CN210105454U - Multifunctional communication tower equipment fixing device - Google Patents

Multifunctional communication tower equipment fixing device Download PDF

Info

Publication number
CN210105454U
CN210105454U CN201920636028.2U CN201920636028U CN210105454U CN 210105454 U CN210105454 U CN 210105454U CN 201920636028 U CN201920636028 U CN 201920636028U CN 210105454 U CN210105454 U CN 210105454U
Authority
CN
China
Prior art keywords
tower
overlap joint
tower body
installation
multifunctional communication
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920636028.2U
Other languages
Chinese (zh)
Inventor
李波
杨建华
尚健
漆超
蔡暘
陈�峰
郑杰
杜胜
童鑫
朱锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA INTERNATIONAL TELECOMMUNICATION CONSTRUCTION GROUP DESIGN INSTITUTE Co Ltd
Original Assignee
CHINA INTERNATIONAL TELECOMMUNICATION CONSTRUCTION GROUP DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA INTERNATIONAL TELECOMMUNICATION CONSTRUCTION GROUP DESIGN INSTITUTE Co Ltd filed Critical CHINA INTERNATIONAL TELECOMMUNICATION CONSTRUCTION GROUP DESIGN INSTITUTE Co Ltd
Priority to CN201920636028.2U priority Critical patent/CN210105454U/en
Application granted granted Critical
Publication of CN210105454U publication Critical patent/CN210105454U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rehabilitation Tools (AREA)

Abstract

The utility model relates to a communication tower technical field provides a multifunctional communication tower equipment fixing device, include the tower body that is formed by the concatenation of multistage tower material, still include the liftable and can supply the staff to surround the tower body and carry out the operation panel of operating, the operation panel is including all can overlap two different installation rings of size outside the tower material and be used for ordering about two the elevating system that the installation ring goes up and down, two the installation ring sets up two with one heart install the walking platform that supplies the staff to walk between the installation ring. The utility model discloses a multifunctional communication tower equipment installation device makes the installation circle of installing the walking platform rise to appointed position through elevating system, and the staff just can stand and be under construction on the walking platform, moreover because the installation circle is encircleed the tower body and sets up for the staff can encircle the tower body as required and be under construction, laborsaving, convenient and safety can greatly improve work efficiency.

Description

Multifunctional communication tower equipment fixing device
Technical Field
The utility model relates to a communication tower technical field specifically is a multifunctional communication tower equipment fixing device.
Background
Communication towers are usually formed by splicing multiple sections of tower materials, and workers need to splice the tower materials into a high-rise tower body section by section.
Because the tower body is higher, among the prior art, the staff usually can be hoisted, or adopt the ladder to climb up along the tower body, or directly climb on the tower material, be difficult for not saying, still have the potential safety hazard.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a multifunctional communication tower equipment installation device makes the collar of installing the walking platform rise to appointed position through elevating system, and the staff just can stand and be under construction on the walking platform, moreover because the collar is around the tower body setting for the staff can encircle the tower body as required and be under construction, laborsaving, convenient and safety can greatly improve work efficiency.
In order to achieve the above object, the embodiment of the present invention provides the following technical solutions: the utility model provides a multifunctional communication tower equipment fixing device, includes the tower body that is formed by the concatenation of multistage tower material, still includes the liftable and can supply the staff to encircle the tower body and carry out the operation panel of operating, the operation panel is including all can overlapping two different collars of size outside the tower material and being used for ordering about two the elevating system that the collar goes up and down, two the collar sets up with one heart, two install the walking platform that supplies the staff to walk between the collar.
Further, be close to the tower body install the overlap joint spare on the installing ring, the overlap joint spare with the installing ring is articulated, the overlap joint spare has the court but overlap joint end on the tower body of overlap joint after the tower body direction swing.
Further, the overlap joint spare includes the overlap joint bridge, the overlap joint bridge is close to the one end of erection circle is equipped with the hinge, the overlap joint bridge is kept away from the one end of erection circle is equipped with and supplies the recess that the body of rod card of tower body is gone into.
Furthermore, elevating system includes the electronic hydraulic push rod that multistage stacks, is located the top the movable rod of electronic hydraulic push rod with the walking platform is connected.
Further, a tool rack for placing tools is arranged on the mounting ring.
And further, a protective fence is arranged on the mounting ring far away from the tower body.
Further, the traveling platform comprises a steel wire mesh, and the steel wire mesh is laid between the two installation rings.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model provides a multifunctional communication tower equipment fixing device, makes the collar of installing the walking platform rise to appointed position through elevating system, and the staff just can stand and be under construction on the walking platform, moreover because the collar encircles the tower body setting for the staff can encircle the tower body as required and be under construction, laborsaving, convenient and safety can greatly improve work efficiency.
Drawings
Fig. 1 is a schematic view of a multifunctional communication tower equipment installation device provided in an embodiment of the present invention;
in the reference symbols: 1-a tower body; 2-an operation table; 20-mounting a ring; 21-a walking platform; 210-steel wire mesh; 22-a bridge; 23-an electro-hydraulic push rod; 24-protective fence.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1, an embodiment of the present invention provides a multifunctional communication tower equipment installation apparatus, including a tower body 1 formed by splicing multiple sections of tower materials, and an operation platform 2 which can be lifted and can be operated by a worker around the tower body 1, where the operation platform 2 includes two installation rings 20 which can be sleeved outside the tower material and have different sizes, and a lifting mechanism for driving the two installation rings 20 to be lifted, the two installation rings 20 are concentrically arranged, and a walking platform 21 for the worker to walk is installed between the two installation rings 20. In this embodiment, fig. 1 is already a state in which the operation table is raised in mid air. The two mounting rings 20 are of different sizes and have a space between them in which the walking board 21 can be mounted when they are concentrically (in case of a circle, the center of the circle, or in case of a square, the center), preferably the two mounting rings 20 are square to match the shape of the tower 1. After the first section of tower material is fixed on the base, the crane can hoist the second section of tower material to the top position of the first section of tower material, at this time, the worker stands on the walking platform 21, drives the two mounting rings 20 to move upwards to the joint of the first section of tower material and the second section of tower material through the lifting mechanism, and the worker can stand on the walking platform 21 to perform splicing operation. And when the two sections of tower materials are connected, the operation is continued, the lifting mechanism conveys the workers standing on the walking platform 21 to the connecting position of the second section of tower material and the third section of tower material, and the workers perform splicing operation. And repeating the operation until the splicing of the tower body 1 is completed. The staff can walk on annular walking platform 21 at the in-process of concatenation to the action that surrounds tower body 1 is accomplished to this, assembles of each different angles, and is convenient and swift. In selecting materials for use, the mounting ring 20 and the walking platform 21 are made of materials with high rigidity, such as steel, so that the safety of workers is guaranteed.
The following are specific examples:
in order to optimize the above solution, please refer to fig. 1, a lap joint is installed on the installation ring 20 close to the tower body 1, the lap joint is hinged to the installation ring 20, and the lap joint has a lap joint end which can lap joint on the tower body 1 after swinging towards the tower body 1. In this embodiment, the communication tower is generally small in top and large in bottom, that is, the size of the tower material near the base is larger than that of the tower material above the base, so that the spliced tower body 1 forms a shape similar to a pyramid with a large top and a small bottom. The mounting rings 20 are sleeved on the lowermost tower material, i.e. the tower material with the largest size, and from this point, when the tower material ascends, the tower material becomes thinner, and since the sizes of the two mounting rings 20 are fixed, when the position where the last tower material and the penultimate tower material are spliced is reached, the mounting rings 20 at this time are too large, so that the worker can stand on the walking platform 21 and then be far away from the tower material, which is inconvenient to construct. Consequently establish this overlap joint piece, after the staff can not reach the tower material, because for articulated between overlap joint piece and the collar 20, can promote this overlap joint piece, the tower connecting piece is rotatory to through its overlap joint end overlap joint on the body of rod of tower body 1, just can assist the staff slope great, the staff can lie prone on the overlap joint piece, then operates, if far away from tower body 1, then the overlap joint gets up the back, the overlap joint piece slope is less, the staff can directly walk on it.
Further optimizing the above scheme, please refer to fig. 1, the overlapping part includes an overlapping bridge 22, a hinge is disposed at one end of the overlapping bridge 22 close to the installation ring 20, and a groove for the rod body of the tower body 1 to be clamped into is disposed at one end of the overlapping bridge 22 far from the installation ring 20. In this embodiment, the overlap joint piece can adopt overlap joint bridge 22, the lapping plate promptly, and polylith overlap joint bridge 22 all can be installed to the side of each tower body 1, and the overlap joint bridge 22 overlap joint back on the body of rod of tower body 1, and the recess can be gone into to its body of rod to make things convenient for the locking. The grooves can be arranged in a plurality of ways, which correspond to different heights, and the positions of the grooves can be calculated in advance, and the inclination angle can be calculated because the positions of the grooves which are lifted to are basically fixed. Besides the lap plate, the lap joint rod can be used for connecting the lap plate and the lap plate, and the lap plate can be used in a plurality of forms, but the selected material of the lap joint is required to ensure the firmness and the reliability.
As an optimization scheme of the embodiment of the present invention, please refer to fig. 1, the lifting mechanism includes a plurality of stages of stacked electric hydraulic push rods 23, and the movable rod of the electric hydraulic push rod 23 located at the top is connected to the walking platform 21. In the embodiment, the lifting mechanism adopts the electro-hydraulic push rod 23 as the lifting mode, and since the pushing stroke of one electro-hydraulic push rod 23 is limited, the lifting mechanism is formed by stacking and combining a plurality of electro-hydraulic push rods 23, and the specific operation mode is, for example, to select two stages of electro-hydraulic push rods 23, the two stages of electro-hydraulic push rods 23 are connected by steel plates, the push rods are arranged at four corners of the steel plate to ensure stability, and the uppermost electro-hydraulic push rod 23 is connected to the walking platform 21 to lift the walking platform 21. Of course, there are many lifting manners in the prior art, for example, a screw transmission manner can be adopted for lifting, which are conventional lifting manners and will not be described in detail here.
As an optimized solution of the embodiment of the present invention, a tool rack (not shown in the figure) for placing tools is installed on the mounting ring 20. In this embodiment, set up this tool holder, can be convenient for the staff place some instruments that need use, make things convenient for it to work aloft.
As an optimized solution of the embodiment of the present invention, please refer to fig. 1, a protection fence 24 is installed on the installation ring 20 far away from the tower body 1. In the embodiment, the mounting ring 20 close to the tower body 1 is provided with the bridging bridge 22, so that in order to improve the safety coefficient of the high-altitude operation of the workers, the mounting ring 20 far away from the tower body 1 is provided with the protective fence 24, so that the workers can be safer.
As an optimization scheme of the embodiment of the present invention, please refer to fig. 1, the walking platform 21 includes a steel wire mesh 210, and the steel wire mesh 210 is laid between two of the installation rings 20. In the embodiment, the walking platform 21 is made of a steel wire mesh 210, the worker can walk on the steel wire mesh 210, and the steel wire mesh 210 needs to be made of a high-strength steel material. In addition, the connecting rods can be adopted, and the connecting rods are densely paved, so that the clamping of the working personnel can be prevented.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a multifunctional communication tower equipment fixing device, includes the tower body that is formed by the concatenation of multistage tower material, its characterized in that: still include liftable and can supply the staff to encircle the tower body and carry out the operation panel of operating, the operation panel is including all can overlapping two different installation rings of size outside the tower material and being used for ordering about two the elevating system that the installation ring goes up and down, two the installation ring sets up with one heart, two install the walking platform that supplies the staff to walk between the installation ring.
2. The multifunctional communication tower apparatus mounting device of claim 1, wherein: be close to the tower body install the overlap joint spare on the installing ring, the overlap joint spare with the installing ring is articulated, the overlap joint spare has the court but overlap joint end on the tower body of overlap joint behind the tower body direction swing.
3. The multifunctional communication tower apparatus mounting device of claim 2, wherein: the overlap joint spare includes the overlap joint bridge, the overlap joint bridge is close to the one end of erection circle is equipped with the hinge, the overlap joint bridge is kept away from the one end of erection circle is equipped with and supplies the recess that the body of rod card of tower body is gone into.
4. The multifunctional communication tower apparatus mounting device of claim 1, wherein: the lifting mechanism comprises electric hydraulic push rods stacked in multiple stages, and movable rods of the electric hydraulic push rods positioned at the top are connected with the walking platform.
5. The multifunctional communication tower apparatus mounting device of claim 1, wherein: and a tool rack for placing tools is arranged on the mounting ring.
6. The multifunctional communication tower apparatus mounting device of claim 1, wherein: keep away from the tower body install the protection rail on the collar installation.
7. The multifunctional communication tower apparatus mounting device of claim 1, wherein: the walking platform comprises a steel wire mesh, and the steel wire mesh is laid between the two installation rings.
CN201920636028.2U 2019-05-06 2019-05-06 Multifunctional communication tower equipment fixing device Active CN210105454U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920636028.2U CN210105454U (en) 2019-05-06 2019-05-06 Multifunctional communication tower equipment fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920636028.2U CN210105454U (en) 2019-05-06 2019-05-06 Multifunctional communication tower equipment fixing device

Publications (1)

Publication Number Publication Date
CN210105454U true CN210105454U (en) 2020-02-21

Family

ID=69539457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920636028.2U Active CN210105454U (en) 2019-05-06 2019-05-06 Multifunctional communication tower equipment fixing device

Country Status (1)

Country Link
CN (1) CN210105454U (en)

Similar Documents

Publication Publication Date Title
US8584429B2 (en) Tower erection system and method
MX2014014014A (en) Self-climbing telescopic crane and method for mounting pre-fabricated concrete towers.
EP3301064B1 (en) Apparatus for lifting heavy loads and method for assembling or disassembling an apparatus for lifting heavy loads
CN103003509A (en) An assembly rig for assembling a wind turbine tower or wind turbine tower sections and a respective method
CN101734560A (en) High-altitude dismantling method of inside-climbing tower crane for towering structure construction
CN107178203A (en) A kind of planar dimension and adjustable for height operating platform
CN103097278A (en) Collapsible hoisting device for use in the construction of large metal containers, and removable accessory applicable thereto
CN210105454U (en) Multifunctional communication tower equipment fixing device
CN207647152U (en) Tower lifts constructing device certainly
CN104989111A (en) Construction method for steel structure high-rise hoisting
JP2015055062A (en) Lift type work scaffold device of tower crane
CN111017696A (en) Hoisting method of integrally assembled prefabricated part
EP2642064A1 (en) Drilling rig
EP2933399A1 (en) Mast system for constructing a mast
CN215886255U (en) Reducing disc for furnace body construction
CN109516409A (en) Flooring construction tower crane turns device for hoisting
CN101858164A (en) Lifting communication base station iron tower
CA2479412A1 (en) Method of fabricating a tall multi-stage work piece
CN104555833B (en) Method for hoisting steel inner cylinder of chimney
CN210313411U (en) Automatic combined type lifting device for processing cylinders of various specifications
CN110271998B (en) Automatic combined lifting device for processing cylinders with various specifications
CN210561720U (en) Pier stud maintenance repair operation platform
EP3425119B1 (en) Demolishing an offshore jacket
US20220177281A1 (en) Apparatus for Lifting Heavy Loads
KR20090103021A (en) Salvare unit with constructing care and constructing method using the same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant