CN213329884U - Waterproof construction device for green building - Google Patents

Waterproof construction device for green building Download PDF

Info

Publication number
CN213329884U
CN213329884U CN202022052126.7U CN202022052126U CN213329884U CN 213329884 U CN213329884 U CN 213329884U CN 202022052126 U CN202022052126 U CN 202022052126U CN 213329884 U CN213329884 U CN 213329884U
Authority
CN
China
Prior art keywords
sides
fixed
welded
waterproof construction
seted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022052126.7U
Other languages
Chinese (zh)
Inventor
钟福平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Huapeng Engineering Construction Co ltd
Original Assignee
Shenzhen Huapeng Engineering Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Huapeng Engineering Construction Co ltd filed Critical Shenzhen Huapeng Engineering Construction Co ltd
Priority to CN202022052126.7U priority Critical patent/CN213329884U/en
Application granted granted Critical
Publication of CN213329884U publication Critical patent/CN213329884U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model relates to a waterproof technical field of building especially relates to a waterproof construction equipment of green building, including fixed subassembly and adjusting part, fixed subassembly comprises grab handle and the fixed plate that is a body structure, and adjusting part includes fixed strip and two sets of scraper blades, and movable chamber has all been seted up to the inside both sides of fixed strip, and the both sides in activity chamber all slide through the spring and be provided with the locating pin, and the locating hole has all been seted up to the inside both sides of fixed plate, and the locating pin is inserted in the locating hole, and the bottom chamber has still been seted up in the inside bottom of fixed strip to the below in activity chamber, has welded the guide shaft between the inner wall in bottom chamber, the below both sides of guide shaft all slide through the guide block and be provided with the. Compared with the prior art, the utility model discloses not only improve work efficiency, but also alleviateed work load for the workman, still be convenient for the device's of while dismouting to carry it.

Description

Waterproof construction device for green building
Technical Field
The utility model relates to a waterproof technical field of building especially relates to a waterproof construction equipment of green building.
Background
Measures are taken from the construction materials and construction to prevent water penetration in certain parts of the building. The waterproof is mostly used in roofs, underground buildings, underground parts of buildings, interior rooms and water storage structures which need to be waterproof, and the like. According to the different measures and means, the waterproof material is divided into two categories of material waterproofing and structural waterproofing. The waterproof material is made up by building material to block water passage so as to attain the goal of water-proofing or raise the capability of resisting leakage, for example, coiled material water-proofing, film water-proofing, concrete and cement mortar rigid water-proofing and clay and lime soil water-proofing, etc.. The waterproof structure is made in a proper structural form, and the water passage is blocked, so that the waterproof purpose is achieved, such as a water stop belt, a cavity structure and the like.
Usually, we will choose to lay the coil or apply the waterproof coating to carry out the waterproof measure, when using the waterproof coating, need to smear it evenly after applying the coating, and some existing tools are because the area that it can be smoothed is too little, so that need the workman to spend a large amount of time on smearing the coating evenly, not only inefficiency, but also increased working strength indirectly, in addition, when using the tool, because it is difficult to dismantle, so it is not very convenient when carrying, therefore need a device to solve the stated problem urgently.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem in the prior art and providing a green building waterproof construction device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a green building waterproof construction device comprises a fixing component and an adjusting component, wherein the fixing component consists of a grab handle and a fixing plate which are of an integral structure, the adjusting component comprises a fixing strip and two groups of scraping plates, movable cavities are formed in two inner sides of the fixing strip, positioning pins are arranged on two sides of each movable cavity in a sliding mode through springs, positioning holes are formed in two inner sides of the fixing plate, the positioning pins are inserted into the positioning holes, bottom cavities are formed in the inner bottom ends of the fixing strip below the movable cavities, guide shafts are welded between the inner walls of the bottom cavities, the scraping plates are arranged on two lower sides of the guide shafts in a sliding mode through guide blocks, connecting plates which are arranged in the movable cavities are inserted between the scraping plates on two sides, and the scraping plates and the connecting plates are fixed through set screws;
all welded the fixing base on the both sides lateral wall of fixed strip, the inside of fixing base is provided with the projection through the spring activity, and the terminal has been welded to the upper surface one end of scraper blade, is connected with the regulation rope on the terminal, adjusts the rope and runs through and go round on the outer end of projection in fixing base and projection.
Preferably, the fixed plate is of a concave structure and is arranged between the side walls of the fixed strip, and inner shafts are welded between the inner walls of the two sides of the inner part of the movable cavity.
Preferably, the positioning pins are in a convex structure and slide on the inner shafts at two sides, and the springs are sleeved on the inner shafts between the positioning pins at two sides.
Preferably, the scraper and the guide block are fixed by welding, and a guide hole matched with the guide shaft is formed in the guide block.
Preferably, the convex column is of a T-shaped structure, one end of the convex column is provided with a first through hole inside, the outer wall of the other end of the convex column is provided with a rope groove, and the outer wall of the convex column is further welded with a limiting piece.
Preferably, the inside of fixing base is the cavity structure, and the inside of fixing base is seted up and is in the ascending second perforation of vertical direction.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through all setting up the locating pin that can bounce in the inside both sides of fixed strip to set up the locating hole with locating pin looks adaptation in the inside of fixed plate, utilize the cooperation of locating pin and locating hole, connect fixedly to fixed strip and fixed plate, not only easy to assemble but also convenient to detach provides convenience for its carries.
2. Through set up built-in connecting plate between two scraper blades, through the pulling scraper blade to adjust the interval between two scraper blades, and the cooperation connecting plate is adjusted its total length, makes when paining the operation, can enlarge the area of paining when the single operation, has not only improved work efficiency, but also has alleviateed work load for the workman.
Drawings
Fig. 1 is a schematic view of an installation structure of a waterproof construction device for green buildings provided by the utility model;
FIG. 2 is a schematic side view of the connection between the fixing plate and the fixing strip of the waterproof construction device for green buildings of the present invention;
FIG. 3 is a schematic view of scraper adjustment of a waterproof construction device for green buildings according to the present invention;
fig. 4 is an enlarged structural diagram of a part a in fig. 3.
In the figure: the device comprises a fixing strip 1, a positioning pin 11, a connecting plate 12, a bottom cavity 13, a guide shaft 14, an inner shaft 15, a scraper 2, a guide block 21, a grab handle 3, a fixing plate 4, a positioning hole 41, a fixing seat 5, a convex column 51, a first through hole 511, a rope groove 512, a second through hole 52 and a limiting sheet 53.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, a green building waterproof construction device, comprising a fixing component and an adjusting component, wherein the fixing component is composed of a grab handle 3 and a fixing plate 4 which are in an integral structure, the adjusting component comprises a fixing strip 1 and two groups of scrapers 2, the fixing plate 4 is in a concave structure and is installed between the side walls of the fixing strip 1, two sides of the inside of the fixing strip 1 are respectively provided with a movable cavity, two sides of the movable cavity are respectively provided with a positioning pin 11 through a spring in a sliding manner, the positioning pin 11 aims to connect and fix the fixing strip 1 and the fixing plate 4 and facilitate the disassembly of the fixing strip, two sides of the inside of the fixing plate 4 are respectively provided with a positioning hole 41, the positioning pin 11 is inserted into the positioning hole 41, a bottom cavity 13 is also arranged at the bottom end of the inside of the fixing strip 1 below the movable cavity, a guide shaft 14 is welded between the inner walls of the bottom cavity 13, the guide shaft 14 has a guiding function on the guide, the scrapers 2 and the guide block 21 are fixed by welding, a guide hole matched with the guide shaft 14 is arranged in the guide block 21, a connecting plate 12 arranged in the scrapers 2 at two sides is inserted between the scrapers 2 (the inner part of each scraper 2 is provided with a groove for the connecting plate 12 to move, and the connecting plate 12 slides between the inner walls of the grooves), the scrapers 2 and the connecting plate 12 are fixed by a set screw, one side of the inner part of each scraper 2 is provided with a screw hole, when in use, the set screw is screwed into the screw hole of each scraper 2, the tail end of the set screw is tightly pressed on the surface of the connecting plate 12, even if the former machine part is fixed on the latter machine part, the fastening and locking of the connecting plate 12 are realized, the set screw can be loosened according to requirements, the scrapers 2 at two ends are pulled apart, further, the length of the connecting plate 12 in the groove arranged in the scrape, the arrangement of the connecting plate 12 can adjust and expand the floating area of the scraper 2;
further, all welded fixing base 5 on the both sides lateral wall of fixed strip 1, the inside of fixing base 5 is provided with projection 51 through the spring activity, and projection 51's effect lies in fixing a position the regulation rope, and the terminal has been welded to the upper surface one end of scraper blade 2, is connected with the regulation rope on the terminal, adjusts the rope and runs through and on the outer end of projection 51 in fixing base 5 and projection 51.
Inner shafts 15 are welded between the inner walls of the two sides of the inner part of the movable cavity, the positioning pins 11 are in a convex structure and slide on the inner shafts 15 on the two sides, and springs are sleeved on the inner shafts between the positioning pins 11 on the two sides.
In addition, the convex column 51 is of a T-shaped structure, one end of the convex column 51 is provided with a first through hole 511 inside, the outer wall of the other end of the convex column 51 is provided with a rope groove 512, the outer wall of the convex column 51 is further welded with a limiting piece 53, the inside of the fixed seat 5 is of a cavity structure, and the inside of the fixed seat 5 is provided with a second through hole 52 in the vertical direction.
In this embodiment, during installation, the fixing plate 4 is slid in along the side wall of the fixing strip 1, and during the sliding process, when contacting the positioning pins 11, the fixing plate is pressed and does not pop up, and then continuously slides to the other side, when sliding to two positioning holes 41 and aligning two groups of positioning pins 11, the pressed positioning pins 11 are released and pop up, and are clamped in the positioning holes 41, and when detaching, otherwise, the fixing plate is only needed.
During operation, the scraping area of the scraper 2 is adjusted according to the actual required floating area, during adjustment, a set screw between the scraper 2 and the connecting plate 12 is unscrewed, the convex column 51 on one side is pressed towards one side of the fixed seat 5 and is kept still, the adjusting rope is positioned in the first through hole and the second through hole and is in a movable state, then the scraper 2 on the side is moved to a proper position, the adjusting rope is pulled to a tight and non-loose state, the convex column 51 is loosened to bounce the convex column 51 towards the outer side of the fixed seat 5, so that the adjusting rope is clamped between the first through hole and the second through hole, then the scraper 2 on the other side is adjusted in the same way, after adjustment is finished, the corresponding length (namely the distance length between the two scrapers 2) is exposed out of the connecting plate 12 at the moment, and finally the loosened set screw is screwed again, the positions of the connecting plate 12 and the scraper 2 are fixed, and after the scraper is used up, the connecting plate 12 can be retracted into the scraper 2.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a green building waterproof construction device, including fixed subassembly and adjusting part, a serial communication port, fixed subassembly comprises grab handle (3) and fixed plate (4) that are a body structure, adjusting part includes fixed strip (1) and two sets of scraper blade (2), movable chamber has all been seted up to the inside both sides of fixed strip (1), movable chamber's both sides all are provided with locating pin (11) through the spring slip, locating hole (41) have all been seted up to the inside both sides of fixed plate (4), locating pin (11) are inserted in locating hole (41), and movable chamber's below still has seted up bottom chamber (13) in the inside bottom of fixed strip (1), have welded guide shaft (14) between the inner wall of bottom chamber (13), the below both sides of guide shaft (14) all slide through guide block (21) and be provided with scraper blade (2), place connecting plate (12) and scraper blade (2) and connecting plate (12) between the scraper blade (2) of both sides through tight set screw between fixed screw Determining;
all welded fixing base (5) on the both sides lateral wall of fixed strip (1), the inside of fixing base (5) is provided with projection (51) through the spring activity, and the terminal has been welded to the upper surface one end of scraper blade (2), is connected with the regulation rope on the terminal, adjusts the rope and runs through and duplex winding in fixing base (5) and projection (51) on the outer end of projection (51).
2. A green building waterproofing device according to claim 1, wherein the fixing plate (4) is of a concave structure and is installed between the side walls of the fixing strip (1), and the inner shafts (15) are welded between the inner walls of the two sides of the inner part of the movable cavity.
3. A green building waterproofing device according to claim 1, wherein the positioning pins (11) are of a convex structure and slide on the inner shafts (15) at both sides, and the springs are sleeved on the inner shafts between the positioning pins (11) at both sides.
4. The waterproof construction device for the green buildings according to the claim 1 is characterized in that the scraper (2) and the guide block (21) are fixed by welding, and a guide hole matched with the guide shaft (14) is formed in the guide block (21).
5. The waterproof construction device for green buildings according to claim 1, wherein the protruding pillar (51) is of a T-shaped structure, one end of the protruding pillar (51) is provided with a first through hole (511) inside, the outer wall of the other end of the protruding pillar is provided with a rope groove (512), and the outer wall of the protruding pillar (51) is further welded with a limiting piece (53).
6. The green building waterproof construction device according to claim 1, wherein the inside of the fixed seat (5) is a cavity structure, and the inside of the fixed seat (5) is provided with a second through hole (52) in a vertical direction.
CN202022052126.7U 2020-09-17 2020-09-17 Waterproof construction device for green building Active CN213329884U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022052126.7U CN213329884U (en) 2020-09-17 2020-09-17 Waterproof construction device for green building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022052126.7U CN213329884U (en) 2020-09-17 2020-09-17 Waterproof construction device for green building

Publications (1)

Publication Number Publication Date
CN213329884U true CN213329884U (en) 2021-06-01

Family

ID=76064556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022052126.7U Active CN213329884U (en) 2020-09-17 2020-09-17 Waterproof construction device for green building

Country Status (1)

Country Link
CN (1) CN213329884U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113417166A (en) * 2021-06-28 2021-09-21 四川金田纸业有限公司 Dry net cleaning scraper

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113417166A (en) * 2021-06-28 2021-09-21 四川金田纸业有限公司 Dry net cleaning scraper

Similar Documents

Publication Publication Date Title
CN213329884U (en) Waterproof construction device for green building
CN111535477B (en) PC (polycarbonate) component for assembly type building and construction method thereof
CN214498052U (en) Suspended ceiling mounting structure
CN212715889U (en) A building templates for building engineering's composite erection of being convenient for
CN111576898A (en) Auxiliary device for building bricks
CN210195272U (en) Constructional column pouring device
CN215168350U (en) Complete set reinforcing structure for reinforcing existing masonry building by assembly type steel structure
CN201212245Y (en) Pumping pasting machine
CN210439640U (en) Plastering device for building
CN220954434U (en) Quick plastering device
CN220667020U (en) Trowel for controlling thickness of masonry mortar
CN212317529U (en) Auxiliary device for building bricks
CN216299155U (en) Closed profiled steel sheet mounting tool
CN217897353U (en) Horizontal mortar joint thickness control device for solid building blocks
CN219864183U (en) Mortar smearing device for building blocks
CN218205543U (en) Wall tile attaching auxiliary tool
CN215055537U (en) Mortar smearing device for wall building
CN218061266U (en) Parallel plaster screeding device that plasters
CN211647396U (en) Portable combined masonry mortar spreading tool suitable for different wall thicknesses
CN110219441A (en) A kind of automatic plastering machine
CN219826239U (en) Concrete smearing device
CN219863895U (en) Floor tile paving and ash scraping device
CN219034076U (en) House construction bed course equipment of making level
CN217129021U (en) Convenient to use's plastering trowel for building
CN220645045U (en) Wall plastering device based on building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant