CN210224878U - Turning guide device for construction engineering cable erection - Google Patents
Turning guide device for construction engineering cable erection Download PDFInfo
- Publication number
- CN210224878U CN210224878U CN201921334854.8U CN201921334854U CN210224878U CN 210224878 U CN210224878 U CN 210224878U CN 201921334854 U CN201921334854 U CN 201921334854U CN 210224878 U CN210224878 U CN 210224878U
- Authority
- CN
- China
- Prior art keywords
- lateral wall
- circular arc
- mounting
- mount pad
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims description 14
- 230000006835 compression Effects 0.000 claims description 8
- 238000007906 compression Methods 0.000 claims description 8
- 239000011810 insulating material Substances 0.000 claims description 2
- 239000000463 material Substances 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 8
- 238000013461 design Methods 0.000 abstract description 6
- 230000000694 effects Effects 0.000 abstract description 3
- 238000006073 displacement reaction Methods 0.000 description 5
- 238000009435 building construction Methods 0.000 description 4
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000002730 additional effect Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000012774 insulation material Substances 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
Images
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
The utility model provides a building engineering cable erection turning guider relates to building engineering building technical field, including mounting panel and half-circular arc cover, the mounting hole that four symmetries set up is seted up respectively to four corners of mounting panel, the installation piece that two symmetries of two fixedly connected with set up respectively is distinguished to the both sides lateral wall of half-circular arc cover, and two upper end lateral wall fixedly connected with of mounting panel correspond the mount pad that sets up with two installation pieces respectively, the lower extreme lateral wall fixedly connected with inserted bar of installation piece, and the mount pad keeps away from one side lateral wall of mounting panel and set up the slot that matches with the inserted bar, the inserted bar is kept away from the one end of installation piece and is inserted and locate the setting in the slot, the lateral wall of mount pad is inserted and is established and the gag lever post. The utility model discloses in, through the design of half-circular arc cover, with the cable setting in half-circular arc cover, can carry out the guide effect to the turn of cable, protected the safety of cable turn, and the installation is dismantled conveniently.
Description
Technical Field
The utility model relates to a building engineering building technical field especially relates to a building engineering cable erection turning guider.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation activities of lines, pipes and equipment matched with the building constructions, the building engineering refers to an engineering entity which is completed by various technical works such as planning, investigation, design, construction and completion of new construction, reconstruction or extension of the building constructions and the auxiliary facilities, and the installation engineering of the lines, pipes and equipment matched with the building engineering, also refers to the construction engineering of various buildings and buildings, and is also called as the construction workload.
In the building engineering work progress, erect to the cable and have important meaning, at the in-process of laying the cable, if do not have the device of turn direction to assist the protection in the direction of cable run turn, the easy excessive deformation of circuit leads to the fracture, not only influences subsequent building construction progress, has the potential safety hazard simultaneously.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering cable erection turning guider to solve above-mentioned technical problem.
The utility model discloses a solve above-mentioned technical problem, adopt following technical scheme to realize: a turning guide device for building engineering cable erection comprises a mounting plate and a semi-circular arc-shaped cover, wherein four corners of the mounting plate are respectively provided with four symmetrically-arranged mounting holes, two symmetrically-arranged mounting blocks are respectively and fixedly connected to the side walls of the two sides of the semi-circular arc-shaped cover, two mounting seats are respectively and correspondingly arranged on the side wall of the upper end of the mounting plate, an inserting rod is fixedly connected to the side wall of the lower end of each mounting block, a slot matched with the inserting rod is formed in the side wall of the mounting seat far away from the mounting plate, one end of the inserting rod far away from the mounting blocks is inserted into the slot and is arranged, a transversely-arranged limiting rod is inserted into and is slidably connected with the side wall of the mounting seat, a limiting groove is formed in the side wall of the inserting rod, one end of the limiting rod far away from the limiting groove is inserted into the limiting groove and is arranged, one end of, a sliding cavity is formed in the mounting seat and is located below the slot, a reset structure is arranged in the sliding cavity, one end of the reset structure penetrates through the sliding cavity and the side wall of the mounting seat to extend outwards, and one end of the reset structure located outside the mounting seat is fixedly connected with the side wall of the pulling block.
Preferably, the reset structure includes the slider with the inner wall sliding connection of smooth chamber, the slider is kept away from the horizontal slide bar that sets up of one side lateral wall fixedly connected with of half-circular arc cover, and the slide bar one end of keeping away from the slider runs through smooth chamber and runs through the lateral wall of mount pad and outwards extend and with the lateral wall fixed connection who draws the piece, is located smooth chamber the cover is equipped with compression spring on the slide bar.
Preferably, the side wall of the mounting seat is provided with a first through hole communicated with the sliding cavity, the sliding rod penetrates through the first through hole, and the side wall of the sliding rod is connected with the inner wall of the first through hole in a sliding mode.
Preferably, the mounting plate and the semi-circular arc cover are made of high-temperature-resistant insulating materials.
Preferably, the side wall of the mounting seat is provided with a second through hole communicated with the slot, the limiting rod is inserted into the second through hole and is arranged, and the outer side wall of the limiting rod is connected with the second through hole in a sliding mode.
Preferably, the inner wall of the semi-circular arc cover is pasted with a buffer layer, and the buffer layer is made of sponge.
The utility model has the advantages that:
1. through the design of semi-circular arc cover, with the cable setting in semi-circular arc cover, can carry out better direction auxiliary action to the turn of cable, protected the safety of cable turn simultaneously better.
2. Through the setting of reset structure, the pulling draws the piece, drive the gag lever post toward the direction displacement of keeping away from the slot, insert the inserted bar in the slot, then loosen and draw the piece, at this moment, compression spring will support the slider displacement owing to the spring action, thereby drive and draw the piece displacement with the slide bar is fixed, thereby promote the gag lever post and reset, automatically, pop into in the spacing groove on the inserted bar and support tightly, accomplish the restriction to the inserted bar, thereby realize the fixed mounting of half arc cover, this design easy operation, use manpower sparingly.
Drawings
Fig. 1 is a schematic structural view of a turning guide device for construction engineering cable erection according to the present invention;
FIG. 2 is an enlarged schematic view of the structure at A in FIG. 1;
fig. 3 is a top view of a turning guide device for construction engineering cable erection according to the present invention;
fig. 4 is the utility model discloses in a building engineering cable erection turning guider's inside cross-sectional view of half-circular arc cover.
Reference numerals: 1. mounting a plate; 2. a semi-circular arc cover; 3. mounting holes; 4. mounting blocks; 5. a mounting seat; 6. inserting a rod; 7. a slot; 8. a limiting rod; 9. a limiting groove; 10. pulling the block; 11. a slide chamber; 12. a slider; 13. a slide bar; 14. a compression spring; 15. a first through hole; 16. a second through hole; 17. a buffer layer.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the functions of the present invention easy to understand, the present invention will be further explained below with reference to the following embodiments and the accompanying drawings, but the following embodiments are only the preferred embodiments of the present invention, and not all embodiments are included. Based on the embodiments in the implementation, other embodiments obtained by those skilled in the art without any creative work belong to the protection scope of the present invention.
Specific embodiments of the present invention will be described below with reference to the accompanying drawings.
As shown in figures 1-4, the turning guide device for the cable erection in the building engineering comprises a mounting plate 1 and a semi-circular arc cover 2, wherein four corners of the mounting plate 1 are respectively provided with four symmetrically arranged mounting holes 3, the mounting plate 1 passes through the mounting holes 3 through fixing bolts to be fixed on a wall, two side walls of the semi-circular arc cover 2 are respectively and fixedly connected with two symmetrically arranged mounting blocks 4, the side wall of the upper end of the mounting plate 1 is fixedly connected with two mounting seats 5 which are respectively corresponding to the two mounting blocks 4, the side wall of the lower end of the mounting block 4 is fixedly connected with an inserting rod 6, one side wall of the mounting seat 5, which is far away from the mounting plate 1, is provided with a slot 7 matched with the inserting rod 6, one end of the inserting rod 6, which is far away from the mounting block 4, is inserted into the slot 7 and arranged, the side wall of the mounting seat 5 is inserted and slidably connected, one end of a limiting rod 8 is inserted into the limiting groove 9 and arranged, one end of the limiting rod 8, far away from the limiting groove 9, extends to the outer side of the mounting seat 5 and is fixedly connected with a pull block 10, a sliding cavity 11 is formed in the mounting seat 5, the sliding cavity 11 is arranged below the slot 7, a reset structure is arranged in the sliding cavity 11, one end of the reset structure penetrates through the sliding cavity 11 and penetrates through the side wall of the mounting seat 5 to extend outwards, and one end of the reset structure, located on the outer side of the mounting seat 5, is fixedly connected with the side wall of the pull block 10;
the reset structure comprises a slide block 12 connected with the inner wall of a slide cavity 11 in a sliding way, a slide rod 13 transversely arranged is fixedly connected with the side wall of one side of the slide block 12 far away from the semi-arc-shaped cover 2, one end of the slide rod 13 far away from the slide block 12 penetrates through the slide cavity 11 and penetrates through the side wall of the mounting seat 5 to extend outwards and is fixedly connected with the side wall of a pull block 10, a compression spring 14 is sleeved on the slide rod 13 positioned in the slide cavity 11 and pulls the pull block 10 to drive a limiting rod 8 to move towards the direction far away from the slot 7, at the moment, the slide block 12 is connected with the slide cavity 11 in a sliding way, the slide block 12 moves along with the slide rod 13 fixed with the pull block 10, at the moment, the compression spring 14 is extruded by the slide block 12 to generate elastic force, when the limiting rod 8 is completely retracted into a second through hole 16, the insertion rod 6 can be inserted into the slot 7 at the moment, thereby driving the pulling block 10 fixed with the sliding rod 13 to displace, pushing the limiting rod 8 to reset, automatically bouncing into the limiting groove 9 on the inserting rod 6 and abutting tightly, completing the limitation of the inserting rod 6, and further realizing the fixed installation of the half-arc cover 2;
first through-hole 15 that sets up with smooth chamber 11 intercommunication is seted up to the lateral wall of mount pad 5, and slide bar 13 runs through first through-hole 15 setting, sliding connection between slide bar 13's the lateral wall and the inner wall of first through-hole 15, make things convenient for slide bar 13 displacement, mounting panel 1 and half-circular arc cover 2 all adopt high temperature insulation material, long service life, prevent the electric leakage, second through-hole 16 that sets up with slot 7 intercommunication is seted up to the lateral wall of mount pad 5, and gag lever post 8 inserts and locates to set up in second through-hole 16, sliding connection between the lateral wall of gag lever post 8 and the second through-hole 16, the gag lever post 8 displacement of being convenient for, the inner wall of half-circular arc cover 2 is pasted and is had buffer layer 17, and buffer layer 17 adopts sponge material, play the cushioning effect to the bending.
The working principle is as follows: when the device is used, the mounting plate 1 can firstly pass through the mounting hole 3 through a fixing bolt to be fixed on a wall, then a cable is placed in the semi-arc-shaped cover 2, then the pulling block 10 is pulled to drive the limiting rod 8 to move in a direction away from the slot 7, at the moment, the sliding block 12 is in sliding connection with the sliding cavity 11, the sliding block 12 moves along with the sliding rod 13 fixed with the pulling block 10, at the moment, the compression spring 14 is extruded by the sliding block 12 to generate elastic force, when the limiting rod 8 is completely retracted into the second through hole 16, the inserting rod 6 can be inserted into the slot 7, then the pulling block 10 is loosened, at the moment, the compression spring 14 pushes against the sliding block 12 to move due to the elastic force, so as to drive the pulling block 10 fixed with the sliding rod 13 to move, thereby pushing the limiting rod 8 to reset, automatically pops into the limiting groove 9 on the inserting rod 6 and pushes against tightly, thereby completing the limitation on the inserting rod 6, and further realizing the, this design easy operation uses manpower sparingly, through the design of half-circular arc cover 2, can carry out better direction additional action to the turn of cable, has protected the safety of cable turn better.
In the present disclosure, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may comprise direct contact between the first and second features, or may comprise contact between the first and second features not directly. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (6)
1. The utility model provides a building engineering cable erection turn guider, includes mounting panel (1) and half-circular arc cover (2), its characterized in that: four symmetrically arranged mounting holes (3) are respectively formed at four corners of the mounting plate (1), two symmetrically arranged mounting blocks (4) are respectively and fixedly connected to two side walls of the semi-circular arc-shaped cover (2), two mounting seats (5) which are respectively arranged corresponding to the two mounting blocks (4) are fixedly connected to the upper side wall of the mounting plate (1), an inserting rod (6) is fixedly connected to the lower side wall of the mounting block (4), a slot (7) matched with the inserting rod (6) is formed in one side wall of the mounting seat (5) far away from the mounting plate (1), one end of the inserting rod (6) far away from the mounting block (4) is inserted into the slot (7) for arrangement, a transverse limiting rod (8) is inserted into the side wall of the mounting seat (5) and is connected with the limiting rod (6) in a sliding manner, a limiting groove (9) is formed in the side wall of the inserting rod (6), and one end of the limiting rod (8) is inserted into the limiting, one end that spacing groove (9) were kept away from in gag lever post (8) extends to the outside of mount pad (5) and fixedly connected with draws piece (10), set up smooth chamber (11) in mount pad (5), and smooth chamber (11) are located the below setting of slot (7), be equipped with reset structure in smooth chamber (11), and reset structure's one end runs through smooth chamber (11) and runs through the lateral wall of mount pad (5) and outwards extend the setting, are located the mount pad (5) outside reset structure's one end and the lateral wall fixed connection who draws piece (10).
2. The construction work cable erection turning guide device of claim 1, wherein: reset structure include with inner wall sliding connection's of smooth chamber (11) slider (12), slider (12) are kept away from horizontal slide bar (13) that sets up of one side lateral wall fixedly connected with of half-circular arc cover (2), and slide bar (13) keep away from the one end of slider (12) and run through smooth chamber (11) and run through the lateral wall of mount pad (5) and outwards extend and with the lateral wall fixed connection who draws piece (10), be located smooth chamber (11) the cover is equipped with compression spring (14) on slide bar (13).
3. A construction work cable erection turn guide as claimed in claim 1 or 2, wherein: the lateral wall of mount pad (5) is seted up first through-hole (15) that set up with smooth chamber (11) intercommunication, and slide bar (13) run through first through-hole (15) and set up, sliding connection between the lateral wall of slide bar (13) and the inner wall of first through-hole (15).
4. The construction work cable erection turning guide device of claim 1, wherein: the mounting plate (1) and the semi-circular arc cover (2) are made of high-temperature-resistant insulating materials.
5. The construction work cable erection turning guide device of claim 1, wherein: the side wall of the mounting seat (5) is provided with a second through hole (16) communicated with the slot (7), the limiting rod (8) is inserted into the second through hole (16) and is arranged, and the outer side wall of the limiting rod (8) is connected with the second through hole (16) in a sliding mode.
6. The construction work cable erection turning guide device of claim 1, wherein: the inner wall of the semi-circular arc cover (2) is pasted with a buffer layer (17), and the buffer layer (17) is made of sponge materials.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921334854.8U CN210224878U (en) | 2019-08-16 | 2019-08-16 | Turning guide device for construction engineering cable erection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921334854.8U CN210224878U (en) | 2019-08-16 | 2019-08-16 | Turning guide device for construction engineering cable erection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210224878U true CN210224878U (en) | 2020-03-31 |
Family
ID=69919717
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921334854.8U Expired - Fee Related CN210224878U (en) | 2019-08-16 | 2019-08-16 | Turning guide device for construction engineering cable erection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210224878U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112803329A (en) * | 2020-12-23 | 2021-05-14 | 林亿凯 | Cable support for municipal works construction |
CN113224702A (en) * | 2021-05-17 | 2021-08-06 | 伽伽科技集团有限公司 | Cable bridge fixing device |
-
2019
- 2019-08-16 CN CN201921334854.8U patent/CN210224878U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112803329A (en) * | 2020-12-23 | 2021-05-14 | 林亿凯 | Cable support for municipal works construction |
CN113224702A (en) * | 2021-05-17 | 2021-08-06 | 伽伽科技集团有限公司 | Cable bridge fixing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210224878U (en) | Turning guide device for construction engineering cable erection | |
CN101215931A (en) | Rapid nailing-free combination type house | |
CN211415605U (en) | Fast-floating shear wall mold | |
CN210597969U (en) | Heat preservation wallboard for building | |
CN211597144U (en) | Noise reduction device for building construction management environmental protection and energy saving | |
CN216743176U (en) | Pipeline fixing device for building engineering | |
CN214618185U (en) | Pipeline support is used in municipal works construction | |
CN201598765U (en) | Novel block brick | |
CN213392178U (en) | Fastening formula tunnel lining section of jurisdiction | |
CN205531310U (en) | Stupefied connected node of vertical section bar of aluminum mould board and aluminum mould board system | |
CN210216768U (en) | Prefabricated wood structure heat preservation wall | |
CN210659893U (en) | Building electrical construction erection equipment | |
CN210086898U (en) | Support frame for assembly type building | |
CN210424216U (en) | Fixing device for building electrical equipment | |
CN210165003U (en) | Be used for rig module high pressure hose protection device | |
CN212613775U (en) | Clear water concrete vertical rib aluminum alloy combined template | |
CN203188917U (en) | Base device of core drill for drilling long and thin holes | |
CN214618477U (en) | Novel bolt-up P type pipe clamp | |
CN214499889U (en) | Wear-resistant engineering plastic for building construction | |
CN218386650U (en) | Building wall pipeline laying device | |
CN215593751U (en) | Impact-resistant reinforced concrete box culvert | |
CN216976048U (en) | Hydraulic engineering is with water pipe strutting arrangement who has joint protective structure | |
CN211646397U (en) | Pile digging device for concrete pipe piles in constructional engineering | |
CN214402632U (en) | Ceramic tile leveling locator | |
CN219011243U (en) | Open cut tunnel unilateral support and template device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200331 |
|
CF01 | Termination of patent right due to non-payment of annual fee |