CN210315974U - Precast concrete bracket post construction equipment - Google Patents
Precast concrete bracket post construction equipment Download PDFInfo
- Publication number
- CN210315974U CN210315974U CN201920888336.4U CN201920888336U CN210315974U CN 210315974 U CN210315974 U CN 210315974U CN 201920888336 U CN201920888336 U CN 201920888336U CN 210315974 U CN210315974 U CN 210315974U
- Authority
- CN
- China
- Prior art keywords
- column
- fixing
- fixed
- internal thread
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 239000011178 precast concrete Substances 0.000 title claims abstract description 15
- 239000000463 material Substances 0.000 claims description 6
- 229910001220 stainless steel Inorganic materials 0.000 claims description 6
- 239000010935 stainless steel Substances 0.000 claims description 6
- 238000000926 separation method Methods 0.000 description 10
- 238000009434 installation Methods 0.000 description 5
- 238000005034 decoration Methods 0.000 description 3
- 241000287127 Passeridae Species 0.000 description 2
- 239000004567 concrete Substances 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to the corbel column construction field, and discloses a precast concrete corbel column construction device, which comprises a lower fixing groove and an upper fixing inserting column device, wherein a first connecting column is sleeved at the inner position above the lower fixing groove, a worker firstly fixedly connects a lower groove fixing column with an external space, then inserts a fixed connecting inserting column in the first connecting column into the lower fixing groove in the lower groove fixing column, and then respectively and fixedly connects with a second internal thread fixing connecting hole and a first internal thread connecting hole in the first connecting column through a fixing nut in a rotating way, because the specifications of the second connecting column and the first connecting column are the same, a plurality of the second connecting columns can be installed according to the steps, then the fixed connecting beam device is fixedly installed with the second connecting column according to the steps, and the upper fixing inserting column device is also fixedly installed with the fixed connecting beam device according to the steps, therefore, the working efficiency is improved, and the human resources are saved.
Description
Technical Field
The utility model relates to a relevant technical field of bracket post construction, in particular to precast concrete bracket post construction equipment.
Background
The bracket and the sparrow are the key points of carving and painting decoration in the ancient Chinese building, and the bracket and the sparrow have the main function of supporting the eave part of the roof. The bracket of ancient China evolved from the support arch, and the bracket is called a horse leg at some places, and the problem of supporting the roof to eaves is solved due to the support arch, but the support arch cannot meet the requirements of a plurality of buildings on the artistic level, so the birth of the bracket solves the problem. The corbel is made by respectively representing the position of the corbel, different contents expressed by the carved board on different positions, the relation with other components and the like. The corbels, regardless of the structural support, are always attached to the cornice column of the frontmost perimeter of the house, so that the corbels are evenly and orderly distributed on a building in a general view, but the form and the decorative content of the corbels are not completely the same. The corbel of the main hall is certainly big in shape and exquisite in decoration, the corbel of the secondary house is concise in shape, and even the corbel is not used but supported, so that the political difference of principal and subordinate grades is shown. In terms of the same building, although the form of the corbel under the eave is the same, the decoration contents are not the same.
However, in the prior art, the right-angle trapezoid cross beam is fixedly connected with the main fixed beam through welding, and the height of the main fixed beam is set to be a fixed value according to the external working environment of workers, so that the whole device can be installed after hoisting the whole device by hoisting equipment in installation, and the hoisting equipment cannot be accommodated in narrow spaces, so that the manual installation of a plurality of workers is needed, the working efficiency is reduced, and human resources are wasted.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide a precast concrete bracket post construction equipment, this bracket post construction equipment has improved work efficiency, has practiced thrift manpower resources.
In order to solve the technical problem, the utility model discloses a technical scheme does: the utility model provides a precast concrete bracket post construction equipment, includes lower groove fixed column and goes up fixed post device of inserting, the inside position department in lower groove fixed column top has cup jointed the spliced pole No. one, the spliced pole passes through fixation nut and lower groove fixed column fixed connection No. one, the inside position department in spliced pole top has cup jointed the spliced pole No. two, No. two the spliced pole passes through fixation nut and spliced pole fixed connection No. one, No. one spliced pole top inside position department has cup jointed fixed connection crossbeam device, fixed connection crossbeam device passes through fixation nut and No. two spliced pole fixed connection, fixed connection crossbeam device middle top inside position department has cup jointed fixed post device of inserting, go up fixed post device of inserting and fixed connection crossbeam device fixed connection through fixation nut.
Preferably, the upper fixed column inserting device comprises an upper fixed column, an upper fixed connection inserted column and an internal thread hole, the middle position of the lower end of the upper fixed column is provided with the upper fixed connection inserted column, the internal thread holes are formed in the inner positions of the left side and the right side of the front end and the rear end of the upper fixed connection inserted column, and the upper fixed column inserting device is fixedly connected with the fixed connection beam device through the upper fixed connection inserted column and the internal thread hole.
Preferably, the first connecting column comprises a first internal thread fixing hole, a connecting and fixing inserting column, a first internal thread connecting hole, a first fixing connecting column and a fixing connecting groove, the fixing connecting groove is formed in the middle of the inner portion of the upper portion of the first fixing connecting column, a first internal thread fixing hole is formed in the left side and right side of the front end and the rear end of the upper portion of the first fixing connecting column, a second internal thread fixing hole is formed in the left side and right side of the front end and the rear end of the first fixing connecting column, a connecting and fixing inserting column is arranged in the middle of the lower end of the first fixing connecting column, a first internal thread connecting hole is formed in the left side and right side of the front end and the rear end of the connecting and fixing column of the lower groove, and the first connecting column is fixedly connected with the fixing column of.
Preferably, the lower groove fixing column comprises a second internal thread fixing connecting hole, a lower fixing seat and a lower fixing groove, the lower fixing seat is provided with the lower fixing groove at the middle inner position above the lower fixing seat, the second internal thread fixing connecting holes are formed in the inner positions of the left side and the right side of the front end and the rear end of the lower fixing seat, the four second internal thread fixing connecting holes are located at the left side and the right side of the middle of the front end and the rear end of the lower fixing groove, and the lower groove fixing column is fixedly connected with the first connecting column through the lower fixing groove.
Preferably, the fixed connection beam device comprises a third internal thread fixing hole, a third fixed inserting column, a third internal thread connecting hole, a third fixed connecting column, a right-angle trapezoid beam and a third connecting groove, a third fixed inserting column is arranged at the middle position of the lower end of the third fixed connecting column, a third internal thread connecting hole is arranged at the inner positions of the left side and the right side of the middle of the front end and the rear end of the third fixed inserting column, a third connecting groove is formed in the middle inner position above the third fixing connecting column, third internal thread fixing holes are formed in the inner positions of the left side and the right side of the front end and the rear end above the third fixing connecting column, four third internal thread fixing holes are formed in the positions of the left side and the right side of the middle of the front end and the rear end of the third connecting groove, and right-angled trapezoid cross beams are arranged at the left end and the right end of the third fixed connecting column, and the fixed connecting cross beam device is fixedly connected with the upper fixed inserting column device through a third internal thread fixing hole and a third connecting groove.
Preferably, the second connecting column has the same specification as the upper fixed column inserting device, and is made of a stainless steel material with three parts and four parts.
Preferably, the number of the fixing nuts is sixteen, sixteen fixing nuts are made of a three-zero four-size stainless steel material, and sixteen fixing nuts are long.
Compared with the prior art, the utility model discloses, possess following beneficial effect:
1. in the utility model, a worker calculates the need of several first connecting columns (second connecting columns) according to the height of space, firstly inserts the fixed connecting inserting columns in the second connecting columns into the fixed connecting grooves in the first connecting columns when installing, when the fixed connecting inserting columns in the second connecting columns are inserted in front and back of the first female connecting holes at the inner positions on the left and right sides of the front and back ends of the fixed connecting columns in the first connecting columns are aligned with the first female fixing holes at the inner positions on the left and right sides of the front and back ends of the fixed connecting columns in the first connecting columns, the fixed nuts are respectively and fixedly connected with the first female connecting holes at the inner positions on the left and right sides of the front and back ends of the fixed connecting columns in the second connecting columns and the first female fixing holes at the inner positions on the left and back sides of the front and back ends of the fixed connecting columns in the first connecting columns by rotating the fixed nuts, make No. two spliced poles and spliced pole fixed connection, after all spliced poles (No. two spliced poles) fixed connection, insert the fixed connection recess inside No. two spliced poles with No. three fixed insertion columns in the fixed connection crossbeam device again, later No. three female connection holes in the rethread fixed nut difference fixed connection crossbeam device and No. one female fixed orifices rotation fixed connection in No. two spliced poles, the staff installation has been made things convenient for, work efficiency is improved, manpower resources has also been practiced thrift simultaneously.
2. The utility model discloses go up fixed post device and the lower groove fixed column of inserting, the staff inserts the post connection with the fixed connection in No. three connecting grooves in fixed connection crossbeam device and the spliced pole respectively with the lower fixed recess in last fixed post and the lower groove fixed column in the fixed post device earlier, then through rotatory fixation nut, fixation nut makes fixation nut respectively with the internal thread hole in last fixed post device, No. three internal thread fixed orifices in the fixed connection crossbeam device, No. two internal thread fixed connection hole rotatory fixed connection in an internal thread connecting hole in the spliced pole and the lower groove fixed column, whole process simple to operate, and only need a staff just can accomplish, work efficiency is improved.
Drawings
FIG. 1 is a structural diagram of a precast concrete corbel column construction device provided by the utility model;
fig. 2 is a schematic structural view of an upper fixing insert column provided by the present invention;
fig. 3 is a schematic structural view of a first connecting column provided by the present invention;
fig. 4 is a schematic structural view of a lower groove fixing column provided by the present invention;
fig. 5 is a schematic structural view of the fixed connection beam device provided by the present invention.
In the figure: 1-fixing a column inserting device; 11-upper fixing column; 12-fixedly connecting the inserting columns; 13-an internally threaded hole; 2-connecting column I; 21-a first internal thread fixing hole; 22-connecting and fixing the inserting column; 23-a first internal thread connecting hole; 24-a fixed connecting column; 25-fixing the connecting groove; 3-lower groove fixing column; 31-second internal thread fixed connection hole; 32-lower fixed seat; 33-lower fixing groove; 4-connecting column II; 5, fixedly connecting a beam device; 51-third internal thread fixing hole; no. 52-three fixed inserting columns; 53-third internal thread connecting hole; 54-third fixed connecting column; 55-right trapezoid cross beam; 56-third connecting groove; 6-fixing the nut.
Detailed Description
The following describes the present invention with reference to the accompanying drawings. It should be noted that the description of the embodiments is provided to help understanding of the present invention, but the present invention is not limited thereto. In addition, the technical features related to the embodiments of the present invention described below may be combined with each other as long as they do not conflict with each other.
As shown in fig. 1-5, the utility model discloses a precast concrete corbel column construction equipment, including lower groove fixed column 3 and last fixed post device 1 of inserting, No. 2 spliced poles have been cup jointed to 3 top inside position departments of lower groove fixed column, No. 2 spliced poles pass through fixation nut 6 and 3 fixed connection of lower groove fixed column, through rotatory fixation nut 6, make fixation nut 6 respectively with No. two female thread fixed connection hole 31 and No. 2 female thread fixed connection hole 23 swivelling separation of spliced pole, then through the fixed recess 33 of lower and spliced pole 22 sliding separation of being connected in spliced pole 2, the separation of spliced pole 2 has been made things convenient for, No. 2 top inside position departments of spliced pole have cup jointed No. two spliced poles 4, through rotatory fixation nut 6, make fixation nut 6 respectively with No. 2 in a female thread fixed connection hole 23 and a No. 2 in a spliced pole 4 and a female thread fixed connection hole in a spliced pole 2 The fixed hole 21 is separated in a rotating way, then the connecting fixed inserting column 22 in the second connecting column 4 is separated from the fixed connecting groove 25 in the first connecting column 2 in a sliding way, so that the first connecting column 2 is conveniently separated from the second connecting column 4, the second connecting column 4 is fixedly connected with the first connecting column 2 through the fixing nut 6, the fixed connecting beam device 5 is sleeved at the upper inner position of the first connecting column 2, the fixed connecting beam device 5 is fixedly connected with the second connecting column 4 through the fixing nut 6, the upper fixed inserting column device 1 is sleeved at the upper inner position in the middle of the fixed connecting beam device 5, the upper fixed inserting column device 1 is fixedly connected with the fixed connecting beam device 5 through the fixing nut 6, and the fixing nut 6 is respectively separated from the internal thread hole 13 and the internal thread fixing hole 51 in the fixed connecting beam device 5 in a rotating way through rotating the fixing nut 6, then, the upper fixed connection inserting column 12 is separated from the third connecting groove 56 in the fixed connection beam device 5 in a sliding way, so that the upper fixed inserting column device 1 is convenient to disassemble and assemble.
Go up fixed post device 1 of inserting including last fixed column 11, go up fixed connection and insert post 12 and internal thread hole 13, it is provided with fixed connection and inserts post 12 to go up fixed column 11 lower extreme intermediate position department, it is provided with internal thread hole 13 to go up fixed connection and insert post 12 front and back both ends left and right sides inside position department, it inserts post 12 and internal thread hole 13 and fixed connection crossbeam device 5 fixed connection through last fixed connection to go up fixed connection and insert post 1, through rotatory fixation nut 6, make fixation nut 6 rotatory the separation with No. three internal thread fixing holes 51 in internal thread hole 13 and the fixed connection crossbeam device 5 respectively, then insert post 12 through last fixed connection and the No. three connecting groove 56 sliding separation in the fixed connection crossbeam device 5 again, the dismouting of fixed post device 1 of inserting has been made things convenient for.
The first connecting column 2 comprises a first internal thread fixing hole 21, a connecting and fixing inserted column 22, a first internal thread connecting hole 23, a first fixing connecting column 24 and a fixing connecting groove 25, the fixing connecting groove 25 is arranged at the middle internal position above the first fixing connecting column 24, the first internal thread fixing holes 21 are arranged at the internal positions of the left side and the right side of the front end and the rear end of the first fixing connecting column 24, the fixing nut 6 is respectively and rotatably separated from the first internal thread connecting hole 23 in the second connecting column 4 and the first internal thread fixing hole 21 in the first connecting column 2 by rotating the fixing nut 6, then the connecting and fixing inserted column 22 in the second connecting column 4 is separated from the fixing connecting groove 25 in the first connecting column 2 in a sliding manner, so that the first connecting column 2 is conveniently separated from the second connecting column 4, and the four first internal thread fixing holes 21 are respectively arranged at the left side and the right side of the middle of the front end and the rear end of the, no. one fixed connection post 24 lower extreme intermediate position department is provided with connects fixed post 22 of inserting, connect fixed post 22 front and back both ends left and right sides inside position department and be provided with female connection hole 23 No. one, No. one spliced pole 2 is through connecting fixed post 22 and female connection hole 23 and lower groove fixed column 3 fixed connection, through rotatory fixation nut 6, make fixation nut 6 respectively with No. two female connection hole 31 and No. one female connection hole 23 swivelling joint in spliced pole 2, then through the fixed post 22 sliding separation of inserting of being connected in lower fixed recess 33 and spliced pole 2, the separation of spliced pole 2 has been made things convenient for.
Lower recess fixed column 3 includes No. two female fixed connection hole 31, lower fixing base 32 and lower fixed recess 33, lower fixing base 32 top middle inside position department is provided with lower fixed recess 33, lower fixing base 32 top front and back both ends left and right sides inside position department is provided with No. two female fixed connection hole 31, four No. two female fixed connection hole 31 are located lower fixing base 33 front and back both ends middle left and right sides position department, lower recess fixed column 3 is through lower fixed recess 33 and spliced pole 2 fixed connection, through rotatory fixation nut 6, make fixation nut 6 respectively with No. two female fixed connection hole 31 and No. 23 swivelling joint of a female fixed connection hole in spliced pole 2, then through the fixed inserted column 22 sliding separation of being connected in lower fixed recess 33 and spliced pole 2, the separation of spliced pole 2 has been made things convenient for.
Fixed connection crossbeam device 5 includes No. three internal thread fixed orificess 51, No. three fixed post 52 of inserting, No. three internal thread connecting hole 53, No. three fixed connection post 54, right trapezoid crossbeam 55 and No. three connecting groove 56, No. three fixed connection post 54 lower extreme intermediate position department is provided with No. three fixed post 52 of inserting, No. three fixed post 52 front and back both ends in the middle of the inside position department of the left and right sides be provided with No. three internal thread connecting hole 53, through fixation nut 6 respectively with No. three internal thread connecting hole 53 and No. one the internal thread fixed orifices 21 rotation separation in the spliced pole 2, then upwards remove fixed connection crossbeam device 5, make No. three fixed post 52 of inserting separate with the fixed connection recess 25 in spliced pole 2, made things convenient for fixed connection crossbeam device 5 to separate with spliced pole 2 No. one. No. three fixed connection post 54 top middle inside position department is provided with No. three connecting groove 56, No. three fixed connection post 54 top front and back both ends left and right sides inside position department is provided with No. three internal thread fixed orifices 51, four No. three internal thread fixed orifices 51 are located No. three connecting groove 56 front and back both ends middle left and right sides position department, No. three fixed connection post 54 left and right sides position department is provided with right trapezoid crossbeam 55, fixed connection crossbeam device 5 is through No. three internal thread fixed orifices 51 and No. three connecting groove 56 and last fixed post inserting device 1 fixed connection, through rotatory fixation nut 6, make fixation nut 6 respectively with No. three internal thread fixed orifices 51 and last fixed post inserting device 1 in internal thread hole 13 swivelling joint, the dismouting of last fixed post inserting device 1 has been made things convenient for.
No. two spliced poles 4 are the same with last fixed column device 1 specification, and No. two spliced poles 4 comprise three zero four stainless steel material, in order to disassemble better and install, make things convenient for the installation of No. two spliced poles 4, also for improving life simultaneously.
Fixing nut 6 sets up to sixteen, and sixteen fixing nut 6 comprises three zero four stainless steel materials, and sixteen fixing nut 6 length are through fixing nut 6 for on fixed the installation and the disassembling of inserting post device 1, spliced pole 2, lower groove fixed column 3, spliced pole 4 and fixed connection crossbeam device 5.
The utility model discloses a theory of operation and use flow: after the utility model is installed, because the second connecting column 4 and the first connecting column 2 have the same specification and model, the staff can calculate the requirement of a plurality of first connecting columns 2 (or second connecting columns 4) according to the height of the external space, firstly fixedly connect the lower groove fixing column 3 with the external fixed end, then insert the connecting fixing inserting column 22 in the first connecting column 2 into the lower fixing groove 33 in the lower groove fixing column 3, after the second internal thread fixing connecting hole 31 in the lower groove fixing column 3 is aligned with the first internal thread connecting hole 23 in the first connecting column 2, the fixing nut 6 is respectively and fixedly connected with the second internal thread fixing connecting hole 31 in the lower groove fixing column 3 and the first internal thread connecting hole 23 in the first connecting column 2 by rotating the fixing nut 6, so that the first connecting column 2 is fixedly connected with the first groove fixing column 3, at this time, the fixed inserting column 22 in the second connecting column 4 is inserted into the fixed connecting groove 25 in the first connecting column 2, after the first female screw connecting hole 23 in the second connecting column 4 is aligned with the first female screw fixing hole 21 in the first connecting column 2, the fixing nut 6 is respectively and fixedly connected with the first female screw connecting hole 23 in the second connecting column 4 and the first female screw fixing hole 21 in the first connecting column 2 by rotating the fixing nut 6, so that the second connecting column 4 is fixedly connected with the first connecting column 2, after the plurality of second connecting columns 4 are installed according to the steps, the third fixed inserting column 52 in the fixed connecting beam device 5 is inserted into the fixed connecting groove 25 in the second connecting column 4 at the uppermost position, after the third female screw connecting hole 53 in the fixed connecting beam device 5 is aligned with the first female screw fixing hole 21 in the second connecting column 4 at the uppermost position, the fixed nut 6 is respectively and fixedly connected with a third internal thread connecting hole 53 in a fixed connection beam device 5 and a first internal thread fixing hole 21 in a second connecting column 4 at the uppermost position by rotating the fixed nut 6, so that the fixed connection beam device 5 is fixedly connected with the second connecting column 4 at the uppermost position, then an upper fixed connection plug-in column 12 in an upper fixed plug-in column device 1 is inserted into a third connecting groove 56 in the fixed connection beam device 5, when an internal thread hole 13 in the upper fixed plug-in column device 1 is aligned with a third internal thread fixing hole 51 in the fixed connection beam device 5, the fixed nut 6 is respectively and fixedly connected with the internal thread hole 13 in the upper fixed plug-in column device 1 and the third internal thread fixing hole 51 in the fixed connection beam device 5 by rotating the fixed nut 6, so that the upper fixed plug-in column device 1 and the fixed connection beam device 5 are realized, thus, the whole construction equipment is installed, the concrete is smeared on the outer wall of the whole construction equipment at this time, and after the concrete is solidified, the two right-angle trapezoidal beams 55 in the fixed connection beam device 5 can be placed and weighed, and can be better supported, so that the working principle of the whole construction equipment is realized.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the described embodiments. It will be apparent to those skilled in the art that various changes, modifications, substitutions and alterations can be made in the embodiments without departing from the principles and spirit of the invention, and the scope of the invention is to be accorded the full scope of the claims.
Claims (7)
1. The utility model provides a precast concrete bracket post construction equipment, includes low groove fixed column (3) and goes up fixed post device (1) of inserting, its characterized in that: a first connecting column (2) is sleeved at the inner position above the lower groove fixing column (3), the first connecting column (2) is fixedly connected with the lower groove fixing column (3) through a fixing nut (6), a second connecting column (4) is sleeved at the inner position above the first connecting column (2), the second connecting column (4) is fixedly connected with the first connecting column (2) through a fixing nut (6), a fixed connecting beam device (5) is sleeved at the inner position above the first connecting column (2), the fixed connecting beam device (5) is fixedly connected with the second connecting column (4) through a fixing nut (6), an upper fixed column inserting device (1) is sleeved at the inner position above the middle of the fixed connection beam device (5), the upper fixing post inserting device (1) is fixedly connected with the fixed connection beam device (5) through a fixing nut (6).
2. The precast concrete corbel column construction device according to claim 1, wherein: go up fixed post device (1) of inserting and include last fixed column (11), go up fixed connection and insert post (12) and internal thread hole (13), go up fixed column (11) lower extreme intermediate position department and be provided with fixed connection and insert post (12), it is provided with internal thread hole (13) to go up fixed connection and insert post (12) front and back both ends left and right sides internal position department, go up fixed post device (1) of inserting and insert post (12) and internal thread hole (13) and fixed connection crossbeam device (5) fixed connection through last fixed connection.
3. The precast concrete corbel column construction device according to claim 1, wherein: the first connecting column (2) comprises a first internal thread fixing hole (21), a connecting and fixing inserting column (22), a first internal thread connecting hole (23), a first fixing connecting column (24) and a fixing connecting groove (25), the fixing connecting groove (25) is arranged at the middle internal position above the first fixing connecting column (24), the first internal thread fixing holes (21) are arranged at the internal positions of the left side and the right side of the front end and the rear end of the first fixing connecting column (24), the four first internal thread fixing holes (21) are respectively arranged at the positions of the left side and the right side of the middle of the front end and the rear end of the fixing connecting groove (25), the connecting and fixing inserting column (22) is arranged at the middle position of the lower end of the first fixing connecting column (24), the first internal thread connecting hole (23) is arranged at the internal positions of the left side and the right side of the front, the first connecting column (2) is fixedly connected with the lower groove fixing column (3) through a first fixed inserting column (22) and a first internal thread connecting hole (23).
4. The precast concrete corbel column construction device according to claim 1, wherein: the lower groove fixing column (3) comprises a second internal thread fixing connecting hole (31), a lower fixing seat (32) and a lower fixing groove (33), the lower fixing seat (32) is provided with the lower fixing groove (33) at the middle inner position above the lower fixing seat, the lower fixing seat (32) is provided with the second internal thread fixing connecting hole (31) at the inner positions of the left side and the right side of the front end and the rear end of the lower fixing seat, the second internal thread fixing connecting hole (31) is located at the left side and the right side of the middle of the front end and the rear end of the lower fixing groove (33), and the lower groove fixing column (3) is fixedly connected with the first connecting column (2) through the lower.
5. The precast concrete corbel column construction device according to claim 1, wherein: the fixed connection beam device (5) comprises a third internal thread fixing hole (51), a third fixed inserting column (52), a third internal thread connecting hole (53), a third fixed connecting column (54), a right trapezoid beam (55) and a third connecting groove (56), wherein the third fixed inserting column (52) is arranged at the middle position of the lower end of the third fixed connecting column (54), the third internal thread connecting hole (53) is arranged at the inner position of the left side and the right side in the middle of the front end and the rear end of the third fixed inserting column (52), the third connecting groove (56) is arranged at the inner position of the middle of the upper part of the third fixed connecting column (54), the third internal thread fixing hole (51) is arranged at the inner position of the left side and the right side in the middle of the front end and the rear end of the third fixed connecting column (54), and the four third internal thread fixing holes (51) are arranged at the left side and the right side in, the right-angle trapezoid cross beam (55) is arranged at the left end and the right end of the third fixed connecting column (54), and the fixed connecting cross beam device (5) is fixedly connected with the upper fixed inserting column device (1) through a third internal thread fixing hole (51) and a third connecting groove (56).
6. The precast concrete corbel column construction device according to claim 1, wherein: no. two spliced poles (4) are the same with last fixed post device (1) specification of inserting, No. two spliced poles (4) comprise No. three No. four stainless steel material.
7. The precast concrete corbel column construction device according to claim 1, wherein: the fixing nuts (6) are arranged to be sixteen, the sixteen fixing nuts (6) are made of three-zero-four stainless steel materials, and the sixteen fixing nuts (6) are long.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920888336.4U CN210315974U (en) | 2019-06-13 | 2019-06-13 | Precast concrete bracket post construction equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920888336.4U CN210315974U (en) | 2019-06-13 | 2019-06-13 | Precast concrete bracket post construction equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210315974U true CN210315974U (en) | 2020-04-14 |
Family
ID=70143611
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920888336.4U Active CN210315974U (en) | 2019-06-13 | 2019-06-13 | Precast concrete bracket post construction equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210315974U (en) |
-
2019
- 2019-06-13 CN CN201920888336.4U patent/CN210315974U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102587647B (en) | Early-removal formwork system for concreting of constructions comprising beams, plates and columns | |
WO2015178584A1 (en) | Prefabrication method for rebar net | |
CN208396106U (en) | Detachable bed die steel bar truss floor support plate | |
CN204402028U (en) | Bayonet type stair construction gang form | |
CN203769310U (en) | Steel column mould | |
CN102828614B (en) | Building template system capable of being quickly detached and installed and installation method thereof | |
CN210315974U (en) | Precast concrete bracket post construction equipment | |
CN205531458U (en) | Composite construction view pavilion | |
CN103806650A (en) | Steel column mould and construction method thereof | |
CN201053204Y (en) | Building template composite supporting structure | |
CN204001416U (en) | For the assemble type truss of the factory building of constructing | |
CN105544838A (en) | Integrated suspended ceiling structure | |
CN211714196U (en) | Adjustable purlin holds in palm | |
CN105064551A (en) | Movable wallboard system | |
CN202577956U (en) | Early dismounted template system for pouring buildings with beams, plates and columns | |
CN207609011U (en) | Assembled architecture agent structure | |
CN206144150U (en) | Aluminum mould board connecting piece | |
CN206667833U (en) | A kind of mobile shelter | |
CN204343666U (en) | Roof plate template bearer combined structure | |
CN212689527U (en) | Protective net frame connecting structure of climbing frame | |
CN201225001Y (en) | Composite die for casting building frame | |
CN203403668U (en) | Self-supporting plate type steel bar mesh frame combination formwork | |
CN210947733U (en) | Splicing reservation device for square opening of civil and electrical wiring duct of building | |
CN103470028A (en) | Assembling type floor formwork system with preset suspension reinforcing steel bars | |
CN213449789U (en) | Plant greening guardrail is used in gardens convenient to dismouting combination |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |