CN210342012U - Wharf foundation environment-friendly construction device - Google Patents

Wharf foundation environment-friendly construction device Download PDF

Info

Publication number
CN210342012U
CN210342012U CN201920658835.4U CN201920658835U CN210342012U CN 210342012 U CN210342012 U CN 210342012U CN 201920658835 U CN201920658835 U CN 201920658835U CN 210342012 U CN210342012 U CN 210342012U
Authority
CN
China
Prior art keywords
wharf
foundations
construction device
mounting
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920658835.4U
Other languages
Chinese (zh)
Inventor
应璞
姚新良
徐锦华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dadongwu Group Construction Co Ltd
Original Assignee
Zhejiang Dadongwu Group Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dadongwu Group Construction Co Ltd filed Critical Zhejiang Dadongwu Group Construction Co Ltd
Priority to CN201920658835.4U priority Critical patent/CN210342012U/en
Application granted granted Critical
Publication of CN210342012U publication Critical patent/CN210342012U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides a pier ground environmental protection construction equipment, relate to engineering construction technical field, including two at least erection columns and the tie-beam that is used for connecting two adjacent erection columns, the erection column includes the installation unit and sets up the cluster connecting rod on the installation unit, be provided with the series connection hole that is used for making things convenient for the polyphone pole to pass on the installation unit, the tie-beam includes the roof beam body and sets up in the connector of roof beam body tip, the installation unit is provided with the recess and sets up the limit baffle in the recess outside, the connector has at least partly to be located the recess, the recess is provided with the forced induction spare with the junction of connector, be provided with the alarm spare of being connected with the forced induction spare electricity in. The utility model relates to a pier ground environmental protection construction equipment simple structure supports stably, need not to trade and fills out the building stones, can be under construction on arbitrary stratum nature, can effectively monitor ground stability, and can quick assembly disassembly.

Description

Wharf foundation environment-friendly construction device
Technical Field
The utility model relates to the technical field of engineering construction,
especially, the utility model relates to a pier ground environmental protection construction equipment.
Background
China has long coastlines, inland rivers and lakes are numerous, and ports and wharfs are large in number. More than 2500 fishing ports are distributed in coastal and inland rivers and lakes in China, wherein more than 1900 fishing ports are arranged in coastal and 500 fishing ports are arranged in inland, the engineering geological conditions of the fishing ports and the wharfs are very complex, loose and soft soil layers formed by coastal deposition, shallow sea deposition, lake deposition, river beach deposition and residual accumulation are formed, and the soil mainly belongs to peat, silt, mucky soil and extremely loose silt soil with high water content, high porosity and soft plastic and flow plastic states, and has low strength, poor stability, high compressibility, large sedimentation amount and extremely weak seismic resistance. A large-excavation method for changing and filling stone is usually adopted for constructing the port gravity wharf on the foundation, so that the cost is huge, and the labor and the time are wasted. Therefore, research on soft foundation treatment of port gravity wharf engineering is needed, and technologies and construction equipment for strengthening and treating soft soil foundations in sea areas more economically, environmentally, reasonably and effectively are created.
Therefore, in order to solve the above problems, it is necessary to design a reasonable environmentally friendly construction device for wharf foundations.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a simple structure supports stably, need not to trade and fills out the building stones, can be under construction on arbitrary stratum nature, can effectively monitor ground stability, and can quick assembly disassembly's pier ground environmental protection construction equipment.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a pier ground environmental protection construction equipment, include two at least erection columns and be used for connecting adjacent two the tie-beam of erection column, the erection column including the installation unit with set up in cluster connecting rod on the installation unit, it is used for conveniently to be provided with on the installation unit the series connection hole that the series connection pole passed, the tie-beam include the roof beam body with set up in the connector of roof beam body tip, the installation unit be provided with the recess and set up in the limit baffle in the recess outside, the connector has at least partly to be located in the recess, the recess with the junction of connector is provided with the forced induction spare, be provided with in the series connection hole with the alarm spare that the forced induction spare electricity is connected.
As the utility model discloses a preferred, the connector with the junction of recess has at least partly for the arc.
Preferably, the number of the mounting units is at least one.
As the utility model discloses a preferred, adjacent two installation unit quantity on the erection column is the same.
As the utility model discloses a preferred, adjacent two installation unit quantity on the erection column is different.
As the utility model discloses a preferred, series connection hole both sides are provided with and are used for setting the arc arch of alarm.
As the utility model discloses a preferred, the quantity of forced induction spare is two, and set up respectively in the connector both sides.
As an optimization of the present invention, the number of the grooves is at least two.
As a preferred aspect of the present invention, the groove is filled with a buffer liquid.
As a preferred aspect of the present invention, the number of the connection beam is at least one.
The utility model relates to a pier ground environmental protection construction equipment beneficial effect lies in: simple structure supports stably, need not to trade and fills out the building stones, can be under construction on arbitrary stratum nature, can effectively monitor ground stability degree, and can quick assembly disassembly.
Drawings
Fig. 1 is a schematic top view of an embodiment of the present invention;
fig. 2 is a schematic top view of a mounting post according to an embodiment of the present invention;
fig. 3 is a schematic structural diagram of another embodiment of the present invention;
in the figure: 1. the device comprises a mounting column, 11, a mounting unit, 111, grooves, 112, limit baffles, 113, a pressure sensing piece, 12, a serial rod, 13, a serial hole, 131, an alarm piece, 2, a connecting beam, 21, a beam body, 22 and a connector.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and examples.
China has long coastlines, inland rivers and lakes are numerous, and ports and wharfs are large in number. A plurality of fishing ports are distributed in coastal and inland rivers and lakes in China, engineering geological conditions of the fishing ports and the wharfs are very complex, loose and soft soil layers are formed by coast deposition, shallow sea deposition, lake deposition, river beach deposition and residual accumulation, and the soil mainly belongs to peat, silt, mucky soil and extremely loose silt soil which have high water content, high porosity and are in soft plastic and flow plastic states, and has low strength, poor stability, high compressibility, large sedimentation amount and extremely weak seismic resistance. A large-excavation method for changing and filling stone is usually adopted for constructing the port gravity wharf on the foundation, so that the cost is huge, and the labor and the time are wasted. Therefore, research on soft foundation treatment of port gravity wharf engineering is needed, and technologies and construction equipment for strengthening and treating soft soil foundations in sea areas more economically, environmentally, reasonably and effectively are created.
The first embodiment is as follows: as shown in fig. 1 and 2, which are only one embodiment of the present invention, an environmental protection construction device for wharf foundations comprises at least two mounting posts 1 and a connecting beam 2 for connecting two adjacent mounting posts 1, the mounting post 1 includes a mounting unit 11 and a string link 12 provided on the mounting unit 11, the mounting unit 11 is provided with a serial hole 13 for facilitating the serial link 12 to pass through, the connecting beam 2 comprises a beam body 21 and a connecting head 22 arranged at the end part of the beam body 21, the mounting unit 11 is provided with a groove 111 and a limit baffle 112 arranged outside the groove 111, at least one part of the connector 22 is located in the groove 111, a pressure sensing part 113 is arranged at the joint of the groove 111 and the connector 22, an alarm 131 electrically connected to the pressure sensor 113 is provided in the serial hole 13.
The utility model discloses in, erection column 1 is concatenated a plurality of installation element 11 by cluster connecting rod 12, then a plurality of erection columns 1 splice through tie-beam 2, forms the pier ground of completion.
Firstly, the mounting column 1 is connected, the mounting column 1 comprises a mounting unit 11 and a string connecting rod 12 arranged on the mounting unit 11, a serial hole 13 for allowing the string connecting rod 12 to pass through is formed in the mounting unit 11, the string connecting rod 12 passes through the serial hole 13 to serially connect a plurality of mounting units 11, the string connecting rod 12 is a rectangular rod, rotation cannot occur in the serial hole 13, and the mounting units 11 are effectively fixed together to form the stable mounting column 1.
Then adjacent two erection column 1's connection, tie-beam 2 include the roof beam body 21 with set up in the connector 22 of roof beam body 21 tip, installation element 11 be provided with recess 111 with set up in the limit baffle 112 in the recess 111 outside, connector 22 has at least partly to be located in the recess 111, roof beam body 21 both ends all are provided with connector 22, and block respectively in two erection column 1's installation element 11, and connector 22 slides in from recess 111 from installation element 11 tip, under limit baffle 112's effect, meets roof beam 2 and installation element 11 and accomplishes the joint.
Actually the quantity of erection column 1 is two at least, and a plurality of erection columns 1 connect gradually and form one row of base, and the dock's ground is constituteed jointly to the multirow base, and can quick assembly disassembly, and the efficiency of construction is high.
Finally, the safety of the mounting column 1 is monitored, a pressure sensing piece 113 is arranged at the joint of the groove 111 and the connector 22, and an alarm piece 131 electrically connected with the pressure sensing piece 113 is arranged in the serial hole 13. The erection column 1 of tie-beam 2 other end takes place great displacement, and tie-beam 2 can take place the deflection, so connector 22 is in can produce pressure with recess 111 inner wall in the recess 111, and the unusual alarm 131 of just informing of pressure response spare 113 response pressure sends the police dispatch newspaper, and alarm 131 sets up in series connection hole 13, can take out at any time and overhaul and change.
Only need an erection column 1 to be built on fixed stratum, this erection column 1 is connected stably, can use it as the fixed point, to other erection columns 1 that both sides are connected with it anchor, judge with it whether the adjacent erection column 1 has taken place the dislocation with it to analogize and can carry out safety inspection to all erection columns 1, this device is very low to the stratum requirement like this, can construct in arbitrary stratum.
The utility model relates to a pier ground environmental protection construction equipment is simple structure not only, supports stably, need not to fill building stones, can be under construction on arbitrary stratum nature, can effectively monitor ground stability degree moreover to can quick assembly disassembly.
Example two: as shown in fig. 1 to 3, only do the utility model discloses a one of them embodiment, in order to make the utility model relates to a pier ground environmental protection construction equipment's construction effect is better, and stability is higher, the utility model discloses in still have following design:
first, at least a portion of the connection between the connection head 22 and the groove 111 is arc-shaped. The connection head 22 is conveniently connected into the groove 111.
In addition, the both sides of series hole 13 are provided with and are used for setting up the arc arch of alarm 131 makes things convenient for alarm 131 to put into, has also avoided the tandem bar 12 to produce the friction with alarm 131 when inserting series hole 13 and has caused the damage.
In addition, the number of the pressure sensing members 113 is two, and the two pressure sensing members are respectively disposed on two sides of the connecting head 22. Thus, the pressure difference between the pressure generated by the connector 22 in the groove 111 and the inner wall of the groove 111 is read, and if the pressure reaches a certain threshold, the alarm 131 is notified to give an alarm.
It is noted that the number of the grooves 111 is at least two. In fig. 2, two grooves 111 are provided on one mounting unit 11 and are oppositely arranged, so that a plurality of mounting posts 1 can be sequentially connected by using the connecting beam 2.
And, the recess 111 is filled with buffer liquid, makes things convenient for connector 22 to insert recess 111, plays lubricated effect, also prevents that external silt and mud pressure from damaging the installation unit.
Finally, the number of the connecting beams 2 is at least one. That is to say can connect many tie-beams 2 between two arbitrary erection columns 1, the connection effect is better like this, and the structure is more stable.
The utility model relates to a pier ground environmental protection construction equipment is simple structure not only, supports stably, need not to trade and fills out the building stones, can be under construction on arbitrary stratum nature, can effectively monitor ground stability moreover to can quick assembly disassembly.
Example three: in practical application, four grooves 111 can be further formed in one mounting unit 11, and the four grooves 111 are formed in four side faces of the mounting unit 11, so that the mounting unit 11 can be connected with one connecting beam 2 in front, back, left and right directions, a field-shaped wharf foundation is formed, and the structure is more stable.
Example four: the number of the mounting units 11 is at least one. It can be said that the number of the mounting units 11 on one mounting post 1 is at least one, that is, a plurality of mounting units 11 are connected in series for the string connecting rod 12.
Moreover, the number of the mounting units 11 on two adjacent mounting columns 1 is the same. If the thickness of the soft stratum is the same in the average stratum structure, the number of the installation units 11 is the same.
Or the number of the mounting units 11 on two adjacent mounting columns 1 is different. If the stratum structure is uneven and the thickness of the soft stratum is different, the number of the installation units 11 is different, as shown in fig. 3, so that the installation construction can be carried out in any geological layer.
The present invention is not limited to the above-described specific embodiments, and various modifications and changes are possible. Any modification, equivalent replacement, improvement and the like made to the above embodiments according to the technical spirit of the present invention should be included in the scope of protection of the present invention.

Claims (10)

1. The utility model provides a pier ground environmental protection construction equipment which characterized in that: comprises at least two mounting columns (1) and a connecting beam (2) for connecting two adjacent mounting columns (1), the mounting column (1) comprises a mounting unit (11) and a series connecting rod (12) arranged on the mounting unit (11), the mounting unit (11) is provided with a serial hole (13) for the serial connecting rod (12) to pass through conveniently, the connecting beam (2) comprises a beam body (21) and a connector (22) arranged at the end part of the beam body (21), the mounting unit (11) is provided with a groove (111) and a limit baffle (112) arranged outside the groove (111), at least one part of the connecting head (22) is positioned in the groove (111), a pressure sensing piece (113) is arranged at the joint of the groove (111) and the connecting head (22), and an alarm piece (131) electrically connected with the pressure sensing piece (113) is arranged in the serial hole (13).
2. The environmentally friendly construction device for wharf foundations of claim 1, wherein: at least one part of the joint of the connector (22) and the groove (111) is arc-shaped.
3. The environmentally friendly construction device for wharf foundations of claim 1, wherein: the number of the mounting units (11) is at least one.
4. The environmentally friendly construction device for wharf foundations of claim 3, wherein: the number of the mounting units (11) on two adjacent mounting columns (1) is the same.
5. The environmentally friendly construction device for wharf foundations of claim 3, wherein: the number of the mounting units (11) on two adjacent mounting columns (1) is different.
6. The environmentally friendly construction device for wharf foundations of claim 1, wherein: arc-shaped bulges used for arranging the alarm pieces (131) are arranged on two sides of the serial hole (13).
7. The environmentally friendly construction device for wharf foundations of claim 1, wherein: the number of the pressure sensing pieces (113) is two, and the two pressure sensing pieces are respectively arranged on two sides of the connector (22).
8. The environmentally friendly construction device for wharf foundations of claim 1, wherein: the number of the grooves (111) is at least two.
9. The environmentally friendly construction device for wharf foundations of claim 8, wherein: and the groove (111) is filled with buffer liquid.
10. The environmentally friendly construction device for wharf foundations of claim 1, wherein: the number of the connecting beams (2) is at least one.
CN201920658835.4U 2019-05-09 2019-05-09 Wharf foundation environment-friendly construction device Expired - Fee Related CN210342012U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920658835.4U CN210342012U (en) 2019-05-09 2019-05-09 Wharf foundation environment-friendly construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920658835.4U CN210342012U (en) 2019-05-09 2019-05-09 Wharf foundation environment-friendly construction device

Publications (1)

Publication Number Publication Date
CN210342012U true CN210342012U (en) 2020-04-17

Family

ID=70181531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920658835.4U Expired - Fee Related CN210342012U (en) 2019-05-09 2019-05-09 Wharf foundation environment-friendly construction device

Country Status (1)

Country Link
CN (1) CN210342012U (en)

Similar Documents

Publication Publication Date Title
CN200985498Y (en) Chain type slope protection building block
CN103786842A (en) Floating building structure and construction method
CN111809565B (en) Ecological bank protection of hydraulic engineering
CN210658383U (en) Silt deep water big rivers foundation ditch combination is strutted
CN203145066U (en) Offshore single-pile basic horizontal carrying force loading device
CN214365119U (en) Mixed structure old wharf reconstruction and extension structure
CN210342012U (en) Wharf foundation environment-friendly construction device
CN211898498U (en) Deepwater foundation structure of tree-shaped multi-section pile bearing platform for strait bridge
CN108018854A (en) A kind of Ecotype Concrete support pile
CN201195820Y (en) Reel type base trestle on the sea structural member
CN204491638U (en) A kind of strand ultra-deep thick-soft base floating type steel sheet-pile cofferdam
CN111424675A (en) Construction method of ultra-large pile spacing deep foundation pit supporting system
CN214737800U (en) Hydraulic engineering is with slope protection net of dismouting of being convenient for
CN105625300A (en) Ecological environment protection type bunding protecting wall and concrete piles used for ecological environment protection type bunding protecting wall
CN104452798A (en) Offshore wind turbine foundation structure and equipment and construction method of offshore wind turbine foundation equipment
CN102477731A (en) Breakwater caisson and caisson breakwater
CN201588221U (en) Artificial dug pile basis
CN211898175U (en) Ecological protection structure of river course bank slope
CN210761202U (en) Ultra-large artificial floating island and marine city group constructed by same
CN204875811U (en) Combined type multirow stake underground structure
CN109644897B (en) Structure for repairing coral reef damaged by typhoon waves
CN206385502U (en) A kind of assembling-type precast channel revetment of rapid construction
CN201990952U (en) Assembled floating body used for construction of underwater pile cap double-walled steel cofferdam
CN105064376A (en) Combined type foundation pit supporting structure with multiple rows of piles
CN205990619U (en) A kind of rich groundwater and geology bad deep pit digging supporting construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200417

CF01 Termination of patent right due to non-payment of annual fee