CN210195272U - Constructional column pouring device - Google Patents

Constructional column pouring device Download PDF

Info

Publication number
CN210195272U
CN210195272U CN201920747664.2U CN201920747664U CN210195272U CN 210195272 U CN210195272 U CN 210195272U CN 201920747664 U CN201920747664 U CN 201920747664U CN 210195272 U CN210195272 U CN 210195272U
Authority
CN
China
Prior art keywords
material pipe
pipe support
positioning
support
constructional column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920747664.2U
Other languages
Chinese (zh)
Inventor
Hua Wang
王�华
Zeqing Yang
杨泽清
Xiaodi Shao
邵小弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Port City Construction And Installation Engineering Co ltd
Original Assignee
Shanghai Port City Construction And Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Port City Construction And Installation Engineering Co ltd filed Critical Shanghai Port City Construction And Installation Engineering Co ltd
Priority to CN201920747664.2U priority Critical patent/CN210195272U/en
Application granted granted Critical
Publication of CN210195272U publication Critical patent/CN210195272U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a device is pour to constructional column belongs to the building structure field, including the template body, this internal die cavity that has seted up of template, all be provided with the frame along the length direction of template body on the both sides wall of template body, the slip is provided with material pipe support in the frame, set up the bar groove that supplies the inlet pipe to pass on the roof of material pipe support, the bottom of material pipe support is provided with the locating rack, the locating rack is located the die cavity, the utility model has the advantages of thereby it reduces artifical intensity of labour to be convenient for make the import of material pipe alignment die cavity.

Description

Constructional column pouring device
Technical Field
The utility model belongs to the technical field of the building structure technique and specifically relates to a device is pour to constructional column is related to.
Background
The constructional column is a concrete column which is manufactured by arranging the reinforcement according to the structure at the specified position of the wall body of the masonry house and pouring the concrete column according to the construction sequence of building the wall and then pouring the concrete column. In the process of pouring the constructional column, the pouring is performed after the wall is finished, so that the pouring gate is arranged on the side surface, and concrete is fed into the pouring gate from the side surface to finish the pouring. After pouring is finished, the pouring gate needs to be closed, and finally pouring of the constructional column can be finished.
The prior Chinese patent with the publication number of CN207348469U discloses a constructional column pouring device, which comprises a first template and a second template which are arranged at two sides of a wall body, and adopts a drawknot component to fix and form a cavity, a feeding port is arranged on the first template, a material guide box is arranged at the position of the feeding port, the material guide box comprises a box body which is communicated with the feeding port and guides concrete into the space between the first template and the second template and a closing plate which is arranged on the box body and is used for sealing, one side of the closing plate is hinged with the box body, a locking component is arranged between the box bodies at the other side, concrete can be poured into the cavity through the feeding port formed in the first template, the concrete can conveniently enter the cavity by adopting the arrangement of the material guide box, after the concrete is poured, through the closure of closing plate, can fill up pan feeding mouth position on the one hand and be full of, in addition, can conveniently seal the pan feeding mouth through the closing plate.
However, it has disadvantages in that: in the pouring process, because the feeding hole of the pouring device is high, a constructor needs to stand on the scaffold to support the material pipe to align to the inlet of the cavity, so that concrete enters the pouring device from the inlet, and the manual labor intensity is high.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a device is pour to constructional column has thereby the import that makes the material pipe aim at the die cavity of being convenient for reduces artifical intensity of labour's advantage.
The above object of the present invention can be achieved by the following technical solutions:
the utility model provides a constructional column pouring device, includes the template body, this internal die cavity that has seted up of template, all be provided with the frame along the length direction of template body on the both sides wall of template body, the slip is provided with material pipe support in the frame, set up the bar groove that supplies the inlet pipe to pass on the roof of material pipe support, the bottom of material pipe support is provided with the locating rack, the locating rack is located the die cavity.
Through adopting above-mentioned technical scheme, when pouring, with the assigned position that material pipe support slided in the frame, penetrate the inlet pipe from the bar groove of material pipe support, fix the discharge gate of inlet pipe in the locating rack again, compare in the import that the die cavity was aimed at to artifical support material pipe of prior art, through setting up material pipe support, the material pipe need not artifical support when the ejection of compact, greatly reduced intensity of labour.
The utility model discloses further set up to: the material pipe support is characterized in that a plurality of blind holes are formed in the rack along the length direction of the rack, each blind hole is internally provided with a positioning spring, each positioning spring is provided with a positioning block, and the material pipe support is provided with a containing hole for the positioning block to be inserted and arranged along the length direction of the rack.
Through adopting above-mentioned technical scheme, when the accommodation hole of material pipe support was located the top of locating piece, the locating piece got into the accommodation hole under positioning spring's elasticity effect to fix the material pipe support in the frame, the setting of locating piece has made things convenient for the relative fixed of material pipe and frame position.
The utility model discloses further set up to: the accommodating holes are at least two, and the distance between every two adjacent accommodating holes is equal to the distance between every two adjacent blind holes.
Through adopting above-mentioned technical scheme, during the location, two locating pieces in the frame are inserted respectively and are established in the accommodation hole of material pipe support, and two or more than two accommodation holes have further improved the location effect, have guaranteed the stability of material pipe support to a certain extent.
The utility model discloses further set up to: the top of the material pipe support located at the containing hole is provided with a jack communicated with the containing hole, an inserting strip is arranged in the jack, the bottom of the inserting strip is abutted to the positioning block, and the top of the inserting strip penetrates out of the jack and extends out of the material pipe support.
By adopting the technical scheme, when the material pipe support needs to be moved, the inserting strip is pressed downwards, the positioning block is pushed out of the accommodating hole by the inserting strip, the inserting strip is loosened after the material pipe support is moved, the material pipe support is moved to the next position, the positioning block at the next position is inserted into the accommodating hole again, the material pipe support is positioned, and the material pipe support is convenient to move due to the arrangement of the inserting strip.
The utility model discloses further set up to: the bottom of the material pipe support is provided with a support above the cavity, and the top of the positioning frame is hinged to the support.
Through adopting above-mentioned technical scheme, penetrate the inlet pipe from the bar groove on the material pipe support, reentrant locating rack, with articulated the setting on the support of locating rack, made things convenient for the inlet pipe rotation export direction in the die cavity.
The utility model discloses further set up to: the positioning frame is characterized in that a positioning pin is arranged below the hinge point, and the support is annularly provided with a plurality of positioning holes for the insertion of the positioning pin by taking the hinge point as a circle center and taking the distance between the hinge point and the positioning pin as a radius.
Through adopting above-mentioned technical scheme, can realize making inlet pipe export direction change through inserting the locating pin different locating holes, compare in prior art and pour the in-process and hold the material pipe through constructor and remove about making the cloth even, greatly reduced artifical intensity of labour.
The utility model discloses further set up to: the bottom of locating rack is provided with the holding ring, a plurality of screw holes have been seted up along the circumferencial direction to the holding ring, and a plurality of screw rod all are inserted in the screw hole and are equipped with the screw rod, the one end that the screw rod is located the holding ring is provided with the piece of supporting tightly.
Through adopting above-mentioned technical scheme, to the position of the centre of a circle direction adjusting screw who keeps away from the holding ring, make to support the piece and remove to keeping away from centre of a circle direction to make the material pipe get into the holding ring, wear to establish in the holding ring the inlet pipe, to the centre of a circle direction adjusting screw who is close to the holding ring, make to support the outer wall of tight piece support inlet pipe, realize the location to the inlet pipe, the setting up of holding ring has made things convenient for the location to the inlet pipe, can fix a position the inlet pipe in multiple different apertures.
The utility model discloses further set up to: the abutting sheet is an arc-shaped rubber sheet.
Through adopting above-mentioned technical scheme, support the tight piece and select to use the arc rubber piece, make the frictional force reinforcing of supporting tight piece and inlet pipe, support tightly effectually, simultaneously because the rubber piece is flexible material, be difficult for making the inlet pipe take place the damage supporting tight in-process.
To sum up, the utility model discloses following beneficial effect has: the utility model discloses a set up frame and material pipe support on the template body, fix the discharge gate of inlet pipe when realizing the feeding, compare in the constructor of prior art stand and support the import that the material pipe aimed at the die cavity on the scaffold frame, make the concrete get into from the import and pour the device, greatly reduced artifical intensity of labour.
Drawings
Fig. 1 is a first structural schematic diagram of an embodiment of the present invention;
fig. 2 is a second schematic structural diagram of the embodiment of the present invention;
fig. 3 is a schematic structural diagram of a material pipe support according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of a positioning frame according to an embodiment of the present invention;
fig. 5 is a schematic view of a connection structure between a rack and a material pipe support according to an embodiment of the present invention.
Reference numerals: 1. a template body; 2. a cavity; 3. a frame; 31. blind holes; 32. a positioning spring; 33. positioning blocks; 4. a material pipe support; 41. a strip-shaped groove; 42. an accommodation hole; 43. a jack; 44. cutting; 45. a support; 451. positioning holes; 5. a positioning frame; 51. positioning pins; 52. a positioning ring; 53. a screw; 54. and a support sheet.
Detailed Description
The technical solution of the embodiment of the present invention will be described below with reference to the accompanying drawings.
As shown in fig. 1 and 4, the constructional column pouring device comprises a formwork body 1, wherein a cavity 2 is formed in the formwork body 1, frames 3 are arranged on two side walls of the formwork body 1 along the length direction of the formwork body 1, and material pipe supports 4 are arranged on the frames 3 in a sliding manner. A strip-shaped groove 41 for the inlet pipe to pass through is formed in the top plate of the material pipe support 4, a support 45 is arranged at the bottom of the material pipe support 4 and above the cavity 2, a positioning frame 5 is hinged to the support 45, the positioning frame 5 is located in the cavity 2, the positioning frame 5 is hinged to the support 45, and the inlet pipe can rotate in the cavity 2 in the outlet direction. The bottom of the positioning frame 5 is provided with a positioning ring 52, the positioning ring 52 is provided with a plurality of threaded holes along the circumferential direction, a screw 53 is inserted into each threaded hole, and one end of the screw 53 located in the positioning ring 52 is provided with a abutting piece 54.
During construction, the feeding pipe penetrates from the strip-shaped groove 41 on the material pipe support 4, then enters the positioning ring 52 at the bottom of the positioning frame 5, and the tightly supporting sheet 54 tightly supports the outer wall of the feeding pipe to the circle center direction adjusting screw 53 close to the positioning ring 52, so that the positioning of the feeding pipe is realized, the positioning ring 52 is convenient to position the feeding pipe, and the feeding pipes in different apertures can be positioned. In this embodiment, the abutting sheet 54 is an arc rubber sheet, which enhances the friction between the abutting sheet 54 and the feeding pipe and has a good abutting effect; meanwhile, the rubber sheet is made of flexible materials, so that the feeding pipe is not easily damaged in the abutting process.
As shown in fig. 1 and 4, a positioning pin 51 is disposed on the positioning frame 5 below a hinge point of the positioning frame 5 and the support 45, and a plurality of positioning holes 451 for the positioning pin 51 to be inserted are circumferentially disposed on the support 45 by using the hinge point as a center of circle and a distance between the hinge point and the positioning pin 51 as a radius.
Through inserting locating pin 51 into different locating hole 451 can realize making inlet pipe export direction change, compare in prior art pour the in-process and hold the material pipe through constructor and remove about making the cloth even, greatly reduced artifical intensity of labour.
As shown in fig. 2 and 5, the rack 3 is provided with a plurality of blind holes 31 along the length direction thereof, each blind hole 31 is provided with a positioning spring 32 therein, the positioning spring 32 is provided with a positioning block 33, the material pipe support 4 is provided with at least two accommodating holes 42 along the length direction of the rack 3 for the positioning block 33 to be inserted, and the distance between two adjacent accommodating holes 42 is equal to the distance between two adjacent blind holes 31.
When the material pipe support 4 is positioned, the material pipe support 4 is pushed to slide on the rack 3, when the accommodating hole 42 of the material pipe support 4 is positioned above the positioning block 33, the positioning block 33 enters the accommodating hole 42 under the elastic action of the positioning spring 32, the positioning effect is improved by two or more accommodating holes 42, and the stability of the material pipe support 4 is ensured to a certain extent, so that the material pipe support 4 is fixed on the rack 3, and the positioning block 33 is convenient for the relative fixation of the position of the material pipe and the rack 3.
As shown in fig. 3 and 5, the top of the material tube holder 4 located at the receiving hole 42 is provided with an insertion hole 43 communicated with the receiving hole 42, an insertion strip 44 is arranged in the insertion hole 43, the bottom of the insertion strip 44 abuts against the positioning block 33, and the top of the insertion strip 44 penetrates through the insertion hole 43 and extends out of the material tube holder 4. When the material pipe support 4 needs to be moved, the inserting strip 44 is pressed downwards, the positioning block 33 is pushed out of the accommodating hole 42 by the inserting strip 44, the inserting strip 44 is loosened after the material pipe support 4 is moved, the material pipe support 4 is moved to the next position, the positioning block 33 at the next position is inserted into the accommodating hole 42 again, the material pipe support 4 is positioned, and the inserting strip 44 is arranged to facilitate the movement of the material pipe support 4.
The specific working process is as follows: when pouring is carried out, the material pipe support 4 is slid to a designated position on the rack 3, and when the accommodating hole 42 of the material pipe support 4 is positioned above the positioning block 33, the positioning block 33 enters the accommodating hole 42 under the elastic force action of the positioning spring 32, so that the material pipe support 4 is fixed on the rack 3; a feeding pipe penetrates through the strip-shaped groove 41 of the material pipe support 4, a discharge port of the feeding pipe extends into the positioning ring 52 at the bottom of the positioning frame 5, and the screw rod 53 is adjusted towards the direction close to the circle center of the positioning ring 52, so that the abutting sheet 54 abuts against the outer wall of the feeding pipe; the outlet direction of the feed pipe can be fixed by inserting the positioning pin 51 into the designated positioning hole 451.
When the material pipe support 4 needs to be moved, the inserting strip 44 is pressed downwards, the positioning block 33 is pushed out of the accommodating hole 42 by the inserting strip 44, the inserting strip 44 is loosened after the material pipe support 4 is moved, the material pipe support 4 is moved to the next position, the positioning block 33 at the next position is inserted into the accommodating hole 42 again, and the material pipe support 4 is positioned again. Compare in the import of prior art's artifical support material pipe alignment die cavity 2, the utility model discloses a material pipe support 4 is managed in the setting, realizes that the material pipe need not artifical support when the ejection of compact, greatly reduced intensity of labour.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a device is pour to constructional column, includes template body (1), set up die cavity (2) in template body (1), its characterized in that: all be provided with frame (3) along the length direction of template body (1) on the both sides wall of template body (1), the slip is provided with material pipe support (4) on frame (3), set up strip groove (41) that supply the inlet pipe to pass on the roof of material pipe support (4), the bottom of material pipe support (4) is provided with locating rack (5), locating rack (5) are located die cavity (2).
2. A constructional column casting apparatus as claimed in claim 1 wherein: a plurality of blind holes (31) are formed in the rack (3) along the length direction of the rack, each blind hole (31) is internally provided with a positioning spring (32), a positioning block (33) is arranged on the positioning spring (32), and a containing hole (42) for the positioning block (33) to be inserted is formed in the material pipe support (4) along the length direction of the rack (3).
3. A constructional column casting apparatus as claimed in claim 2 wherein: at least two accommodating holes (42) are formed, and the distance between every two adjacent accommodating holes (42) is equal to the distance between every two adjacent blind holes (31).
4. A constructional column casting apparatus as claimed in claim 2 wherein: the material pipe support is characterized in that a jack (43) communicated with the accommodating hole (42) is formed in the top of the accommodating hole (42) on the material pipe support (4), an inserting strip (44) is arranged in the jack (43), the bottom of the inserting strip (44) is abutted to the positioning block (33), and the top of the inserting strip (44) penetrates out of the jack (43) and extends out of the material pipe support (4).
5. A constructional column casting apparatus as claimed in claim 1 wherein: a support (45) is arranged at the bottom of the material pipe support (4) and above the cavity (2), and the top of the positioning frame (5) is hinged to the support (45).
6. A constructional column casting apparatus as claimed in claim 5 wherein: the positioning frame (5) is provided with a positioning pin (51) below the hinge point, and the support (45) is provided with a plurality of positioning holes (451) for the insertion of the positioning pin (51) by taking the hinge point as the center of a circle and the distance between the hinge point and the positioning pin (51) as the radius.
7. A constructional column casting apparatus as claimed in claim 1 wherein: the bottom of locating rack (5) is provided with holding ring (52), a plurality of screw holes have been seted up along the circumferencial direction in holding ring (52), and a plurality of screw rod (53) have all been inserted in the screw hole, the one end that screw rod (53) are located holding ring (52) is provided with and supports tight piece (54).
8. A constructional column casting apparatus as claimed in claim 7 wherein: the abutting sheet (54) is an arc-shaped rubber sheet.
CN201920747664.2U 2019-05-22 2019-05-22 Constructional column pouring device Active CN210195272U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920747664.2U CN210195272U (en) 2019-05-22 2019-05-22 Constructional column pouring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920747664.2U CN210195272U (en) 2019-05-22 2019-05-22 Constructional column pouring device

Publications (1)

Publication Number Publication Date
CN210195272U true CN210195272U (en) 2020-03-27

Family

ID=69875906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920747664.2U Active CN210195272U (en) 2019-05-22 2019-05-22 Constructional column pouring device

Country Status (1)

Country Link
CN (1) CN210195272U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112609990A (en) * 2020-10-28 2021-04-06 温州城建集团股份有限公司 Device is pour in construction of frame shear wall structure
CN113482354A (en) * 2021-08-03 2021-10-08 中国建筑第二工程局有限公司 Large-area dense upper reversed beam construction equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112609990A (en) * 2020-10-28 2021-04-06 温州城建集团股份有限公司 Device is pour in construction of frame shear wall structure
CN113482354A (en) * 2021-08-03 2021-10-08 中国建筑第二工程局有限公司 Large-area dense upper reversed beam construction equipment

Similar Documents

Publication Publication Date Title
CN210195272U (en) Constructional column pouring device
CN112227749B (en) Masonry engineering construction device and construction process thereof
CN208473298U (en) Square cross section column type mould reinforcing member
CN210774867U (en) Automatic continuous water quality sampler
CN211817720U (en) Mortar plastering device for building roof
US20210293034A1 (en) Plastering machine with a handle, and a method for operating the plastering machine
CN215278106U (en) Coating device capable of spraying uniformly
CN211262816U (en) Concrete production sampling equipment
CN213329884U (en) Waterproof construction device for green building
CN213979933U (en) Concrete pouring device convenient to use
CN206883813U (en) A kind of thicknessing machine with lasting feeding function
CN210151744U (en) Movable grouting clamping device for foundation construction
CN217205457U (en) Plastering device for building construction
CN220203403U (en) Fixing tool for sill coping
CN219691108U (en) Pouring mechanism convenient for connecting feed pipe
CN220768923U (en) Wall body masonry device for building engineering
CN215094469U (en) Portable watering pulping equipment of unloading conveniently carries out
CN213104896U (en) Steel fiber production peeling apparatus
CN210590161U (en) Pouring device for polyurethane rubber production
CN214460078U (en) Novel construction chute support
CN217925904U (en) Supplementary construction equipment of partition wall top water catch bowl waterstop in double arch tunnel
CN217433742U (en) Numerical control machine tool is with anchor clamps of being convenient for change
CN211257882U (en) Building cement device of building a wall
CN108798044A (en) Walling uniformly painting slurry bucket
CN210032516U (en) Spatula for one-step forming of water dripping groove

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant