CN210117719U - Assembled steel pile with flange - Google Patents

Assembled steel pile with flange Download PDF

Info

Publication number
CN210117719U
CN210117719U CN201920512668.2U CN201920512668U CN210117719U CN 210117719 U CN210117719 U CN 210117719U CN 201920512668 U CN201920512668 U CN 201920512668U CN 210117719 U CN210117719 U CN 210117719U
Authority
CN
China
Prior art keywords
steel
steel pipe
pile
end plate
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920512668.2U
Other languages
Chinese (zh)
Inventor
赵俭斌
郭泗煜
张岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Jianyue Engineering Technology Co., Ltd
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201920512668.2U priority Critical patent/CN210117719U/en
Application granted granted Critical
Publication of CN210117719U publication Critical patent/CN210117719U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses an assembled piling bar with flange is formed by the equipment of a plurality of monomer piling bars, the monomer piling bar includes two triangle cylindricality steel pipes, deformed steel plate, steel pipe intussuseption and bolt, constitutes the cuboid steel pipe behind two triangle cylindricality steel pipe fixed connection, and deformed steel plate is the edge of a wing of piling bar, and the cuboid steel pipe passes through bolt and deformed steel plate fixed connection, and two triangle cylindricality steel pipes are poured into to the steel pipe intussuseption. The utility model discloses a structure that combination triangle-shaped steel pipe and deformed steel plate make the edge of a wing fuses the form, can full play steel intensity height, stability good, rigidity is big, the effectual characteristics of stagnant water, compare with ordinary steel-pipe pile and have higher anti side direction bearing capacity, solve the engineering problem pluralism more, application range is more extensive. The foundation pit excavation device can be combined randomly according to the specific conditions in the actual foundation pit excavation process on site, is convenient and quick, and has good economic and social benefits.

Description

Assembled steel pile with flange
Technical Field
The utility model belongs to the technical field of geotechnical engineering, especially, relate to an assembled steel pile with flange.
Background
The traditional steel pipe pile has the advantages of simple structure, good impact performance, easy processing of joints, easy lap joint, convenient use, good sealing performance and convenient transportation; the Larsen steel sheet pile plays an important role in projects such as wharfs and unloading yards as retaining walls, retaining walls and embankment revetments. The Larsen steel sheet pile cofferdam has a good waterproof function, but two kinds of steel pipe piles have limitations in use, such as complex construction process, high cost, long operation period and the like by using traditional foundation pit supporting equipment.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an assembled piling bar with flange, this piling bar can realize quick installation to can reuse. The water-stopping device has the characteristics of environmental protection, obvious water-stopping effect and stable structure.
The utility model adopts the technical proposal that:
the utility model provides an assembled piling bar with flange, is formed by the equipment of a plurality of monomer piling bars, the monomer piling bar includes two triangular prism shape steel pipes, steel sheet, steel pipe intussuseption and bolt, constitutes the cuboid steel pipe behind two triangular prism shape steel pipe fixed connection, and the steel sheet is the flange of piling bar, and the cuboid steel pipe passes through bolt and steel sheet fixed connection, and two triangular prism shape steel pipes are gone into to the steel pipe intussuseption.
Furthermore, one side of each steel plate is provided with a protrusion, the other side of each steel plate is provided with a groove, and adjacent steel plates are connected with the grooves in an assembling mode through the protrusions.
Still further, the steel plate comprises a bottommost end plate, a topmost end plate and a standard end plate, and the bottommost end plate, the topmost end plate and the standard end plate are connected together through a tongue-and-groove structure.
Furthermore, the bottom of the topmost end plate is provided with a groove, the top of the standard end plate is provided with a protrusion, the bottom of the protrusion is provided with a groove, the top of the bottommost end plate is provided with a protrusion, and adjacent end plates are spliced together.
Furthermore, the filler in the steel pipe is coarse sand and mixed sand and stone in part of the foundation pit.
The utility model has the advantages and beneficial effects that:
the utility model relates to an assembled steel pile with flange is applicable to the fine sand, and weak soil and groundwater are in regions such as abundant. The integral structure of the steel tube comprises a triangular steel tube, a steel plate, a bolt and a steel tube filler. Connecting the steel plate with the short side of the triangular steel pipe by using a bolt to form a whole; the left end and the right end of the steel plate are provided with a groove and a bulge, and the steel plates are mutually buckled and lapped through the tongue-and-groove structure for fixing; the plurality of assembled connecting units are connected end to form a transverse connecting device, so that a continuous assembled steel pipe pile supporting structure with a water stopping function is formed around the foundation pit; the assembled steel pile is inserted into a soft soil foundation soil layer to bear the lateral soil pressure of the foundation pit; the assembly type steel pile can be installed in sections according to field conditions during construction, and the triangular steel pipe and the steel plate are connected through bolts to form the steel pile with the flange; after the driving construction of the assembled steel pipe pile is completed, backfilling coarse sand and part of mixed gravel in the foundation pit into the steel pipe in a filler mode; the water stopping height of the assembled steel pipe pile can be freely spliced by steel plates according to the actual engineering phenomenon. The utility model discloses on the advantage basis that has fused traditional steel-pipe pile and Larsen steel sheet pile, provide a novel assembled steel pipe pile foundation ditch supporting construction, have intensity height, rigidity big, stability good, the stagnant water effect is obvious, the characteristics of simple and convenient, green of construction. The combined triangular steel pipe and the steel plate are adopted as the flange structure fusion form, the characteristics of high strength, good stability, large rigidity and good water stopping effect of steel can be fully exerted, and compared with a common steel pipe pile, the combined triangular steel pipe has higher lateral bearing capacity, solves the engineering problem more diversified and has wider application range. The foundation pit excavation device can be combined randomly according to the specific conditions in the actual foundation pit excavation process on site, is convenient and quick, and has good economic and social benefits. The foundation pit excavation construction method has the advantages of greatly improving the working efficiency of foundation pit excavation, shortening the construction period, having good soil-resistant side bearing capacity and rigidity, strong stability, good waterproof performance, recycling and reuse and good economic benefit. The utility model discloses a segmentation equipment part can use bolted connection to become the stake as required in the work progress, and on-the-spot welding work volume is less, and construction speed is fast. In the construction process, the steel pipe pile is pressed into a foundation soil layer in a piling mode, and coarse sand is filled into the triangular steel pipe, so that the strength and the bending resistance of the pile body are improved, and the stability of a foundation pit is improved.
Drawings
Fig. 1 is a top view of an assembled steel pile with flanges according to the present invention;
fig. 2 is a schematic perspective view of an assembled steel pile with flanges according to the present invention;
FIG. 3 is a schematic view of the bottom-most end plate;
FIG. 4 is a schematic view of the configuration of the topmost panel;
FIG. 5 is a schematic diagram of a standard endplate;
FIG. 6 is a detailed view of the connection of the fabricated steel pile with flanges according to example 1;
FIG. 7 is another detail view showing the connection of the fabricated steel pile with flanges according to example 2;
fig. 8 is a structural schematic diagram of a single steel pile.
In the figure: 1-triangular steel pipe, 2-steel plate, 3-steel pipe filler, 4-bolt, 4-1-bolt rod, 4-2-bolt nut and 4-3-bolt washer.
Detailed Description
For further explanation of the present invention, the following detailed description of the present invention is provided with reference to the drawings and examples, which should not be construed as limiting the scope of the present invention.
Example 1:
as shown in fig. 1 and 2, the assembled steel pile with flanges of the present invention is assembled by a plurality of single steel piles.
As shown in fig. 8, the single steel pile comprises two hollow triangular prism-shaped steel pipes, a steel plate, a steel pipe filler and a bolt.
As shown in fig. 6, the hypotenuses of the two triangular steel pipes 1 are overlapped, and the overlapped surfaces are connected by spot welding to ensure that the two triangular steel pipes are integrated, or the overlapped surfaces are bolted to connect.
The two hollow triangular-cylindrical steel pipes are fixedly connected to form a rectangular steel pipe, the steel plate is a flange of the steel pile, the center of a long edge of the steel pile is aligned with the center of a short edge of the triangular-cylindrical steel pipe, and the two sides of the central line are fixed together by bolts 4 respectively. After the steel pile with the flange is integrally driven, the filler in the steel pipe is filled into the two hollow triangular prism-shaped steel pipes to increase the bending resistance and the shearing resistance, so that the integral stability is improved. The filler in the steel pipe is coarse sand and mixed sand and stone in part of the foundation pit. Because the triangular column shape steel pipe has stability, the bevel edges, namely the maximum faces, of the two steel pipes are overlapped together and connected at the joint along the longitudinal direction of the pile body, so that the two triangular column shape steel pipes can be connected into a rigid whole. Pre-punching holes on two sides of the center line of the short side of the triangular column-shaped steel pipe when the triangular column-shaped steel pipe is manufactured for convenient assembly, wherein the diameter of the hole is the same as the diameter of a bolt rod 4-1 of a used bolt; pre-punching holes on two sides of the center line of the length of the deformed steel plate, wherein the diameter of the hole is the same as the diameter of a bolt rod 4-1 of a used bolt.
As shown in fig. 6, the bolt includes a bolt shank 4-1, a bolt nut 4-2, and a bolt washer 4-3.
The steel plate 2 comprises a bottommost end plate 21, a topmost end plate 22 and a standard end plate 23, the bottom most end plate 21, the topmost end plate 22 and the standard end plate 23 are freely spliced and combined according to the underground water condition according to needs, and the bottommost end plate 21, the topmost end plate 22 and the standard end plate 23 are connected together through a tongue-and-groove structure to form a combined structure with a good water stopping effect.
The bottom of the topmost panel is provided with a recess, as shown in figure 4. As shown in fig. 5, the top of the standard endplate is provided with a protrusion and the bottom is provided with a groove. As shown in figure 3, the top of the bottommost end plate is provided with a bulge, and adjacent end plates are spliced together.
The utility model discloses the assembly procedure as follows:
factory prefabricated parts:
a. prefabricating basic parts in a factory according to the drawing: triangular steel pipe 1, steel sheet 2, wherein steel sheet 2 has three kinds of structures, the classification work of doing well.
b. Holes are punched on the two sides of the center line of the short side of the triangular steel pipe 1 every 500mm along the longitudinal direction of the steel pipe according to the bolt rod diameter of the bolt.
c. Holes are punched on both sides of the center line of the long side of the steel plate 2 every 500mm along the longitudinal direction of the steel plate according to the bolt diameter of the bolt.
And (3) field assembly construction:
d. the inclined planes of the two triangular steel pipes 1 are butted, and welding is carried out from bottom to top along the pile length direction in a spot welding mode.
e. And d, assembling the bottommost section by utilizing the bottommost end plate of the steel plate 2 and the steel pipe pile combined in the step d to penetrate through a pre-reserved hole and utilizing a bolt 4 to be connected and fixed to form a pile bottom end flange.
f. And d, assembling the standard section by utilizing a standard end plate of the steel plate 2 and the steel pipe pile combined in the step d to penetrate through a pre-reserved hole and utilizing a bolt 4 to connect and fix to form a pile middle section flange.
g. And d, the topmost plate of the steel plate 2 and the steel pipe pile combined in the step d are used for assembling the topmost section, penetrate through a pre-reserved hole and are fixedly connected through a bolt 4 to form a top flange.
h. And (4) engaging and inserting the three steel plates in the step efg through the grooves and the protrusions at the upper end and the lower end of the plate in longitudinal connection to form a full-section flange of the single pile, so that the water stopping effect and the connection stability are ensured.
i. And h, driving the formed single pile with the flange into the foundation integrally by using a pile driver.
j. The connection in the horizontal direction is carried out seamless lap joint and is driven into the foundation according to the groove and the bulge which are arranged in advance at the two ends of the steel plate 2 at the left side and the right side of the flange through the single pile body formed by repeating the steps.
k. And after all the steel pipe piles are in place, backfilling coarse sand and part of mixed sand and stones in the foundation pit into the steel pipes in the form of the fillers 3 in the pipes.
And l, after the construction of the foundation pit supporting engineering is finished, the prefabricated steel pipe pile component can be recycled.
Example 2:
as shown in fig. 7, the present embodiment differs from embodiment 1 only in that: the bevel edges of the two triangular steel pipes 1 are overlapped and connected through a bolt joint overlapped surface. The rest is the same as example 1.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (4)

1. The utility model provides an assembled steel pile with flange which characterized in that: the steel pile is assembled by a plurality of steel piles, each steel pile comprises two triangular prism-shaped steel pipes (1), a steel plate (2), steel pipe inner fillers (3) and bolts (4), the rectangular steel pipe is formed after the two triangular prism-shaped steel pipes are fixedly connected, the steel plate (2) is the flange of the steel pile, the rectangular steel pipe passes through the bolts (4) and the steel plate (2) and is fixedly connected, and the steel pipe inner fillers (3) are poured into the two triangular prism-shaped steel pipes.
2. The assembled steel pile with flange according to claim 1, wherein: one side of the steel plate (2) is provided with a protrusion, the other side of the steel plate is provided with a groove, and adjacent steel plates are connected through the protrusion and the groove in an assembled mode.
3. The assembled steel pile with flange according to claim 1 or 2, wherein: the steel plate (2) comprises a bottommost end plate (21), a topmost end plate (22) and a standard end plate (23), and the bottommost end plate, the topmost end plate and the standard end plate are connected together through a tongue-and-groove structure.
4. The assembled steel pile with flange according to claim 3, wherein: the bottom of the topmost end plate (22) is provided with a groove, the top of the standard end plate (23) is provided with a protrusion, the bottom of the protrusion is provided with a groove, the top of the bottommost end plate (21) is provided with a protrusion, and adjacent end plates are spliced together.
CN201920512668.2U 2019-04-16 2019-04-16 Assembled steel pile with flange Active CN210117719U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920512668.2U CN210117719U (en) 2019-04-16 2019-04-16 Assembled steel pile with flange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920512668.2U CN210117719U (en) 2019-04-16 2019-04-16 Assembled steel pile with flange

Publications (1)

Publication Number Publication Date
CN210117719U true CN210117719U (en) 2020-02-28

Family

ID=69613154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920512668.2U Active CN210117719U (en) 2019-04-16 2019-04-16 Assembled steel pile with flange

Country Status (1)

Country Link
CN (1) CN210117719U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109881685A (en) * 2019-04-16 2019-06-14 沈阳建筑大学 A kind of assembled piling bar and its assembly method with the edge of a wing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109881685A (en) * 2019-04-16 2019-06-14 沈阳建筑大学 A kind of assembled piling bar and its assembly method with the edge of a wing

Similar Documents

Publication Publication Date Title
US8974152B2 (en) Polymer grouting method for constructing vertical supporting system
CN106677205A (en) Fabricated special-shaped steel pipe pile combined retaining wall
CN108487231B (en) Snowflake type steel sheet pile and processing method thereof
CN108239984B (en) Trapezoidal wave shaped steel plate and steel truss combined assembled type enclosure structure and construction method thereof
CN207109795U (en) A kind of recyclable HC engineering methods steel diaphram wall
CN210117719U (en) Assembled steel pile with flange
CN110670603B (en) Assembled type long-strip foundation pit supporting device and method
CN109881685A (en) A kind of assembled piling bar and its assembly method with the edge of a wing
CN111236952A (en) Full-recovery assembly type rectangular pipe-jacking working well steel structure supporting device and construction method of working well
CN107326896A (en) One kind combination steel construction support pile and construction method
CN110952538A (en) Connecting piece for precast concrete member and connecting method thereof
CN207176670U (en) A kind of environmentally friendly U-shaped concrete slab stake
CN215165648U (en) Vertical bearing device of reverse construction area structure that can retrieve
CN212801549U (en) H-shaped double-row steel sheet pile supporting structure
EP2848739A1 (en) Steel wall
CN211773883U (en) Underground pipeline with integrated supporting piles and pipeline wall
CN212772285U (en) Steel-plastic grille
CN110792103A (en) Underground pipeline with integrated supporting piles and pipeline wall and construction method
CN108487303B (en) Combined retaining wall of supporting pile and counterfort retaining wall and construction method
CN110700274A (en) Mechanically-connected assembled stand column and stand column pile
CN210766336U (en) Round pipe culvert type temporary bridge structure
CN214500393U (en) Corrugated plate reinforced anti-leakage flange structure
CN219930754U (en) Corrugated steel culvert reinforced structure
CN213773425U (en) Soil pressure control precast pile coincide sheet pile seam stagnant water structure
CN214005288U (en) Novel steel assembled highway subgrade step scour protection reinforced structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200703

Address after: Room 2106, Jinli building, Beizhan Road, Shenhe District, Shenyang City, Liaoning Province

Patentee after: Liaoning Jianyue Engineering Technology Co., Ltd

Address before: Hunnan Hunnan Road Shenyang city Liaoning province 110168 No. 9

Patentee before: SHENYANG JIANZHU University

TR01 Transfer of patent right