되는 경우 그 상세한 설명을 생략한다.As the invention allows for various changes and numerous embodiments, particular embodiments will be illustrated in the drawings and described in detail in the written description. However, this is not intended to limit the present invention to specific embodiments, it should be understood to include all transformations, equivalents, and substitutes included in the spirit and scope of the present invention. In the following description of the present invention, if it is determined that the detailed description of the related known technology may obscure the gist of the present invention, the detailed description thereof will be omitted.

제1, 제2 등의 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 상기 구성요소들은 상기 용어들에 의해 한정되어서는 안 된다. 상기 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 사용된다. Terms such as first and second may be used to describe various components, but the components should not be limited by the terms. The terms are used only for the purpose of distinguishing one component from another.

본 출원에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르 게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 출원에서, "포함하다" 또는 "가지다" 등의 용어는 명세서상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.The terminology used herein is for the purpose of describing particular example embodiments only and is not intended to be limiting of the present invention. Singular expressions include plural expressions unless the context clearly indicates otherwise. In this application, the terms "comprise" or "have" are intended to indicate that there is a feature, number, step, operation, component, part, or combination thereof described in the specification, and one or more other features. It is to be understood that the present invention does not exclude the possibility of the presence or the addition of numbers, steps, operations, components, components, or a combination thereof.

이하, 본 발명의 실시예를 첨부한 도면들을 참조하여 상세히 설명하기로 하며, 첨부 도면을 참조하여 설명함에 있어, 동일하거나 대응하는 구성 요소는 동일한 도면번호를 부여하고 이에 대한 중복되는 설명은 생략하기로 한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings, and in the following description with reference to the accompanying drawings, the same or corresponding components are given the same reference numerals and redundant description thereof will be omitted. Shall be.

도 1은 본 발명의 일 실시예에 따른 조립식 거푸집 구조를 나타낸 단면도이고, 도 2 및 도 3은 본 발명의 일 실시예에 따른 조립식 거푸집 구조의 사용상태를 나타낸 도면이고, 도 4는 본 발명의 다른 실시예에 따른 조립식 거푸집 구조를 나타낸 단면도이다. 도 1 내지 도 4를 참조하면, 배수로(1), 내벽(3), 외벽(5), 내벽 거푸집 패널(10), 외벽 거푸집 패널(12), 내벽 거푸집 고정틀(20), 링크부(22), 가로바(24), 고정볼트(25), 제1 결속부(26), 제2 결속부(27), 너비 조정간(28), 외벽 거푸집 고정틀(30), 프레임(32), 세로바(34), 제3 결속부(36), 높이 조정간(38), 중앙부재(242), 가동부재(244)이 도시되어 있다.1 is a cross-sectional view showing a prefabricated formwork structure according to an embodiment of the present invention, Figures 2 and 3 is a view showing a state of use of the prefabricated formwork structure according to an embodiment of the present invention, Figure 4 is Cross-sectional view showing a prefabricated formwork structure according to another embodiment. 1 to 4, the drainage path 1, the inner wall 3, the outer wall 5, the inner wall formwork panel 10, the outer wall formwork panel 12, the inner wall formwork fixing frame 20, and the link part 22. , Horizontal bar 24, fixing bolt 25, the first binding unit 26, the second binding unit 27, width adjustment section 28, outer wall formwork frame 30, frame 32, vertical bar ( 34), the third engagement section 36, the height adjustment section 38, the center member 242, and the movable member 244 are shown.

본 실시예는 현장 콘크리트 타설식 배수로 공사를 신속하고 용이하게 진행할 수 있도록 미리 제작된 부재를 조립함으로써 거푸집을 구성할 수 있는 '조립식 거푸집 구조'를 특징으로 한다.This embodiment is characterized by the 'prefabricated formwork structure' that can form the formwork by assembling the pre-fabricated member to proceed quickly and easily on-site concrete pouring drainage construction.

즉, 본 실시예는 철제 거푸집 패널과 거푸집 패널을 지지, 보강하는 내, 외벽 고정틀을 미리 규격에 맞게 제작하여, 신속하게 거푸집 구조를 조립하고 콘크리트를 타설할 수 있도록 함으로써, 배수로 공사가 신속, 용이하게 진행되도록 한 것이다. 또한, 공사가 완료된 후에도 거푸집 구조를 쉽게 해체하여 여러 번 반복하여 사용할 수 있도록 거푸집 부재를 제작함으로써 공사비를 대폭 절감할 수 있다.That is, the present embodiment is to prepare the inner and outer wall fixing frame to support and reinforce the steel formwork panel and the formwork panel to meet the standard in advance, so as to quickly assemble the formwork structure and cast concrete, the construction of the drainage channel is quick, easy It is to proceed. In addition, even after the construction is completed, it is possible to easily dismantle the formwork structure to reduce the construction cost by manufacturing the formwork member to be used repeatedly many times.

본 실시예에 따른 배수로(1)는 요(凹)홈 형상의 단면이 일방향으로 연장된 형상으로 시공되며, 이러한 형상의 콘크리트 구조물을 시공하기 위해서는 거푸집을 조립하여 콘크리트를 타설할 공간을 미리 형성해 놓아야 한다.The drainage path 1 according to the present embodiment is constructed in a shape in which a cross section of a recess groove is extended in one direction, and in order to construct a concrete structure of such a shape, a space must be formed in advance by assembling formwork. do.

콘크리트가 타설될 공간은 거푸집에 의해 형성되는데, 본 실시예에 따른 거푸집 구조는 기본적으로 내벽 거푸집 패널(10), 외벽 거푸집 패널(12), 및 내벽 거푸집 고정틀(20)로 구성된다.The space where concrete is to be poured is formed by formwork, and the formwork structure according to the present embodiment basically consists of the inner wall formwork panel 10, the outer wall formwork panel 12, and the inner wall formwork fixing frame 20.

내벽 거푸집 패널(10)은 배수로(1)의 양측 내벽(3), 즉 물이 흐르는 트렌치(trench)의 양쪽 측벽을 형성하기 위해 한 쌍으로 설치되는 부재로서, 배수로(1)의 규격에 맞도록 합판, 철판, 합성수지 등의 재질을 절단, 조립, 성형, 가공하여 제작할 수 있다. 또한, 유로폼과 같이 기성 패널을 규격에 맞도록 변형시켜 사용할 수도 있다. 거푸집 패널끼리는 볼트 등을 사용하여 결속할 수 있다.The inner wall formwork panel 10 is a member provided in pairs to form both inner walls 3 of the drain channel 1, that is, both sidewalls of a trench through which water flows, so as to meet the specification of the drain channel 1. It can be produced by cutting, assembling, molding and processing materials such as plywood, iron plate and synthetic resin. In addition, like a flow-foam, the ready-made panel can also be modified and used to meet a specification. Formwork panels can be bound together using bolts or the like.

외벽 거푸집 패널(12)은 배수로(1)의 양측 외벽(5), 즉 배수로(1) 구조물의 양쪽 외벽(5)을 형성하기 위해 한 쌍으로 설치되는 부재로서, 내벽 거푸집 패널(10)과 마찬가지로 배수로(1) 규격에 맞도록 제작하거나, 기성 패널을 변형시켜 사용할 수 있다.The outer wall formwork panel 12 is a member provided in pairs to form both outer walls 5 of the drainage passage 1, that is, both outer walls 5 of the drainage passage 1 structure, and like the inner wall formwork panel 10. It can be manufactured to meet the drainage channel (1) standard, or the ready-made panel can be modified and used.

내벽 거푸집 고정틀(20)은, 한 쌍의 내벽 거푸집 패널(10)에 걸치도록 트렌치 부분에 설치함으로써 거푸집 패널을 특정 위치에 고정시키는 역할을 한다. 내벽 거푸집 고정틀(20)에는 내벽 거푸집 패널(10)이 움직이지 않도록 잡아주는 제1 결속부(26)가 형성되어 있으며, 배수로(1)의 규격에 따라 내벽 거푸집 패널(10)의 위치가 변경될 수 있으므로 이에 대응할 수 있도록, 즉 한 쌍의 내벽 거푸집 패널(10) 간의 간격에 따라 한 쌍의 제1 결속부(26) 간의 간격을 조절할 수 있도록 너비 조정간(28)이 설치된다. 이하, 내벽 거푸집 고정틀(20)의 구조에 대해 보다 상세히 설명한다.The inner wall formwork fixing frame 20 serves to fix the formwork panel to a specific position by providing the inner wall formwork frame 10 in the trench portion to span the pair of inner wall formwork panels 10. The inner wall formwork fixing frame 20 is formed with a first binding portion 26 to hold the inner wall formwork panel 10 so as not to move, and the position of the inner wall formwork panel 10 may be changed according to the specification of the drainage path 1. Therefore, the width adjusting section 28 is installed to cope with this, that is, to adjust the gap between the pair of first binding portions 26 according to the gap between the pair of inner wall formwork panels 10. Hereinafter, the structure of the inner wall formwork fixing frame 20 will be described in more detail.

내벽 거푸집 고정틀(20)은, 도 1에 도시된 것처럼, 링크부(22)와 가로바(24)로 이루어진다. 링크부(22)는 배수로(1)의 단면 형상과 동일하게 역사다리꼴 형상으로 조립된 링크로 이루어지며, 트렌치 부분의 규격이 달라짐에 따라 도 2에 도시된 것처럼 링크의 형상이 연동하여 변형될 수 있도록 링크부재의 일부는 서로 힌지결합(도 1의 'A' 참조)이 되어 있다.As shown in FIG. 1, the inner wall formwork fixing frame 20 includes a link part 22 and a horizontal bar 24. The link portion 22 is formed of a link assembled in an inverted trapezoidal shape in the same manner as the cross-sectional shape of the drainage passage 1, and as the size of the trench portion is changed, as shown in FIG. Some of the link members are hinged to each other (see 'A' in Fig. 1).

가로바(24)는 배수로(1)의 상단에 걸쳐지는 부재로서, 링크부(22)의 상(上)변을 이루는 중앙부재(242)와 중앙부재(242)로부터 양측으로 수납, 인출되는 한 쌍의 가동부재(244)로 이루어진다. 이로써, 가로바(24)를 배수로(1)의 상단에 걸쳐놓은 상태에서 가동부재(244)를 수납, 인출하여 가로바(24)가 거푸집 패널을 커버하도록 할 수 있다.The horizontal bar 24 is a member that extends over the upper end of the drainage path 1 and is provided to both sides from the central member 242 and the central member 242 forming the upper side of the link portion 22. It consists of a pair of movable members 244. Thereby, the movable member 244 can be accommodated and withdrawn in a state where the horizontal bar 24 is placed over the upper end of the drainage path 1 so that the horizontal bar 24 covers the formwork panel.

가동부재(244)에 전술한 제1 결속부(26)를 형성하게 되면, 내벽 거푸집 패널(10)의 설치 위치에 따라 가동부재(244)를 움직여 제1 결속부(26)가 내벽 거푸집 패널(10)에 결합되도록 할 수 있으며, 이에 따라 본 실시예에 따른 내벽 거푸집 고정틀(20)을 다양한 규격의 배수로용 거푸집 공사에 쉽게 적용할 수 있다.When the first binding portion 26 is formed on the movable member 244, the movable member 244 is moved according to the installation position of the inner wall formwork panel 10 so that the first binding portion 26 moves to the inner wall formwork panel ( 10) can be coupled to it, and thus the inner wall formwork fixing frame 20 according to the present embodiment can be easily applied to the formwork for the drainage of various specifications.

가동부재(244)에 제1 결속부(26)가 형성된 경우, 제1 결속부(26) 간의 간격은 한 쌍의 가동부재(244)가 중앙부재(242)로부터 수납, 인출된 정도에 따라 조절될 수 있는데, 전술한 너비 조정간(28)을 중앙부재(242)에 설치함으로써 가동부재(244)의 수납, 인출된 정도를 조절할 수 있으며, 이에 따라 제1 결속부(26) 간의 간격을 조절할 수 있다.When the first binding unit 26 is formed on the movable member 244, the interval between the first binding units 26 is adjusted according to the degree of the pair of movable members 244 stored and drawn from the central member 242. It may be, by installing the above-described width adjustment interval 28 to the central member 242 can adjust the storage, the degree of extraction of the movable member 244, accordingly can adjust the interval between the first binding portion 26. have.

너비 조정간(28)으로는 턴버클(turnbuckle)을 사용할 수 있으며, 이 경우 가동부재(244)의 단부는 턴버클에 스크류 결합될 수 있다. 이로써, 턴버클을 어느 한쪽 방향으로 회전시켜 가동부재(244)가 중앙부재(242)로부터 인출되도록 할 수 있으며, 턴버클을 반대 방향으로 회전시켜 가동부재(244)가 중앙부재(242)에 수납되도록 할 수 있다. 턴버클 이외에도 가동부재(244)의 수납, 인출 정도를 조절할 수 있는 다양한 기구적 메커니즘이 적용될 수 있음은 물론이다.A turnbuckle may be used as the width adjusting section 28, in which case the end of the movable member 244 may be screwed to the turnbuckle. Accordingly, the turnbuckle may be rotated in either direction to allow the movable member 244 to be drawn out from the central member 242, and the turnbuckle may be rotated in the opposite direction to accommodate the movable member 244 in the central member 242. Can be. In addition to the turnbuckle, various mechanical mechanisms for adjusting the storage and withdrawal degree of the movable member 244 may be applied.

또한, 도 4에 도시된 것처럼, 턴버클 등의 너비 조정간(28)을 가로바(24)가 아닌 링크부(22)에 설치할 수도 있는데, 이 경우 너비 조정간(28)은 링크부(22)의 폭을 조절하는 역할을 하여 결과적으로 가동부재(244)가 중앙부재(242)로부터 인출, 수납된 정도가 조절되므로, 링크부(22)를 기준으로 제1 결속부(26)의 상대적인 간격이 조절될 수 있다.In addition, as shown in FIG. 4, a width adjusting section 28 such as a turnbuckle may be provided in the link section 22 instead of the horizontal bar 24. In this case, the width adjusting section 28 is the width of the link section 22. As a result, since the movable member 244 is withdrawn and received from the central member 242 as a result, the relative distance of the first binding unit 26 is adjusted based on the link unit 22. Can be.

중앙부재(242)가 관(管)형상으로 형성되고, 가동부재(244)가 중앙부재(242)보다 관경이 작은 관형상으로 형성될 경우, 가동부재(244)는 중앙부재(242) 내에 수용되도록, 즉 텔레스코픽(telescopic) 방식으로 결합될 수 있다.When the central member 242 is formed in a tubular shape and the movable member 244 is formed in a tubular shape having a smaller diameter than the central member 242, the movable member 244 is accommodated in the central member 242. If possible, that is, it can be combined in a telescopic manner.

한편, 가동부재(244)를 특정 위치에서 고정시키기 위해 중앙부재(242)에 고정볼트(25)를 체결할 수 있다. 즉, 가동부재(244)가 수납 또는 인출되어 제1 결속부(26)가 내벽 거푸집 패널(10)에 결합된 경우, 가동부재(244)가 더 이상 움직이지 않고 고정되도록 함으로써 내벽 거푸집 패널(10)도 움직이지 않고 고정되도록 할 수 있는데, 이를 위해 중앙부재(242)에 설치된 고정볼트(25)를 체결하여 가동부재(244)를 중앙부재(242)에 고정시킬 수 있다.Meanwhile, the fixing bolt 25 may be fastened to the central member 242 to fix the movable member 244 at a specific position. That is, when the movable member 244 is accommodated or drawn out and the first binding portion 26 is coupled to the inner wall formwork panel 10, the inner wall formwork panel 10 is fixed by allowing the movable member 244 to be fixed without moving anymore. ) Can also be fixed without moving, for this purpose can be fixed to the central member 242 by fastening the fixing bolt 25 installed in the central member 242.

나아가, 본 실시예에 따른 가동부재(244)에는 외벽 거푸집 패널(12)에 결합되는 제2 결속부(27)가 더 형성될 수 있다. 즉, 내벽 거푸집 고정틀(20)을 사용하여 내벽 거푸집 패널(10)뿐만 아니라 외벽 거푸집 패널(12)의 위치도 고정시킬 수 있는 것이다.Furthermore, the second member 27 coupled to the outer wall formwork panel 12 may be further formed in the movable member 244 according to the present embodiment. That is, the inner wall formwork fixing frame 20 can be used to fix the position of the outer wall formwork panel 12 as well as the inner wall formwork panel 10.

이 경우, 가동부재(244)를 수납, 인출하여 제2 결속부(27) 간의 간격을 조절할 수 있으며, 가동부재(244)를 특정위치에 고정시켜 외벽 거푸집 패널(12)을 고정시킬 수 있는데, 그 구체적인 기술은 전술한 제1 결속부(26)의 경우와 마찬가지이므로, 이에 대한 상세한 설명은 생략한다.In this case, the gap between the second binding portions 27 may be adjusted by storing and withdrawing the movable member 244, and the outer wall formwork panel 12 may be fixed by fixing the movable member 244 at a specific position. Since the detailed description is the same as in the case of the first binding unit 26 described above, a detailed description thereof will be omitted.

거푸집 패널을 내벽 거푸집 고정틀(20)에 결합시키는 역할을 하는 제1 결속부(26) 및/또는 제2 결속부(27)는 거푸집 패널의 단부가 삽입되는 홈 형상으로 형성함으로써 거푸집 패널을 용이하게 결합, 고정시킬 수 있다. 즉, 도 1에 도시된 것처럼, 제1 결속부(26)로서 내벽 거푸집 패널(10)이 삽입되는 홈(제1 홈)을, 제2 결속부(27)로서 외벽 거푸집 패널(12)의 단부가 삽입되는 홈(제2 홈)을 형성할 수 있다. 홈 형상 이외에도 거푸집 패널과 결합되어 패널의 위치를 고정시킬 수 있는 다양한 형상, 구조의 결속부가 형성될 수 있음은 물론이다.The first engagement portion 26 and / or the second engagement portion 27, which serve to couple the formwork panel to the inner wall formwork fixing frame 20, are formed in a groove shape into which the end of the formwork panel is inserted, thereby easily forming the formwork panel. Can be combined and fixed. That is, as shown in FIG. 1, the groove (first groove) into which the inner wall formwork panel 10 is inserted as the first binding portion 26 is the end of the outer wall formwork panel 12 as the second binding portion 27. Can form a groove (second groove) is inserted. In addition to the groove shape may be combined with the formwork panel can be formed of a binding unit of various shapes, structures to fix the position of the panel.

이처럼, 본 실시예에 따른 내벽 거푸집 고정틀(20)은 링크부(22)와 가로바(24)로 이루어지는데, 배수로(1) 시공과정에서 거푸집 패널을 설치한 후, 링크부(22)가 트렌치 부분에 수용되도록 내벽 거푸집 고정틀(20)을 설치하고, 가동부재(244)를 인출하여 제1 결속부(26)가 내벽 거푸집 패널(10)에, 제2 결속부(27)가 외벽 거푸집 패널(12)에 결합되도록 한 후 고정볼트(25)를 체결하여 가동부재(244)를 고정시킴으로써 거푸집 패널의 위치도 고정되게 된다.As such, the inner wall formwork fixing frame 20 according to the present embodiment is composed of a link portion 22 and a horizontal bar 24, after the formwork panel is installed in the course of the drainage passage 1, the link portion 22 is a trench The inner wall formwork fixing frame 20 is installed so as to be accommodated in the portion, and the movable member 244 is withdrawn so that the first binding portion 26 is in the inner wall formwork panel 10 and the second binding portion 27 is the outer wall formwork panel ( 12) and then the fixing bolt 25 is fastened by fixing the movable member 244, the position of the formwork panel is also fixed.

한편, 본 실시예에 따른 조립식 거푸집 구조는 외벽 거푸집 고정틀(30)을 더 포함할 수 있다. 외벽 거푸집 고정틀(30)은, 외벽 거푸집 패널(12)을 지지하도록 설치함으로써 거푸집 패널이 쓰러지지 않고 고정되도록 하는 역할을 한다. 외벽 거푸집 고정틀(30)에는 외벽 거푸집 패널(12)에 결합되는 제3 결속부(36)가 형성되어 있으며, 배수로(1)의 규격에 따라 도 3에 도시된 것처럼 외벽 거푸집 패널(12)의 높이가 변경될 수 있으므로 이에 대응할 수 있도록, 즉 외벽 거푸집 패널(12)의 높이에 따라 제3 결속부(36)의 높이를 조절할 수 있도록 높이 조정간(38)이 설치된다. 이하, 외벽 거푸집 고정틀(30)의 구조에 대해 보다 상세히 설명한다.On the other hand, the prefabricated formwork structure according to the present embodiment may further include an outer wall formwork fixing frame (30). The outer wall formwork fixing frame 30 serves to support the outer wall formwork panel 12 so that the formwork panel is fixed without falling down. The outer wall formwork fixing frame 30 is provided with a third binding portion 36 coupled to the outer wall formwork panel 12, and the height of the outer wall formwork panel 12 as shown in FIG. 3 according to the specification of the drainage path 1. May be changed, so that the height adjustment section 38 is installed to cope with this, that is, to adjust the height of the third binding unit 36 according to the height of the outer wall formwork panel 12. Hereinafter, the structure of the outer wall formwork fixing frame 30 will be described in more detail.

외벽 거푸집 고정틀(30)은, 도 1에 도시된 것처럼, 프레임(32)과 세로바(34)로 이루어진다. 프레임(32)은 외벽 거푸집 패널(12)을 지지하여 거푸집 패널이 기댈 수 있도록 L자형으로 형성되며, 프레임(32)은 앵커볼트나 말뚝을 사용하여 지반에 고정시킬 수 있다(도 1의 'B' 참조).The outer wall formwork fixing frame 30 is composed of a frame 32 and a vertical bar 34, as shown in FIG. Frame 32 is formed in an L shape so that the formwork panel can lean to support the outer wall formwork panel 12, the frame 32 can be fixed to the ground using anchor bolts or piles ('B of Figure 1 ' Reference).

세로바(34)는 외벽 거푸집 패널(12)을 받쳐주는 부재로서, 프레임(32)에 수납, 인출되도록 결합되며, 외벽 거푸집 패널(12)을 지지하도록 외벽 거푸집 고정틀(30)을 설치한 상태에서 세로바(34)를 수납, 인출하여 세로가 거푸집 패널을 지지하도록 할 수 있다.The vertical bar 34 is a member supporting the outer wall formwork panel 12 and is coupled to the frame 32 so as to be stored and drawn out therein, and the outer wall formwork fixing frame 30 is installed to support the outer wall formwork panel 12. The vertical bar 34 may be stored and withdrawn so that the vertical bars support the formwork panel.

세로바(34)에 전술한 제3 결속부(36)를 형성하게 되면, 외벽 거푸집 패널(12)의 높이에 따라 세로바(34)를 움직여 제3 결속부(36)가 외벽 거푸집 패널(12)에 결합되도록 할 수 있으며, 이에 따라 본 실시예에 따른 외벽 거푸집 고정틀(30)을 다양한 규격의 배수로용 거푸집 공사에 쉽게 적용할 수 있다.When the third binding unit 36 is formed on the vertical bar 34, the vertical bar 34 is moved according to the height of the outer wall formwork panel 12 so that the third binding unit 36 moves to the outer wall formwork panel 12. ) Can be coupled to the outer wall formwork fixing frame 30 according to the present embodiment can be easily applied to the formwork for the drainage of various specifications.

세로바(34)에 제3 결속부(36)가 형성된 경우, 제3 결속부(36)의 높이는 세로바(34)가 프레임(32)으로부터 수납, 인출된 정도에 따라 조절될 수 있는데, 전술한 높이 조정간(38)을 프레임(32)에 설치함으로써 세로바(34)의 수납, 인출된 정도를 조절할 수 있으며, 이에 따라 제3 결속부(36)가 위치하는 높이를 조절할 수 있다.When the third binding unit 36 is formed on the vertical bar 34, the height of the third binding unit 36 may be adjusted according to the degree in which the vertical bar 34 is received and drawn from the frame 32. By installing one height adjustment section 38 in the frame 32, the storage and withdrawal of the vertical bar 34 can be adjusted, and accordingly, the height at which the third binding unit 36 is located can be adjusted.

높이 조정간(38)은 작업자가 손으로 잡고 세로바(34)를 이동시킬 수 있도록 핸들 형태로 구현될 수 있으며, 이 외에도 세로바(34)의 수납, 인출 정도를 조절할 수 있는 다양한 기구적 메커니즘이 적용될 수 있음은 물론이다.Height adjustment section 38 may be implemented in the form of a handle to allow the operator to move the vertical bar (34) by hand, in addition to the various mechanical mechanisms for adjusting the storage, withdrawal degree of the vertical bar (34) Of course, it can be applied.

프레임(32)이 관(管)형상으로 형성되고, 세로바(34)가 중앙부재(242)보다 관경이 작은 관형상으로 형성될 경우, 세로바(34)는 프레임(32) 내에 수용되도록, 즉 텔레스코픽(telescopic) 방식으로 결합될 수 있다.When the frame 32 is formed in a tubular shape, and the vertical bar 34 is formed in a tubular shape having a smaller diameter than the central member 242, the vertical bar 34 is accommodated in the frame 32. That is, it can be combined in a telescopic manner.

한편, 세로바(34)를 특정 높이에서 고정시키기 위해 프레임(32)에 고정볼 트(25)를 체결할 수 있다. 즉, 세로바(34)가 수납 또는 인출되어 제3 결속부(36)가 외벽 거푸집 패널(12)에 결합된 경우, 세로바(34)가 더 이상 움직이지 않고 고정되도록 함으로써 외벽 거푸집 패널(12)도 움직이지 않고 고정되도록 할 수 있는데, 이를 위해 프레임(32)에 설치된 고정볼트(25)를 체결하여 세로바(34)를 프레임(32)에 고정시킬 수 있다.On the other hand, in order to fix the vertical bar 34 at a specific height can be fastened to the fixing bolt 25 to the frame (32). That is, when the vertical bar 34 is stored or drawn out and the third binding unit 36 is coupled to the outer wall formwork panel 12, the outer wall formwork panel 12 is fixed by allowing the vertical bar 34 to be fixed without moving anymore. ) Can also be fixed without moving, for this purpose can be fixed to the frame 32 by fastening the fixing bolt 25 installed in the frame 32.

거푸집 패널을 외벽 거푸집 고정틀(30)에 결합시키는 역할을 하는 제3 결속부(36)는 거푸집 패널의 단부가 삽입되는 홈 형상으로 형성함으로써 거푸집 패널을 용이하게 결합, 고정시킬 수 있다. 즉, 도 1에 도시된 것처럼, 제3 결속부(36)로서 외벽 거푸집 패널(12)이 삽입되는 홈(제3 홈)을 형성할 수 있다. 홈 형상 이외에도 거푸집 패널과 결합되어 패널의 위치를 고정시킬 수 있는 다양한 형상, 구조의 결속부가 형성될 수 있음은 물론이다.The third binding portion 36, which serves to couple the formwork panel to the outer wall formwork fixing frame 30, has a groove shape into which an end portion of the formwork panel is inserted, so that the formwork panel can be easily coupled and fixed. That is, as shown in FIG. 1, a groove (third groove) into which the outer wall formwork panel 12 is inserted may be formed as the third binding portion 36. In addition to the groove shape may be combined with the formwork panel can be formed of a binding unit of various shapes, structures to fix the position of the panel.

이처럼, 본 실시예에 따른 외벽 거푸집 고정틀(30)은 프레임(32)과 세로바(34)로 이루어지는데, 배수로(1) 시공과정에서 거푸집 패널을 설치한 후, 외벽 거푸집 패널(12)에 기대도록 외벽 거푸집 고정틀(30)을 설치하고, 세로바(34)를 인출하여 제3 결속부(36)가 외벽 거푸집 패널(12)에 결합되도록 한 후 고정볼트(25)를 체결하여 세로바(34)를 고정시킴으로써 외벽 거푸집 패널(12)도 고정되게 된다.As described above, the outer wall formwork fixing frame 30 according to the present embodiment is composed of a frame 32 and a vertical bar 34. After the formwork panel is installed during the construction of the drainage path 1, the outer wall formwork panel 12 is leaned on the outer wall formwork panel 12. The outer wall formwork fixing frame 30 is installed, and the vertical bar 34 is pulled out so that the third binding unit 36 is coupled to the outer wall formwork panel 12, and then the fixing bolt 25 is fastened to the vertical bar 34. ), The outer wall formwork panel 12 is also fixed.

내, 외벽 거푸집 패널(10, 12) 및 내, 외벽 거푸집 고정틀(20, 30)을 조립한 상태에서 거푸집에 의해 형성되는 공간에 콘크리트를 타설하여 배수로(1)를 시공하게 된다. 이처럼 본 실시예에 따른 조립식 거푸집 구조는 각목이나 파이프 등의 가설재를 사용하지 않고 내, 외벽 거푸집 고정틀(20, 30)만으로 거푸집을 조립 할 수 있어, 거푸집을 용이하고 신속하게 설치할 수 있으며, 시공이 끝난 후 해체한 거푸집 부재들은 추후 재사용할 수 있다.In the state in which the inner and outer wall formwork panels 10 and 12 and the inner and outer wall formwork fixing frames 20 and 30 are assembled, concrete is poured into the space formed by the formwork to construct the drainage path 1. As described above, the prefabricated formwork structure according to the present embodiment can assemble the formwork only by the inner and outer wall formwork fixing frames 20 and 30 without using temporary materials such as wood or pipe, so that the formwork can be easily and quickly installed, and the construction is easy. Formwork members dismantled afterwards can be reused later.

도 5는 본 발명의 일 실시예에 따른 배수로 시공방법을 나타낸 순서도이다.Figure 5 is a flow chart showing a drainage construction method according to an embodiment of the present invention.

본 실시예는 전술한 거푸집 패널 및 거푸집 고정틀을 사용하여 거푸집 구조를 조립한 후, 콘크리트를 타설하여 배수로를 시공하는 공법으로서, 철근콘크리트 구조의 배수로를 시공할 경우, 배수로(1)의 골조를 구성하는 철근을 배근한 후(S8), 내, 외벽 거푸집 패널(10, 12)을 설치하여 배수로(1)의 단면 형상을 형성한다. 배수로(1)의 양측 내벽(3)은 한 쌍의 내벽 거푸집 패널(10)에 의해, 배수로(1)의 양측 외벽(5)은 한 쌍의 외벽 거푸집 패널(12)에 의해 형성될 수 있다(S10).This embodiment is a method of constructing a drainage structure after assembling the formwork structure using the formwork panel and the formwork fixing frame as described above, and then pouring concrete, when constructing the drainage passage of the reinforced concrete structure, the frame of the drainage passage (1) After reinforcing the reinforcing bars (S8), the inner and outer wall formwork panels 10 and 12 are provided to form a cross-sectional shape of the drainage passage 1. Both inner side walls 3 of the drainage passage 1 may be formed by a pair of inner wall formwork panels 10 and both outer side walls 5 of the drainage passage 1 may be formed by a pair of outer wall formwork panels 12 ( S10).

다음으로, 링크부(22)가 트렌치 부분에 수용되도록 내벽 거푸집 고정틀(20)을 설치하고, 가동부재(244)를 인출하여 제1 결속부(26)가 내벽 거푸집 패널(10) 간의 간격에 맞도록, 그리고 제2 결속부(27)가 외벽 거푸집 패널(12) 간의 간격에 맞도록 조절한 후, 제1 결속부(26)를 내벽 거푸집 패널(10)에, 제2 결속부(27)를 외벽 거푸집 패널(12)에 결합한다. 제1 결속부(26)를 내벽 거푸집 패널(10)에 결합하고 고정볼트(25)를 체결하여 가동부재(244)를 고정시킴으로써 내벽 거푸집 패널(10)이 소정의 위치에 고정되며(S20), 이 과정에서 제2 결속부(27)와 외벽 거푸집 패널(12)에 결합되어 있으므로 외벽 거푸집 패널(12)도 소정의 위치에 고정된다(S22).Next, the inner wall formwork fixing frame 20 is installed so that the link portion 22 is accommodated in the trench portion, and the movable member 244 is pulled out so that the first binding portion 26 fits the gap between the inner wall formwork panels 10. And the second binding portion 27 is adjusted to fit the gap between the outer wall formwork panels 12, and then the first binding portion 26 is attached to the inner wall formwork panel 10, and the second binding portion 27 is attached to the inner wall formwork panel 10. It is coupled to the outer wall formwork panel (12). The inner wall formwork panel 10 is fixed at a predetermined position by coupling the first binding part 26 to the inner wall formwork panel 10 and fastening the fixing bolt 25 to fix the movable member 244 (S20). In this process, since it is coupled to the second binding portion 27 and the outer wall formwork panel 12, the outer wall formwork panel 12 is also fixed at a predetermined position (S22).

다음으로, 외벽 거푸집 패널(12)에 기대도록 외벽 거푸집 고정틀(30)을 설 치하고, 세로바(34)를 인출하여 제3 결속부(36)를 외벽 거푸집 패널(12)의 높이에 맞도록 조절한 후, 제3 결속부(36)를 외벽 거푸집 패널(12)에 결합한다. 내벽 거푸집 고정틀(20)의 경우와 마찬가지로 고정볼트(25)를 체결하여 세로바(34)를 고정시킴으로써 외벽 거푸집 패널(12)이 소정의 높이에 고정된다(S24).Next, the outer wall formwork fixing frame 30 is installed so as to lean on the outer wall formwork panel 12, the vertical bar 34 is pulled out so that the third binding portion 36 fits the height of the outer wall formwork panel 12. After adjustment, the third binding unit 36 is coupled to the outer wall formwork panel 12. As in the case of the inner wall formwork fixing frame 20, the outer wall formwork panel 12 is fixed at a predetermined height by fastening the fixing bolt 25 to fix the vertical bar 34 (S24).

이와 같이 내, 외벽 거푸집 패널(10, 12) 및 내, 외벽 거푸집 고정틀(20, 30)을 조립하여 형성되는 거푸집 공간 내에 콘크리트를 타설(S30)하고, 일정 기간 양생시킴(S40)으로써 배수로(1) 시공이 완료된다. 콘크리트 타설 과정에서 트렌치 부분의 바닥면에도 콘크리트를 타설할 수 있다.In this way, the concrete is poured into the form space formed by assembling the inner and outer wall formwork panels 10 and 12 and the inner and outer wall formwork fixing frames 20 and 30 (S30), and curing for a predetermined period (S40). ) Construction is completed. In the concrete pouring process, concrete can also be poured on the bottom of the trench.

배수로(1) 시공이 완료된 후 조립식 거푸집 구조, 즉 내, 외벽 거푸집 패널(10, 12) 및 내, 외벽 거푸집 고정틀(20, 30)을 해체, 탈형한다. 해체된 거푸집 구조 부재들은 콘크리트 잔여물 등을 제거하고 파손된 부분이 있으면 수리하여 다른 시공 현장으로 운반하여 재사용하거나, 추후 재사용할 수 있도록 별도의 장소에 보관한다(S50).After the construction of the drainage passage 1 is completed, the prefabricated formwork structure, that is, the inner and outer wall formwork panels 10 and 12 and the inner and outer wall formwork fixing frames 20 and 30 are dismantled and demolded. The dismantled formwork structural members are removed from the concrete residue and repaired if there is a damaged part, and transported to another construction site for reuse, or stored in a separate place for later reuse (S50).

상기에서는 본 발명의 바람직한 실시예를 참조하여 설명하였지만, 해당 기술분야에서 통상의 지식을 가진 자라면 하기의 특허청구범위에 기재된 본 발명의 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 발명을 다양하게 수정 및 변경시킬 수 있음을 이해할 수 있을 것이다.Although described above with reference to a preferred embodiment of the present invention, those skilled in the art that various modifications of the present invention without departing from the spirit and scope of the invention described in the claims below And can be changed.

도 1은 본 발명의 일 실시예에 따른 조립식 거푸집 구조를 나타낸 단면도.1 is a cross-sectional view showing a prefabricated formwork structure according to an embodiment of the present invention.

도 2 및 도 3은 본 발명의 일 실시예에 따른 조립식 거푸집 구조의 사용상태를 나타낸 도면.2 and 3 is a view showing a state of use of the prefabricated formwork structure according to an embodiment of the present invention.

도 4는 본 발명의 다른 실시예에 따른 조립식 거푸집 구조를 나타낸 단면도.Figure 4 is a cross-sectional view showing a prefabricated formwork structure according to another embodiment of the present invention.

도 5는 본 발명의 일 실시예에 따른 배수로 시공방법을 나타낸 순서도.5 is a flow chart showing a drainage construction method according to an embodiment of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1 : 배수로 3 : 내벽1: drainage 3: inner wall

5 : 외벽 10 : 내벽 거푸집 패널5: outer wall 10: inner wall formwork panel

12 : 외벽 거푸집 패널 20 : 내벽 거푸집 고정틀12: outer wall formwork panel 20: inner wall formwork fixing frame

22 : 링크부 24 : 가로바22: link portion 24: horizontal bar

25 : 고정볼트 26 : 제1 결속부25: fixing bolt 26: the first binding portion

27 : 제2 결속부 28 : 너비 조정간27: 2nd binding part 28: Width adjustment period

30 : 외벽 거푸집 고정틀 32 : 프레임30: outer wall formwork fixing frame 32: frame

34 : 세로바 36 : 제3 결속부34: vertical bar 36: third binding unit

38 : 높이 조정간 242 : 중앙부재38: height adjustment 242: center member

244 : 가동부재244: movable member

Claims (18)

요(凹)홈 형상의 단면이 일방향으로 연장되는 소정의 공간을 형성하고 상기 공간에 콘크리트를 타설함으로써, 배수로를 시공하는 데에 사용되는 거푸집 구조로서,As a formwork structure used for constructing a drainage path by forming a predetermined space in which a cross section of a concave groove shape extends in one direction and placing concrete in the space, 상기 배수로의 양측 내벽을 형성하도록 설치되는 한 쌍의 내벽 거푸집 패널과;A pair of inner wall formwork panels installed to form inner walls on both sides of the drainage channel; 상기 배수로의 양측 외벽을 형성하도록 설치되는 한 쌍의 외벽 거푸집 패널과;A pair of outer wall formwork panels installed to form outer walls on both sides of the drainage channel; 상기 한 쌍의 내벽 거푸집 패널에 걸치도록 설치되어, 상기 한 쌍의 내벽 거푸집 패널을 소정의 위치에 고정시키는 내벽 거푸집 고정틀과;An inner wall formwork fixing frame which is installed to span the pair of inner wall formwork panels and fixes the pair of inner wall formwork panels to a predetermined position; 상기 한 쌍의 외벽 거푸집 패널을 지지하도록 설치되어, 상기 한 쌍의 외벽 거푸집 패널을 소정의 위치에 고정시키는 외벽 거푸집 고정틀을 포함하되,It is installed so as to support the pair of outer wall formwork panel, including an outer wall formwork fixing frame for fixing the pair of outer wall formwork panel to a predetermined position, 상기 내벽 거푸집 고정틀은,The inner wall formwork fixing frame, 상기 배수로의 단면 형상에 상응하여 역사다리꼴 형상으로 조립된 링크부와, 상기 배수로의 상단에 걸쳐지는 가로바(bar)를 포함하고;A link portion assembled in an inverted trapezoidal shape corresponding to the cross-sectional shape of the drainage passage, and a horizontal bar extending over an upper end of the drainage passage; 상기 가로바는 상기 링크부의 일 변을 구성하는 중앙부재와, 상기 중앙부재의 양측에 수납 또는 인출 가능하도록 결합되며 고정볼트를 체결함에 따라 상기 중앙부재에 고정되는 한 쌍의 가동부재를 포함하며;The horizontal bar includes a central member constituting one side of the link unit and a pair of movable members coupled to both sides of the central member so as to be received or withdrawn and fixed to the central member by fastening a fixing bolt; 상기 가동부재에는, 상기 한 쌍의 내벽 거푸집 패널의 단부가 각각 삽입되는 홈 형상의 한 쌍의 제1 결속부와, 상기 한 쌍의 외벽 거푸집 패널의 단부가 각각 삽입되는 홈 형상의 한 쌍의 제2 결속부가 형성되고;The movable member may include a pair of first binding portions having a groove shape into which end portions of the pair of inner wall formwork panels are respectively inserted, and a pair of groove shapes having end portions of the pair of outer wall formwork panels respectively inserted therein. 2 binding portions are formed; 상기 중앙부재에는, 상기 한 쌍의 내벽 거푸집 패널 간의 간격에 상응하여 상기 한 쌍의 제1 결속부 간의 간격을 조절하는 너비 조정간이 형성되며;The center member is provided with a width adjustment section for adjusting a distance between the pair of first binding portions corresponding to the distance between the pair of inner wall formwork panels; 상기 외벽 거푸집 고정틀은,The outer wall formwork fixing frame, 상기 외벽 거푸집 패널을 지지하는 L자형 프레임과, 상기 프레임에 수납 또는 인출 가능하도록 결합되며 고정볼트를 체결함에 따라 상기 프레임에 고정되는 세로바(bar)를 포함하고;An L-shaped frame supporting the outer wall formwork panel, and a vertical bar coupled to the frame so as to be stored or withdrawn and fixed to the frame by fastening a fixing bolt; 상기 세로바에는, 상기 세로바를 상기 프레임에 수납 또는 인출함에 따라 상기 외벽 거푸집 패널의 단부가 삽입되는 홈 형상의 제3 결속부가 형성되고;The vertical bar is provided with a third binding portion having a groove shape into which an end portion of the outer wall formwork panel is inserted as the vertical bar is received or withdrawn from the frame; 상기 프레임에는 상기 외벽 거푸집 패널의 높이에 상응하여 상기 제3 결속부의 높이를 조절하는 높이 조정간이 형성되는 것을 특징으로 하는 조립식 거푸집 구조.The frame is a prefabricated formwork structure, characterized in that the height adjustment section for adjusting the height of the third binding portion corresponding to the height of the outer wall formwork panel is formed. 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 요(凹)홈 형상의 단면이 일방향으로 연장되는 형상의 배수로를 시공하는 방법으로서,As a method of constructing a drainage passage in which a cross section of a concave groove shape extends in one direction, (a1) 상기 배수로의 골조를 구성하는 철근을 배근하는 단계;(a1) reinforcing the reinforcing bars constituting the framework of the drainage channel; (a) 상기 배수로의 양측 내벽을 형성하도록 한 쌍의 내벽 거푸집 패널을, 상기 배수로의 양측 외벽을 형성하도록 한 쌍의 외벽 거푸집 패널을 배치하는 단계;(a) arranging a pair of inner wall formwork panels to form both inner wall walls of the drainage channel and a pair of outer wall formwork panels to form both outer wall of the drainage channel; (b) 내벽 거푸집 고정틀을 상기 한 쌍의 내벽 거푸집 패널 및 상기 한 쌍의 외벽 거푸집 패널에 걸치도록 설치하고, 내벽 거푸집 고정틀에 형성된 홈 형상의 제1 결속부에 상기 한 쌍의 내벽 거푸집 패널의 단부를 각각 삽입시키고, 내벽 거푸집 고정틀에 형성된 홈 형상의 제2 결속부에 상기 한 쌍의 외벽 거푸집 패널의 단부를 각각 삽입시킨 후, 상기 한 쌍의 제1 결속부 및 제2 결속부 간의 간격을 조절하여 상기 한 쌍의 내벽 거푸집 패널 및 상기 한 쌍의 외벽 거푸집 패널이 소정의 간격을 유지하도록 고정시키며,(b) end portions of the pair of inner wall formwork panels are installed so as to span the pair of inner wall formwork panels and the pair of outer wall formwork panels, and the groove-shaped first engagement portion formed in the inner wall formwork fixing frame; Inserting the respective end portions of the pair of outer wall formwork panels into the groove-shaped second engagement portion formed in the inner wall formwork fixing frame, and then adjusting the distance between the pair of first binding portions and the second binding portion. By fixing the pair of inner wall formwork panel and the pair of outer wall formwork panel to maintain a predetermined distance, 상기 외벽 거푸집 패널을 지지하도록 외벽 거푸집 고정틀을 설치하고, 외벽 거푸집 고정틀에 형성된 홈 형상의 제3 결속부에 상기 외벽 거푸집 패널의 단부를 삽입시킨 후, 상기 제3 결속부의 높이를 조절하여 상기 외벽 거푸집 패널이 소정의 높이를 유지하도록 고정시키는 단계;The outer wall formwork fixing frame is installed to support the outer wall formwork panel, and the end of the outer wall formwork panel is inserted into the third binding portion of the groove shape formed in the outer wall formwork fixing frame, and then the height of the third binding portion is adjusted to adjust the outer wall formwork. Fixing the panel to maintain a predetermined height; (c) 상기 한 쌍의 내벽 거푸집 패널 및 상기 한 쌍의 외벽 거푸집 패널에 의해 구획되는 소정의 공간 및 상기 배수로의 바닥면에 콘크리트를 타설하는 단계;(c) placing concrete in a predetermined space partitioned by the pair of inner wall formwork panels and the pair of outer wall formwork panels and the bottom surface of the drainage channel; (d) 상기 콘크리트를 양생시키는 단계; 및(d) curing the concrete; And (e) 상기 내벽 거푸집 고정틀, 상기 외벽 거푸집 고정틀, 상기 한 쌍의 내벽 거푸집 패널 및 상기 한 쌍의 외벽 거푸집 패널을 탈형하여 재사용에 제공하는 단계를 포함하는 배수로 시공방법.(e) demolding the inner wall formwork holding frame, the outer wall formwork holding frame, the pair of inner wall formwork panels and the pair of outer wall formwork panels, and providing the reuse to the reuse. 삭제delete 삭제delete 삭제delete 삭제delete
KR1020090026351A 2009-03-27 2009-03-27 Prefabricated mold structure of waterway and construction method of drainage canal KR100938821B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090026351A KR100938821B1 (en) 2009-03-27 2009-03-27 Prefabricated mold structure of waterway and construction method of drainage canal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090026351A KR100938821B1 (en) 2009-03-27 2009-03-27 Prefabricated mold structure of waterway and construction method of drainage canal

Publications (1)

Publication Number Publication Date
KR100938821B1 true KR100938821B1 (en) 2010-01-26

Family

ID=41810260

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090026351A KR100938821B1 (en) 2009-03-27 2009-03-27 Prefabricated mold structure of waterway and construction method of drainage canal

Country Status (1)

Country Link
KR (1) KR100938821B1 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102373692A (en) * 2011-11-25 2012-03-14 中国科学院水利部成都山地灾害与环境研究所 Box body lining type mudslide discharging and guiding groove and application and construction method thereof
KR101135925B1 (en) * 2011-04-21 2012-04-13 합자회사 거광산업 Construction method of trench type cable trough
KR101445682B1 (en) * 2012-06-07 2014-10-01 주식회사 한맥정공 Apparatus constructed for side gutter and constructing method this using
KR101464216B1 (en) 2012-12-26 2014-11-21 경상북도(관련부서:경상북도산림자원개발원) All in one cast for outlet of forest road open channel
KR101553338B1 (en) * 2014-12-17 2015-09-15 주식회사 엘에스폼웍 Drain forming device
CN106884415A (en) * 2017-03-17 2017-06-23 中交航局第工程有限公司 A kind of Extendible dynamic formula template-driven system, template system, and construction method
KR101757224B1 (en) * 2016-07-20 2017-07-12 신성구조이엔지 주식회사 Cast Frame Using Steel production side gutter
CN106988314A (en) * 2017-03-17 2017-07-28 中交航局第工程有限公司 A kind of counter weight type formwork jumbo, counter weight type outrigger platform, and construction method
KR102078321B1 (en) * 2019-06-28 2020-02-18 주식회사 이알에스 Lower part separating type mold for constructing embedded rail track
KR20220040606A (en) 2020-09-24 2022-03-31 리움건설 주식회사 Binding device for eurofoam
KR20220040609A (en) 2020-09-24 2022-03-31 리움건설 주식회사 Formwork provided with euroform fastener type wella and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5295831A (en) * 1976-02-07 1977-08-11 Hiroumi Arai Method of fixing concrete forms at their bottoms
JPS58143033A (en) 1982-02-15 1983-08-25 Omoto Constr Co Ltd Concrete trough constructing method and moving mold frame apparatus for constructing concrete trough
JPH04309664A (en) * 1991-04-08 1992-11-02 Hory Corp Channel constructing mold
JP2005113474A (en) 2003-10-07 2005-04-28 Akira Kato Form assembling compacting method for constructing waterway

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5295831A (en) * 1976-02-07 1977-08-11 Hiroumi Arai Method of fixing concrete forms at their bottoms
JPS58143033A (en) 1982-02-15 1983-08-25 Omoto Constr Co Ltd Concrete trough constructing method and moving mold frame apparatus for constructing concrete trough
JPH04309664A (en) * 1991-04-08 1992-11-02 Hory Corp Channel constructing mold
JP2005113474A (en) 2003-10-07 2005-04-28 Akira Kato Form assembling compacting method for constructing waterway

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101135925B1 (en) * 2011-04-21 2012-04-13 합자회사 거광산업 Construction method of trench type cable trough
CN102373692A (en) * 2011-11-25 2012-03-14 中国科学院水利部成都山地灾害与环境研究所 Box body lining type mudslide discharging and guiding groove and application and construction method thereof
KR101445682B1 (en) * 2012-06-07 2014-10-01 주식회사 한맥정공 Apparatus constructed for side gutter and constructing method this using
KR101464216B1 (en) 2012-12-26 2014-11-21 경상북도(관련부서:경상북도산림자원개발원) All in one cast for outlet of forest road open channel
KR101553338B1 (en) * 2014-12-17 2015-09-15 주식회사 엘에스폼웍 Drain forming device
KR101757224B1 (en) * 2016-07-20 2017-07-12 신성구조이엔지 주식회사 Cast Frame Using Steel production side gutter
CN106884415A (en) * 2017-03-17 2017-06-23 中交航局第工程有限公司 A kind of Extendible dynamic formula template-driven system, template system, and construction method
CN106988314A (en) * 2017-03-17 2017-07-28 中交航局第工程有限公司 A kind of counter weight type formwork jumbo, counter weight type outrigger platform, and construction method
KR102078321B1 (en) * 2019-06-28 2020-02-18 주식회사 이알에스 Lower part separating type mold for constructing embedded rail track
KR20220040606A (en) 2020-09-24 2022-03-31 리움건설 주식회사 Binding device for eurofoam
KR20220040609A (en) 2020-09-24 2022-03-31 리움건설 주식회사 Formwork provided with euroform fastener type wella and construction method thereof

Similar Documents

Publication Publication Date Title
KR100938821B1 (en) Prefabricated mold structure of waterway and construction method of drainage canal
KR100951097B1 (en) Slab and subgrade external wall structure and method for constructing underground slab and subgrade external wall, bracket
JP2011157720A (en) Method for constructing railway reinforced concrete rigid-frame structure viaduct
KR101627279B1 (en) Biased soil pressure reinforcement rigid-frame bridge and construction method of the same
KR101904692B1 (en) Method for the final working to the slab hole and mold
KR20160000702A (en) Fastening member used in concrete filled steel tube and its using concrete filled steel tube mounting structure and method and its includes build underground structure and method
KR102149662B1 (en) Method for constructing transfer layer of building using precast concrete slab
KR20060096706A (en) Deck suspension top-down method of sub-structure
KR100626326B1 (en) concrete structure
KR101880813B1 (en) A sandwitch pc pannel structure and construction method of structure using thereof
KR101473218B1 (en) A construction method of an underground structure
KR102286225B1 (en) Method for constructing underground structure busing PC integrating method without support
KR101091600B1 (en) Precast form structure for gutter and construction method using the same
KR100746669B1 (en) Embeded form system using a pair of expanded metal lath having crossed reinforcement
KR200390421Y1 (en) Top-down substructure by deck suspension
KR101799237B1 (en) Method of manufacturing grounding stone for pillar fixed and grounding stone for pillar fixed produced by the same
KR101230986B1 (en) Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow
KR101140627B1 (en) Construction method of concrete building
KR101078292B1 (en) Concrete slab mold assembly and method for constructing slab
KR20090123388A (en) Mold for manufacturing pc beam
KR101563710B1 (en) J Method for constrJcting Jtype roadside drain and sliding form
KR100949868B1 (en) The enlargement construction method for base of bridge with guides and molds in the shape of pipes
KR102149661B1 (en) Method for constructing overground transfer layer of building using precast concrete
CN113738157B (en) Temporary supports on two sides of post-cast strip of building and method for constructing constructional column by using temporary supports
KR101971554B1 (en) Method constructuring an underground structure using a temporary structure

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee