CN210180274U - Digging-free artillery hoe-standing fixing device - Google Patents

Digging-free artillery hoe-standing fixing device Download PDF

Info

Publication number
CN210180274U
CN210180274U CN201920999890.XU CN201920999890U CN210180274U CN 210180274 U CN210180274 U CN 210180274U CN 201920999890 U CN201920999890 U CN 201920999890U CN 210180274 U CN210180274 U CN 210180274U
Authority
CN
China
Prior art keywords
hoe
artillery
hole
bolt
stationary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920999890.XU
Other languages
Chinese (zh)
Inventor
Zhonghua Du
杜中华
Haiping Liu
刘海平
Xinxin Huang
黄欣鑫
Yue Li
李玥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Army Engineering University of PLA
Original Assignee
Army Engineering University of PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Army Engineering University of PLA filed Critical Army Engineering University of PLA
Priority to CN201920999890.XU priority Critical patent/CN210180274U/en
Application granted granted Critical
Publication of CN210180274U publication Critical patent/CN210180274U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a digging-free artillery stationary hoe fixing device, which comprises a bottom plate, stationary hoe holes arranged at four vertex angles of the bottom plate and a supporting frame arranged on the bottom plate; the top of the support frame is provided with a connecting frame matched with the artillery big frame fixing seat; the side part of the support frame is provided with a bolt hole for connecting the artillery winter hoe, a bolt penetrates through the bolt hole, and an operation hole is formed in one side of the support frame, which is opposite to the bolt hole; the hoe comprises a hoe hole, a hoe hole and a four-pointed star hoe, wherein the hoe hole is a four-pointed star hoe, and the four-pointed star hoe is arranged in the hoe hole in a matched mode. The utility model discloses can save fighter's physical power, improve the battlefield viability of artillery.

Description

Digging-free artillery hoe-standing fixing device
Technical Field
The utility model relates to a weapon equipment uses guarantee field, concretely relates to exempt from to dig hole artillery stationary hoe fixing device.
Background
At present, the quantity of the traction type ground artillery is large in all countries in the world, and most of the artillery needs to carry out service work when in use, namely digging a hoe pit and burying the hoe in the pit so as to ensure the stationarity and the stability of the artillery when in shooting. Digging a hoe pit is a very hard physical labor, which consumes a lot of physical energy for soldiers and consumes a lot of time. After the artillery is shot, a large amount of physical strength and time are consumed for digging the standing hoe out of the hole.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a save soldier's physical power, improve the artillery battlefield viability's exempt from to dig hole artillery stationary hoe fixing device.
The utility model adopts the following technical scheme:
a digging-free artillery stationary hoe fixing device comprises a bottom plate, stationary hoe holes arranged at four top corners of the bottom plate and a supporting frame arranged on the bottom plate; the top of the support frame is provided with a connecting frame matched with the artillery big frame fixing seat; the side part of the support frame is provided with a bolt hole for connecting the artillery winter hoe, a bolt penetrates through the bolt hole, and an operation hole is formed in one side of the support frame, which is opposite to the bolt hole; the hoe comprises a hoe hole, a hoe hole and a four-pointed star hoe, wherein the hoe hole is a four-pointed star hoe, and the four-pointed star hoe is arranged in the hoe hole in a matched mode.
Furthermore, the number of the bolt holes is 4, and the bolt holes are arranged in a rectangular shape.
Further, the support frame is a rectangular shell.
Furthermore, the four-pointed star hoe is in a spindle shape with one end being a tip end and the other end being a cylinder, and the cross section of the four-pointed star hoe is a four-pointed star; and crowbar holes are uniformly distributed on the side wall of the upper part of the quadrangular star stationary hoe.
Further, the anti-loosening bolt also comprises an anti-loosening nut matched with the bolt.
The utility model has the advantages that:
the utility model discloses fix original formula of buryying stationary hoe (artillery is with stationary hoe in winter) on a base, this base can be fixed in ground with four corners star stationary hoe, owing to need not dig the stationary hoe hole and bury the stationary hoe and dig out with the stationary hoe from the stationary hoe hole, can save the soldier's physical power greatly to save artillery combat preparation and the time of withdrawing from behind the war by a wide margin.
The utility model discloses a towed ground artillery battlefield of equipping in a large number of army at present uses and provides a convenient laborsaving device, helps improving army's combat power, can be used to the artillery of army to use.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic top view of the present invention.
The device comprises a base plate 1, a hoe hole 2, a support frame 3, a big gun frame fixing seat 4, a connecting frame 5, a big gun winter hoe 6, a bolt hole 7, a bolt 8, an operation hole 9, a star hoe with four corners 10, a crowbar hole 11, a locknut 12 and a big gun frame 13.
Detailed Description
Referring to fig. 1-2, a digging-free artillery hoe-retaining fixing device comprises a bottom plate 1, hoe-retaining holes 2 arranged at four top corners of the bottom plate 1, and a support frame 3 arranged on the bottom plate 1; the top of the support frame 3 is provided with a connecting frame 5 matched with the artillery big frame fixing seat 4; a bolt hole 7 for connecting a artillery winter hoe 6 is formed in the side portion of the support frame 3, a bolt 8 penetrates through the bolt hole 7, and an operation hole 9 is formed in one side, opposite to the bolt hole 7, of the support frame 3; the hoe standing hole 2 is a quadrangle star, and a quadrangle star hoe 10 is arranged in the hoe standing hole 2 in a matching mode.
The bolt holes 7 are 4 and are arranged in a rectangular shape. The support frame 3 is a rectangular shell. The four-pointed star stationary hoe 10 is in a spindle shape with one end being a pointed end and the other end being a cylinder, and the section of the four-pointed star stationary hoe 10 is a four-pointed star; and crowbar holes 11 are uniformly distributed on the side wall of the upper part of the quadrangular star stationary hoe 10. The bolt 8 is fitted with a locknut 12.
The bottom plate is a flat-bottom thick steel plate. The support frame is located the central authorities of bottom plate, and current artillery winter is with stationary hoe and do not have the needs of handle hole to set up, and simultaneously, the winter is with stationary hoe and correspond on the support frame fitting surface and set up 4 bolt holes, runs through the bolt hole with 4 pairs of bolt and nut, links firmly winter with stationary hoe and support frame.
The working principle is as follows: after the artillery is set off and opened, the utility model is placed below the winter hoe, the connecting frame is matched with the appearance of the artillery frame fixing seat at the bottom of the artillery frame 13, and the artillery frame fixing seat is directly seated on the connecting frame. The winter standing hoe is fixedly connected with the support frame through the operation hole by using a bolt and a nut, then the 4 four-corner star standing hoes are driven into 4 standing hoe holes of the bottom plate (the cylindrical part of the four-corner star standing hoe is hammered) by using a sledge hammer, and the gun can shoot. After the gun shooting is finished, a crowbar is inserted into a crowbar hole to crow the four-corner star hoe, a bolt and a nut which are used for connecting the winter hoe and the support are screwed off (the bolt and the nut are prevented from being lost and can be screwed in the support hole at ordinary times), and then the gun is folded on the support.
The structure of the hoe for winter use and the fixing seat of the big gun frame behind the big gun frame is common knowledge in the gun industry and is not described in detail herein.
With the help of the utility model discloses an exempt from artillery fixing device that digs pit, avoided digging the hoeing pit and buried the hoeing underground and dig out the operation of hoeing, saved the soldier physical power greatly, can improve the army's combat power, owing to shortened artillery combat preparation and withdrawn from the combat time simultaneously, also improved the battlefield viability of artillery.
The above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the embodiments of the present invention.

Claims (5)

1. A digging-free artillery stationary hoe fixing device is characterized by comprising a bottom plate (1), stationary hoe holes (2) arranged at four top corners of the bottom plate (1) and a support frame (3) arranged on the bottom plate (1); the top of the support frame (3) is provided with a connecting frame (5) matched with the artillery big frame fixing seat (4); a bolt hole (7) for connecting a artillery winter hoe (6) is formed in the side portion of the support frame (3), a bolt (8) penetrates through the bolt hole (7), and an operation hole (9) is formed in one side, opposite to the bolt hole (7), of the support frame (3); the hoe is characterized in that the hoe hole (2) is a quadrangle star, and a quadrangle star hoe (10) is arranged in the hoe hole (2) in a matched mode.
2. The digging-free artillery hoe fixed device according to claim 1, wherein the number of the bolt holes (7) is 4 and the bolt holes are arranged in a rectangle.
3. The digging-free artillery hoe fixed device according to claim 1, wherein the support frame (3) is a rectangular shell.
4. The digging-free artillery stationary hoe fixing device as recited in claim 1, wherein the four-pointed star stationary hoe (10) is in a spindle shape with one end being a sharp end and the other end being a cylinder, and the cross section of the four-pointed star stationary hoe (10) is a four-pointed star; crowbar holes (11) are uniformly distributed on the side wall of the upper part of the four-corner star stationary hoe (10).
5. The grooveless artillery hoe fixed device according to claim 1, further comprising a locknut (12) engaged with the bolt (8).
CN201920999890.XU 2019-06-24 2019-06-24 Digging-free artillery hoe-standing fixing device Expired - Fee Related CN210180274U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920999890.XU CN210180274U (en) 2019-06-24 2019-06-24 Digging-free artillery hoe-standing fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920999890.XU CN210180274U (en) 2019-06-24 2019-06-24 Digging-free artillery hoe-standing fixing device

Publications (1)

Publication Number Publication Date
CN210180274U true CN210180274U (en) 2020-03-24

Family

ID=69839419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920999890.XU Expired - Fee Related CN210180274U (en) 2019-06-24 2019-06-24 Digging-free artillery hoe-standing fixing device

Country Status (1)

Country Link
CN (1) CN210180274U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114152141A (en) * 2021-12-23 2022-03-08 西安昆仑工业(集团)有限责任公司 Positioning and orienting support stabilizing device for traction artillery

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114152141A (en) * 2021-12-23 2022-03-08 西安昆仑工业(集团)有限责任公司 Positioning and orienting support stabilizing device for traction artillery

Similar Documents

Publication Publication Date Title
CN210180274U (en) Digging-free artillery hoe-standing fixing device
CN212612415U (en) Positioning pile body for civil construction
CN215568949U (en) Water pipe protection mechanism for hydraulic engineering
CN205828695U (en) A kind of field quick installing grounding pole
CN205557630U (en) Earthwork evener
CN211340775U (en) Hollow pile for civil construction
CN211395502U (en) A isolating device for road construction
CN213573120U (en) Deep basal pit is with easy to detach's protective bracket
CN208749131U (en) Shovel floor tile electric hammer trolley
CN205646190U (en) A earthing device that is arranged in river embankment and pond
CN212876730U (en) Hand-held type device of digging
CN108756276A (en) Shovel floor tile electric hammer trolley
CN220086407U (en) Electric power grounding pile with good stability
CN206503246U (en) A kind of solid wood post and concrete beam connection
CN201898274U (en) Hammering component for grounding electrode
CN216529388U (en) Grounding pile easy to nail in
CN205284726U (en) Solar energy mosquito killer lamp fixer
CN217325413U (en) Foundation ditch slope is with reinforcing apparatus of high security
CN219741427U (en) Portable seedling raising machine
CN218376282U (en) Portable man-ladder device fixed on foundation pit retaining wall
CN212367870U (en) Afforestation soil and water conservation tree planting device
CN212896159U (en) Slope protection net for hydraulic engineering that protecting effect is good
CN209659880U (en) A kind of Multifunctional garden spade
CN203984320U (en) A kind of earth anchor photovoltaic bracket
CN201206349Y (en) Spiral cone pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200324

Termination date: 20210624