CN210086247U - Put in storage device of fast ann's dismantlement concrete - Google Patents
Put in storage device of fast ann's dismantlement concrete Download PDFInfo
- Publication number
- CN210086247U CN210086247U CN201920652746.9U CN201920652746U CN210086247U CN 210086247 U CN210086247 U CN 210086247U CN 201920652746 U CN201920652746 U CN 201920652746U CN 210086247 U CN210086247 U CN 210086247U
- Authority
- CN
- China
- Prior art keywords
- chute
- hopper
- concrete
- horizontal pole
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a fast ann tears concrete warehousing device open, including last chute, hopper and lower chute, it is fixed that the hopper passes through the support element, and the hopper top is provided with the chute, and the discharge gate of hopper passes through movable connecting part and connects chute down, the support element is including supporting the horizontal pole and the support of hopper the square timber of horizontal pole. The utility model discloses can install, dismantle conveniently, fast, have great meaning to the construction quality and the progress of guaranteeing the working well, be particularly useful for artifical push pipe working well concrete construction.
Description
Technical Field
The utility model relates to a concrete placement device field, especially a fast ann tears concrete warehousing device open.
Background
The artificial pipe jacking is the leading edge of the current urban water environment treatment development, but in order to meet the requirements of the artificial pipe jacking working well, the pipe jacking construction can be carried out after the quality of the working well meets the requirements. Therefore, how to reach the construction requirement once and quickly when the working well is constructed becomes a key point for saving cost. According to the past field construction experience, when the working well is used for pouring concrete, the warehousing and the slump of the concrete are main factors for limiting the construction efficiency and the construction quality. The existing concrete warehousing method is mainly characterized in that concrete is transported to a construction site through a concrete tank truck, and the concrete is unloaded through a manual matching chute, so that the efficiency is low and the quality is poor. In order to improve the construction efficiency and simplify the operation process, the development of the concrete warehousing device which can be quickly assembled and disassembled and has strong stability is very important.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a fast ann tears concrete warehousing device open is provided, can accelerate the construction progress of working well, controls concrete warehousing speed and slump better, and then guarantees the construction quality of working well.
In order to solve the technical problem, the utility model discloses a technical scheme is:
the utility model provides a put in storage device is torn open to ann fast, includes chute, hopper and lower chute, the hopper passes through the support element and fixes, and the hopper top is provided with the chute, and the discharge gate of hopper is through chute under the swing joint part connection, the support element is including supporting the horizontal pole of hopper and support the square timber of horizontal pole.
Furthermore, the movable connecting part is a steel ball, namely, the discharge port of the hopper is connected with the downward chute through the steel ball.
Furthermore, a telescopic groove is sleeved outside the lower chute, so that the length of the whole chute is adjusted.
Furthermore, the cross rod is made of steel pipes.
Compared with the prior art, the beneficial effects of the utility model are that: the concrete pouring device can be conveniently and quickly installed and disassembled, concrete pouring construction progress is accelerated, concrete entering collapse degree is better controlled, construction quality of a working well is guaranteed, and the concrete pouring device is particularly suitable for concrete construction of an artificial pipe-jacking working well.
Drawings
Fig. 1 is the utility model relates to a fast ann tears concrete warehousing device overall structure sketch map open.
In the figure: 1, feeding a chute; 2-a hopper; 3-a cross bar; 4-square timber; 5-steel balls; 6-a chute is arranged; 7-a telescopic groove; 8-concrete dado.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
The utility model relates to a fast ann tears concrete warehousing device open, its structure is: including last chute 1, hopper 2 and lower chute 6, hopper 2 is fixed through the support element, and 2 tops of hopper are provided with chute 1, and chute 6 is down connected through swing joint spare to the discharge gate of hopper 2, the support element is including supporting horizontal pole 3 of hopper 2 and support the square timber 4 of horizontal pole 3.
In the practical engineering, the movable connecting part is a steel ball 5, namely, the discharge port of the hopper 2 is connected with the downward chute 6 through the steel ball 5; the steel balls 5 are adopted, so that the purpose of movable connection can be achieved, the structure is simple, and the cost is saved. In order to adjust the length of whole chute to concrete placement can adapt to more construction environment, the utility model discloses in, down 6 outside still covers of chute have flexible groove 7, when needing long chute, only need with flexible groove 7 pull out can, reach the purpose of extension chute. The utility model discloses a removal all around of lower chute 6 is pour concrete transportation to the assigned position.
In the construction, concrete transportation tank car transports concrete to appointed position in storehouse to in putting into hopper 2 with concrete through last chute 1, hopper 2 is reliably connected with lower chute 6 through two steel balls 5, and then can carry out concrete placement to the assigned position through the removal all around of lower chute 6.
By adopting the device, the large amount of manual chute erection investment in concrete pouring at each time is reduced, and the construction cost is saved; the problem of slump of concrete entering a warehouse is solved, and the construction quality of concrete pouring is ensured; meanwhile, the device has good turnover performance and can be recycled in similar engineering construction.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The scope of the invention is indicated by the appended claims rather than by the foregoing description, and all changes that come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (4)
1. The utility model provides a fast ann tears concrete warehousing device open, its characterized in that includes chute (1), hopper (2) and lower chute (6), hopper (2) are fixed through the support element, and hopper (2) top is provided with chute (1), and chute (6) are down connected through swing joint spare to the discharge gate of hopper (2), the support element is including supporting horizontal pole (3) and the support of hopper (2) square timber (4) of horizontal pole (3).
2. The quick-mounting and dismounting concrete warehousing device as claimed in claim 1, characterized in that the movable connecting component is a steel ball (5), i.e. the discharge port of the hopper (2) is connected with the chute (6) through the steel ball (5).
3. A quick-mounting and-dismounting concrete warehousing device as claimed in claim 1, characterized in that the outside of said lower chute (6) is also covered with a telescopic trough (7) to adjust the length of the whole chute.
4. A quick-release concrete entry device according to claim 1, characterized in that said cross-bar (3) is made of steel pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920652746.9U CN210086247U (en) | 2019-05-08 | 2019-05-08 | Put in storage device of fast ann's dismantlement concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920652746.9U CN210086247U (en) | 2019-05-08 | 2019-05-08 | Put in storage device of fast ann's dismantlement concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210086247U true CN210086247U (en) | 2020-02-18 |
Family
ID=69477507
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920652746.9U Active CN210086247U (en) | 2019-05-08 | 2019-05-08 | Put in storage device of fast ann's dismantlement concrete |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210086247U (en) |
-
2019
- 2019-05-08 CN CN201920652746.9U patent/CN210086247U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203669884U (en) | Movable all-round steel pipe scaffold for tunnel lining construction | |
CN205116715U (en) | Cast -in -situ box girder template bracing device | |
CN207749409U (en) | Detachable assembling type reinforced concrete bridge pier cushion cap connection structure | |
CN216428331U (en) | Assembled piping lane mid-board positioner | |
CN210086247U (en) | Put in storage device of fast ann's dismantlement concrete | |
CN104863357A (en) | Integral template for concrete middle beam and construction method thereof | |
CN207482772U (en) | A kind of applied to precasting yard concrete transportation and the operation for moving beam vehicle | |
CN204040450U (en) | A kind of for angle connector in tools type section steel builder's jack | |
CN206625553U (en) | For pouring the formwork bracing system of high-low bay structure simultaneously | |
CN206128634U (en) | Air conditioner shelf and window one -piece casting template support structure that wafts | |
CN202369931U (en) | Arch ring bracket | |
CN204662369U (en) | A kind of slope cantilever large form | |
CN208266915U (en) | Underground pipe gallery overall movement full hall scaffold | |
CN207079578U (en) | A kind of pile for prestressed pipe | |
CN206902768U (en) | A kind of post-cast strip adjustable supporting | |
CN215332834U (en) | Hopper for pouring reverse well wall | |
CN105756067B (en) | A kind of method of horizontal temporary support support replacement in deep basal pit | |
CN205116776U (en) | Support access structure | |
CN104045014A (en) | Pole arraying frame for pole welding | |
CN203795448U (en) | Building foundation | |
CN206924959U (en) | A kind of steel pipe inner wall fills paint device | |
CN208105049U (en) | A kind of carrier setting bolt hole precision positioning model | |
CN207314179U (en) | A kind of sound barrier monoblock type rim of a cup mounting structure | |
CN201786033U (en) | Traveling type concrete chute | |
CN208441597U (en) | One kind increasing steel tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |