CN210087336U - 一种埋入式柔性盾构隧道管片接头 - Google Patents
一种埋入式柔性盾构隧道管片接头 Download PDFInfo
- Publication number
- CN210087336U CN210087336U CN201920739599.9U CN201920739599U CN210087336U CN 210087336 U CN210087336 U CN 210087336U CN 201920739599 U CN201920739599 U CN 201920739599U CN 210087336 U CN210087336 U CN 210087336U
- Authority
- CN
- China
- Prior art keywords
- joint
- shield tunnel
- section
- flexible shield
- jurisdiction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
一种埋入式柔性盾构隧道管片接头,由第一接头和第二接头相互卡紧构成,第二接头卡入第一接头凹槽内;所述的第一接头为:第一接头本体为凹形结构,第一接头本体的底面上均布设置有至少3根连接柱;所述的第二接头为:卡板和连接板相互垂直设置,卡板设置于第一接头本体内;本实用新型具有结构简单、利于管片快速拼装、加快施工进度、避免应力集中等优点,可推广应用到盾构管片拼装设备或装置技术领域。
Description
技术领域
本实用新型属于地铁隧道盾构拼装技术领域,具体涉及到一种埋入式柔性盾构隧道管片接头。
背景技术
盾构法与传统隧道修建方法(矿山法、新奥法)相比较,具有施工扰动小,速度快,安全等优点,其广泛应用于城市地铁、水工隧道等工程的修建。
盾构隧道是由纵向接头、环向接头连接管片拼装而成的结构物,管片一般采用预制的方式制造,按材料可分为混凝土管片、钢管片、铸铁管片、合成管片等;管片环之间的拼装方式有通缝和错缝两种方式;管片之间的连接主要依靠环间接头,其种类较多,有直螺栓、斜螺栓、弯螺栓等等。直螺栓接头用钢量较少,但是手孔过大,消弱了管片截面承载能力;斜螺栓施工时易于安装,可实现自动化安装。弯螺栓接头对截面削弱程度较小,但用钢量大,安装繁琐。
盾构隧道中常面临地基不均匀沉降,管片上浮,结构抗震等问题,对于上述刚性接头,会出现应力集中现象,轻则造成管片破损,重则隧道坍塌;同时上述管片都需要后期人工或机械进行安装,施工进度缓慢;本发明拟采用一种快速连接、允许管片在一定范围内移动的接头避免接头周围因应力过大而使管片破坏。
发明内容
本实用新型所要解决的技术问题在于克服上述现有技术的不足,提供一种设计合理、结构简单、利于管片快速拼装、加快施工进度、避免应力集中的埋入式柔性盾构隧道管片接头。
解决上述技术问题采用的技术方案是:由第一接头和第二接头相互卡紧构成,第二接头卡入第一接头凹槽内;
所述的第一接头为:第一接头本体为凹形结构,第一接头本体的底面上均布设置有至少3根连接柱;
所述的第二接头为:卡板和连接板相互垂直设置,卡板设置于第一接头本体内。
本实用新型的卡板设置于第一接头本体内且距第一接头本体内侧壁的上下距离均为20mm。
本实用新型的第一接头本体的底面上均布设置有4根连接柱。
本实用新型的连接柱设置于管片内,连接板设置于管片内,管片下部设置有密封垫。
本实用新型的密封垫横截面上一侧加工有圆形孔、另一侧加工有U形凹槽,密封垫的宽度为55mm。
本实用新型相比于现有技术具有以下优点:
1、卡板安装于第一接头本体内且距第一接头本体内侧壁的上下距离均为20mm,当出现不均匀沉降,管片上浮等情况时,两连接管片可上下移动一定范围,避免了管片出现应力集中。
2、增加密封垫的宽度,有效避免管片移动时,密封垫错开导致密封垫失效。
3、拼装前将密封垫安装在管片上,拼装方式采用管片拼装机轴向拼装的方式,用千斤顶加力使得卡板滑入第一接头本体内,保证拼装精度。
本实用新型具有结构简单、利于管片快速拼装、加快施工进度、避免应力集中等优点,可推广应用到盾构管片拼装设备或装置技术领域。
附图说明
图1是本实用新型一个实施例的结构示意图。
图2是图1的立体示意图。
图3是第一接头1在管片4中的安装示意图。
图4是第二接头2在管片4中的安装示意图。
图5是密封垫的结构示意图。
图中:1、第一接头;2、第二接头;3、密封垫;4、管片。
具体实施方式
下面结合附图和实施例对本实用新型做进一步详细说明,但本实用新型不限于这些实施例。
实施例1
在图1~5中,本实用新型一种埋入式柔性盾构隧道管片接头,由第一接头1和第二接头2相互卡紧构成,第二接头2卡入第一接头1凹槽内,通过第一接头凹形空腔与第二接头T形耦合,实现了管片接头的固定作用,本实施例的第一接头由第一接头本体和连接柱连接构成,第一接头本体为凹形结构,第一接头本体的底面上均布焊接固定有至少3根连接柱;进一步地,本实施例的第一接头本体的底面上均布设置有4根连接柱,第二接头由卡板和连接板构成,卡板和连接板相互垂直焊接固定,管片4安装时,千斤顶施加一定的力,使卡板滑入第一接头本体内,卡板安装于第一接头本体内且距第一接头本体内侧壁的上下距离均为20mm,当出现不均匀沉降,管片4上浮等情况时,两连接管片可上下移动一定范围,避免了管片出现应力集中。实际应用中连接柱浇筑于管片4内,连接板浇筑于相邻管片4内,管片4下部安装有密封垫3,本实施例的密封垫3横截面上一侧加工有圆形孔、另一侧加工有U形凹槽,密封垫3的宽度为55mm,增加密封垫3的宽度,有效避免管片4移动时,密封垫3错开导致密封垫3失效。
Claims (5)
1.一种埋入式柔性盾构隧道管片接头,其特征在于:由第一接头和第二接头相互卡紧构成,第二接头卡入第一接头凹槽内;
所述的第一接头为:第一接头本体为凹形结构,第一接头本体的底面上均布设置有至少3根连接柱;
所述的第二接头为:卡板和连接板相互垂直设置,卡板设置于第一接头本体内。
2.根据权利要求1所述的一种埋入式柔性盾构隧道管片接头,其特征在于:所述的卡板设置于第一接头本体内且距第一接头本体内侧壁的上下距离均为20mm。
3.根据权利要求1所述的一种埋入式柔性盾构隧道管片接头,其特征在于:所述的第一接头本体的底面上均布设置有4根连接柱。
4.根据权利要求1所述的一种埋入式柔性盾构隧道管片接头,其特征在于:所述的连接柱设置于管片内,连接板设置于管片内,管片下部设置有密封垫。
5.根据权利要求4所述的一种埋入式柔性盾构隧道管片接头,其特征在于:所述的密封垫横截面上一侧加工有圆形孔、另一侧加工有U形凹槽,密封垫的宽度为55mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920739599.9U CN210087336U (zh) | 2019-05-22 | 2019-05-22 | 一种埋入式柔性盾构隧道管片接头 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920739599.9U CN210087336U (zh) | 2019-05-22 | 2019-05-22 | 一种埋入式柔性盾构隧道管片接头 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210087336U true CN210087336U (zh) | 2020-02-18 |
Family
ID=69479516
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920739599.9U Expired - Fee Related CN210087336U (zh) | 2019-05-22 | 2019-05-22 | 一种埋入式柔性盾构隧道管片接头 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210087336U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113738397A (zh) * | 2021-10-18 | 2021-12-03 | 重庆交通大学 | 一种装配式类矩形盾构隧道管片拼装结构 |
-
2019
- 2019-05-22 CN CN201920739599.9U patent/CN210087336U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113738397A (zh) * | 2021-10-18 | 2021-12-03 | 重庆交通大学 | 一种装配式类矩形盾构隧道管片拼装结构 |
CN113738397B (zh) * | 2021-10-18 | 2023-10-27 | 重庆交通大学 | 一种装配式类矩形盾构隧道管片拼装结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3645102A (en) | Telescoping lining and support structure and method for lining tunnels and shafts | |
CN105756685A (zh) | 一种管片衬砌加强型联合支护结构 | |
CN109630133B (zh) | 一种顶管机免拆装管线系统及其施工方法 | |
CN106121658B (zh) | 冻结法凿井井筒井壁支护结构及其施工方法 | |
CN210087336U (zh) | 一种埋入式柔性盾构隧道管片接头 | |
CN111321764A (zh) | 地下连续墙接缝止水工艺及其装置 | |
CN111852488B (zh) | 一种高速铁路大直径盾构隧道接触网槽道施工方法 | |
CN209742908U (zh) | 装配式大断面矩形顶管管节 | |
CN110410144B (zh) | 一种盾构隧道的防排水结构 | |
CN204852606U (zh) | 一种曲线顶管管节承插口连接形式 | |
CN204416673U (zh) | 地源热泵灌浆管道提管机 | |
CN216008513U (zh) | 一种铁路盾构隧道管片环分块结构 | |
CN103557007B (zh) | 过地质异常带极破碎软岩巷道的施工方法 | |
CN103382842B (zh) | 一种防止顶管机和管节旋转的施工方法 | |
CN215165530U (zh) | 一种深水桩基施工钢护筒的装配式接长结构 | |
CN209604020U (zh) | 一种盾构管片半环拼装处反力装置 | |
CN209816906U (zh) | 一种直螺栓连接预制综合管廊 | |
CN209195417U (zh) | 用于盾构机始发的钢套箱组件 | |
CN112761681A (zh) | 一种高水头盾构隧道管片的螺栓孔防水结构 | |
CN211228460U (zh) | 一种框格式地下连续墙槽段结构 | |
CN217204194U (zh) | 一种装配式矩形沉井 | |
CN219316966U (zh) | 一种用于煤矿巷道tbm施工支护循环利用钢管片 | |
CN220416427U (zh) | 一种适用于复杂地层的半刚性顶管管节的连接结构 | |
CN213625601U (zh) | 外凸式三铰拱受力型钢结构基坑支护装置 | |
CN219841235U (zh) | 一种井下预留巷道用非金属波纹管连接加固结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200218 Termination date: 20210522 |
|
CF01 | Termination of patent right due to non-payment of annual fee |