CN112609990A - Device is pour in construction of frame shear wall structure - Google Patents
Device is pour in construction of frame shear wall structure Download PDFInfo
- Publication number
- CN112609990A CN112609990A CN202011173082.1A CN202011173082A CN112609990A CN 112609990 A CN112609990 A CN 112609990A CN 202011173082 A CN202011173082 A CN 202011173082A CN 112609990 A CN112609990 A CN 112609990A
- Authority
- CN
- China
- Prior art keywords
- fixed
- wall structure
- shear wall
- connecting rod
- frame shear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
- E04G21/0418—Devices for both conveying and distributing with distribution hose
- E04G21/0436—Devices for both conveying and distributing with distribution hose on a mobile support, e.g. truck
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The invention discloses a frame shear wall structure building construction pouring device, which comprises an underframe, a roller, a first motor, a belt wheel group, a placing plate, a stirring barrel main body, a conveying device main body, an output pipe, a stable feeding device and a supporting piece, wherein the stable feeding device is arranged at the bottom of the output pipe; the left end of the fixing ring installed in the stable feeding device is provided with the stabilizing mechanism, the adjusting mechanism is installed in the stabilizing mechanism, the bottom of the adjusting mechanism is connected with the clamping mechanism, the height position adjustment of the clamping mechanism is achieved, the pouring work cannot be influenced, the clamping mechanism can rapidly clamp the side plate of the left end of the pouring position, the corrugated pipe is stabilized, and manual support is not needed.
Description
Technical Field
The invention relates to the relevant field of pouring devices, in particular to a frame shear wall structure building construction pouring device.
Background
The frame shear wall structure is also called a frame shear structure, a certain number of shear walls are arranged in the frame structure to form a flexible and free use space, the requirements of different building functions are met, meanwhile, enough shear walls are provided, and the shear walls have quite large lateral rigidity (the lateral rigidity of the shear walls is high and means that the shear walls have strong deformation resistance under the action of horizontal load (wind load and horizontal earthquake force)), when the frame shear wall structure is constructed, concrete needs to be poured, and a special pouring device needs to be used for pouring.
In the actual use process of the existing frame shear wall structure building construction pouring device, because concrete is easy to adhere to the inner wall of an output pipe in the concrete conveying process, the blockage is caused, manual cleaning is needed, and manpower is consumed; when pouring, need artifical handheld pipe of pouring to pour, comparatively hard to stability is lower, causes the concrete to spill outside pouring the position easily.
Disclosure of Invention
Therefore, in order to solve the above-mentioned disadvantages, the present invention provides a building construction pouring device for a frame shear wall structure.
The invention is realized in such a way that a frame shear wall structure building construction pouring device is constructed, the device comprises a bottom frame, wherein four ends of the bottom frame are fixedly provided with idler wheels, the middle part of the front end surface of the bottom frame is provided with a first motor, the bottom of the first motor is connected with a belt pulley set, the middle part of the rear end of the top of the bottom frame is fixedly provided with a placing plate, the middle part of the top end of the placing plate is provided with a stirring barrel main body, the bottom of the stirring barrel main body is connected with the rear end of the top of the belt pulley set, the right rear end of the bottom frame is provided with a conveying device main body, the left end of the top of the conveying device main body is communicated with the inner lower end of the stirring barrel main body, the middle part of the bottom end of the conveying device main body, The anti-blocking mechanism comprises a vibrating motor, a corrugated pipe, a fixing ring and a stabilizing mechanism, wherein the top of the anti-blocking mechanism is connected with an output pipe, the vibrating motor is arranged in the middle of the left side of the anti-blocking mechanism, the bottom of the anti-blocking mechanism is connected with the corrugated pipe, the bottom of the corrugated pipe is fixedly provided with the fixing ring, and the stabilizing mechanism is installed at the left end of the top of the fixing.
Preferably, the anti-blocking mechanism comprises a box body, an inlet, a spring, a vibrating plate and a connecting ring, the inlet is formed in the upper end in the box body, the middle of the inlet is communicated with the output pipe, the spring is fixed on the inner side of the box body, the inner side of the spring is fixed with the vibrating plate, the connecting ring is welded at the bottom of the box body, and the bottom of the connecting ring is connected with the corrugated pipe.
Preferably, the stabilizing mechanism comprises an adjusting mechanism and a clamping mechanism, the bottom of the adjusting mechanism is connected with the fixing ring, and the clamping mechanism is arranged at the lower end of the front end face of the adjusting mechanism.
Preferably, adjustment mechanism includes fixed block, guide arm, threaded rod, slider and rotation button, the fixed block is provided with two sets ofly to fixed block bottom and solid fixed ring welded fastening, both ends vertical fixation has the guide arm about the fixed block inboard, the middle part is provided with the threaded rod in the fixed block, the slider all runs through in guide arm and the middle part of the threaded rod external diameter surface, fixed block top middle part is arranged in to the rotation button to rotate button bottom and threaded rod and rotate and be connected, the slider front end is connected with clamping mechanism.
Preferably, the clamping mechanism comprises a fixing piece, a second motor, a screw rod, a pushing piece, a linkage rod, a first connecting rod, a second connecting rod and a clamping piece, the fixing piece is fixed to the middle of the top end of the fixing piece, the back face of the fixing piece is fixed to the sliding block, the second motor is installed in the middle of the top end of the fixing piece, an output shaft at the bottom of the second motor penetrates through the fixing piece and is connected with the screw rod, the middle of the outer diameter surface of the screw rod is in threaded connection with the pushing piece, the left end and the right end of the pushing piece are hinged to the linkage rod, the left end and the right end of the linkage rod are hinged to the middle of the first connecting rod, the upper end of the first connecting rod is hinged to the fixing piece, the left end and the right end of the fixing piece are hinged.
Preferably, the folder comprises a board body, a clamping groove, a substrate, a silica gel layer and a rubber layer, wherein the left end and the right end of the inner upper end of the board body are hinged to the lower ends of the first connecting rod and the second connecting rod respectively, the clamping groove is formed in the lower end of the inner side of the board body, the substrate is fixed to the inner side of the clamping groove, the other end of the substrate is bonded to the silica gel layer, and the outer side of the silica gel layer is attached to the rubber.
Preferably, the springs are eight in number, and four springs are distributed at two ends of the inner side of the box body in a group.
Preferably, the inner wall of the hole in the middle of the sliding block is provided with an internal thread, and the middle of the sliding block is in threaded connection with the threaded rod.
Preferably, the first connecting rod and the second connecting rod are respectively provided with four groups, and the two groups are arranged at the front ends of the fixing piece and the clamping piece.
Preferably, the inner side surface of the rubber layer is smooth, and the middle part in the rubber layer is arc-shaped.
Preferably, the sliding block is made of alloy steel.
Preferably, the first connecting rod and the second connecting rod are made of stainless steel.
The invention has the following advantages: the invention provides a frame shear wall structure building construction pouring device through improvement, which has the following improvement compared with the same type of equipment:
the method has the advantages that: according to the frame shear wall structure building construction pouring device, the stable feeding device is arranged at the bottom of the output pipe, the anti-blocking mechanism is arranged in the stable feeding device, the vibration motor is arranged in the mechanism, and the vibration plate is shaken by matching with the spring in the mechanism, so that passing concrete falls down more quickly, the adhesion of the concrete is reduced, and the occurrence of blocking is reduced.
The method has the advantages that: according to the frame shear wall structure building construction pouring device, the fixing ring is arranged at the left end of the fixing ring in the stable feeding device, the adjusting mechanism is arranged in the fixing mechanism, the bottom of the adjusting mechanism is connected with the clamping mechanism, so that the height position adjustment of the clamping mechanism is realized, the pouring work cannot be influenced, the clamping mechanism can rapidly clamp the side plate at the left end of the pouring position, the stability of a corrugated pipe is realized, and manual support is not needed.
The method has the advantages that: according to the frame shear wall structure building construction pouring device, the clamping piece is arranged in the clamping mechanism, when the mechanism fixes the side plate at the pouring position, the clamping piece can stably press and fix the side plate, the silica gel layer and the rubber layer are arranged in the clamping piece, the buffering capacity of the two is good, the friction force is large, and the stable clamping effect is improved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of a steady feeding device according to the present invention;
FIG. 3 is a schematic view of the anti-jamming mechanism of the present invention;
FIG. 4 is a schematic view of the structure of the securing mechanism of the present invention;
FIG. 5 is a schematic view of the adjustment mechanism of the present invention;
FIG. 6 is a schematic view of the clamping mechanism of the present invention;
fig. 7 is a cross-sectional view of a clip according to the present invention.
Wherein: chassis-1, roller-2, first motor-3, pulley group-4, placing plate-5, mixing drum body-6, conveying device body-7, output pipe-8, stable feeding device-9, supporting piece-10, anti-blocking mechanism-91, vibrating motor-92, bellows-93, fixing ring-94, fixing mechanism-95, box-911, inlet-912, spring-913, vibrating plate-914, connecting ring-915, adjusting mechanism-951, clamping mechanism-952, fixing block-9511, guide rod-9512, threaded rod-9513, slide block-9514, rotating button-9515, fixing piece-9521, fixing piece-9522, second motor-9523, screw-9524, pushing piece-9525, The linkage rod-9526, the first connecting rod-9527, the second connecting rod-9528, the clamping piece-9529, the plate body-95291, the clamping groove-95292, the base plate-95293, the silica gel layer-95294 and the rubber layer-95295.
Detailed Description
The present invention will be described in detail below with reference to fig. 1 to 7, and the technical solutions in the embodiments of the present invention will be clearly and completely described, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example one
Referring to fig. 1, the invention provides a frame shear wall structure building construction pouring device through improvement, which includes an underframe 1, rollers 2 are fixed at four ends of the bottom of the underframe 1, a first motor 3 is installed in the middle of the front end face of the underframe 1, the bottom of the first motor 3 is connected with a pulley group 4, a placing plate 5 is fixed in the middle of the rear end of the top of the underframe 1, a stirring barrel main body 6 is arranged in the middle of the top end of the placing plate 5, the bottom of the stirring barrel main body 6 is connected with the rear end of the top of the pulley group 4, a conveying device main body 7 is arranged at the right rear end of the bottom of the underframe 1, the left end of the top of the conveying device main body 7 is communicated with the inner lower end of the stirring barrel main body 6, the middle of the bottom of the conveying device main body 7 is welded and fixed with the underframe 1 through a support.
Referring to fig. 2, the invention provides a frame shear wall structure building construction pouring device through improvement, the stable feeding device 9 includes an anti-blocking mechanism 91, a vibration motor 92, a corrugated pipe 93, a fixing ring 94 and a stabilizing mechanism 95, the top of the anti-blocking mechanism 91 is connected to the output pipe 8, the vibration motor 92 is disposed in the middle of the left side of the anti-blocking mechanism 91, the bottom of the anti-blocking mechanism 91 is connected to the corrugated pipe 93, the fixing ring 94 is fixed at the bottom of the corrugated pipe 93, and the stabilizing mechanism 95 is installed at the left end of the top of the fixing ring 94.
Referring to fig. 3, the invention provides a frame shear wall structure building construction pouring device through improvement, the anti-blocking mechanism 91 comprises a box body 911, an inlet 912, springs 913, a vibrating plate 914 and a connecting ring 915, the inlet 912 is arranged at the upper end in the box body 911, the middle of the inlet 912 is communicated with the output pipe 8, the springs 913 are fixed on the inner side of the box body 911, the inner sides of the springs 913 and the vibrating plate 914 are fixed, the connecting ring 915 is welded at the bottom of the box body 911, the bottom of the connecting ring 915 is connected with the corrugated pipe 93, the springs 913 are eight, and every four springs are respectively distributed at two ends of the inner side of the box body 911 in a group, so that the.
Referring to fig. 4, the present invention provides a frame shear wall structure building construction pouring device through improvement, the stabilizing mechanism 95 includes an adjusting mechanism 951 and a clamping mechanism 952, the bottom of the adjusting mechanism 951 is connected to the fixing ring 94, and the clamping mechanism 952 is disposed at the lower end of the front end face of the adjusting mechanism 951.
Referring to fig. 5, the present invention provides a frame shear wall structure building construction pouring device through improvement, wherein an adjusting mechanism 951 includes a fixed block 9511, guide rods 9512, a threaded rod 9513, a sliding block 9514 and a rotating button 9515, the fixed block 9511 is provided with two sets, the bottom of the fixed block 9511 is welded and fixed with a fixed ring 94, the guide rods 9512 are vertically fixed at the left and right ends of the inner side of the fixed block 9511, the threaded rod 9513 is arranged at the middle part of the inner side of the fixed block 9511, the middle parts of the outer diameter surfaces of the guide rods 9512 and the threaded rod 9513 penetrate through the sliding block 9514, the rotating button 9515 is arranged at the middle part of the top end of the fixed block 9511, the bottom of the rotating button 9515 is rotatably connected with the threaded rod 9513, the front end of the sliding block 9514 is connected with a clamping mechanism 952, an inner wall of an opening at the middle part of the sliding block, high strength and stability.
Referring to fig. 6, the present invention provides a frame shear wall structure building construction casting device by improvement, the clamping mechanism 952 includes a fixed member 9521, a steady member 9522, a second motor 9523, a screw 9524, a push member 9525, a linkage rod 9526, a first link 9527, a second link 9528 and a clip 9529, the steady member 9522 is fixed to a middle portion of a top end of the fixed member 9521, a back surface of the steady member 9522 is fixed to a slider 9514, the second motor 9523 is installed to a middle portion of a top end of the steady member 9522, a bottom output shaft of the second motor 9523 penetrates through the steady member 9522 and is connected to the screw 9524, a middle portion of an outer diameter surface of the screw 9524 is in threaded connection with the push member 9525, left and right ends of the push member 9525 are hinged to the linkage rod 9526, left and right ends of the linkage rod 9526 are hinged to a middle portion of the first link 9527, an upper end of the first link 9527 is hinged to the fixed member 9521, left and right ends of the fixed member 95, the lower ends of the first connecting rod 9527 and the second connecting rod 9528 are connected with the clamping piece 9529, four groups of the first connecting rod 9527 and the second connecting rod 9528 are arranged, two groups of the first connecting rod 9527 and the second connecting rod 9528 are arranged at the front ends of the fixing piece 9521 and the clamping piece 9529, stable transmission is facilitated, and the first connecting rod 9527 and the second connecting rod 9528 are made of stainless steel materials, so that rust caused by long-term use is prevented.
Referring to fig. 7, the present invention provides a frame shear wall structure building construction pouring device through improvement, wherein a clip 9529 includes a plate 95291, a slot 95292, a base plate 95293, a silica gel layer 95294 and a rubber layer 95295, the left and right ends of the inner upper end of the plate 95291 are hinged to the lower ends of a first link 9527 and a second link 9528, the lower end of the inner side of the plate 95291 is provided with a slot 95292, the inner side of the slot 95292 is fixed with a base plate 95293, the other end of the base plate 95293 is bonded to the silica gel layer 95294, the outer side of the silica gel layer 95294 is bonded to the rubber layer 95295, the inner surface of the rubber layer 95295 is smooth, and the inner middle of the rubber layer 95295 is arc-shaped.
Example two
The invention provides a frame shear wall structure building construction pouring device through improvement, the inner side of a vibrating plate 914 is smooth, and the upper end and the lower end of the vibrating plate 914 incline inwards, so that materials can fall conveniently and stably and downwards move downwards; the anti-slip lines are arranged on the outer diameter surface of the rotating button 9515, so that a user can rotate conveniently, and a layer of anti-slip silica gel is bonded at the connecting position of the bottom of the rotating button 9515 and the fixed block 9511, so that the friction force is improved, and the rotation is prevented; through holes are formed in the left end and the right end of the inner upper end of the plate body 95291, and the plate body is conveniently and stably connected with the first connecting rod 9527 and the second connecting rod 9528.
The invention provides a frame shear wall structure building construction pouring device through improvement, and the working principle is as follows;
firstly, when the equipment needs to be used, firstly, force is applied to the bottom frame 1 to enable the bottom idler wheel 2 to move, the equipment can be moved to a position where the equipment needs to be used, then concrete which needs to be poured can be poured into the stirring barrel main body 6, then, external electric control equipment is connected with a pouring device, and needed electric energy can be provided for the work of the equipment;
secondly, the first motor 3 is started to work, the output shaft at the bottom of the first motor 3 drives the belt wheel group 4 to move, so that concrete can be stirred in the stirring barrel main body 6, and when output is needed, the conveying device main body 7 is started to work, so that the concrete in the stirring barrel is output through the output pipe 8 at the bottom;
thirdly, a user pulls out the fixing ring 94 at the bottom to move the fixing ring to a position where pouring is needed, then the user rotates the rotating button 9515, the bottom of the rotating button 9515 drives the threaded rod 9513 to rotate, the threaded rod 9513 can drive the sliding block 9514 at the lower end to move in the rotating process, and the sliding block 9514 enables the clamping mechanism 952 to move downwards under the guiding action of the guide rod 9512;
fourthly, the clamping mechanism 952 can move downwards, then a user starts the second motor 9523 to work, the second motor 9523 drives the screw 9524 to rotate, the screw 9524 drives the pushing member 9525 to move upwards in the rotating process, the pushing member 9525 can pull the first connecting rods 9527 at two ends through the linkage rods 9526 at two ends, the first connecting rods 9527 can act on the clamping piece 9529 at the lower end, and the clamping piece 9529 can move inwards under the guiding action of the second connecting rods 9528;
fifthly, when the inner sides of the clamping pieces 9529 are combined, the rubber layer 95295 on the inner side can be stably pressed and fixed on the side plate of the pouring position to finish the fixation during pouring, and the silica gel layer 95294 is arranged on the inner side of the rubber layer 95295, so that the rubber-rubber composite material has a good buffering effect;
sixthly, finally, the user starts the conveying device main body 7 to work, namely, the concrete can be output through the output pipe 8 to enter the anti-blocking mechanism 91 at the bottom, and then the concrete is discharged to a pouring position through the corrugated pipe 93 for pouring;
seventhly, in the pouring process, the vibration motor 92 on the left side of the box 911 is started to work, the vibration motor 92 generates exciting force to match with eight groups of springs 913 on the inner side of the box 911, so that the vibration plate 914 moves, the pouring process is realized, the blockage is not easy to occur, and the pouring smooth effect is improved.
The invention provides a frame shear wall structure building construction pouring device through improvement, wherein a stable feeding device 9 is arranged at the bottom of an output pipe 8, an anti-blocking mechanism 91 is arranged in the stable feeding device 9, a vibration motor 92 is arranged in the mechanism, and a vibration plate 914 is shaken by matching with a spring 913 in the mechanism, so that passing concrete falls down more quickly, the adhesion of the concrete is reduced, and the occurrence of blocking is reduced; a fixing mechanism 95 is arranged at the left end of a fixing ring 94 arranged in the stable feeding device 9, an adjusting mechanism 951 is arranged in the fixing mechanism 5, the bottom of the adjusting mechanism 951 is connected with a clamping mechanism 952, so that the height position adjustment of the clamping mechanism 952 is realized, the pouring work cannot be influenced, the clamping mechanism 952 can rapidly clamp a side plate at the left end of the pouring position, the stability of the corrugated pipe is realized, and manual support is not needed; install folder 9529 in clamping mechanism 952, when the mechanism is fixed the work to pouring position curb plate, the stable offside board of pressing solid of folder 9529 can be stable, and install silica gel layer 95294 and rubber layer 95295 in the folder 9529, both buffer capacity is good, and frictional force is big, improves the tight stable effect of clamp.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described, and the standard parts used in the present invention are all available on the market, the special-shaped parts can be customized according to the description and the accompanying drawings, the specific connection mode of each part adopts the conventional means of bolt and rivet, welding and the like mature in the prior art, the machinery, parts and equipment adopt the conventional type in the prior art, and the circuit connection adopts the conventional connection mode in the prior art, and the details are not described herein.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (10)
1. A frame shear wall structure building construction pouring device comprises an underframe (1), wherein four ends of the bottom of the underframe (1) are fixed with idler wheels (2), a first motor (3) is arranged in the middle of the front end surface of the underframe (1), the bottom of the first motor (3) is connected with a belt wheel set (4), a placing plate (5) is fixed in the middle of the rear end of the top of the bottom frame (1), a stirring barrel main body (6) is arranged in the middle of the top end of the placing plate (5), the bottom of the stirring barrel main body (6) is connected with the rear end of the top of the belt wheel set (4), a conveying device main body (7) is arranged at the right rear end of the bottom of the underframe (1), the left end of the top of the conveying device main body (7) is communicated with the inner lower end of the stirring barrel main body (6), the middle part of the bottom end of the conveying device main body (7) is welded and fixed with the bottom frame (1) through a support part (10), an output pipe (8) is fixed at the right end of the bottom of the conveying device main body (7);
the method is characterized in that: still including stabilizing pan feeding device (9), output tube (8) bottom right-hand member meets with stabilizing pan feeding device (9), stabilize pan feeding device (9) including preventing blockking up mechanism (91), vibrating motor (92), bellows (93), solid fixed ring (94) and stabilizing mean (95), prevent blockking up mechanism (91) top and meet with output tube (8), prevent blockking up mechanism (91) left side middle part and be provided with vibrating motor (92), prevent blockking up mechanism (91) bottom and meet with bellows (93), bellows (93) bottom is fixed with solid fixed ring (94), gu fixed ring (94) top left end installs stabilizing mean (95).
2. The frame shear wall structure construction pouring device of claim 1, characterized in that: the anti-blocking mechanism (91) comprises a box body (911), an inlet (912), a spring (913), a vibrating plate (914) and a connecting ring (915), wherein the inlet (912) is formed in the upper end of the box body (911), the middle of the inlet (912) is communicated with an output pipe (8), the spring (913) is fixed on the inner side of the box body (911), the inner side of the spring (913) is fixed with the vibrating plate (914), the connecting ring (915) is welded at the bottom of the box body (911), and the bottom of the connecting ring (915) is connected with the corrugated pipe (93).
3. The frame shear wall structure construction pouring device of claim 1, characterized in that: firm mechanism (95) include adjustment mechanism (951) and clamping mechanism (952), adjustment mechanism (951) bottom meets with solid fixed ring (94), adjustment mechanism (951) preceding terminal surface lower extreme is provided with clamping mechanism (952).
4. The frame shear wall structure construction pouring device of claim 3, characterized in that: adjustment mechanism (951) includes fixed block (9511), guide arm (9512), threaded rod (9513), slider (9514) and rotation button (9515), fixed block (9511) is provided with two sets ofly, and fixed block (9511) bottom and solid fixed ring (94) welded fastening, both ends vertical fixation has guide arm (9512) about fixed block (9511) inboard, middle part is provided with threaded rod (9513) in fixed block (9511), slider (9514) all runs through in guide arm (9512) and threaded rod (9513) external diameter surface middle part, rotation button (9515) are placed in fixed block (9511) top middle part, and rotate button (9515) bottom and threaded rod (9513) and are rotated and be connected, slider (9514) front end is connected with clamping mechanism (952).
5. The frame shear wall structure construction pouring device of claim 3, characterized in that: the clamping mechanism (952) comprises a fixing piece (9521), a steady piece (9522), a second motor (9523), a screw rod (9524), a pushing piece (9525), a linkage rod (9526), a first connecting rod (9527), a second connecting rod (9528) and a clamping piece (9529), the steady piece (9522) is fixed in the middle of the top end of the fixing piece (9521), the back of the steady piece (9522) is fixed with a sliding block (9514), the second motor (9523) is installed in the middle of the top end of the steady piece (9522), an output shaft at the bottom of the second motor (9523) penetrates through the steady piece (9522) and is connected with the screw rod (9524), the middle of the outer diameter surface of the screw rod (9524) is in threaded connection with the pushing piece (9525), the left end and the right end in the pushing piece (9525) are hinged with the linkage rod (9526), the left end and the right end of the linkage rod (9526) are hinged with the middle in the first connecting rod (9527), and the upper end in the first connecting rod (95, the inner left end and the inner right end of the fixing piece (9521) are hinged with a second connecting rod (9528) near the edge, and the lower ends of the first connecting rod (9527) and the second connecting rod (9528) are connected with a clamping piece (9529).
6. The frame shear wall structure construction pouring device of claim 5, characterized in that: folder (9529) includes plate body (95291), draw-in groove (95292), base plate (95293), silica gel layer (95294) and rubber layer (95295), both ends are articulated with first connecting rod (9527) and second connecting rod (9528) lower extreme respectively about the upper end in plate body (95291), draw-in groove (95292) have been seted up to the inboard lower extreme of plate body (95291), draw-in groove (95292) inboard is fixed with base plate (95293), base plate (95293) other end bonds with silica gel layer (95294), the silica gel layer (95294) outside is laminated with rubber layer (95295) mutually.
7. The frame shear wall structure construction pouring device of claim 2, characterized in that: the eight springs (913) are arranged, and every four springs are respectively distributed at two ends of the inner side of the box body (911) in a group.
8. The frame shear wall structure construction pouring device of claim 4, characterized in that: the inner wall of the opening hole in the middle in the sliding block (9514) is provided with an internal thread, and the middle in the sliding block (9514) is in threaded connection with the threaded rod (9513).
9. The frame shear wall structure construction pouring device of claim 5, characterized in that: the first connecting rod (9527) and the second connecting rod (9528) are respectively provided with four groups, and the two groups are arranged at the front ends of the fixing member (9521) and the clamping member (9529).
10. The frame shear wall structure construction pouring device of claim 6, characterized in that: the inner side surface of the rubber layer (95295) is smooth, and the inner middle part of the rubber layer (95295) is arc-shaped.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011173082.1A CN112609990A (en) | 2020-10-28 | 2020-10-28 | Device is pour in construction of frame shear wall structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011173082.1A CN112609990A (en) | 2020-10-28 | 2020-10-28 | Device is pour in construction of frame shear wall structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112609990A true CN112609990A (en) | 2021-04-06 |
Family
ID=75224449
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011173082.1A Pending CN112609990A (en) | 2020-10-28 | 2020-10-28 | Device is pour in construction of frame shear wall structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112609990A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114961267A (en) * | 2022-04-27 | 2022-08-30 | 温州一建城建集团有限公司 | Civil construction pouring process and construction equipment thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN206368538U (en) * | 2016-12-30 | 2017-08-01 | 中铁二局集团有限公司 | A kind of fixing device of concrete delivery pump pipe |
KR20190005559A (en) * | 2017-07-07 | 2019-01-16 | 전남대학교산학협력단 | Robotic concrete placing apparatus utilizing parallel cable-robot |
CN209066891U (en) * | 2018-10-11 | 2019-07-05 | 青岛北苑混凝土有限公司 | A kind of concreting vibration drainage device |
CN210195272U (en) * | 2019-05-22 | 2020-03-27 | 上海港城建筑安装工程有限公司 | Constructional column pouring device |
CN210939249U (en) * | 2019-09-11 | 2020-07-07 | 苏州斯莱格自动化科技有限公司 | Fixing mechanism is held to SMT work piece transplanter |
CN211646867U (en) * | 2019-12-31 | 2020-10-09 | 四川中亮建设管理有限公司 | House building rapid construction wall |
-
2020
- 2020-10-28 CN CN202011173082.1A patent/CN112609990A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN206368538U (en) * | 2016-12-30 | 2017-08-01 | 中铁二局集团有限公司 | A kind of fixing device of concrete delivery pump pipe |
KR20190005559A (en) * | 2017-07-07 | 2019-01-16 | 전남대학교산학협력단 | Robotic concrete placing apparatus utilizing parallel cable-robot |
CN209066891U (en) * | 2018-10-11 | 2019-07-05 | 青岛北苑混凝土有限公司 | A kind of concreting vibration drainage device |
CN210195272U (en) * | 2019-05-22 | 2020-03-27 | 上海港城建筑安装工程有限公司 | Constructional column pouring device |
CN210939249U (en) * | 2019-09-11 | 2020-07-07 | 苏州斯莱格自动化科技有限公司 | Fixing mechanism is held to SMT work piece transplanter |
CN211646867U (en) * | 2019-12-31 | 2020-10-09 | 四川中亮建设管理有限公司 | House building rapid construction wall |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114961267A (en) * | 2022-04-27 | 2022-08-30 | 温州一建城建集团有限公司 | Civil construction pouring process and construction equipment thereof |
CN114961267B (en) * | 2022-04-27 | 2024-02-20 | 温州一建城建集团有限公司 | Civil engineering construction irrigation process and construction equipment thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112609990A (en) | Device is pour in construction of frame shear wall structure | |
CN111301969A (en) | Device for intermittent feeding of columnar parts | |
CN109267730A (en) | A kind of automatic plastering machine | |
CN211804611U (en) | Pressure vessel welding butt joint device | |
CN211729726U (en) | Raw material lifting device for production of bonding mortar | |
CN109226320B (en) | Guide wheel frame for continuous extrusion production of copper bars | |
CN217680752U (en) | Temporary supporting assembly for pipe truss installation | |
CN215211472U (en) | Sewage lifting device | |
CN217030216U (en) | Building pipe laying fixing device among hydraulic engineering | |
CN220555520U (en) | Feeding device for gypsum mortar production line | |
CN218871900U (en) | Stirring device with adjustable stirring teeth | |
CN216491449U (en) | Spiral shell centrifuge current protection equipment crouches | |
CN219834190U (en) | Wireless support that fills that possesses collapsible function | |
CN219308619U (en) | Electric control packing quantitative paint mixing machine | |
CN220747760U (en) | Supporting structure | |
CN109018681A (en) | A kind of assembled architecture wall stacking bracket | |
CN217870493U (en) | Underground pipe gallery settlement corrector | |
CN210303988U (en) | Vibration grid suitable for cold regeneration aggregate storehouse | |
CN217172269U (en) | Automatic mechanism of going up of tool | |
CN220803580U (en) | Grinding mechanism for grinding roller | |
CN213559628U (en) | Reinforcing bar bending device that engineering construction used | |
CN216916274U (en) | Unmanned aerial vehicle with multiple load modes | |
CN215903740U (en) | Concrete mixer with manual and automatic material guiding function | |
CN219311651U (en) | Discharging mechanism of concrete mixer | |
CN217200071U (en) | Chain type garbage can unloading device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210406 |
|
RJ01 | Rejection of invention patent application after publication |