CN210164239U - Instrument formula intelligence extrusion constructional column pours device - Google Patents
Instrument formula intelligence extrusion constructional column pours device Download PDFInfo
- Publication number
- CN210164239U CN210164239U CN201920735586.4U CN201920735586U CN210164239U CN 210164239 U CN210164239 U CN 210164239U CN 201920735586 U CN201920735586 U CN 201920735586U CN 210164239 U CN210164239 U CN 210164239U
- Authority
- CN
- China
- Prior art keywords
- fan
- template
- shaped
- support
- constructional column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model relates to a device is pour to instrument formula intelligence extrusion constructional column, its characterized in that: the concrete pouring device comprises a formwork part and a concrete pouring part, wherein the formwork part comprises a lower formwork; concrete placement part includes the upper portion template, the type of falling L support, fan-shaped baffle, the fly leaf, jack and picture peg, the type of falling L support mounting is at lower part template top, upper portion template bottom is connected with the cooperation of lower part template top, upper portion template lateral surface and the type of falling L support in close contact with, fan-shaped baffle top is fixed with the girth, the bottom is fixed with the type of falling L support, the jack is fixed on the type of falling L support, the fly leaf sets up between two fan-shaped baffles of homonymy, the bottom is articulated with the type of falling L support, fly leaf and jack cooperation, the picture peg can be dismantled with the upper portion template and be connected. The utility model discloses can resources are saved, ann tear convenient, convenient operation, structure firm, and the constructional column top is connected perfectly with the breast, and follow-up need not to chisel out horn mouth, new and old concrete connection position is difficult for cracking, component recovery rate of recycling is high.
Description
Technical Field
The utility model belongs to the building engineering field is applicable to the construction of brick concrete structure building constructional column, especially relates to a device is pour to instrument formula intelligence extrusion constructional column.
Background
The constructional column is characterized in that in order to enhance the integrity and stability of a building, a reinforced concrete constructional column is arranged in a wall body of a multi-layer brick-concrete structure building and is connected with each layer of ring beam to form a space frame capable of resisting bending and shearing, and the constructional column is an effective measure for preventing a house from collapsing.
The construction method of the constructional column of the framework masonry infilled wall and the pouring device thereof are disclosed in the utility model with application number 201010557034.2, and the construction method comprises the following construction layout, end rebar planting, end flexibility, material paving, rebar binding, wall construction, pouring device installation, concrete pouring, pouring device dismantling and maintenance. The construction of the constructional column by adopting the method has the following defects:
1. according to the construction method, the horn mouth is left at the top of the constructional column after concrete pouring is finished, the horn mouth needs to be manually chiseled off after concrete curing and forming, so that construction resource waste is large, work efficiency is low, the constructional column can be damaged when the horn mouth is chiseled off, and the practical function of the constructional column is reduced;
2. the integrity that this constructional column pours the in-process and can't guarantee constructional column top and ring beam is connected, and the compactness is not enough at the in-process of pouring of concrete, often can cause the crack, and construction quality is not passed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problems that horn mouth chisels out and the wasting of resources is big and the work efficiency is low, the constructional column top is connected insecure with the roof beam top and the component recycling rate such as crack, template is low and the like in the traditional constructional column pouring method, and the tool type intelligent extrusion constructional column pouring device is provided.
In order to realize the technical purpose, the utility model discloses a following technical scheme:
the utility model relates to a device is pour to instrument formula intelligence extrusion constructional column, including the collar tie beam, its characterized in that: the concrete pouring formwork comprises a formwork part and a concrete pouring part, wherein the formwork part comprises lower formworks, and the lower formworks on two sides are connected through split screws; the concrete pouring part comprises an upper template, an inverted L-shaped bracket, a fan-shaped baffle, a movable plate, a jack and an inserting plate, wherein the inverted L-shaped bracket is arranged at the top of the lower template, the bottom of the upper template is matched and connected with the top of the lower template, the outer side surface of the upper template is tightly contacted with the inverted L-shaped bracket, two fan-shaped baffles are respectively arranged on two sides of the ring beam, the upper half parts of the fan-shaped baffles are fixed with the ring beam, the inner side surfaces of the fan-shaped baffles are tightly attached to the ring beam, the bottom ends of the fan-shaped baffles are fixed with the inverted L-shaped bracket, the jack is fixed on the inverted L-shaped bracket, the movable plate is arranged between the two fan-shaped baffles on the same side, the front edge and the rear edge of the movable plate are tightly contacted with the fan-shaped baffles, the bottom of the movable plate is arranged at the junction of the upper template and, and is hinged with the inverted L-shaped support, the movable plate is matched with the jack, and the inserting plate is detachably connected with the upper template.
Preferably, the outside of lower part template be equipped with vertically and horizontally staggered and erect stupefied and violently stupefied, the screw rod of drawing run through violently stupefied, the one end of the type of falling L support insert in erecting stupefied. The arrangement of the vertical ribs and the horizontal ribs improves the stability of the lower template and can be used as an installation support of the L-shaped support.
Preferably, the inverted-L-shaped support comprises a vertical pipe and an overhanging pipe, the vertical pipe comprises a socket joint section at the lower half part and a port section at the upper half part, the shape and the size of the horizontal section of the port section are respectively the same as those of the horizontal section of the vertical ridge, the size of the horizontal section of the socket joint section is smaller than that of the horizontal section of the port section, the socket joint section is inserted into the vertical ridge, the port section is lapped at the top of the vertical ridge, and the inner side end of the overhanging pipe is lapped on the port section.
Preferably, the fan-shaped baffle is provided with an ear plate, a sliding groove and a barrier strip, the ear plate is tightly attached to the ring beam and fixed with the ring beam through an expansion bolt, the barrier strip is arranged at the top of one side edge of the fan-shaped baffle, which is far away from the ring beam, and the sliding groove is of an arc-shaped structure; the front edge and the rear edge of the movable plate are provided with bulges, and the bulges are inserted into the sliding grooves of the front side fan-shaped baffle and the rear side fan-shaped baffle and are connected with the fan-shaped baffles in a sliding mode.
Preferably, the lower part of the movable plate is provided with a circular hollow structure arranged in the front-back direction, a rotating shaft is arranged in the circular hollow structure, the two ends of the rotating shaft extend out of the movable plate, the parts of the two ends of the rotating shaft extending out of the movable plate are provided with supports, and the supports are fixed on the inverted-L-shaped support.
Preferably, the upper edge of the lower template is provided with a first tongue-and-groove, the lower edge of the upper template is provided with a second tongue-and-groove, and the first tongue-and-groove is matched with the second tongue-and-groove when the lower template is spliced with the upper template.
Preferably, the upper half of the upper template is provided with a hollow part, slots are arranged on the front side and the rear side of the hollow part, and the front side edge and the rear side edge of the inserting plate are inserted into the slots.
Preferably, the length of the movable plate is equal to the radius of the fan-shaped baffle.
Adopt the utility model relates to a scheme compares with the conventional art and has following characteristics and beneficial effect:
(1) the movable plate is pressed for multiple times through the jack in the concrete pouring process, the concrete is pressed tightly at the gap of the chiseling part at the bottom of the ring beam through the pressing of the movable plate, and residual air bubbles in the concrete are extruded, so that the concrete is more compact, the generation of constructional column cracks is avoided, the construction quality is improved, and meanwhile, the intellectualization of the pouring device is realized through the automatic operation of the jack.
(2) Before the concrete is hardened, the inserting plate is inserted into the inserting groove, and the redundant concrete between the inserting plate and the movable plate is removed, so that the surface of the concrete at the pouring opening is smooth, the operation of chiseling and removing a horn mouth in the traditional construction is omitted, and the construction is more convenient and faster; meanwhile, after the inserting plates are inserted, redundant concrete in the pouring device is recycled for other use, so that materials are saved, and the manufacturing cost is reduced.
(3) The concrete placement part downside is inserted through the riser and is located the perpendicular stupefied of lower part template, and the upside is fixed in on the circle roof beam through beating to establish expansion bolts in the otic placode, and the ann tears the simple operation open, and structural stability is strong, and construction safety is high.
(4) The concrete pouring part and the lower template are prefabricated in a factory, so that the workload of a construction site is reduced, and the components can be recycled, so that the energy-saving and environment-friendly effects are remarkable.
Drawings
Fig. 1 is a front view of the tool-type intelligent extruded constructional column pouring device of the utility model;
fig. 2 is a side view of the tool-type intelligent extruded constructional column pouring device of the present invention;
FIG. 3 is a detailed structural view of a concrete cast section;
fig. 4 is a perspective view of the movable plate;
FIG. 5 is a side view of the movable plate and cantilever tube connection structure;
FIG. 6 is a front view of the connection structure of the movable plate and the cantilever;
FIG. 7 is a perspective view of the upper die plate;
FIG. 8 is a perspective view of the insert plate;
fig. 9 is a detailed view of the structure of the riser.
Illustration of the drawings: 1. the novel concrete slab comprises a fan-shaped baffle, 2 parts of a movable plate, 201 parts of protrusions, 202 parts of rotating shafts, 203 parts of supports, 3 parts of sliding grooves, 4 parts of blocking strips, 5 parts of jacks, 6 parts of cantilever pipes, 7 parts of inserting plates, 8 parts of vertical pipes, 801 parts of port sections, 802 parts of socket sections, 9 parts of upper templates, 901 parts of inserting grooves, 10 parts of lower templates, 11 parts of vertical ridges, 12 parts of transverse ridges, 13 parts of counter-pull screw rods, 14 parts of ring beams, 15 parts of floor slabs and 16 parts of lug plates.
Detailed Description
The present invention will be described in further detail below by way of examples with reference to the accompanying drawings, and the following examples are illustrative of the present invention and are not limited to the following examples.
The thickness of a brick wall in certain brick-concrete structure building construction is 240mm, the height of a ring beam is 14 mm, the ring beam 14 supports a floor slab on the upper part, a constructional column with the thickness of 240mm multiplied by 240mm is required to be poured between the brick walls, and the constructional column concrete is poured and constructed by means of a tool type intelligent extrusion constructional column pouring device in the construction process.
With reference to fig. 1 and 2, the utility model relates to a device is pour to instrument formula intelligence extrusion constructional column includes template part and concrete placement part. The template part include lower part template 10, lower part template 10 adopts the steel sheet that the wall thickness is 12mm, the outside of the lower part template 10 of both sides all is equipped with vertically and horizontally staggered's stupefied 11 and horizontal stupefied 12 to improve the stability of lower part template 10, erect stupefied 11 and adopt the cross section size to be 40 mm's square steel, the wall thickness of pipe is 5mm, horizontal stupefied 12 is two phi 30 round steel, connect through drawing screw 13 between the lower part template 10 of both sides, this drawing screw 13 runs through horizontal stupefied 12.
With reference to fig. 1 to 3, the concrete pouring part includes an upper formwork 9, an inverted L-shaped bracket, a fan-shaped baffle 1, a movable plate 2, a jack 5 and a flashboard 7. The inverted-L-shaped support comprises a vertical pipe 8 and an overhanging pipe 6, the vertical pipe is structurally shown in figure 9 and comprises a socket section 802 of the lower half part and a port section 801 of the upper half part, the shape and the size of the horizontal section of the port section 801 are respectively the same as those of the horizontal section of the vertical ridge 11, the size of the horizontal section of the socket section 802 is smaller than that of the horizontal section of the port section 801, in the embodiment, the port section 801 adopts a square steel pipe with the cross section size of 40mm multiplied by 40mm, the pipe wall thickness is 5mm, the total length of the port section 801 is 40mm, the socket section 802 adopts a square steel pipe with the cross section size of 30mm multiplied by 30mm, the pipe wall thickness is 5mm, and the total length of the socket section 802 is 150 mm. The inverted L-shaped support is installed at the top of the lower formwork 10, during installation, the socket section 802 is inserted into the vertical ridge 11, the port section 801 is just lapped at the top of the vertical ridge 11, and the inner side end of the cantilever pipe 6 is lapped on the port section 801 and fixed in a welding mode.
Referring to fig. 1, the upper edge of the lower template 10 is provided with a first tongue-and-groove, and the thickness of the first tongue-and-groove is 6mm, that is, the thickness of the lower template 10 is half of the thickness, and the height is also 6 mm; referring to fig. 1 and 3, the upper form 9 is a steel plate with a wall thickness of 12mm, the size is 400mm × 320mm, a second tongue-and-groove is arranged on the lower edge of the upper form 9, the thickness of the second tongue-and-groove is 6mm, namely, the thickness of the second tongue-and-groove is half of the thickness of the upper form 9, the height of the second tongue-and-groove is 6mm, when the lower form 10 and the upper form 9 are spliced, the first tongue-and-groove and the second tongue-and-groove are engaged with each other, so that the bottom of the upper form 9 is connected with the top of the lower form 10 in a matched manner, and the outer.
As shown in the attached drawings 1-3, two fan-shaped baffles 1 are respectively installed on two sides of a ring beam 14, the fan-shaped baffles 1 are made of steel plates with the wall thickness of 10mm and the radius of 350mm, ear plates 16, sliding grooves 3 and barrier strips 4 are arranged on the fan-shaped baffles 1, the ear plates 16 are closely attached to the ring beam 14, the upper half part of the inner side surface of each fan-shaped baffle 1 is closely attached to the ring beam 14 and fixed with the ring beam 14 through expansion bolts, and the bottom end of each fan-shaped baffle 1 is fixed with an inverted-L-shaped support; the barrier strip 4 is arranged between the front fan-shaped baffle plate 1 and the rear fan-shaped baffle plate 1 and is far away from the top of one side edge of the ring beam 14, the barrier strip is used for limiting the unfolding angle of the movable plate 2, and the sliding groove 3 is of an arc-shaped structure. Referring to fig. 5 and 6, the movable plate 2 is disposed between two fan-shaped baffles 1 on the same side, the movable plate 2 is made of a steel plate with a wall thickness of 10mm, the length of the movable plate 2 in the front-back direction is 400mm, the length of the movable plate 2 in the radial direction of the fan-shaped baffles 1 is 350mm, the front and back edges of the movable plate 2 are in close contact with the fan-shaped baffles 1, the lower portion of the movable plate 2 is provided with a circular hollow structure arranged in the front-back direction, the front and back ends of the hollow portion of the movable plate 2 are both provided with notches, a rotating shaft 202 is disposed in the circular hollow structure, the rotating shaft 202 is made of a phi 6 steel pipe with a length of 400mm, both ends of the rotating shaft extend out of the movable plate 2, the support 203 is disposed at the portion where both ends of the rotating shaft 202 extend out of the movable plate 2, the support 203 is made, and is fixed on the inverted-L bracket so that the movable plate 2 can rotate around the rotation shaft 202; jack 5 fix on the type of falling L support, the lateral surface of fly leaf 2 is withstood to the telescopic link of jack 5 for drive fly leaf 2 rotates, the front and back edge of fly leaf 2 all is equipped with protruding 201, protruding 201 adopts the steel pipe that the model is phi 10, and length is 5mm, protruding 201 inserts in the sliding tray 3 of front and back side sector baffle 1, when fly leaf 2 rotates, protruding 201 slides along sliding tray 3. Referring to fig. 7, the upper half of the upper template 9 is provided with a hollow part, and the size of the hollow part is 350mm × 230 mm; the front side and the rear side of the hollowed-out part are both provided with slots 901, the size of the slots 901 is 4m multiplied by 5mm, the inserting plate 7 is made of a steel plate with the wall thickness of 4mm, the size is 360mm multiplied by 230mm, and during installation, the front side edge and the rear side edge of the inserting plate 7 are both inserted into the slots 901 to realize fixation.
When the tool type intelligent extrusion constructional column pouring mold is adopted for construction, a lower template 10 is firstly erected, and the lower templates 10 at two sides are oppositely pulled by using opposite-pulling screw rods 13; assembling a concrete pouring part, namely welding an overhanging pipe 6 and a vertical pipe 8, installing a fan-shaped baffle plate 1, a movable plate 2 and a jack 5 above the overhanging pipe 6, welding an upper template 9 at the inner side end of the overhanging pipe 6, and temporarily not installing an inserting plate 7; mounting the concrete pouring part on the lower formwork part, namely inserting the vertical pipe 8 into the vertical ridge 11, and connecting the upper formwork 9 and the lower formwork 10 in an interlocking manner; pouring constructional column concrete, wherein the liquid level of the concrete is higher than the bottom surface of the ring beam 14, pushing the movable plate to rotate through the jack and extruding the fluid concrete, so that air bubbles in the concrete are discharged, and meanwhile, the concrete is more firmly bonded with the ring beam 14; then inserting the inserting plate 7, and extracting the redundant concrete between the inserting plate 7 and the movable plate 2; and finally, after the constructional column concrete reaches the strength, removing the concrete pouring part and the lower template part, wherein two sides of the constructional column are flush with the ring beam 14, and no excess concrete needs to be chiseled off in the later period.
The present invention has been described in detail with reference to the embodiments, but the description is only for the preferred embodiments of the present invention and should not be construed as limiting the scope of the present invention. All the equivalent changes and improvements made according to the application scope of the present invention are still within the patent coverage of the present invention.
Claims (8)
1. The utility model provides a device is pour to instrument formula intelligence extrusion constructional column, includes circle roof beam (14), its characterized in that: the concrete pouring formwork comprises a formwork part and a concrete pouring part, wherein the formwork part comprises lower formworks (10), and the lower formworks (10) on two sides are connected through split screws (13); the concrete pouring part comprises an upper template (9), an inverted L-shaped support, fan-shaped baffles (1), a movable plate (2), a jack (5) and a plugboard (7), the inverted L-shaped support is installed at the top of a lower template (10), the bottom of the upper template (9) is connected with the top of the lower template (10) in a matching manner, the outer side surface of the upper template (9) is in close contact with the inverted L-shaped support, two fan-shaped baffles (1) are respectively installed on two sides of a ring beam (14), the upper half part of each fan-shaped baffle (1) is fixed with the ring beam (14), the inner side surface of each fan-shaped baffle (1) is tightly attached to the ring beam (14), the bottom end of each fan-shaped baffle (1) is fixed with the inverted L-shaped support, the jack (5) is fixed on the inverted L-shaped support, the movable plate (2) is arranged between the two fan-shaped baffles (1) on the same side, the bottom is arranged at the junction of the upper template (9) and the inverted L-shaped support and is hinged with the inverted L-shaped support, the movable plate (2) is matched with the jack (5), and the inserting plate (7) is detachably connected with the upper template (9).
2. The tool-type intelligent extruded constructional column pouring device as claimed in claim 1, wherein: the outside of lower part template (10) be equipped with vertically and horizontally staggered perpendicular stupefied (11) and violently stupefied (12), counter-pull screw rod (13) run through violently stupefied (12), the one end of type of falling L support insert in perpendicular stupefied (11).
3. The tool-type intelligent extruded constructional column pouring device as claimed in claim 1, wherein: the inverted-L-shaped support comprises a vertical pipe (8) and an overhanging pipe (6), wherein the vertical pipe (8) comprises a socket section (802) of the lower half part and a port section (801) of the upper half part, the shape and the size of the horizontal section of the port section (801) are respectively the same as those of the horizontal section of the vertical ridge (11), the horizontal section of the socket section (802) is smaller than that of the port section (801), the socket section (802) is inserted into the vertical ridge (11), the port section (801) is lapped at the top of the vertical ridge (11), and the inner side end of the overhanging pipe (6) is lapped on the port section (801).
4. The tool-type intelligent extruded constructional column pouring device as claimed in claim 1, wherein: the fan-shaped baffle (1) is provided with an ear plate (16), a sliding groove (3) and a barrier strip (4), the ear plate (16) is tightly attached to the ring beam (14) and fixed with the ring beam (14) through an expansion bolt, the barrier strip (4) is arranged at the top of one side edge of the fan-shaped baffle (1) far away from the ring beam (14), and the sliding groove (3) is of an arc-shaped structure; the front edge and the rear edge of the movable plate (2) are both provided with bulges (201), and the bulges (201) are inserted into the sliding grooves (3) of the front fan-shaped baffle plate and the rear fan-shaped baffle plate (1) and are in sliding connection with the fan-shaped baffle plates (1).
5. The tool-type intelligent extruded constructional column pouring device as claimed in claim 1, wherein: the lower part of fly leaf (2) be equipped with the circular hollow structure that the fore-and-aft direction set up, be equipped with pivot (202) in the circular hollow structure, fly leaf (2) are all stretched out at the both ends of pivot, the part that fly leaf (2) were stretched out at pivot (202) both ends all is equipped with support (203), support (203) are fixed on the type of falling L support.
6. The tool-type intelligent extruded constructional column pouring device as claimed in claim 1, wherein: the upper edge of the lower template (10) is provided with a first tongue-and-groove, the lower edge of the upper template (9) is provided with a second tongue-and-groove, and the first tongue-and-groove is matched with the second tongue-and-groove when the lower template (10) is spliced with the upper template (9).
7. The tool-type intelligent extruded constructional column pouring device as claimed in claim 1, wherein: the upper half part of the upper template (9) is provided with a hollow part, the front side and the rear side of the hollow part are respectively provided with a slot (901), and the front side edge and the rear side edge of the inserting plate (7) are respectively inserted into the slots (901).
8. The tool-type intelligent extruded constructional column pouring device as claimed in claim 1, wherein: the length of the movable plate (2) is equal to the radius of the fan-shaped baffle (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920735586.4U CN210164239U (en) | 2019-05-21 | 2019-05-21 | Instrument formula intelligence extrusion constructional column pours device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920735586.4U CN210164239U (en) | 2019-05-21 | 2019-05-21 | Instrument formula intelligence extrusion constructional column pours device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210164239U true CN210164239U (en) | 2020-03-20 |
Family
ID=69793241
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920735586.4U Expired - Fee Related CN210164239U (en) | 2019-05-21 | 2019-05-21 | Instrument formula intelligence extrusion constructional column pours device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210164239U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111705921A (en) * | 2020-07-09 | 2020-09-25 | 中国十七冶集团有限公司 | Concrete pouring construction tool for intensive reinforcing steel bar joints and construction method thereof |
CN115788052A (en) * | 2022-11-26 | 2023-03-14 | 陕西巨森建筑工程有限公司 | Assembled building constructional column linkage support frame |
-
2019
- 2019-05-21 CN CN201920735586.4U patent/CN210164239U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111705921A (en) * | 2020-07-09 | 2020-09-25 | 中国十七冶集团有限公司 | Concrete pouring construction tool for intensive reinforcing steel bar joints and construction method thereof |
CN115788052A (en) * | 2022-11-26 | 2023-03-14 | 陕西巨森建筑工程有限公司 | Assembled building constructional column linkage support frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110984562B (en) | Double-shear wall long and narrow deformation joint and construction method | |
CN210164239U (en) | Instrument formula intelligence extrusion constructional column pours device | |
CN110130646A (en) | The Constructional Col-umn Construction method of device is poured based on tool-type intelligence compressional structure column | |
CN210658959U (en) | Constructional column concrete placement construction structures of smashing | |
CN110777659A (en) | Construction method of box culvert template system | |
CN207177286U (en) | Add region mould after fabricated shear wall is reserved | |
CN210263491U (en) | Assembly type heat-insulating wall structure free of mold disassembly | |
CN109138274A (en) | A kind of filling wall construction column construction method | |
CN105442737B (en) | A kind of complex heat-preservation floorboard and its construction method | |
CN112412013A (en) | Construction method for plugging reserved hole of structural outer wall | |
CN218911883U (en) | Assembled wall | |
CN214220178U (en) | Prefabricated disassembly-free side mold and adjustable supporting system for one-step molding of floor water retaining strip | |
CN210738077U (en) | Waterproof reverse-edge aluminum alloy hanging die | |
CN114197526A (en) | Formwork system with vertical structure by reverse construction method and construction method | |
CN114215345A (en) | Construction method for independent support bracket template of post-cast strip of top plate of reservoir | |
CN108442698B (en) | Deformation joint split bolt pvc sleeve plugging method and plugging fixing sleeve | |
CN113700037A (en) | Reverse construction method underground ultra-thick side wall pouring construction device and method thereof | |
CN217501049U (en) | A can have enough to meet need design mould for building wall body air conditioner hole | |
CN216422942U (en) | Integral prefabricated mould for arc-shaped roof | |
CN219952648U (en) | Sectional bolt for prefabricated laminated slab | |
CN215519925U (en) | Arc shear force wall pouring template system | |
CN219855127U (en) | Layered compact pouring mold | |
CN219973893U (en) | Constructional column formwork device | |
CN221321385U (en) | Titanium-magnesium fireproof plate assembly type disassembly-free mold construction | |
CN220414837U (en) | Can have enough to meet need assembled post-cast strip independent support system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200320 Termination date: 20210521 |