CN210177796U - Wallboard in waterproof type mill's prefabricated cement assembled - Google Patents
Wallboard in waterproof type mill's prefabricated cement assembled Download PDFInfo
- Publication number
- CN210177796U CN210177796U CN201920859929.8U CN201920859929U CN210177796U CN 210177796 U CN210177796 U CN 210177796U CN 201920859929 U CN201920859929 U CN 201920859929U CN 210177796 U CN210177796 U CN 210177796U
- Authority
- CN
- China
- Prior art keywords
- shaped support
- opening
- plate
- waterproof
- baffle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a wallboard in prefabricated cement assembled of waterproof type mill, including first U-shaped support and second U-shaped support, sliding connection has a plurality of plates in first U-shaped support and the second U-shaped support, and first counter bore has been seted up in running through of first U-shaped support upper surface, and first opening has been seted up to first U-shaped support front surface one side, and first U-shaped support is located first opening part and has first baffle through hinged joint. Compared with the prior art, the beneficial effects of the utility model are that: firstly, through the first U-shaped support and the second U-shaped support that set up to set up first opening and second opening on first U-shaped support and second U-shaped support respectively, make the equipment and the dismantlement of this wallboard all more convenient, thereby be convenient for this wallboard reuse, secondly, through the draw-in groove that sets up, make and to take together between the plate, thereby made the clearance that has formed the L shape between the plate, and then avoided the not waterproof problem in linear type clearance.
Description
Technical Field
The utility model relates to a building wallboard field specifically is a wallboard in prefabricated cement assembled of waterproof type mill.
Background
The wall board is a building material, and is a building structure of a bearing system consisting of walls and floor slabs, wherein the bearing wall of the wall board structure can be made of bricks, building blocks, prefabricated or cast-in-place concrete, and can be divided into a mixed structure, an assembled large-plate structure and a cast-in-place wall board structure according to different used materials and construction methods.
The installation of current wallboard is more complicated, and is difficult to dismantle and carry out used repeatedly, and in addition, in the installation, the clearance between the plate is the linear type, and waterproof nature is relatively poor.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a wallboard in prefabricated cement assembled of waterproof type mill to solve the problem that proposes in the above-mentioned background art.
In order to realize the purpose, the utility model provides the following technical scheme that the waterproof factory-prefabricated cement assembly type inner wallboard comprises a first U-shaped bracket and a second U-shaped bracket, wherein a plurality of plates are slidably connected in the first U-shaped bracket and the second U-shaped bracket, a first counter bore is formed on the upper surface of the first U-shaped bracket in a penetrating way, a first opening is formed on one side of the front surface of the first U-shaped bracket, the first U-shaped bracket is positioned at the first opening and is connected with a first baffle through a hinge, a plurality of groups of first mounting holes are formed on the front surface of the first U-shaped bracket in a penetrating way, a second counter bore is formed on the upper surface of the second U-shaped bracket in a penetrating way, a second opening is formed on one side of the front surface of the second U-shaped bracket, the second U-shaped bracket is positioned at the second opening and is connected with a second baffle through a hinge, a plurality of groups of second mounting holes are, the plate is characterized in that clamping grooves are formed in two sides of the plate, stop blocks are connected in the clamping grooves in a sliding mode, and through holes are symmetrically formed in the top and the bottom of the front surface of the plate around a vertical central line.
Preferably, the first U-shaped bracket is open downward, and the first opening extends to the upper surface and the lower surface of the first U-shaped bracket.
Preferably, the second U-shaped bracket opens upward, and the second opening extends to the upper surface and the lower surface of the second U-shaped bracket.
Preferably, the width of the first opening and the width of the second opening are both larger than the width of the plate.
Preferably, each group of the first mounting holes and the second mounting holes are provided with two mounting holes, and the pitch of the first mounting holes and the pitch of the second mounting holes of each group are equal to the pitch of the through holes.
Preferably, the front surfaces of the first baffle and the second baffle are respectively provided with a first mounting hole and a second mounting hole.
Compared with the prior art, the beneficial effects of the utility model are that: firstly, through the first U-shaped support and the second U-shaped support that set up, and set up first opening and second opening on first U-shaped support and second U-shaped support respectively, make the plate can imbed in first U-shaped support and the second U-shaped support through gliding mode, accomplish the equipment process, in addition, when dismantling, can also pass through first opening and second opening roll-off again with the plate, make the equipment and the dismantlement of this wallboard all more convenient, thereby be convenient for this wallboard reuse, secondly, through the draw-in groove that sets up, make and to take together between the plate, thereby make the clearance of L shape between the plate, and then avoided the waterproof problem in linear type clearance.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic overall sectional structure of the present invention;
fig. 3 is a schematic top view of the plate of the present invention.
In the figure: 1. a stopper; 2. a plate block; 3. a first counterbore; 4. a first U-shaped bracket; 5. a card slot; 6. a second counterbore; 7. a second U-shaped bracket; 8. a through hole; 9. a first mounting hole; 10. a second mounting hole; 11. a first baffle plate; 12. a first opening; 13. a second baffle; 14. a second opening.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
Referring to fig. 1-3, the present invention provides an embodiment: a waterproof factory-prefabricated cement assembly type inner wall board comprises a first U-shaped support 4 and a second U-shaped support 7, a plurality of plates 2 are slidably connected in the first U-shaped support 4 and the second U-shaped support 7, the plates 2 jointly form a wall body, a first counter bore 3 penetrates through the upper surface of the first U-shaped support 4, a first opening 12 is formed in one side of the front surface of the first U-shaped support 4, the first U-shaped support 4 is located at the first opening 12 and is connected with a first baffle 11 through a hinge, a plurality of groups of first mounting holes 9 penetrate through the front surface of the first U-shaped support 4, the opening of the first U-shaped support 4 faces downwards, the first opening 12 extends to the upper surface and the lower surface of the first U-shaped support 4, the part with the larger diameter of the first counter bore 3 faces downwards, the first U-shaped support 4 can be conveniently mounted on a ceiling through bolts, the first opening 12 penetrates through the front side surface of the first U-shaped support 4, the plate 2 is convenient to mount in the first U-shaped support 4, the first baffle 11 is used for sealing the first opening 12, so that the first U-shaped support 4 is more flat as a whole, the upper surface of the second U-shaped support 7 is provided with a second counter bore 6 in a penetrating way, one side of the front surface of the second U-shaped support 7 is provided with a second opening 14, the second U-shaped support 7 is positioned at the second opening 14 and is connected with a second baffle 13 through a hinge, the front surface of the second U-shaped support 7 is provided with a plurality of groups of second mounting holes 10 in a penetrating way, the opening of the second U-shaped support 7 is upward, the second opening 14 extends to the upper surface and the lower surface of the second U-shaped support 7, the width of the first opening 12 and the width of the second opening 14 are both larger than the width of the plate 2, the part with the larger diameter of the second counter bore 6 faces downward and upward, so that the second U-shaped support 7 can be conveniently mounted on the ground by using bolts, and the, the plate 2 is convenient to mount in the second U-shaped support 7, the second baffle 13 is used for sealing the second opening 14, so that the second U-shaped support 7 is more flat as a whole, the two sides of the plate 2 are both provided with clamping grooves 5, wherein the two clamping grooves 5 are internally and slidably connected with the baffle 1, the clamping grooves 5 slidably connected with the baffle 1 are positioned at the outermost end of the whole device, the baffle 1 is arranged because the plate 2 is not clamped with the clamping grooves 5, so that the whole wall surface is more flat, the top and the bottom of the front surface of the plate 2 are symmetrically provided with through holes 8 about a vertical central line, two first mounting holes 9 and two second mounting holes 10 are arranged in each group, the hole distance between the first mounting hole 9 and the second mounting hole 10 in each group is equal to the hole distance between the through holes 8, the plate 2 is convenient to be connected with the first U-shaped support 4 and the second U-shaped support 7, the first mounting hole 9 and the second mounting hole 10 are respectively arranged on the front surfaces of, so that the first and second skirts 11 and 13 can be coupled to the panel 2 in the same manner as the first and second U-shaped brackets 4 and 7, thereby making the wall body more flat.
The working principle is as follows: when the wallboard is installed, firstly, the first U-shaped bracket 4 is installed on a ceiling through bolts, a tool is used for determining the installation position of the second U-shaped bracket 7, then the second U-shaped bracket 7 is connected with the ground through the bolts, secondly, one stop block 1 is slid into the space between the first U-shaped bracket 4 and the second U-shaped bracket 7, then a plate block 2 is slid into the space between the first U-shaped bracket 4 and the second U-shaped bracket 7 through the first opening 12 and the second opening 14, the position is adjusted, so that the first installation hole 9 is superposed with the through hole 8 at the top of the plate block 2, the stop block 1 in the first U-shaped bracket 4 and the second U-shaped bracket 7 is positioned in one clamping groove 5 of the plate block 2, the installation bolt firstly penetrates through the first installation hole 9 and is fixed by the nut, then the installation bolt penetrates through the second installation hole 10 and is fixed by the nut, at the moment, the first plate block 2 is installed, when other plates 2 are installed, the plates 2 slide in repeatedly, the bolts are installed, the locking nuts can be used, when the last plate 2 is installed, the plate 2 and the stop dog 1 are placed between the first U-shaped support 4 and the second U-shaped support 7 through the first opening 12 and the second opening 14 according to the sequence, then the first baffle plate 11 and the second baffle plate 13 are rotated, the first baffle plate 11 and the second baffle plate 13 are attached to the surface of the plate 2, the first installing hole 9 and the second installing hole 10 are sequentially installed through the installation bolts, when the wall is disassembled, the reverse operation of installation can be performed, namely the bolts at the second opening 14 and the first opening 12 are firstly disassembled, after the plate 2 at the position is disassembled, other plates 2 are sequentially disassembled, and then the first U-shaped support 4 and the second U-shaped support 7 are disassembled.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a wallboard in waterproof type mill's prefabricated cement assembled, includes first U-shaped support (4) and second U-shaped support (7), its characterized in that: the first U-shaped support (4) and the second U-shaped support (7) are connected with a plurality of plates (2) in a sliding mode, a first counter bore (3) penetrates through the upper surface of the first U-shaped support (4), a first opening (12) is formed in one side of the front surface of the first U-shaped support (4), a first baffle (11) is connected to the position, located at the first opening (12), of the first U-shaped support (4) through a hinge, a plurality of groups of first mounting holes (9) penetrate through the front surface of the first U-shaped support, a second counter bore (6) penetrates through the upper surface of the second U-shaped support (7), a second opening (14) is formed in one side of the front surface of the second U-shaped support (7), a second baffle (13) is connected to the position, located at the second opening (14), of the second U-shaped support (7) through a plurality of second mounting holes (10), the plate is characterized in that clamping grooves (5) are formed in two sides of the plate (2), stop blocks (1) are connected in the clamping grooves (5) in a sliding mode, and through holes (8) are formed in the top and the bottom of the front surface of the plate (2) symmetrically about a vertical central line.
2. The waterproof factory-prefabricated cement-assembled interior wall panel according to claim 1, wherein: the first U-shaped bracket (4) is opened downwards, and the first opening (12) extends to the upper surface and the lower surface of the first U-shaped bracket (4).
3. The waterproof factory-prefabricated cement-assembled interior wall panel according to claim 1, wherein: the second U-shaped bracket (7) is opened upwards, and the second opening (14) extends to the upper surface and the lower surface of the second U-shaped bracket (7).
4. The waterproof factory-prefabricated cement-assembled interior wall panel according to claim 1, wherein: the width of the first opening (12) and the width of the second opening (14) are both larger than the width of the plate (2).
5. The waterproof factory-prefabricated cement-assembled interior wall panel according to claim 1, wherein: every group first mounting hole (9) and second mounting hole (10) all are equipped with two, and every group will first mounting hole (9) and second mounting hole (10) the pitch-row with through-hole (8) equal.
6. The waterproof factory-prefabricated cement-assembled interior wall panel according to claim 1, wherein: the front surfaces of the first baffle (11) and the second baffle (13) are respectively provided with a first mounting hole (9) and a second mounting hole (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920859929.8U CN210177796U (en) | 2019-06-10 | 2019-06-10 | Wallboard in waterproof type mill's prefabricated cement assembled |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920859929.8U CN210177796U (en) | 2019-06-10 | 2019-06-10 | Wallboard in waterproof type mill's prefabricated cement assembled |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210177796U true CN210177796U (en) | 2020-03-24 |
Family
ID=69836806
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920859929.8U Expired - Fee Related CN210177796U (en) | 2019-06-10 | 2019-06-10 | Wallboard in waterproof type mill's prefabricated cement assembled |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210177796U (en) |
-
2019
- 2019-06-10 CN CN201920859929.8U patent/CN210177796U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208502433U (en) | A kind of prefabricated assembled Assembled surrounding wall with vertical curtain wall penel component | |
CN111980230B (en) | Dry-method connection assembly type partition plate | |
CN107090974B (en) | Roof quick-release supporting system and construction method thereof | |
CN209779938U (en) | Environment-friendly wallboard | |
CN210369345U (en) | Novel light outer wall bracket based on steel construction | |
CN210067415U (en) | Scaffold connecting device | |
CN210177796U (en) | Wallboard in waterproof type mill's prefabricated cement assembled | |
CN213268311U (en) | Modular design's assembled building | |
CN215367999U (en) | Assembled energy-conserving building wall component | |
CN212104724U (en) | Unit formula aluminum plate connection structure for curtain convenient to use | |
CN212001708U (en) | Socket joint formula shear force wall of protruding structure of area grafting | |
CN204782178U (en) | System is just before a battle changed to people's air defence basement | |
DE602005001936T2 (en) | Method for mounting a dividing wall integrated in the concrete floor | |
CN208844782U (en) | A kind of fast-assembling walling system and hangar system | |
CN215564978U (en) | Transformer substation is with assembled enclosure | |
CN111058374A (en) | Rapid support mounting device and method for mounting prefabricated bridge support by using same | |
CN213062829U (en) | Wallboard mounting machine | |
CN218493284U (en) | Assembled precast concrete enclosure | |
CN214220250U (en) | Prefabricated pipeline assembled floor panel for outdoor decoration | |
CN216275827U (en) | Protective plate for building well chamber | |
CN211548302U (en) | Pour floor with exempting from to tear open truss plate | |
CN217353856U (en) | Assembled precast concrete encloses fender | |
CN213741606U (en) | Assembled building frame construction | |
CN208508245U (en) | A kind of switch-box prefabricated component | |
CN214402618U (en) | Plastering frame structure of movable clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200324 Termination date: 20210610 |