CN210117833U - Curtain wall - Google Patents

Curtain wall Download PDF

Info

Publication number
CN210117833U
CN210117833U CN201920514554.1U CN201920514554U CN210117833U CN 210117833 U CN210117833 U CN 210117833U CN 201920514554 U CN201920514554 U CN 201920514554U CN 210117833 U CN210117833 U CN 210117833U
Authority
CN
China
Prior art keywords
connecting piece
curtain wall
fixed
shielding cover
glass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920514554.1U
Other languages
Chinese (zh)
Inventor
曹佃祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Decai Tech New Material Co ltd
Original Assignee
Decai Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Decai Decoration Co Ltd filed Critical Decai Decoration Co Ltd
Priority to CN201920514554.1U priority Critical patent/CN210117833U/en
Application granted granted Critical
Publication of CN210117833U publication Critical patent/CN210117833U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a curtain wall, including glass curtain wall and the real stone paint layer of spraying on the civil engineering body, the civil engineering body is including first lateral wall, and glass curtain wall is including the crossbeam that stand and parallel first lateral wall set up, and the stand passes through built-in fitting and civil engineering body fixed connection, is formed with the clearance between crossbeam and first lateral wall the clearance position corresponds the department and is provided with and shelters from the lid. Through the utility model provides a real mineral varnish of curtain that real mineral varnish and glass curtain wall among the prior art constitute take place the fracture easily and lead to the problem that the infiltration drops.

Description

Curtain wall
Technical Field
The utility model belongs to the technical field of domestic fitment, concretely relates to curtain wall construction's improvement.
Background
With the rapid development of the building industry, the demand on environment-friendly building curtain walls is wider and wider, and the requirement on building safety is higher and higher. The outer wall decoration of the building is better than the coat of the building, so-called people's clothing, the material selection of the outer wall decoration influences the style trend and the cost of the building, the glass curtain wall has simple and luxurious shape and strong modern sense, can reflect the surrounding scenery, has good decoration effect, keeps the high and big texture of the building, and selects the outer wall real stone paint to replace dry hanging stone or metal plates, and the outer wall real stone paint is analyzed from the economy, adopts the coating formula design, and is far cheaper than the dry hanging stone, metal plates and the like; technically, the stone paint is simple and convenient to construct, and can meet the requirements of different grades of exterior wall decoration; the stone paint has good decorative effect, rich and bright colors, can change the colors, keeps the freshness of buildings, and can express more rich design styles of strip bricks, marbles and the like; the stone paint is safe and environment-friendly from the aspect of safety, and cannot cause light pollution, radiation or falling potential safety hazard. Therefore, more and more buildings are decorated by matching glass curtain walls and stone paint at present, so that the high mountain of the building is reflected, the manufacturing cost is saved, and the safety performance is high.
The structure of the existing glass curtain wall and the real stone paint is shown in figure 1 as follows: firstly fixing the glass curtain wall 910 and the civil engineering body 920, then spraying a real stone paint layer 921 on the outer side of the civil engineering body 920, specifically, the glass curtain wall 910 comprises a beam 911 and a column 912, the column 912 and the civil engineering body 920 are fixed, the beam 911 is perpendicular to the column 912 and parallel to a first side wall 922 of the civil engineering body 920 opposite to the beam 911, a gap is formed between the first side wall 922 and the beam 911, at this time, in order to realize perfect combination between the glass curtain wall 910 and the real stone paint layer 921, an EPS board 930 or other substances such as foaming agent and the like are filled in the gap between the two to realize blocking, then, outside putty coating and real stone paint filling the position of the EPS board 930 is performed, namely, the real stone paint is sprayed from the civil engineering body 920 to the position where the EPS board 930 is filled in the gap, but the column 912 and the beam 911 of the glass curtain wall 910 can generate size change due to thermal expansion and cold contraction or external stress, and further drive the EPS board 930 to move or generate extrusion force on the, thereby leading to the real mineral varnish on EPS board 930 and the real mineral varnish on civil engineering body 920 to ftracture in butt joint 940, appear after a long time and drop, the infiltration.
SUMMERY OF THE UTILITY MODEL
The utility model discloses to the curtain wall construction that real mineral varnish and glass curtain wall among the prior art constitute, real mineral varnish takes place the problem that the fracture easily and lead to the infiltration to drop and provides a new curtain wall construction.
In order to realize the purpose of the utility model, the utility model adopts the following technical scheme to realize:
the utility model provides a curtain, includes glass curtain wall and the real stone lacquer layer of spraying on the civil engineering body, and the civil engineering body is including first lateral wall, and glass curtain wall is including the crossbeam that stand and parallel first lateral wall set up, and the stand passes through built-in fitting and civil engineering body fixed connection, is formed with the clearance between crossbeam and first lateral wall the clearance position corresponds the department and is provided with and shelters from the lid.
Further, glass curtain wall is still including fixing vice frame of glass, first connecting piece and the second connecting piece on the crossbeam in proper order from the bottom up, it establishes to shelter from the lid knot first connecting piece, second connecting piece position department and follow first connecting piece, second connecting piece upwards extend to civil engineering body position department and shelter from the clearance and seal fixedly with second connecting piece and real stone paint layer respectively through sealed glue.
Furthermore, shelter from the lateral surface parallel and level of lid lateral surface and real stone lacquer layer.
Further, glass curtain wall is still including the vice frame of glass, first connecting piece, third connecting piece, vacuum glass and the buckle closure of from the bottom up fixing on the crossbeam in proper order, the buckle closure is detained and is established in first connecting piece and third connecting piece position department, it shelters from on the clearance and one end and sealed fixed with the civil engineering body to shelter from the lid, and the other end is fixed with the third connecting piece, and the buckle closure is connected with first connecting piece and simultaneously sealed fixed with the shelter cover, is formed with the glass assembly chamber between buckle closure and the vice frame of glass, and the vacuum glass assembly just seals fixedly through sealed glue and glass assembly chamber in the glass assembly chamber.
Furthermore, shelter from the lid including lid, first arm and second arm, the setting of the first side wall of first arm laminating is just fixed with first side wall through sealed glue, the second arm with the laminating of third connecting piece just is connected fixedly through screw and third connecting piece.
Furthermore, the first connecting piece comprises a first connecting hanging piece and a second connecting hanging piece, the first connecting hanging piece is fixedly clamped with the cross beam, the second connecting hanging piece is fixedly clamped with the first connecting hanging piece, and the shielding cover and the second connecting hanging piece are screwed and fixed through bolts.
Furthermore, an assembly gap exists between the shielding cover and the real stone paint surface, the assembly gap is 8-10mm, the sealant is silicone sealant, and the shielding cover and the real stone paint layer are connected in a sealing mode.
Furthermore, the shielding cover comprises a shielding cover body and a cover body, an assembly groove is formed in the shielding cover body, the cover body is buckled at the position of the notch of the assembly groove, a bolt is sequentially screwed into the assembly groove, the second connecting hanging piece and the first connecting hanging piece to be locked and fixed, and a pressing foot is arranged on the shielding cover body.
Compared with the prior art, the utility model discloses an advantage is with positive effect:
the utility model provides a curtain, including glass curtain wall and the real stone paint layer of spraying on civil engineering body, form the clearance between civil engineering body and glass curtain wall's crossbeam, set up in clearance position department and shelter from the lid, the utility model provides a curtain, through set up in clearance position department and shelter from the lid and replace the true stone paint of spraying after filling EPS board, can shelter from sealed to clearance position through sheltering from the lid at first, not only satisfied whole aesthetic requirement and also can shelter from the water that will get into in the clearance, realize sealedly, in addition, because the real stone paint layer only is located the civil engineering body, even so stand or crossbeam also can not apply force to the real stone paint layer when perhaps receiving exogenic action to take place to warp because of expend with heat and contract with cold, the problem of real stone paint fracture can not appear.
Other features and advantages of the present invention will become more apparent from the following detailed description of the invention when read in conjunction with the accompanying drawings.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
FIG. 1 is a schematic view of a curtain wall construction of the prior art;
FIG. 2 is a schematic structural view of a first embodiment of the curtain wall of the present invention;
fig. 3 is a schematic structural view of a second embodiment of the curtain wall of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail with reference to the accompanying drawings and embodiments.
The utility model provides an embodiment of curtain, refer to fig. 2-3 and show, including glass curtain wall and the real stone lacquer layer 200 of spraying on civil engineering body 100, civil engineering body 100 is including first lateral wall 110, and glass curtain wall is including the crossbeam 300 that stand 200 and parallel first lateral wall 110 set up, and stand 700 passes through built-in fitting and civil engineering body 100 fixed connection, is formed with clearance 400 between crossbeam 300 and first lateral wall 110 clearance 400 position department of correspondence is provided with shielding cover 500.
The first implementation mode of the curtain wall in the embodiment is as follows: glass curtain wall is still including from the bottom up fixing in proper order the vice frame 310 of glass, first connecting piece 320 and the second connecting piece 330 on crossbeam 300, shelters from lid 310 and detains and establish first connecting piece 320, second connecting piece 330 position department and follow first connecting piece 310, second connecting piece 320 upwards extend to civil engineering body 100 position department and shelter from the clearance and seal fixedly with second connecting piece 330 and real stone paint layer 200 respectively through sealed glue 600. That is, the shielding cover 500 in this embodiment extends to the position of the real stone paint layer 200 from the corresponding positions of the first connecting member 320 and the second connecting member 330, and is fixed to the real stone paint layer 200, the shielding of the position of the gap 400 is realized through the shielding cover 500, the aesthetic property is enhanced, and meanwhile, the problem of water leakage is effectively avoided, and meanwhile, the bottom of the shielding cover 500 extends downwards to the position of the glass subframe 310 in this embodiment, and the sealing and fixing are performed through the sealant 600 and the glass.
Preferably, the first connecting member 320 includes a first connecting suspension member 321 and a second connecting suspension member 322, the first connecting suspension member 321 is fixed to the cross beam 300 in a clamping manner, the second connecting suspension member 322 is fixed to the first connecting suspension member 321 in a clamping manner, and the shielding cover 500 is fixed to the second connecting suspension member 322 and the first connecting suspension member 321 by tightening bolts 340. Specifically, the shielding cover 500 in this embodiment includes a shielding cover body 510 and a cover body 520, an inward-concave assembling groove 511 is formed inside the shielding cover body 510, the bolt 340 is screwed into the assembling groove 511 and sequentially screwed into the second connecting suspension member 330 and the first connecting suspension member 320 to be connected and fixed with the two, and the cover body 520 is fastened at the notch position of the assembling groove 511 and is clamped and fixed with the assembling groove 511.
Preferably, in order to ensure the aesthetic property of the whole curtain wall structure, the outer side surface of the shielding cover 500 in the present embodiment is flush with the outer side surface of the real stone paint layer 200 after the assembly is completed.
For preventing to shelter from lid 500 and taking place to warp when receiving expend with heat and contract with cold, this embodiment is in shelter from and reserve the fit-up gap in advance between lid 500 and the real stone lacquer layer 200, guarantee to shelter from the activity space of lid 500 expend with heat and contract with cold, the fit-up gap is 8-10mm, sealed glue 600 is sealed glue for silicone, sealing connection is on sheltering from lid 500 and real stone lacquer layer 200 to silicone sealed glue has the flexibility, even shelter from lid 500 its flexible deformation still can take place after the atress, avoids causing the damage to the real stone lacquer layer 200 rather than closing on.
The second embodiment of the curtain wall in the embodiment is as follows: glass curtain wall is still including from the bottom up fixing in proper order the vice frame 310 of glass on crossbeam 300, first connecting piece 320, third connecting piece 350, vacuum glass and buckle cover 360, buckle cover 360 detains and establishes in first connecting piece 320 and third connecting piece 350 position department, shelter from cover 500 and shelter from on clearance 400 and one end and civil engineering body 100 sealed fixed, the other end is fixed with third connecting piece 350, buckle cover 360 is connected with first connecting piece 320 and simultaneously with the sealed fixed in the shelter from cover 500 outside, is formed with the glass assembly chamber between the vice frame 310 of buckle cover 360 and glass, and the vacuum glass assembly just seals fixedly with the glass assembly chamber through sealed glue 600 in the glass assembly chamber. Preferably, the shielding cover 500 in this embodiment includes a cover body 530, a first arm 540 and a second arm 550, the first arm 540 is attached to the first sidewall 110 and fixed to the first sidewall 110 by a sealant 600, and the second arm 550 is attached to the third connecting member 350 and fixed to the third connecting member 350 by a screw.
The utility model provides a curtain, through set up in clearance 400 position department and shelter from lid 500 and replace to spray real stone paint after filling the EPS board, at first can shelter from sealed to clearance 400 position through sheltering from lid 500, not only satisfied whole aesthetic property's requirement and also can shelter from the water that will get into in clearance 400, the realization is sealed, in addition, because real stone paint layer 200 only is located civil engineering body 100, even like this stand 700 or crossbeam 300 can not apply force to real stone paint layer 200 when perhaps deforming because of receiving the exogenic action because of expend with heat and contract with cold, the problem of real stone paint fracture can not appear.
It should be noted that in the description of the present invention, the terms of direction or positional relationship indicated by the terms "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, which are merely for convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
The above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or that equivalents may be substituted for elements thereof; such modifications and substitutions do not depart from the spirit and scope of the present invention, which is claimed.

Claims (8)

1. The utility model provides a curtain, its characterized in that includes glass curtain wall and the real stone lacquer layer of spraying on the civil engineering body, and the civil engineering body is including first lateral wall, and glass curtain wall is including the crossbeam that stand and parallel first lateral wall set up, and the stand passes through built-in fitting and civil engineering body fixed connection, is formed with the clearance between crossbeam and first lateral wall the clearance position corresponds the department and is provided with and shelters from the lid.
2. The curtain wall as claimed in claim 1, wherein the glass curtain wall further comprises a glass subframe, a first connecting piece and a second connecting piece which are sequentially fixed on the cross beam from bottom to top, and the shielding cover is buckled on the first connecting piece and the second connecting piece and extends upwards to the civil engineering body from the first connecting piece and the second connecting piece to shield the gap and is respectively fixed with the second connecting piece and the real stone paint layer in a sealing manner through a sealant.
3. The curtain wall as claimed in claim 2, wherein the outer side of the shielding cover is flush with the outer side of the real stone paint layer.
4. The curtain wall according to claim 1, wherein the glass curtain wall further comprises a glass auxiliary frame, a first connecting piece, a third connecting piece, vacuum glass and a buckle cover, wherein the glass auxiliary frame, the first connecting piece, the third connecting piece, the vacuum glass and the buckle cover are sequentially fixed on the cross beam from bottom to top, the buckle cover is buckled at the positions of the first connecting piece and the third connecting piece, the shielding cover is sheltered on the gap, one end of the shielding cover is fixed with the civil engineering body in a sealing mode, the other end of the shielding cover is fixed with the third connecting piece, the buckle cover is connected with the first connecting piece and is fixed with the shielding cover in a sealing mode, a glass assembly cavity is formed between the buckle cover and the glass auxiliary frame, and the vacuum glass is.
5. The curtain wall as claimed in claim 4, wherein the shielding cover comprises a cover body, a first arm and a second arm, the first arm is attached to the first side wall and fixed to the first side wall through a sealant, and the second arm is attached to the top surface of the third connecting piece and fixed to the third connecting piece through a screw.
6. The curtain wall as claimed in claim 2, wherein the first connecting piece comprises a first connecting hanging piece and a second connecting hanging piece, the first connecting hanging piece is clamped and fixed with the cross beam, the second connecting hanging piece is clamped and fixed with the first connecting hanging piece, and the shielding cover is screwed and fixed with the second connecting hanging piece and the first connecting hanging piece through bolts.
7. The curtain wall as claimed in claim 2, wherein an assembly gap exists between the shielding cover and the real stone paint surface, the assembly gap is 8-10mm, and the sealant is silicone sealant and is hermetically connected to the shielding cover and the real stone paint layer.
8. The curtain wall as claimed in claim 6, wherein the shielding cover comprises a shielding cover body and a cover body, an assembling groove is formed in the shielding cover body, the cover body is buckled at the notch position of the assembling groove, a bolt is sequentially screwed into the assembling groove, the second connecting hanging piece and the first connecting hanging piece to be locked and fixed, and a pressing foot is arranged on the shielding cover body.
CN201920514554.1U 2019-04-16 2019-04-16 Curtain wall Active CN210117833U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920514554.1U CN210117833U (en) 2019-04-16 2019-04-16 Curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920514554.1U CN210117833U (en) 2019-04-16 2019-04-16 Curtain wall

Publications (1)

Publication Number Publication Date
CN210117833U true CN210117833U (en) 2020-02-28

Family

ID=69613112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920514554.1U Active CN210117833U (en) 2019-04-16 2019-04-16 Curtain wall

Country Status (1)

Country Link
CN (1) CN210117833U (en)

Similar Documents

Publication Publication Date Title
KR101060059B1 (en) Unit multi-layer panel with home space frame
CN207314605U (en) A kind of fish scale-shaped cell curtain wall and building
CN202913541U (en) Semi-unit open aluminum panel curtain wall structure
CN210117833U (en) Curtain wall
CN206529948U (en) A kind of concealed frame glass curtain wall constructs system
CN104769195A (en) Combined wall body and construction method thereof
CN207079856U (en) Combined wall board assembling assembly
CN109537767A (en) A kind of cell board and window integrated system and preparation method thereof
CN109281413A (en) Combined type decorates external thermal insulation exterior wall and construction method
CN105401675A (en) Integrated curtain wall capable of realizing quick construction
CN202595981U (en) Open aluminum plate curtain wall system
CN202627376U (en) Decoration wall of ultrathin and oversized indoor decoration plate
CN207513066U (en) The decoration thermal insulation structure of building parapet
CN201762924U (en) Heat-insulation decorating plate
CN205530864U (en) Metal clad sheet curtain mounting structure
CN209339441U (en) A kind of cross aluminium attachment device of horizontally-arranged metal board wall
CN102230327A (en) Curtain wall top closing beam
CN105113684B (en) A kind of unit assembled building external protecting system and its construction method equipped with window
CN204983235U (en) Connected node structure of battenboard wall body and glass curtain wall window
CN210177867U (en) Soil style of calligraphy wall fossil fragments
CN211690965U (en) Glue-free aluminum plate curtain wall structure
CN207934286U (en) Small space veneer glass wall system
CN210395774U (en) Box type integral assembling building curtain wall
CN210177868U (en) Open-word type wall fossil fragments
CN207998996U (en) Parapet wall top rigid waterproofing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210609

Address after: 266300 Industrial Park Area 3, Ligezhuang Town, Jiaozhou City, Qingdao City, Shandong Province

Patentee after: Qingdao Decai tech new material Co.,Ltd.

Address before: 266000 Hongkong Middle Road 169, Shinan District, Qingdao City, Shandong Province

Patentee before: DECAI DECORATION Co.,Ltd.

TR01 Transfer of patent right