CN210264180U - Construction guardrail - Google Patents

Construction guardrail Download PDF

Info

Publication number
CN210264180U
CN210264180U CN201920908921.6U CN201920908921U CN210264180U CN 210264180 U CN210264180 U CN 210264180U CN 201920908921 U CN201920908921 U CN 201920908921U CN 210264180 U CN210264180 U CN 210264180U
Authority
CN
China
Prior art keywords
upright post
base
stand
guardrail
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920908921.6U
Other languages
Chinese (zh)
Inventor
苏卓
李盈浩
张磊
李盈冰
袁红霞
谭娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Xinghua Construction Engineering Co Ltd
Original Assignee
Hunan Xinghua Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Xinghua Construction Engineering Co Ltd filed Critical Hunan Xinghua Construction Engineering Co Ltd
Priority to CN201920908921.6U priority Critical patent/CN210264180U/en
Application granted granted Critical
Publication of CN210264180U publication Critical patent/CN210264180U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a construction guardrail, including guardrail body and concatenation subassembly, the guardrail body is provided with two sets ofly, and is two sets ofly the guardrail body passes through the concatenation subassembly to be connected, the guardrail body includes first base, first stand, coupling assembling, baffle, altitude mixture control subassembly, second base and second stand, first base top intermediate position department installs first stand perpendicularly, second base and first base parallel correspondence setting, just second base top intermediate position department installs the second stand perpendicularly, be connected through coupling assembling between first stand and the second stand. The utility model improves the utilization rate of the transportation space and is convenient to adjust and use by matching with the width of the baffle plate; the structure is simple, the adjustment is easy, and the fixing is convenient to match with baffles with different widths and heights; be favorable to two sets of guardrail bodies concatenation to use, convenient to detach has improved work efficiency simultaneously.

Description

Construction guardrail
Technical Field
The utility model relates to a protective equipment field for the construction specifically is construction guardrail.
Background
The building is essential in the life, to the building trade, needs keep apart the construction site, improves the guardrail and warns and protect, improves the security. However, the existing construction guardrail has the following defects: the storage is inconvenient, the utilization rate of a transportation space is reduced, and the adjustment and the use are inconvenient in matching with the width of the baffle; the baffle plate is not easy to adjust and is not convenient to be fixed by matching with baffle plates with different widths and heights; the splicing use of the two groups of guardrail bodies is not facilitated, and the guardrail is inconvenient to disassemble, so that the working efficiency during the installation and the disassembly is reduced; therefore, it is necessary to design a construction guard rail.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems, the utility model aims to provide a building construction guardrail, which improves the utilization rate of transportation space and is convenient to adjust and use in cooperation with the width of a baffle plate; the structure is simple, the adjustment is easy, and the fixing is convenient to match with baffles with different widths and heights; be favorable to two sets of guardrail bodies concatenation to use, convenient to detach has improved work efficiency simultaneously.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a building construction guardrail comprises guardrail bodies and splicing assemblies, wherein the guardrail bodies are provided with two groups, the two groups of guardrail bodies are connected through the splicing assemblies, each guardrail body comprises a first base, a first upright, a connecting assembly, a baffle, a height adjusting assembly, a second base and a second upright, the first upright is vertically installed at the middle position of the top of the first base, the second base and the first base are arranged in parallel and correspondingly, the second upright is vertically installed at the middle position of the top of the second base, the first upright and the second upright are connected through the connecting assembly, and the height adjusting assemblies are installed on the first upright and the second upright;
the connecting assembly comprises a sleeve with an internal thread hole and a screw rod, one side of the sleeve end with the internal thread hole perpendicular to the first stand column is rotatably connected, one side of the screw rod end perpendicular to the second stand column is installed, and the sleeve with the internal thread hole is in threaded connection with the screw rod.
Wherein, it is two sets of the affiliated part position that altitude mixture control subassembly installed respectively on first stand and second stand is the same, altitude mixture control subassembly includes threaded rod, screw hole and the lantern ring that has the internal thread hole, first stand top intermediate position department sets up threaded hole, just screw hole threaded connection has the threaded rod, threaded connection has the lantern ring that has the internal thread hole on the threaded rod, first stand with the spacing groove has been seted up to second stand side symmetry, the joint is at two spacing inslots to baffle bottom both ends correspondence, just baffle top both ends correspond contradicts with two lantern ring bottoms that have the internal thread hole.
The splicing assembly comprises a bolt, a bolt hole a, a clamping groove, a clamping block and a bolt hole b, the clamping groove is formed in one side of the first base, the clamping block is installed on one side of the second base, the clamping block and the clamping groove are of a matched clamping structure, the bolt hole a leading to the other side is formed in one side of the first stand column, the bolt hole b leading to the other side is formed in one side of the second stand column, the second stand column of the guardrail body is in fit contact with the first stand column of the other guardrail body, and the bolt penetrates through the bolt hole b in the second stand column of the guardrail body and is in threaded connection with the bolt hole a in the first stand column of the other guardrail body.
Preferably, the first base and the second base are the same in size, and the first upright post and the second upright post are the same in size.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the sleeve with the internal thread hole is rotated, and the sleeve with the internal thread hole is in threaded connection with the lead screw, so that the relative length between the sleeve with the internal thread hole and the lead screw is adjusted, widening and contraction are facilitated, the first stand column and the second stand column are convenient to use and store, the utilization rate of a transportation space is improved, and meanwhile, the width of the baffle is convenient to adjust and use;
2. by rotating the threaded rod, the depth of the threaded rod in the threaded hole is adjusted due to the threaded connection of the threaded rod and the threaded hole, the position of the threaded rod is well adjusted, then the lantern ring with the internal threaded hole is rotated, and the lantern ring with the internal threaded hole is in threaded connection with the threaded rod, so that the position of the lantern ring with the internal threaded hole on the threaded rod is adjusted, because the two ends of the bottom of the baffle are correspondingly clamped in the two limiting grooves, and the two ends of the top of the baffle are correspondingly abutted against the bottoms of the two lantern rings with the internal threaded hole, the structure is simple, the adjustment is easy, and the baffle with different widths;
3. the utility model discloses in, the bolt passes bolt hole b on the second stand of a set of guardrail body and the bolt hole a threaded connection on the first stand of another group's guardrail body, and in the draw-in groove on the first stand of the fixture block correspondence group on the second stand of this group simultaneously, be favorable to two sets of guardrail body concatenations to use, convenient to detach improves work efficiency simultaneously.
Drawings
Fig. 1 is a schematic structural view of the spliced two sets of guardrail bodies in the utility model;
fig. 2 is a schematic structural diagram of the present invention.
Description of reference numerals:
1. a first base; 2. a first upright post; 3. a connecting assembly; 31. a sleeve with an internally threaded bore; 32. a screw rod; 4. a baffle plate; 5. a height adjustment assembly; 51. a threaded rod; 52. a threaded hole; 53. a collar with an internally threaded bore; 6. a second base; 7. a second upright post; 8. splicing the components; 81. a bolt; 82. a bolt hole a; 83. a card slot; 84. a clamping block; 85. bolt holes b.
Detailed Description
In order to make the technical problems, technical solutions and advantages to be solved by the present invention clearer, the following detailed description will be given with reference to the accompanying drawings and specific embodiments.
Please refer to description attached drawing 1, fig. 2, the utility model relates to a construction guardrail, including guardrail body and concatenation subassembly 8, the guardrail body is provided with two sets ofly, and two sets of guardrail bodies pass through concatenation subassembly 8 to be connected, the guardrail body includes first base 1, first stand 2, coupling assembling 3, baffle 4, altitude mixture control subassembly 5, second base 6 and second stand 7, first stand 2 is installed perpendicularly to 1 top intermediate position department of first base, second base 6 corresponds the setting with first base 1 parallel, and 6 top intermediate position departments of second base install second stand 7 perpendicularly, be connected through coupling assembling 3 between first stand 2 and the second stand 7, all install altitude mixture control subassembly 5 on first stand 2 and the second stand 7.
The connecting assembly 3 comprises a sleeve 31 with an internal thread hole and a screw rod 32, one end of the sleeve 31 with the internal thread hole is connected with one side of the first upright post 2 in a rotating mode, one end of the screw rod 32 is installed on one side of the second upright post 7 in a perpendicular mode, and the sleeve 31 with the internal thread hole is in threaded connection with the screw rod 32.
Two sets of altitude mixture control subassembly 5 installs respectively on first stand 2 and second stand 7 affiliated part position the same, altitude mixture control subassembly 5 includes threaded rod 51, screw hole 52 and has the lantern ring 53 in internal thread hole, 2 top intermediate position departments of first stand have screw hole 52, and screw hole 52 threaded connection has threaded rod 51, threaded connection has the lantern ring 53 that has the internal thread hole on the threaded rod 51, the spacing groove has been seted up to first stand 2 and 7 one side symmetries of second stand, 4 bottom both ends of baffle correspond the joint at two spacing inslots, and 4 top both ends of baffle correspond the conflict with two lantern rings 53 bottoms that have the internal thread hole, are favorable to altitude mixture control, fixed stop 4.
Splicing assembly 8 includes bolt 81, bolt hole a82, draw-in groove 83, fixture block 84 and bolt hole b85, draw-in groove 83 has been seted up to first base 1 one side, fixture block 84 is installed to 6 one sides of second base, and fixture block 84 and draw-in groove 83 are cooperation joint structure, bolt hole a82 that leads to the opposite side is seted up to first stand 2 one side, bolt hole b85 that leads to the opposite side is seted up to second stand 7 one side, and the second stand 7 of a set of guardrail body and the first stand 2 laminating contact of another group guardrail body, bolt 81 passes bolt hole b85 on the second stand 7 of a set of guardrail body and the bolt hole a82 threaded connection on the first stand 2 of another group guardrail body, is favorable to two sets of guardrail body splices to use.
First base 1 is the same with 6 size dimensions of second base, first stand 2 is the same with 7 size dimensions of second stand, is favorable to cooperation chucking baffle 4.
The utility model discloses a theory of operation does: the sleeve with the internal thread hole is rotated, and the sleeve with the internal thread hole is in threaded connection with the screw rod, so that the relative length between the sleeve with the internal thread hole and the screw rod is adjusted, widening and contraction are facilitated, the first upright post and the second upright post are convenient to use and store, the utilization rate of a transportation space is improved, and the adjustment and use are facilitated by matching with the width of the baffle plate; the threaded rod is rotated, the depth of the threaded rod in the threaded hole is adjusted due to the threaded connection of the threaded rod and the threaded hole, the position of the threaded rod is well adjusted, then the lantern ring with the internal threaded hole is rotated, the lantern ring with the internal threaded hole is in threaded connection with the threaded rod, the position of the lantern ring with the internal threaded hole on the threaded rod is adjusted, the two ends of the bottom of the baffle are correspondingly clamped in the two limiting grooves, and the two ends of the top of the baffle are correspondingly abutted against the bottoms of the two lantern rings with the internal threaded hole; the bolt passes bolt hole b on the second stand of a set of guardrail body and the bolt hole a threaded connection on the first stand of another group's guardrail body, and in the fixture block correspondence on this group's second stand corresponded the draw-in groove on the first stand of group simultaneously, be favorable to two sets of guardrail body splices to use, and convenient to detach improves work efficiency simultaneously.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation. The use of the phrase "comprising one of the elements does not exclude the presence of other like elements in the process, method, article, or apparatus that comprises the element.
The above embodiments are merely preferred embodiments of the present disclosure, which are not intended to limit the present disclosure, and any modifications, equivalents, improvements and the like, which are within the spirit and principle of the present disclosure, should be included in the scope of the present disclosure.

Claims (4)

1. A building construction guardrail is characterized by comprising a guardrail body and a splicing component (8), the guardrail bodies are provided with two groups, the two groups of guardrail bodies are connected through a splicing component (8), the guardrail body comprises a first base (1), a first upright post (2), a connecting assembly (3), a baffle (4), a height adjusting assembly (5), a second base (6) and a second upright post (7), a first upright post (2) is vertically arranged at the middle position of the top of the first base (1), the second base (6) and the first base (1) are arranged in parallel and correspondingly, a second upright post (7) is vertically arranged at the middle position of the top of the second base (6), the first upright post (2) is connected with the second upright post (7) through a connecting component (3), the first upright post (2) and the second upright post (7) are both provided with a height adjusting component (5);
wherein, coupling assembling (3) are including sleeve (31) and lead screw (32) that have the internal thread hole, the perpendicular first stand of sleeve (31) one end (2) one side that have the internal thread hole is rotated and is connected, the perpendicular second stand of lead screw (32) one end (7) one side installation, sleeve (31) and lead screw (32) threaded connection that have the internal thread hole.
2. The construction fence according to claim 1, wherein the parts of the two sets of height adjustment assemblies (5) mounted on the first upright (2) and the second upright (7), respectively, are in the same position, the height adjusting component (5) comprises a threaded rod (51), a threaded hole (52) and a collar (53) with an internal threaded hole, a threaded hole (52) is arranged in the middle of the top of the first upright post (2), and the threaded hole (52) is in threaded connection with a threaded rod (51), the threaded rod (51) is in threaded connection with a lantern ring (53) with an internal threaded hole, limiting grooves are symmetrically formed in one sides of the first upright post (2) and the second upright post (7), two ends of the bottom of the baffle plate (4) are correspondingly clamped in the two limiting grooves, and the two ends of the top of the baffle (4) are correspondingly abutted against the bottoms of the two lantern rings (53) with the internal thread holes.
3. The construction fence according to claim 1, wherein the splice assembly (8) comprises a bolt (81), a bolt hole a (82), a catch (83), a catch (84), and a bolt hole b (85), a clamping groove (83) is formed in one side of the first base (1), a clamping block (84) is installed on one side of the second base (6), the clamping block (84) and the clamping groove (83) are in a matched clamping structure, one side of the first upright post (2) is provided with a bolt hole a (82) communicated with the other side, one side of the second upright post (7) is provided with a bolt hole b (85) communicated to the other side, the second upright post (7) of one group of guardrail bodies is in contact with the first upright post (2) of the other group of guardrail bodies in a fitting manner, and the bolt (81) penetrates through a bolt hole b (85) on the second upright post (7) of one group of guardrail bodies and is in threaded connection with a bolt hole a (82) on the first upright post (2) of the other group of guardrail bodies.
4. The construction fence according to claim 1, characterized in that the first base (1) and the second base (6) are of the same size and the first upright (2) and the second upright (7) are of the same size.
CN201920908921.6U 2019-06-17 2019-06-17 Construction guardrail Expired - Fee Related CN210264180U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920908921.6U CN210264180U (en) 2019-06-17 2019-06-17 Construction guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920908921.6U CN210264180U (en) 2019-06-17 2019-06-17 Construction guardrail

Publications (1)

Publication Number Publication Date
CN210264180U true CN210264180U (en) 2020-04-07

Family

ID=70043006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920908921.6U Expired - Fee Related CN210264180U (en) 2019-06-17 2019-06-17 Construction guardrail

Country Status (1)

Country Link
CN (1) CN210264180U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112026940A (en) * 2020-09-19 2020-12-04 薛巧红 High for trailer stand additional strengthening of security
CN112502532A (en) * 2020-11-20 2021-03-16 林丹妮 Rail transit is with preventing climbing rail based on infrared detection alarming function

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112026940A (en) * 2020-09-19 2020-12-04 薛巧红 High for trailer stand additional strengthening of security
CN112502532A (en) * 2020-11-20 2021-03-16 林丹妮 Rail transit is with preventing climbing rail based on infrared detection alarming function
CN112502532B (en) * 2020-11-20 2022-02-08 姚金福 Rail transit is with preventing climbing rail based on infrared detection alarming function

Similar Documents

Publication Publication Date Title
CN210264180U (en) Construction guardrail
CN107060352B (en) Movable anchor bolt locating rack
CN209855375U (en) Building construction rail guard convenient to dismouting and angularly adjustable
CN214456271U (en) H-shaped beam splicing platform for crane
CN209760856U (en) Adjustable assembled face limit guardrail bar convenient to use
CN210460187U (en) Construction safety protective guard convenient to dismouting
CN215612317U (en) Ceramic machining's deironing equipment
CN219528627U (en) Novel cartridge formula guardrail
CN221742019U (en) Wall pull rod structure of clear water template
CN217352719U (en) No negative pressure water supply installation convenient to installation
CN220813677U (en) A side slope protection structure for hydraulic and hydroelectric construction
CN215978821U (en) Removable supporting is used in building engineering construction
CN220014143U (en) Building curtain wall with splicing structure
CN221278218U (en) Assembled T-shaped bolt
CN212582517U (en) Road rail guard for municipal administration of convenient dismantlement
CN216406141U (en) Dismantle convenient template for construction
CN221545293U (en) Hanging basket for double-hoop bent cap construction
CN220014008U (en) H-shaped steel structure with splicing structure
CN209891620U (en) Aluminum veneer mounting structure on cylinder
CN218522421U (en) Fence for municipal works convenient to installation
CN215926751U (en) Aluminum alloy roof template
CN209855216U (en) Scaffold convenient to installation for curtain wall construction
CN218765035U (en) Fool-proof assembly for detecting hole distance of automobile part
CN218265360U (en) Temporary railing convenient to build fast for building engineering
CN219220002U (en) Construction security protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200407