CN210086079U - Pier stud maintenance film covering device and pier stud maintenance construction device - Google Patents

Pier stud maintenance film covering device and pier stud maintenance construction device Download PDF

Info

Publication number
CN210086079U
CN210086079U CN201920747710.9U CN201920747710U CN210086079U CN 210086079 U CN210086079 U CN 210086079U CN 201920747710 U CN201920747710 U CN 201920747710U CN 210086079 U CN210086079 U CN 210086079U
Authority
CN
China
Prior art keywords
pier stud
support
pier
bracket
film covering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920747710.9U
Other languages
Chinese (zh)
Inventor
王高辉
陈立军
曹胜利
李旭
李鹏云
谢省平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Tunnel Construction Co Ltd
Original Assignee
China Construction Tunnel Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Tunnel Construction Co Ltd filed Critical China Construction Tunnel Construction Co Ltd
Priority to CN201920747710.9U priority Critical patent/CN210086079U/en
Application granted granted Critical
Publication of CN210086079U publication Critical patent/CN210086079U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a pier stud maintenance film covering device and a pier stud maintenance construction device, which comprises a bracket body which is annularly arranged at the periphery of a pier stud to form a movable supporting structure at the periphery of the pier stud, wherein a hoisting mechanism which is used for connecting hoisting equipment to drive the bracket body to move up and down along the height direction of the pier stud and rotate along the circumferential direction of the pier stud is arranged on the bracket body; the support body is internally provided with a sliding adjusting mechanism which is used for surrounding and attaching on the outer surface of the pier stud and can move along the wall surface of the pier stud, and a film covering mechanism which is used for spirally winding and covering a film on the outer wall surface of the pier stud. The utility model discloses a pier stud maintenance film covering device, overall structure is simple, easily processing production, and the processing cost is low to through slide adjusting mechanism's regulation, the pier stud maintenance work of adaptable different yards, application scope is wide, and the commonality is stronger.

Description

Pier stud maintenance film covering device and pier stud maintenance construction device
Technical Field
The utility model relates to a pier stud maintenance field especially relates to a pier stud maintenance film covering device. Furthermore, the utility model discloses still relate to a pier stud maintenance construction equipment including above-mentioned pier stud maintenance film covering device.
Background
For solid pier columns, the most adopted curing method at present is drip irrigation film curing, and if film curing is adopted after form removal, the following two methods are generally adopted: the first kind of outside does not have the construction support body, and normal construction is for lifting by crane the bucket, and personnel stand in the bucket along pier stud circle cover film. The construction method has the following problems: a. the bucket can swing back and forth in high altitude, so that the quality of the covering film is unqualified, and the film is easy to damage or be blown away in severe weather such as strong wind and the like, so that the maintenance quality is influenced; b. personnel work in the bucket, so that great safety risk exists; c. in the operation process, a specially-assigned person is required to command the crane, so that the cost is high. The second kind of outside has the construction support body, begins to cover the film along the pier stud hoop from the support body top. The construction method has the following problems: a. an operation platform must be arranged on each layer of frame body along the height direction of the pier stud, and a worker must hang a safety rope according to the standard in the construction process, so that the construction efficiency is low; b. in order to ensure normal construction of the pier stud template, a construction space of about 80cm can be reserved between the outer side of the general pier stud and the frame body, and the high-altitude falling risk exists at the position when the film is used for covering construction.
SUMMERY OF THE UTILITY MODEL
The utility model provides a pier stud maintenance film covering device and pier stud maintenance construction equipment to solve traditional technology and adopt the manual work to carry out the film and cover, construction quality is poor, when meeting bad weather, leads to the film to damage easily, influences maintenance quality and has the technical problem of very high safe risk.
The utility model adopts the technical scheme as follows:
a pier stud curing film covering device comprises a support body, a lifting mechanism and a film covering device, wherein the support body is annularly arranged on the periphery of a pier stud to form a movable supporting structure on the periphery of the pier stud; the support body is internally provided with a sliding adjusting mechanism which is used for surrounding and attaching on the outer surface of the pier stud and can move along the wall surface of the pier stud, and a film covering mechanism which is used for spirally winding and covering a film on the outer wall surface of the pier stud.
Furthermore, the bracket body comprises a first bracket and a second bracket, the first bracket and the second bracket are arranged in parallel, and a supporting piece for connecting and fixing the first bracket and the second bracket is arranged between the first bracket and the second bracket; the first support, the second support and the support piece are combined to form a space grid structure.
Further, the first support adopts a polygonal frame or a circular frame; the second bracket adopts a polygonal frame or a circular frame; the first bracket structure is matched with the second bracket structure; the supporting piece is at least one of a vertical supporting rod, an oblique supporting rod, a spiral supporting rod and a supporting truss.
Furthermore, the sliding adjusting mechanism comprises a universal wheel which is in rolling contact with the wall surface of the pier stud and can move on the wall surface of the pier stud in a self-adaptive mode and an adjusting rod which is used for adjusting the radial position of the universal wheel so that the universal wheel can abut against the wall surface of the pier stud, one end of the adjusting rod is connected with the universal wheel, and the adjusting rod is installed on the first support or the second support in an adjustable mode along the axial direction.
Furthermore, the adjusting rod adopts a telescopic adjusting rod; or at least one of sliding groove connection, sliding rail connection, sliding block connection, clamping connection or threaded connection is adopted between the adjusting rod and the first support or between the adjusting rod and the second support.
Furthermore, at least three sliding adjusting mechanisms are arranged on the first support, and the sliding adjusting mechanisms are arranged on the first support at equal intervals; at least three sliding adjusting mechanisms are arranged on the second support, and the sliding adjusting mechanisms are arranged on the second support at equal intervals; the sliding adjusting mechanisms on the first support and the sliding adjusting mechanisms on the second support are correspondingly arranged one by one, and/or the sliding adjusting mechanisms on the first support and the sliding adjusting mechanisms on the second support are arranged in a staggered mode.
Further, the film laminating mechanism comprises a rotating rod and a first mounting rod, wherein the rotating rod is used for being attached to the surface of the pier stud in a rolling mode to carry out film laminating on the surface of the pier stud, the first mounting rod is used for supporting the rotating rod and adjusting the relative position relation between the rotating rod and the pier stud to enable the rotating rod to be attached to the surface of the pier stud, the first mounting rod is assembled on the first support in an axially adjustable mode, the rotating rod is movably connected to the first mounting rod, and a film is wound on the outer surface of the rotating; and/or, tectorial membrane mechanism is including being used for the roll laminating in order to carry out the dwang of tectorial membrane on the pier stud surface, be used for supporting the dwang and adjust dwang and pier stud relative position relation so that the second installation pole on dwang laminating pier stud surface, and second installation pole axial adjustable assembles on the second support, and dwang swing joint is on second installation pole, and the surface winding of dwang has the film.
Furthermore, the first mounting rod and the first support are connected by at least one of a sliding groove, a sliding rail, a sliding block, a clamping connection or a threaded connection; at least one of sliding groove connection, sliding rail connection, sliding block connection, clamping connection or threaded connection is adopted between the second mounting rod and the second support.
Further, the laminating mechanism also comprises a pressing piece for compacting the film after the film is covered on the outer wall surface of the pier column.
According to the utility model discloses an on the other hand still provides a pier stud maintenance construction equipment, including above-mentioned pier stud maintenance film covering device.
The utility model discloses following beneficial effect has:
the utility model discloses a pier stud maintenance film covering device, including support body and hoisting mechanism, the hoisting and hoisting equipment connects hoisting mechanism, through hoisting mechanism with support body ring in pier stud periphery, the initiating terminal of the film on the tectorial membrane mechanism covers on the pier stud surface and compresses tightly; then hoisting and hoisting equipment drives the hoisting mechanism to slowly rise and rotate at the same time, so that the support body is driven to slowly rise and rotate, the film covering mechanism moves in a spiral rising manner on the outer wall surface of the pier column, the film uniformly covers the outer wall surface of the pier column in a spiral rising manner, the support body and the film are separated from the wall surface of the pier column through the adjustment of the sliding adjusting mechanism, the hoisting and hoisting equipment lifts, the maintenance work of one pier column is completed, and the maintenance of the next pier column is carried out. Pier stud maintenance film covering device overall structure is simple, easily processing production, and the processing cost is low to through the regulation of slip adjustment mechanism, adaptable different yardstick pier stud maintenance work, application scope is wide, and the commonality is stronger. Pier stud maintenance work is carried out through pier stud maintenance film covering device, effectual assurance film construction quality and personnel's safety when improving the work efficiency, even at abominable environment, also can operate, guarantee pier stud maintenance quality.
In addition to the above-described objects, features and advantages, the present invention has other objects, features and advantages. The present invention will be described in further detail below with reference to the accompanying drawings.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification. In the drawings:
FIG. 1 is a schematic front view of a pier curing film covering device according to a preferred embodiment of the present invention;
fig. 2 is a schematic view of a first bracket according to a preferred embodiment of the present invention;
FIG. 3 is a schematic view of a second bracket according to a preferred embodiment of the present invention;
FIG. 4 is a schematic view of a stent body according to a preferred embodiment of the present invention;
FIG. 5 is a schematic view of a slide adjustment mechanism according to a preferred embodiment of the present invention; and
fig. 6 is a schematic view of a film covering mechanism according to a preferred embodiment of the present invention.
Description of reference numerals:
1. a stent body; 11. a slide adjustment mechanism; 111. a universal wheel; 112. adjusting a rod; 12. a film covering mechanism; 121. a first mounting bar; 122. a second mounting bar; 123. rotating the rod; 13. a first bracket; 14. a second bracket; 15. a support member; 2. a hoisting mechanism.
Detailed Description
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
FIG. 1 is a schematic front view of a pier curing film covering device according to a preferred embodiment of the present invention; fig. 2 is a schematic view of a first bracket according to a preferred embodiment of the present invention; FIG. 3 is a schematic view of a second bracket according to a preferred embodiment of the present invention; FIG. 4 is a schematic view of a stent body according to a preferred embodiment of the present invention; FIG. 5 is a schematic view of a slide adjustment mechanism according to a preferred embodiment of the present invention; fig. 6 is a schematic view of a film covering mechanism according to a preferred embodiment of the present invention.
As shown in fig. 1 and 4, the pier stud curing film covering device of the present embodiment includes a bracket body 1 annularly disposed at the periphery of a pier stud to form a movable supporting structure at the periphery of the pier stud, and a hoisting mechanism 2 for connecting a hoisting device to drive the bracket body 1 to move up and down along the height direction of the pier stud and to rotate along the circumferential direction of the pier stud is disposed on the bracket body 1; the stent body 1 is internally provided with a sliding adjusting mechanism 11 which is used for surrounding and attaching on the outer surface of the pier stud and can move along the wall surface of the pier stud, and a film covering mechanism 12 which is used for spirally winding and covering a film on the outer wall surface of the pier stud. The utility model discloses a pier stud maintenance film covering device, including support body 1 and hoisting mechanism 2, hoisting and hoisting equipment connects hoisting mechanism 2, encircles support body 1 in the pier stud periphery through hoisting mechanism 2, and the initiating terminal of the film on tectorial membrane mechanism 12 covers on the pier stud surface and compresses tightly; then hoisting equipment drives the hoisting mechanism 2 to slowly rise and rotate at the same time, so as to drive the support body 1 to slowly rise and rotate, so that the film coating mechanism 12 moves spirally on the outer wall surface of the pier column and uniformly covers the outer wall surface of the pier column in a spiral rising manner, the support body 1 and the film are separated from the wall surface of the pier column through the adjustment of the sliding adjusting mechanism 11, and the hoisting equipment is hoisted to finish the maintenance work of one pier column and perform the maintenance of the next pier column. Pier stud maintenance film covering device overall structure is simple, easily processing production, and the processing cost is low to through the regulation of slip adjustment mechanism 11, adaptable different yardstick pier stud maintenance work, application scope is wide, and the commonality is stronger. Pier stud maintenance work is carried out through pier stud maintenance film covering device, effectual assurance film construction quality and personnel's safety when improving the work efficiency, even at abominable environment, also can operate, guarantee pier stud maintenance quality.
The lifting device 2 comprises a first lifting rope used for being connected with lifting equipment and a second lifting rope used for being connected with the support body 1, and flat steel is connected between the first lifting rope and the second lifting rope. The flat steel disperses the stress on the first lifting rope and the second lifting rope, and disperses the stress. The lifting device 2 has the characteristics of high strength and strong bearing capacity. Preferably, first lifting rope is two, connects at the both ends of band steel, and the second lifting rope also is two, and the one end of second lifting rope is connected on the band steel, and the other end is connected on support body 1, and two second lifting ropes are located the both ends of band steel and support body 1 symmetric position respectively, and the position setting of above-mentioned first lifting rope, second lifting rope and band steel is effectual to be avoided contacting with the pier stud, influences pier stud maintenance work.
As shown in fig. 2, 3 and 4, in the present embodiment, the stent body 1 includes a first stent 13 and a second stent 14, the first stent 13 and the second stent 14 are arranged in parallel, and a supporting member 15 for connecting and fixing the first stent 13 and the second stent 14 is provided between the first stent 13 and the second stent 14. The first bracket 13, the second bracket 14 and the support member 15 constitute a space truss structure in combination. The first support 13, the second support 14 and the support 15 are all made of 5cm × 5cm angle steel, the joints are made of double full-length welding, and the 5cm × 5cm angle steel is welded into a space grid structure after cutting and blanking are completed according to a certain size. Above-mentioned support body 1 includes that first support 13, second support 14 and support piece 15 make up and constitute space grid structure, and structural stability is strong, and support body 1 is inside to hold the pier stud, cooperatees with the pier stud appearance, even at bad weather, support body 1 is also very stable, reduces the risk that takes place to turn on one's side or the structure is broken.
As shown in fig. 1 and 4, in the present embodiment, the first bracket 13 is a polygonal frame or a circular frame. The second bracket 14 adopts a polygonal frame or a circular frame; the first bracket 13 is structurally matched with the second bracket 14. The supporting member 15 is at least one of a vertical supporting rod, an oblique supporting rod, a spiral supporting rod, and a supporting truss. The inner wall surfaces of the first bracket 13 and the second bracket 14 accommodate a pier stud, the structural shape of the first bracket 13 and the second bracket 14 is the same as the cross section shape of the pier stud, for example, when the pier stud is a cylindrical pier, the first bracket 13 and the second bracket 14 are circular frame structures. The structural shape of the first bracket 13 and the second bracket 14 may be different from the cross-sectional shape of the pillar, for example, when the pillar is a cylindrical pillar, the first bracket 13 and the second bracket 14 are square frame structures. Therefore, the first bracket 13 and the second bracket 14 have various structures and can be sleeved on pillars with different structures. Preferably, the first support 13 and the second support 14 are both square structures, the side length is 2000mm, and the length of the vertical support rod between the first support 13 and the second support 14 is 1400 mm.
As shown in fig. 2, 3 and 5, in the present embodiment, the sliding adjustment mechanism 11 includes a universal wheel 111 for rolling contact with and moving on the wall surface of the pier, and an adjustment rod 112 for adjusting the radial position of the universal wheel 111 so that the universal wheel 111 abuts against the wall surface of the pier, one end of the adjustment rod 112 is connected to the universal wheel 111, and the adjustment rod 112 is mounted on the first bracket 13 or the second bracket 14 in an axially adjustable manner. The sliding adjusting mechanism 11 is fixedly installed on the first support 13 or the second support 14 through a connecting piece, and the universal wheel 111 is abutted to the wall surface of the pier column by adjusting the radial positions of the universal wheel 111 on the first support 13 and the second support 14; on the other hand, the sliding adjusting mechanism 11 is convenient to be separated from the pier stud, and the pier stud covered with the thin film is prevented from being damaged.
In this embodiment, the adjusting rod 112 is a telescopic adjusting rod. Or at least one of sliding groove connection, sliding rail connection, sliding block connection, clamping connection or threaded connection is adopted between the adjusting rod 112 and the first support 13 or between the adjusting rod 112 and the second support 14. The adjusting rod with the telescopic structure can realize self length adjustment and multi-directional adjustment, and is suitable for different operation requirements. The adjusting rod 112 adjusts the radial position through the connecting piece, so as to satisfy the self-adaptive movement on the pier stud wall surfaces with different shapes.
As shown in fig. 2 and 3, in the present embodiment, at least three slide adjusting mechanisms 11 are arranged on the first support 13, and the slide adjusting mechanisms 11 are arranged on the first support 13 at equal intervals. At least three sliding adjusting mechanisms 11 are arranged on the second support 14, and the sliding adjusting mechanisms 11 are arranged on the second support 14 at equal intervals. The sliding adjusting mechanisms 11 on the first support 13 and the sliding adjusting mechanisms 11 on the second support 14 are arranged in a one-to-one correspondence manner, and/or the sliding adjusting mechanisms 11 on the first support 13 and the sliding adjusting mechanisms 11 on the second support 14 are arranged in a staggered manner. The number of the sliding adjusting mechanisms 11 on the first support 13 or the number of the sliding adjusting mechanisms 11 on the second support 14 is at least three, so that the stability of the support body 1 moving up and down on the wall surface of the pier column is improved.
As shown in fig. 2, 3 and 6, in the present embodiment, the film coating mechanism 12 includes a rotating rod 123 for rolling and adhering to the surface of the pier stud to coat the surface of the pier stud, and a first mounting rod 121 for supporting the rotating rod 123 and adjusting the relative position relationship between the rotating rod 123 and the pier stud to make the rotating rod 123 adhere to the surface of the pier stud, the first mounting rod 121 is axially adjustably assembled on the first bracket 13, the rotating rod 123 is movably connected to the first mounting rod 121, and a film is wound on the outer surface of the rotating rod 123; and/or, the laminating mechanism 12 includes the dwang 123 that is used for the roll laminating to carry out the tectorial membrane on the pier stud surface in order to carry out the pier stud surface, is used for supporting the dwang 123 and adjusts dwang 123 and pier stud relative position relation so that the dwang 123 laminates the second installation pole 122 on pier stud surface, and second installation pole 122 axially adjustable assembles on second support 14, and dwang 123 swing joint is on second installation pole 122, and the surface winding of dwang 123 has the film.
In this embodiment, the first mounting rod 121 and the first bracket 13 are connected by at least one of a sliding groove, a sliding rail, a sliding block, a snap connection, or a screw connection. The second mounting rod 122 is connected to the second bracket 14 by at least one of a sliding groove connection, a sliding rail connection, a sliding block connection, a clamping connection, or a threaded connection.
In this embodiment, the film covering mechanism 12 further includes a pressing member for pressing the film after covering the film on the outer wall surface of the pier. The aforesaid compresses tightly the piece and covers the in-process at the film, and the limit covers the limit compaction, avoids the production of bubble in the film, will compress tightly the piece and press one time gently on the film face, drives out the bubble in the film, makes film and pier stud avoid closely laminating, and the effectual loss and the volatilization of avoiding pier stud surface moisture have played the maintenance effect.
In the embodiment, the hoisting and hoisting equipment is connected with the hoisting mechanism 2, the bracket body 1 is annularly arranged on the periphery of the pier stud and at the bottom of the pier stud through the hoisting mechanism 2, and the starting end of the film on the film covering mechanism 12 covers the surface of the pier stud and is tightly pressed; then hoisting and hoisting equipment drives the hoisting mechanism 2 to slowly rise and rotate at the same time, so that the support body 1 is driven to slowly rise and rotate, the film coating mechanism 12 moves spirally on the outer wall surface of the pier column, the film uniformly covers the outer wall surface of the pier column in a spiral rising mode until the top of the pier column is reached, the support body 1 and the film are separated from the wall surface of the pier column through adjustment of the sliding adjusting mechanism 11, the hoisting and hoisting equipment is hoisted, one pier column maintenance work is completed, and next pier column maintenance is carried out. Or the bracket body 1 is arranged around the pier stud through the hoisting mechanism 2 and is positioned at the top of the pier stud, and the starting end of the film on the film coating mechanism 12 covers the surface of the pier stud and is tightly pressed; then hoisting and hoisting equipment drives the hoisting mechanism 2 to slowly descend and rotate at the same time, so as to drive the support body 1 to slowly descend and rotate, so that the film coating mechanism 12 moves spirally downwards on the outer wall surface of the pier column and uniformly covers the outer wall surface of the pier column with the film spirally descending till the bottom of the pier column, the support body 1 and the film are separated from the outer wall surface of the pier column through the adjustment of the sliding adjusting mechanism 11, the hoisting and hoisting equipment is hoisted to finish the maintenance work of one pier column, and the maintenance work of the next pier column is carried out
According to the utility model discloses an on the other hand still provides a pier stud maintenance construction equipment, including above-mentioned pier stud maintenance film covering device. Pier stud maintenance film covering device covers the film on the pier stud surface, collects the moisture in the concrete on the film surface, avoids the concrete can volatilize moisture at the initial stage, prevents the loss of moisture, maintains a self-maintenance environment, has solved the problem of spilling water maintenance pier stud, has reduced the maintenance expense, has improved the efficiency of construction.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. A pier stud curing film covering device is characterized in that,
comprises a bracket body (1) which is used for being annularly arranged at the periphery of a pier column to form a movable supporting structure at the periphery of the pier column,
the support body (1) is provided with a hoisting mechanism (2) which is used for connecting hoisting equipment to drive the support body (1) to move up and down along the height direction of the pier stud and rotate along the circumferential direction of the pier stud;
the support is characterized in that a sliding adjusting mechanism (11) which is used for surrounding and attaching to the outer surface of the pier stud and can move along the wall surface of the pier stud and a film coating mechanism (12) which is used for spirally winding and covering the film on the outer wall surface of the pier stud are arranged in the support body (1).
2. The pier curing film covering device according to claim 1,
the bracket body (1) comprises a first bracket (13) and a second bracket (14), the first bracket (13) and the second bracket (14) are arranged in parallel, and a supporting piece (15) for connecting and fixing the first bracket (13) and the second bracket (14) is arranged between the first bracket (13) and the second bracket (14);
the first support (13), the second support (14) and the support (15) are combined to form a space grid structure.
3. The pier curing film covering device according to claim 2,
the first bracket (13) adopts a polygonal frame or a circular frame;
the second bracket (14) adopts a polygonal frame or a circular frame;
the first bracket (13) structure is matched with the second bracket (14) structure;
the supporting piece (15) is at least one of a vertical supporting rod, an oblique supporting rod, a spiral supporting rod and a supporting truss.
4. The pier curing film covering device according to claim 2,
slide adjusting mechanism (11) including be used for with the wall rolling contact of pier stud and on the wall of pier stud self-adaptation removes universal wheel (111) with be used for adjusting the radial position of universal wheel (111) is so that universal wheel (111) top support extremely adjust pole (112) on the wall of pier stud, adjust the one end of pole (112) with universal wheel (111) are connected, it installs adjustably along the axial to adjust pole (112) on first support (13) or second support (14).
5. The pier curing film covering device according to claim 4,
the adjusting rod (112) adopts a telescopic adjusting rod; or
At least one of sliding groove connection, sliding rail connection, sliding block connection, clamping connection or threaded connection is adopted between the adjusting rod (112) and the first support (13) or between the adjusting rod (112) and the second support (14).
6. The pier curing film covering device according to claim 5,
at least three sliding adjusting mechanisms (11) are arranged on the first support (13), and the sliding adjusting mechanisms (11) are arranged on the first support (13) at equal intervals;
at least three sliding adjusting mechanisms (11) are arranged on the second support (14), and the sliding adjusting mechanisms (11) are arranged on the second support (14) at equal intervals;
the sliding adjusting mechanisms (11) on the first support (13) and the sliding adjusting mechanisms (11) on the second support (14) are arranged in a one-to-one correspondence mode, and/or the sliding adjusting mechanisms (11) on the first support (13) and the sliding adjusting mechanisms (11) on the second support (14) are arranged in a staggered mode.
7. The pier curing film covering device according to claim 2,
the film coating mechanism (12) comprises a rotating rod (123) which is used for rolling and attaching to the surface of the pier stud to coat the surface of the pier stud, and a first installation rod (121) which is used for supporting the rotating rod (123) and adjusting the relative position relationship between the rotating rod (123) and the pier stud to enable the rotating rod (123) to attach to the surface of the pier stud, wherein the first installation rod (121) is axially assembled on the first support (13) in an adjustable manner, the rotating rod (123) is movably connected to the first installation rod (121), and a film is wound on the outer surface of the rotating rod (123); and/or
Tectorial membrane mechanism (12) are including being used for the roll laminating pier stud surface is in order to right pier stud surface carries out dwang (123) of tectorial membrane, is used for supporting dwang (123) and adjusts dwang (123) with pier stud relative position relation is so that dwang (123) laminating second installation pole (122) on pier stud surface, second installation pole (122) axial adjustable assembles on second support (14), dwang (123) swing joint be in on second installation pole (122), the surface winding of dwang (123) has the film.
8. The pier curing film covering device according to claim 7,
the first mounting rod (121) and the first bracket (13) are connected through at least one of a sliding groove, a sliding rail, a sliding block, a clamping connection or a threaded connection;
the second mounting rod (122) and the second support (14) are connected through at least one of a sliding groove, a sliding rail, a sliding block, a clamping connection or a threaded connection.
9. The pier curing film covering device according to claim 7,
the film covering mechanism (12) further comprises a pressing piece for pressing the film after the film is covered on the outer wall surface of the pier column.
10. An apparatus for maintaining and constructing a pier, comprising the pier maintaining film covering apparatus of any one of claims 1 to 9.
CN201920747710.9U 2019-05-23 2019-05-23 Pier stud maintenance film covering device and pier stud maintenance construction device Active CN210086079U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920747710.9U CN210086079U (en) 2019-05-23 2019-05-23 Pier stud maintenance film covering device and pier stud maintenance construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920747710.9U CN210086079U (en) 2019-05-23 2019-05-23 Pier stud maintenance film covering device and pier stud maintenance construction device

Publications (1)

Publication Number Publication Date
CN210086079U true CN210086079U (en) 2020-02-18

Family

ID=69479603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920747710.9U Active CN210086079U (en) 2019-05-23 2019-05-23 Pier stud maintenance film covering device and pier stud maintenance construction device

Country Status (1)

Country Link
CN (1) CN210086079U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111455861A (en) * 2020-04-30 2020-07-28 丁钟魁 Pier tectorial membrane device
CN112225019A (en) * 2020-10-21 2021-01-15 中冶交通建设集团有限公司 Covering and winding device and method for pier column concrete curing material
CN112554065A (en) * 2020-11-30 2021-03-26 中国电建集团山东电力建设第一工程有限公司 Device for covering thin film of concrete pier column
CN113653350A (en) * 2021-09-18 2021-11-16 国网山东省电力公司建设公司 Concrete pier post watering curing means
CN113756182A (en) * 2021-09-05 2021-12-07 中建三局第一建设工程有限责任公司 Pier stud maintenance device and film coating construction method
CN115500184A (en) * 2022-09-01 2022-12-23 中国一冶集团有限公司 Maintenance cover device suitable for vase mound

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111455861A (en) * 2020-04-30 2020-07-28 丁钟魁 Pier tectorial membrane device
CN112225019A (en) * 2020-10-21 2021-01-15 中冶交通建设集团有限公司 Covering and winding device and method for pier column concrete curing material
CN112554065A (en) * 2020-11-30 2021-03-26 中国电建集团山东电力建设第一工程有限公司 Device for covering thin film of concrete pier column
WO2022110949A1 (en) * 2020-11-30 2022-06-02 中国电建集团山东电力建设第一工程有限公司 Apparatus for covering concrete pier column by thin film
CN113756182A (en) * 2021-09-05 2021-12-07 中建三局第一建设工程有限责任公司 Pier stud maintenance device and film coating construction method
CN113756182B (en) * 2021-09-05 2024-03-19 中建三局第一建设工程有限责任公司 Pier stud maintenance device and laminating construction method
CN113653350A (en) * 2021-09-18 2021-11-16 国网山东省电力公司建设公司 Concrete pier post watering curing means
CN113653350B (en) * 2021-09-18 2023-03-10 国网山东省电力公司建设公司 Concrete pier post watering curing means
CN115500184A (en) * 2022-09-01 2022-12-23 中国一冶集团有限公司 Maintenance cover device suitable for vase mound

Similar Documents

Publication Publication Date Title
CN210086079U (en) Pier stud maintenance film covering device and pier stud maintenance construction device
DE202015002974U1 (en) Mobile, rotating and climbing 3D building printer
CN113944363A (en) Ultrahigh chimney barrel and liner synchronous construction platform and method
CN109879179B (en) Assembled steel construction tower crane platform
CN106351441B (en) Chimney climbing formwork for construction device and construction method
CN106812300B (en) Multidirectional adjusting type operation platform for construction site and construction method thereof
CN109895117B (en) Giant telescope reflecting surface maintenance device
CN109687816B (en) Composite photovoltaic support structure system
CN206144127U (en) Simple and easy butt clamp integral type operation platform
CN210636779U (en) Protective hanging basket for high-altitude operation
CN211714495U (en) Building glass installation equipment and positioning mechanism thereof
CN212742234U (en) Aluminum alloy movable cross-bridge type hanging basket frame system
CN204490295U (en) A kind of gig
CN112897283A (en) Wind power generation tower cylinder maintenance and repair device
CN109184174B (en) Outer wall climbing frame and application method thereof
JPH08198586A (en) Movable working device for chimney
CN221521900U (en) Lifting support for building engineering construction
CN218438125U (en) House building scaffold
CN109748210B (en) Combined metal pipe pillar high-altitude robot
CN215749025U (en) Auxiliary device is used in processing of building steel member
CN219973808U (en) Uniform spraying device for protecting ancient building surface
CN110790118A (en) High-altitude component hoisting construction method
CN206360314U (en) A kind of moveable interior decoration scaffold
CN205602979U (en) Take hauler spandrel girder of leveling function
CN221346506U (en) But height-adjusting's traffic monitoring pole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant