CN210239241U - Fully-prefabricated integrated assembly type concrete charging sentry box - Google Patents

Fully-prefabricated integrated assembly type concrete charging sentry box Download PDF

Info

Publication number
CN210239241U
CN210239241U CN201920686361.4U CN201920686361U CN210239241U CN 210239241 U CN210239241 U CN 210239241U CN 201920686361 U CN201920686361 U CN 201920686361U CN 210239241 U CN210239241 U CN 210239241U
Authority
CN
China
Prior art keywords
sentry box
box body
wallboard
integral type
integrated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920686361.4U
Other languages
Chinese (zh)
Inventor
Lifei Chen
陈丽飞
Changjiang Guo
郭长江
Hui Wang
王辉
Yushuan Guo
郭玉拴
Yunzhou Li
李云周
Xiang Yu
于祥
Zhijia Liu
刘志家
Ruijuan Luo
罗瑞娟
Liqin Bai
白丽琴
Yongtao Guo
郭勇涛
Bin Wang
王斌
Guoqing Zhao
赵国青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Dongfang Construction Group Development Co ltd
Henan Jiudong Construction Engineering Co Ltd
Ruzhou Dongjiang Building Industrial Technology Co ltd
Original Assignee
Henan Dongfang Construction Group Development Co ltd
Henan Jiudong Construction Engineering Co Ltd
Ruzhou Dongjiang Building Industrial Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Dongfang Construction Group Development Co ltd, Henan Jiudong Construction Engineering Co Ltd, Ruzhou Dongjiang Building Industrial Technology Co ltd filed Critical Henan Dongfang Construction Group Development Co ltd
Priority to CN201920686361.4U priority Critical patent/CN210239241U/en
Application granted granted Critical
Publication of CN210239241U publication Critical patent/CN210239241U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a fully-prefabricated integrated assembled concrete charging sentry box, which comprises an integrated sentry box body, wherein the integrated sentry box body is of a hollow cuboid structure, the front section and the rear section of the integrated sentry box body are open, and a carriage body with two open ends is enclosed by a top plate, a bottom plate and two side plates; the lower extreme of wallboard is provided with two sets of vertical preformed holes, is provided with the reserve reinforcing bar just to the preformed hole drill way on the integral type sentry box body, and the reserve reinforcing bar passes through fixed establishment to install at the preformed hole to fix the wallboard on the integral type sentry box body. The utility model discloses rational in infrastructure, the engineering volume is little, and production installation rate is fast, weak point consuming time, on satisfying structure safety and service function's basis, construction speed is fast, and the quality is easily controlled, and component appearance quality is good, and the durability is good to and reduce the on-the-spot wet work, be favorable to the environmental protection.

Description

Fully-prefabricated integrated assembly type concrete charging sentry box
Technical Field
The utility model relates to an assembly type structure technical field, concretely relates to integrative assembled concrete charging sentry box of full prefabrication.
Background
The prefabricated building refers to a building construction mode of a building with use functions, wherein part or all components of the building are produced in a component prefabricating factory and then are transported to a construction site in a corresponding transportation mode, and the components are assembled by adopting a reliable installation mode and an installation machine. The assembly type building has the advantages of high industrialization level, convenience for winter construction, reduction of wet operation amount of a construction site, reduction of material consumption, reduction of site dust and construction waste and the like, and is beneficial to realizing the purposes of improving the building quality, improving the production efficiency, reducing the cost, realizing energy conservation and emission reduction and protecting the environment.
The construction of the prior common traditional sentry box has the following defects: 1. traditional charging sentry box adopts the brick-concrete structure, and after the construction of brick-concrete structure was accomplished, the process construction such as plastering, heat preservation need be carried out again. The construction period is long, the construction is greatly influenced by seasons and weather, the construction quality is difficult to control, common quality problems such as hollowing and cracks of a plastering layer and a heat insulation layer occur frequently, the foundation is not uniformly settled, even the wall is cracked, and the structure safety is influenced; 2. if the building adopts a cast-in-place structure, the using amount of a field template scaffold is large, the appearance quality of cast-in-place concrete is difficult to control, common quality problems such as honeycombs, pitted surfaces, hollows, rib leakage and the like often occur, and after the concrete pouring is finished, the working procedures such as plastering, a heat insulation layer and the like are required to be carried out for construction; 3. the stainless steel sentry box is bent, punched and formed by adopting a bending forming process, so that the cost is high, the price is high, the stainless steel sentry box can generate electrochemical reaction when being subjected to alkaline substances, the stainless steel sentry box can rust due to the alkaline substances being electrolytes, and the stainless steel sentry box can be corroded after a long time, so that the alkali resistance of the stainless steel sentry box is poor.
How to design a rational in infrastructure, design benefit, the engineering volume is little, and production installation rate is fast, weak point consuming time, satisfies on the basis of structure safety and service function, builds fastly, and the quality is easily controlled, and component appearance quality is good, and the durability is good to and reduce the on-the-spot wet operation, the problem that needs to solve at present is the whole prefabricated integrative assembled concrete charging sentry box that is favorable to the environmental protection.
SUMMERY OF THE UTILITY MODEL
In order to solve the on-the-spot work period that current traditional charging sentry box exists, it is big to receive season and weather influence, construction quality is difficult to control, quality common fault such as plaster layer and heat preservation hollowing, crack often takes place, the uneven settlement of ground can also cause the wall body fracture even, influence technical problem such as structure safety, the utility model provides a charging sentry box is assembled to prefabricated assembled concrete integral type entirely, it is rational in infrastructure to come to realize, design benefit, and the engineering volume is little, and production installation is fast, weak point consuming time, on satisfying structure safety and service function's the basis, construction speed is fast, and quality is easily controlled, and component appearance is of high quality, and the durability is good to and reduce on-the-spot wet operation, be favorable to the purpose.
The utility model discloses a solve the technical scheme that above-mentioned technical problem adopted and be: a fully-prefabricated integrated assembly type concrete charging sentry box comprises an integrated sentry box body, wherein the integrated sentry box body is of a hollow cuboid structure and comprises a top plate, a bottom plate and two side plates, the front section and the rear section of the integrated sentry box body are open, and the top plate, the bottom plate and the two side plates are enclosed to form a box body with two open ends; one end of the carriage body is provided with a sentry box door, the other end opposite to the sentry box door is provided with a wallboard, and a gap is reserved between the upper edge of the wallboard and the top plate so as to install a window; the lower extreme of wallboard is provided with two sets of vertical preformed holes, is provided with the reserve reinforcing bar just to the preformed hole drill way on the integral type sentry box body, and the reserve reinforcing bar passes through fixed establishment to install at the preformed hole to fix the wallboard on the integral type sentry box body.
The side plate is provided with a pre-buried wire box, and a switch, a socket and a wire are arranged in the pre-buried wire box.
And the top plate is provided with a pre-embedded lamp box.
The reserved steel bar is provided with a through hole, a bolt piece is arranged in the through hole in a penetrating mode, and the wallboard is fixed with the base plate of the integrated sentry box body through the bolt piece.
The surfaces of all the components of the integrated sentry box body are polished and smoothed, so that all the components are connected in a smooth transition mode, and construction is facilitated.
Compared with the prior art, the beneficial effects of the utility model are that:
1) the utility model discloses an integral type sentry box body, integral type sentry box body be hollow cuboid structure, including roof, bottom plate and two curb plates, two sections open for the front and back of integral type sentry box body, roof, bottom plate and two curb plates enclose into the railway carriage or compartment body of both ends open-ended, through the standardized component that can the volume production, change the charge sentry box that the tradition needs cast in situ processing into concreting in advance to preset relevant accessory structure, directly lay in the field can, realize energy saving and emission reduction, the product percent of pass is high, convenient operation, simple and practical's purpose;
2) one end of the carriage body is provided with a sentry box door, the other end opposite to the sentry box door is provided with a wallboard, and a gap is reserved between the upper edge of the wallboard and the top plate so as to install a window; the lower end of the wall plate is provided with two groups of vertical preformed holes, the integral sentry box body is provided with preformed steel bars which are opposite to the orifices of the preformed holes, and the preformed steel bars are arranged in the preformed holes through a fixing mechanism so as to fix the wall plate on the integral sentry box body;
3) the side plate is provided with a pre-buried wire box, a switch, a socket and a wire are arranged in the pre-buried wire box, and the wire socket and the switch are pre-buried in advance to be connected, so that the line distribution of the sentry box is facilitated;
4) the reserved steel bars are provided with through holes, bolt pieces penetrate through the through holes, and the wall plate and the integrated sentry box body bottom plate are fixed together through the bolt pieces;
5) on the basis of meeting the structural safety and the use function, the problem of on-site concrete wet operation is solved, the influence of seasons and weather on-site construction is avoided, and the concrete wet construction method has the characteristics of high construction speed, easy quality control, good component appearance quality, good durability, reduction of on-site wet operation, contribution to environmental protection and the like;
6) the full precast concrete component is adopted, the flatness and the dimensional deviation of the finished component are very small, the later wall plastering process is omitted, and the materials and the labor are saved; the concrete maintenance is not influenced by weather and temperature, the construction period is shortened, and the maintenance measure cost in winter is saved; construction workers are specialized, and the quality is guaranteed;
7) the integrated assembled charging sentry box is subjected to on-site full-assembly construction, the prefabrication rate of components is 100%, on-site concrete operation is avoided, and the on-site construction speed is improved.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of the structure of the present invention;
FIG. 3 is a left side view of the structure of the present invention;
FIG. 4 is a schematic diagram of the right-side view structure of the present invention;
the labels in the figure are: 1. integral type sentry box body, 2, wallboard, 3, pre-buried line box, 4, pre-buried lamp box, 5, reserved steel bar, 6, preformed hole.
Detailed Description
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings.
As shown in the figures, the fully-prefabricated integrated assembly type concrete charging sentry box comprises an integrated sentry box body 1, wherein the integrated sentry box body 1 is of a hollow cuboid structure and comprises a top plate, a bottom plate and two side plates, the front section and the rear section of the integrated sentry box body 1 are open, and the top plate, the bottom plate and the two side plates form a box body with two open ends; one end of the carriage body is provided with a sentry box door, the other end opposite to the sentry box door is provided with a wallboard 2, and a gap is reserved between the upper edge of the wallboard 2 and a top plate so as to install a window; the lower extreme of wallboard 2 is provided with two sets of vertical preformed holes 6, is provided with on the integral type sentry box body 1 just to the preformed reinforcement 5 in the 6 drill ways in preformed hole, and preformed reinforcement 5 passes through fixed establishment to install at preformed hole 6 to fix wallboard 2 on integral type sentry box body 1.
The basic implementation manner of the present invention can be further improved, perfected and limited on the basis: be provided with pre-buried line box 3 on the curb plate, be provided with switch, socket and wire in the pre-buried line box 3.
The basic implementation manner of the present invention can be further improved, perfected and limited on the basis: the top plate is provided with an embedded lamp box 4.
The basic implementation manner of the present invention can be further improved, perfected and limited on the basis: if reserve reinforcing bar 5 on be provided with the through-hole, wear to be equipped with bolt spare in the through-hole, fix wallboard 2 and 1 bottom plate of integral type sentry box body together through bolt spare.
The basic implementation manner of the present invention can be further improved, perfected and limited on the basis: for example, the surfaces of all the components of the integrated sentry box body 1 are polished and smoothed, so that all the components are connected in a smooth transition manner, and construction is facilitated.
In the practical application, compare with current traditional charging sentry box, the beneficial effects of the utility model are embodied in:
in the production process, batch processing and production are carried out in a factory through a standardized production management system, the product qualification rate is high, and the overall quality of the product is greatly improved;
compared with the traditional sentry box construction, the construction period is short, the occupied space is small, the installation is firm, the pressure resistance and the stress resistance are strong, the manufacturing cost is low, the construction is not influenced by weather, the construction can be carried out at any time, the field wet operation amount is reduced, and the environment protection is facilitated;
in the using process, the problems of good quality, strong integrity, difficult damage, difficult settlement and the like can be achieved;
in practical application, the workload of a construction site is reduced, the material waste is reduced to a certain extent, and the allocation of site construction personnel can be greatly reduced due to mechanical installation of components;
and fifthly, in the aspect of cost control, batch production and efficient construction are realized through standardized design and production, so that the cost is well saved.
The utility model discloses rational in infrastructure, design benefit, the engineering volume is little, the production installation rate is fast, weak point consuming time, on satisfying structure safety and service function's the basis, it is fast to build, the quality is easily controlled, component appearance quality is good, the durability is good, and reduce on-the-spot wet work, be favorable to the environmental protection, the on-the-spot industrial period who solves current traditional charging sentry box and exist is long, receive season and weather effect big, construction quality is difficult to control, plaster layer and heat preservation hollowing, quality common fault such as crack often takes place, the ground is inhomogeneous to subsides and still can cause the wall body fracture even, technical problem such as influence structure safety.
The preferred embodiments and examples of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the embodiments and examples, and various changes can be made without departing from the concept of the present invention within the knowledge of those skilled in the art.

Claims (4)

1. The utility model provides a complete integrative assembled concrete charging sentry box of prefabricating, includes integral type sentry box body (1), its characterized in that: the integral sentry box body (1) is of a hollow cuboid structure and comprises a top plate, a bottom plate and two side plates, the front section and the rear section of the integral sentry box body (1) are open, and the top plate, the bottom plate and the two side plates form a box body with two open ends; one end of the carriage body is provided with a sentry box door, the other end opposite to the sentry box door is provided with a wallboard (2), and a gap is reserved between the upper edge of the wallboard (2) and the top plate so as to install a window; the lower extreme of wallboard (2) is provided with two sets of vertical preformed holes (6), is provided with on integral type sentry box body (1) just to preformed hole (6) drill way reserved reinforcing bar (5), and reserved reinforcing bar (5) are installed in preformed hole (6) through fixed establishment to fix wallboard (2) on integral type sentry box body (1).
2. A fully prefabricated integrally assembled concrete charging kiosk according to claim 1 wherein: the side plate is provided with a pre-buried wire box (3), and a switch, a socket and a wire are arranged in the pre-buried wire box (3).
3. A fully prefabricated integrally assembled concrete charging kiosk according to claim 1 wherein: the top plate is provided with a pre-embedded lamp box (4).
4. A fully prefabricated integrally assembled concrete charging kiosk according to claim 1 wherein: reserve reinforcing bar (5) on be provided with the through-hole, wear to be equipped with bolt spare in the through-hole, fix wallboard (2) and integral type sentry box body (1) bottom plate together through bolt spare.
CN201920686361.4U 2019-05-14 2019-05-14 Fully-prefabricated integrated assembly type concrete charging sentry box Expired - Fee Related CN210239241U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920686361.4U CN210239241U (en) 2019-05-14 2019-05-14 Fully-prefabricated integrated assembly type concrete charging sentry box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920686361.4U CN210239241U (en) 2019-05-14 2019-05-14 Fully-prefabricated integrated assembly type concrete charging sentry box

Publications (1)

Publication Number Publication Date
CN210239241U true CN210239241U (en) 2020-04-03

Family

ID=69969761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920686361.4U Expired - Fee Related CN210239241U (en) 2019-05-14 2019-05-14 Fully-prefabricated integrated assembly type concrete charging sentry box

Country Status (1)

Country Link
CN (1) CN210239241U (en)

Similar Documents

Publication Publication Date Title
CN208502433U (en) A kind of prefabricated assembled Assembled surrounding wall with vertical curtain wall penel component
CN105019573A (en) Prefabricated external wall template structure system with heat insulation function, and construction method thereof
CN105696744B (en) Steam-pressing aero-concrete integral wall and its production technology
CN107740522B (en) Connecting structure of prefabricated regenerated block concrete slab and superposed beam and construction method thereof
CN105863155A (en) Heat insulation and energy storage type RPC prefabricated wall panel system
CN209907841U (en) Prefabricated high-strength concrete floor tile of assembled
CN113638489B (en) RC beam column node can be dismantled to assembled
CN103255860A (en) On-site concrete shear wall structure with permanent heat insulation formwork and construction process of on-site concrete shear wall structure
CN110792164A (en) Transverse assembling device and method for assembled shear wall
CN104947846A (en) Assembled integral type frame filling light weight inner wallboard and preparation method thereof
CN113047479A (en) Non-dismantling composite heat-insulating template and construction method thereof
CN210178013U (en) Fully-prefabricated assembled house
CN116145856A (en) Assembled profiled steel sheet composite shear wall and construction method thereof
CN210887565U (en) Assembled bolted connection roof beam-post node
CN215563533U (en) Composite prefabricated wallboard with reinforcing belt
CN208168032U (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node
CN214994967U (en) Non-dismantling composite heat-insulating template
CN210239241U (en) Fully-prefabricated integrated assembly type concrete charging sentry box
CN210239240U (en) Novel assembled sentry box of dry-type connection
CN114457953B (en) Assembled insulation structure integrated window lower filling wall and manufacturing method thereof
CN211547801U (en) Ring main unit basis is assembled to prefabricated assembled concrete entirely
CN206625450U (en) A kind of novel and multifunctional environmentally friendly combined wall board
CN114658141A (en) Connecting structure and method for T-shaped constructional column and independent foundation of assembled composite wallboard
CN212427799U (en) Integrated reinforcing steel bar formwork-free cast-in-place concrete beam
CN214169600U (en) Laminated floor slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200403