CN214402618U - Plastering frame structure of movable clamp - Google Patents

Plastering frame structure of movable clamp Download PDF

Info

Publication number
CN214402618U
CN214402618U CN202120460252.8U CN202120460252U CN214402618U CN 214402618 U CN214402618 U CN 214402618U CN 202120460252 U CN202120460252 U CN 202120460252U CN 214402618 U CN214402618 U CN 214402618U
Authority
CN
China
Prior art keywords
frame
plastering
wallboard
fixed
upright post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120460252.8U
Other languages
Chinese (zh)
Inventor
马仁武
张建羽
李萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tibet Zhonghuan Green Building Integrated Housing Technology Co.,Ltd.
Original Assignee
Zhonghuan Lvjian Integrated Housing Technology Hebei Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhonghuan Lvjian Integrated Housing Technology Hebei Co ltd filed Critical Zhonghuan Lvjian Integrated Housing Technology Hebei Co ltd
Priority to CN202120460252.8U priority Critical patent/CN214402618U/en
Application granted granted Critical
Publication of CN214402618U publication Critical patent/CN214402618U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a plastering frame structure of a movable clamp, which comprises a movable frame, a fixed frame and a wallboard clamp; the movable frame comprises a movable base, a first upright post is fixed on the top surface of the movable base, a roller is arranged on the bottom surface of the movable base, the roller moves along a guide rail paved on the ground, the fixed frame is arranged along the direction of the guide rail, the fixed frame comprises a bottom plate fixed on the ground, and a second upright post is fixed on the bottom plate; the wallboard fixture comprises a side plate, the side plate is connected to the first stand column or the second stand column, and a plurality of clamping block assemblies used for clamping the assembled wallboard are arranged on the side plate. The utility model discloses can adjust according to the specification size of wallboard, can support the wallboard of different specifications, the wallboard after supporting stand can carry out the operation of plastering on two sides simultaneously, the effectual efficiency of plastering that improves the wallboard.

Description

Plastering frame structure of movable clamp
Technical Field
The utility model relates to an assembly type structure field especially relates to a portable anchor clamps's frame structure of plastering.
Background
Fabricated wallboard refers to concrete products that are manufactured in a factory by standardized, mechanized processes. The corresponding traditional cast-in-place concrete needs site moulding, site pouring and site maintenance. The concrete prefabricated member is widely applied to the fields of buildings, traffic, water conservancy and the like, and plays an important role in national economy.
The assembled wallboard needs to be through cement facing (plastering) process in the course of working, often will carry out the turn-over through the crane to the wallboard that tiles subaerial among the prior art, can only carry out the operation of facing to the single face of wallboard at every turn, lead to wallboard preparation inefficiency.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a portable anchor clamps's frame structure of plastering solves the problem that the wallboard preparation inefficiency of plastering among the background art.
In order to solve the technical problem, the utility model adopts the following technical scheme:
the utility model relates to a plastering frame structure of a movable clamp, which comprises a movable frame and a fixed frame, wherein the movable frame and the fixed frame are both provided with a wallboard clamp;
the moving frame comprises a moving base, a first upright post is fixed on the top surface of the moving base, rollers are arranged on the bottom surface of the moving base and move along guide rails laid on the ground,
the fixing frame is arranged along the direction of the guide rail and comprises a bottom plate fixed on the ground, and a second upright post is fixed on the bottom plate;
the wallboard fixture comprises a side plate, the side plate is connected to the first stand column or the second stand column, and a plurality of clamping block assemblies used for clamping the assembled wallboard are arranged on the side plate.
Furthermore, a guide sleeve is fixed on the back of the side plate, the guide sleeve is sleeved on the first upright post or the second upright post, and a jackscrew for fixing is connected to the guide sleeve through threads.
Further, the clamp splice subassembly is including seting up four waist shape holes that are the rectangle and arrange on the curb plate, every all be provided with the bolt in the waist shape hole, the screw thread end of bolt with be located the inboard clamp splice threaded connection of curb plate.
Furthermore, a reinforcing rod is arranged behind the first upright column, the upper end of the reinforcing rod is fixedly connected with the first upright column, and the lower end of the reinforcing rod is connected with the movable base.
Furthermore, both ends of the guide rail are provided with baffle plates for preventing the roller from slipping.
Furthermore, a groove hopper is arranged between the two guide rails.
Compared with the prior art, the utility model discloses a beneficial technological effect:
the utility model discloses can adjust according to the specification size of wallboard, can support the wallboard of different specifications, the wallboard after supporting stand can carry out the operation of plastering on two sides simultaneously, the effectual efficiency of plastering that improves the wallboard.
Drawings
The present invention will be further explained with reference to the following description of the drawings.
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic structural view of the movable frame of the present invention;
FIG. 3 is a schematic structural view of the fixing frame of the present invention;
fig. 4 is a schematic front structural view of the wallboard fixture of the present invention;
fig. 5 is a schematic view of the back structure of the wallboard fixture of the present invention.
Description of reference numerals: 1. a movable frame; 101. moving the base; 102. a first upright post; 103. a roller; 104. a guide rail; 105. a reinforcing bar; 106. a baffle plate; 2. a fixed mount; 201. a base plate; 202. a second upright post; 3. a wallboard fixture; 301. a side plate; 302. a clamp block assembly; 302-1, kidney-shaped hole; 302-2, bolts; 302-3, clamping blocks; 303. a guide sleeve; 304. carrying out top thread; 4. a trough bucket.
Detailed Description
In order to make the technical solutions of the present invention better understood by those skilled in the art, the present invention will be further described in detail with reference to the accompanying drawings and the detailed description.
As shown in fig. 1, the present embodiment discloses a plastering frame structure of a movable clamp, which includes a movable frame 1 and a fixed frame 2, wherein the movable frame 1 and the fixed frame 2 are both provided with a wallboard clamp 3.
As shown in fig. 2, the movable frame 1 includes a movable base 101, a first upright 102 is welded to the top surface of the movable base 101, a reinforcing rod 105 is disposed behind the first upright 102, the upper end of the reinforcing rod 105 is welded to the first upright 102, and the lower end is welded to the movable base 101. The bottom surface of the movable base 101 is provided with four rollers 103, and the four rollers 103 move along two guide rails 104 laid on the ground. Baffles 106 for preventing the rollers 103 from slipping off are welded to both ends of the guide rail 104.
As shown in fig. 3, the fixing frame 2 is arranged along the direction of the guide rail 104, and the fixing frame 2 includes a bottom plate 201 fixed on the ground by expansion bolts, and a second upright 202 is welded on the bottom plate 201.
As shown in fig. 4 and 5, the wall panel clip 3 includes a side panel 301, the side panel 301 is connected to the first upright post 102 or the second upright post 202, and a plurality of clamping block assemblies 302 for clamping the assembly wall panel are provided on the side panel 301.
In order to adjust the height of the wallboard fixture 3 to adapt to wallboards with different heights, in this embodiment, the back of the side plate 301 is welded with the guide sleeve 303, the guide sleeve 303 is sleeved on the first upright post 102 or the second upright post 202, the guide sleeve 303 is connected with the jackscrew 304 for fixing through a thread, and the thread end of the jackscrew 304 abuts against the side wall of the upright post.
The clamping block assembly 302 comprises four slotted holes 302-1 which are arranged on the side plate 301 in a rectangular mode, a bolt 302-2 is arranged in each slotted hole 302-1, and the threaded end of each bolt 302-2 is in threaded connection with a clamping block 302-3 located on the inner side of the side plate 301.
In the process of plastering a wall panel, a chute 4 is provided between the two guide rails 104 in order to collect the falling ash.
It should be noted that, in the present embodiment, the single plastering frame structures can be arranged in rows and columns to form a streamlined plastering process workshop. The wallboard can be lifted by the overhead crane above.
The utility model discloses a use as follows:
firstly, hoisting a wallboard to the upper part of a movable frame 1 and a fixed frame through a crown block, then moving the movable frame 1 along a guide rail 104, so that the wallboard is just placed between a first upright post 102 and a second upright post 202, a side plate 301 of a wallboard clamp 3 is tightly attached to the side wall of the wallboard, respectively sliding bolts 302-2 along waist-shaped holes 302-1, screwing each bolt 302-2, so that four clamping blocks 302-3 clamp the wallboard, the wallboard is erected in a trough hopper 4, and finally, performing surface finishing operation on two surfaces of the wallboard.
The above-mentioned embodiments are only intended to describe the preferred embodiments of the present invention, but not to limit the scope of the present invention, and those skilled in the art should also be able to make various modifications and improvements to the technical solution of the present invention without departing from the spirit of the present invention, and all such modifications and improvements are intended to fall within the scope of the present invention as defined in the appended claims.

Claims (6)

1. The utility model provides a frame structure of plastering of portable anchor clamps which characterized in that: the wall plate clamping device comprises a moving frame (1) and a fixed frame (2), wherein wall plate clamps (3) are arranged on the moving frame (1) and the fixed frame (2);
the movable frame (1) comprises a movable base (101), a first upright post (102) is fixed on the top surface of the movable base (101), rollers (103) are arranged on the bottom surface of the movable base (101), the rollers (103) move along guide rails (104) laid on the ground,
the fixing frame (2) is arranged along the direction of the guide rail (104), the fixing frame (2) comprises a bottom plate (201) fixed on the ground, and a second upright post (202) is fixed on the bottom plate (201);
the wallboard fixture (3) comprises a side plate (301), the side plate (301) is connected to the first upright post (102) or the second upright post (202), and a plurality of clamping block assemblies (302) used for clamping assembled wallboards are arranged on the side plate (301).
2. A plastering frame structure of a mobile jig according to claim 1, wherein: the back of curb plate (301) is fixed with uide bushing (303), uide bushing (303) cover is established on first stand (102) or second stand (202), there is jackscrew (304) that is used for fixing through threaded connection on uide bushing (303).
3. A plastering frame structure of a mobile jig according to claim 1, wherein: the clamping block assembly (302) comprises four waist-shaped holes (302-1) which are arranged on the side plate (301) in a rectangular mode, each waist-shaped hole (302-1) is internally provided with a bolt (302-2), and the threaded end of each bolt (302-2) is in threaded connection with a clamping block (302-3) located on the inner side of the side plate (301).
4. A plastering frame structure of a mobile jig according to claim 1, wherein: a reinforcing rod (105) is arranged behind the first upright post (102), the upper end of the reinforcing rod (105) is fixedly connected with the first upright post (102), and the lower end of the reinforcing rod is connected with the movable base (101).
5. A plastering frame structure of a mobile jig according to claim 1, wherein: and two ends of the guide rail (104) are respectively provided with a baffle (106) for preventing the roller (103) from slipping.
6. A plastering frame structure of a mobile jig according to claim 1, wherein: a trough hopper (4) is arranged between the two guide rails (104).
CN202120460252.8U 2021-03-03 2021-03-03 Plastering frame structure of movable clamp Active CN214402618U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120460252.8U CN214402618U (en) 2021-03-03 2021-03-03 Plastering frame structure of movable clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120460252.8U CN214402618U (en) 2021-03-03 2021-03-03 Plastering frame structure of movable clamp

Publications (1)

Publication Number Publication Date
CN214402618U true CN214402618U (en) 2021-10-15

Family

ID=78027774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120460252.8U Active CN214402618U (en) 2021-03-03 2021-03-03 Plastering frame structure of movable clamp

Country Status (1)

Country Link
CN (1) CN214402618U (en)

Similar Documents

Publication Publication Date Title
CN212503601U (en) Installation die for unit sections of vertical pipes of pipe well
CN204040450U (en) A kind of for angle connector in tools type section steel builder's jack
CN214402618U (en) Plastering frame structure of movable clamp
CN210066503U (en) Thin-wall hollow pier die of sliding frame lifting die
CN204982673U (en) Continuous steel of high mound of hollow thin wall structure 0# section binds and pre -compaction support in 100 -meter dash
CN216616848U (en) Beam plate post-cast strip supporting and mold sealing structure
CN203296310U (en) Curtain wall pendant capable of being adjusted in three-dimensional mode
CN212614754U (en) Tunnel ditch cable duct moving die carrier
CN210858229U (en) Assembled precast concrete enclosure
CN211173126U (en) A pour support frame for prefabricating assembled concrete shear wall
CN203307837U (en) Foundation bolt pouring positioning device
CN219622281U (en) Internal corner supporting structure for formwork system
CN211499849U (en) Prefabricated plate construction locating rack
CN217811752U (en) Flanging steel reinforced concrete building wall
CN217292753U (en) Stair are size adjustable supporting seat for mould
CN217924898U (en) House steel construction building plane template support supporting device
CN218643923U (en) Steel bar positioning clamp
CN220377930U (en) Concrete beam side direction bearing structure that opens a hole
CN218757495U (en) Slope-shaped independent foundation formwork support and slope forming control tool
CN217353856U (en) Assembled precast concrete encloses fender
CN105350770B (en) For making the construction tool that enclosure wall bears down on one
CN220747233U (en) Steel construction factory building that can install fast
CN216474414U (en) Auxiliary material machine of highway engineering construction usefulness
CN112962960B (en) Early formwork stripping support system of coincide floor rigid coupling independent stay
CN213741606U (en) Assembled building frame construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230815

Address after: Commercial Housing of Tibet Hongteng Cultural Tourism Development Co., Ltd., Building 10, Cangyuan Fengqing Street, Cijuelin Yuntian Road, Chengguan District, Lhasa City, Tibet Autonomous Region, 850032

Patentee after: Tibet Zhonghuan Green Building Integrated Housing Technology Co.,Ltd.

Address before: 066300 China Merchants Building, northwest corner of intersection of Yingbin Road and Jiankang street, Funing District, Qinhuangdao City, Hebei Province

Patentee before: Zhonghuan Lvjian integrated housing technology Hebei Co.,Ltd.

TR01 Transfer of patent right