CN210067482U - Ceiling construction platform with super high-rise hollowed-out interlayer - Google Patents

Ceiling construction platform with super high-rise hollowed-out interlayer Download PDF

Info

Publication number
CN210067482U
CN210067482U CN201920645591.6U CN201920645591U CN210067482U CN 210067482 U CN210067482 U CN 210067482U CN 201920645591 U CN201920645591 U CN 201920645591U CN 210067482 U CN210067482 U CN 210067482U
Authority
CN
China
Prior art keywords
fixed
wire rope
platform
steel wire
rise
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920645591.6U
Other languages
Chinese (zh)
Inventor
汪峰
陈龙
吴梅贵
刘东海
陈晓莉
胡奂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN BAUING CONSTRUCTION GROUP Co Ltd
Original Assignee
SHENZHEN BAUING CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN BAUING CONSTRUCTION GROUP Co Ltd filed Critical SHENZHEN BAUING CONSTRUCTION GROUP Co Ltd
Priority to CN201920645591.6U priority Critical patent/CN210067482U/en
Application granted granted Critical
Publication of CN210067482U publication Critical patent/CN210067482U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model provides a furred ceiling construction platform of superelevation layer fretwork interlayer, including fixing first mount, the second mount at the both sides floor of the unsettled position of building, hang moving platform and locate the hoist engine of first mount one side floor on the first wire rope between the two, moving platform hang through a plurality of chain block in coaster lower extreme on the first wire rope, the one end of the last second wire rope of hoist engine is fixed in moving platform is last to be close to one side of hoist engine is walked around two-way fixed pulley on first mount, twine on the reel after, again walk around the bottom of moving platform, after the two-way fixed pulley on the second mount in proper order, is fixed in one side of keeping away from the hoist engine on the moving platform. The utility model has the characteristics of the mountable is convenient, raise the efficiency, factor of safety is high.

Description

Ceiling construction platform with super high-rise hollowed-out interlayer
Technical Field
The utility model relates to a fretwork interlayer furred ceiling construction field on super high-rise building specifically is a furred ceiling construction platform of super high-rise fretwork interlayer.
Background
Along with the continuous development of urban construction, various high buildings rise up, the height of the buildings is higher and higher, the shapes of the buildings are more novel, the difficulty of building construction is increased, and particularly the construction of hollow interlayer suspended ceilings on the super high-rise buildings is realized.
The prior art is used for constructing the hollow interlayer suspended ceiling on a super high-rise building, a common method is to adopt a mode of constructing a safety frame, but the construction cost of the safety frame is high, the operation difficulty is high, and the safety factor is small by adopting a hoisting mode. In a word, to the construction of fretwork interlayer furred ceiling on the super high-rise building, prior art does not have the equipment that a set of reasonable factor of safety is high for the staff uses.
Disclosure of Invention
The to-be-solved technical problem of the utility model is to provide a furred ceiling construction platform of superelevation layer fretwork interlayer has the characteristics that the mountable is convenient, raises the efficiency, factor of safety is high.
In order to solve the technical problem, the utility model provides a furred ceiling construction platform of super high-rise fretwork interlayer, including fixing first mount, the second mount at the both sides floor of the unsettled position of building, hang the hoist engine of moving platform and locating first mount one side floor on the first wire rope between the two, moving platform hang through a plurality of chain block in coaster lower extreme on the first wire rope, the one end of the second wire rope on the hoist engine is fixed in moving platform is last to be close to one side of hoist engine, walk around two-way fixed pulley on first mount, twine on the reel after, walk around the bottom of moving platform, after the two-way fixed pulley on the second mount in proper order again, be fixed in one side of keeping away from the hoist engine on the moving platform.
Preferably, the first fixing frame and the second fixing frame each include a framework formed by two upright posts and two cross rods, two ends of the first steel wire rope are fixed to the fixing pieces on the opposite side surfaces of each group of upright posts, and the bidirectional fixed pulleys are mounted on the cross rods at lower positions.
As a preferred mode, the mobile platform comprises a base and guardrails surrounding the periphery of the base, two side faces, parallel to the first steel wire rope, of the base are respectively provided with a hanging lug, and the chain block is hung between the hanging hook of the pulley and the hanging lug.
Preferably, a steel wire rope sleeve is further sleeved between the hook of the pulley and the framework of the base.
Preferably, a third steel wire rope for hanging a safety belt of a constructor is connected between the cross rods at the upper positions of the first fixing frame and the second fixing frame.
Preferably, the first fixing frame and the second fixing frame are fixed with diagonal draw bars on the sides deviating from each other.
The utility model relates to a furred ceiling construction platform of superelevation layer fretwork interlayer compares with current design, and its advantage lies in: the device is the platform that carries out safe construction to fretwork interlayer furred ceiling on super high-rise building, has solved the problem that current furred ceiling construction operation degree of difficulty is big, factor of safety is little to improve the efficiency of fretwork interlayer furred ceiling construction, save time ensures staff's safety, also the staff's of being convenient for operation need not to build the high-altitude construction, practices thrift the cost, and the device can used repeatedly moreover, and the flexibility is strong, and multiple safety facility reduces the danger coefficient.
Drawings
Figure 1 is the utility model discloses the ceiling construction platform's of super high-rise fretwork interlayer schematic diagram.
Fig. 2 is a schematic view of the mobile platform of the present invention.
Fig. 3 is a schematic view of the fixing member of the present invention.
The reference numbers are as follows:
11-a first fixing frame, 12-a second fixing frame, 13-a diagonal draw bar, 14-a fixing piece, 141-a fixing bolt, 101-an upright post, 102-a cross bar, 102 a-a first cross bar, 102 b-a second cross bar, 103-a fixing steel plate, 21-a first steel wire rope, 22-a second steel wire rope, 23-a third steel wire rope, 30-a moving platform, 31-a base, 32-a guardrail, 33-a pulley, 34-a lug, 35-a chain block, 36-a steel wire rope sleeve, 37-a bidirectional fixed pulley, 40-a winch, 41-a motor fixing plate, 42-a motor, 43-a reduction gearbox, 44-a winding drum and 45-a control box.
Detailed Description
The utility model relates to a furred ceiling construction platform of superelevation layer fretwork interlayer, it is right with specific embodiment to combine description attached drawing 1-3 below the utility model discloses carry out the detailed description.
As shown in fig. 1, the ceiling construction platform with the super high-rise hollow interlayer comprises a first fixing frame 11, a second fixing frame 12, a moving platform 30 and a winch 40, wherein the first fixing frame 11 and the second fixing frame 12 are located on floors on two sides of a suspended position of a building, the winch 40 is located on a floor on one side of the first fixing frame and the second fixing frame, the moving platform 30 is suspended between the first fixing frame and the second fixing frame through a first steel wire rope 21, and the moving platform 30 is moved through the winch 40.
In this embodiment, the first fixing frame 11 and the second fixing frame 12 both include two vertical columns 101 and two horizontal rods 102, the two vertical columns 101 are arranged at intervals and fixed on the embedded steel plate of the building floor through a fixed steel plate 103 and a carbon steel bolt, the two horizontal rods 102 are arranged at intervals and fixed between the two vertical columns 101, the horizontal rod 102 located at the upper position is a first horizontal rod 102a, and the horizontal rod 102 located at the lower position is a second horizontal rod 102 b. In order to improve the stability of the first fixing frame 11 and the second fixing frame 12, inclined pull rods 13 are respectively fixed on opposite sides of the first fixing frame and the second fixing frame, the tops of the inclined pull rods 13 are fixed between the two ear plates on the upper portion of the upright post 101 through bolts, and the bottom ends of the inclined pull rods are fixed on embedded steel plates of a building floor through fixed steel plates 103 and carbon steel bolts.
A first steel wire rope 21 is fixed between two sets of parallel and opposite upright posts of the first fixing frame 11 and the second fixing frame 12, and two ends of the first steel wire rope 21 are fixed on fixing bolts 141 inserted in the fixing pieces 14 on opposite side surfaces of each set of upright posts through steel wire rope buckles, as shown in fig. 3. Every two pulleys are slidably hung on each first steel wire rope 21 through rollers, and the moving platform 30 is hung at the bottom ends of the four pulleys.
As shown in fig. 2, the framework of the mobile platform 30 is a box-type framework formed by a plurality of square tubes which are crossed vertically and horizontally and are connected by bolts, and the bolts are connected to be easy to disassemble later. The mobile platform 30 includes a base 31 on which an applicator worker stands and a fence 32 surrounding the base. Hanging lugs 34 are respectively fixed at positions corresponding to the four pulleys 33 one by one up and down on two side surfaces of the base 31 parallel to the first steel wire rope, and four chain blocks 35 are respectively hung between the hanging hooks of the corresponding pulleys 33 and the hanging lugs 34. The hanging lugs 34 are arranged on the frame of the base 31, so that the shaking of the mobile platform 30 is reduced, and the construction safety is improved. Due to the arrangement of the chain block 35, the heights of the four hanging points of the mobile platform 30 can be conveniently adjusted by a constructor according to the site construction requirement, and the operation flexibility is improved. In order to further improve the safety of the mobile platform 30, a steel wire rope sleeve 36 is further sleeved between the hook of the pulley 33 and the framework of the base 31, so that the mobile platform is prevented from falling off accidentally.
The winch 40 is commercially available, and is fixed on an embedded steel plate of a building floor through a motor fixing plate 41 and bolts, the motor 42 and the reduction gearbox 43 are fixed on the motor fixing plate 41 through bolts, the motor 42 and the reduction gearbox 43 are connected through a motor rotating shaft, the winding drum 44 is fixed on the rotating shaft of the reduction gearbox 43, and the motor 42 is electrically connected with the control box 45 of the winch 40.
The two-way fixed pulleys 37 are respectively installed on the opposite surfaces of the second cross bars 102b of the first fixed frame 11 and the second fixed frame 12, one end of the second steel wire rope 22 is fixed on one side of the base 31 close to the winch 40, and is fixed on one side of the base 31 far away from the winch after passing around the two-way fixed pulley 37 close to one side of the winch 40, being wound on the winding drum 44, sequentially passing around the bottom of the moving platform 30 and the two-way fixed pulley 37 far away from one side of the winch 40.
Control box 45 of hoist engine 40 can be through remote control, remote control in through the staff hand is signal transmission to control box 45 in, through control box 45 control motor 42 corotation reversal, thereby utilize the rope lock on the reel 19 to drive moving platform 30 at dangerous suspension area round trip movement, the staff of being convenient for is under construction in the dangerous area, and utilize two-way fixed pulley, let moving platform 30 slow moving, prevent that the too fast emergence scram from appearing inertia and influencing the phenomenon of constructor safety.
In order to further improve the safety of the constructors, the third steel wire rope 23 is connected to the opposite surfaces of the first cross rod 102a of the first fixing frame 11 and the second fixing frame 12, the safety belt buckle of the constructors can be hung on the third steel wire rope 10, and when an accident occurs, a plurality of safety guarantees are provided for the constructors.

Claims (6)

1. The utility model provides a furred ceiling construction platform of superelevation layer fretwork interlayer which characterized in that: comprises a first fixed frame (11) fixed on floors on two sides of a suspended position of a building, a second fixed frame (12), a mobile platform (30) hung on a first steel wire rope (21) between the first fixed frame and the second fixed frame, and a winch (40) arranged on the floor on one side of the first fixed frame (11), the mobile platform (30) is hung at the lower end of a pulley (33) on the first steel wire rope (21) through a plurality of chain blocks (35), one end of a second steel wire rope (22) on the winch (40) is fixed on one side, close to the winch (40), of the mobile platform (30), and after the second steel wire rope is wound on the winding drum (44) and bypasses the bottom of the mobile platform (30) and the bidirectional fixed pulley (37) on the second fixed frame (12) in sequence after bypassing the bidirectional fixed pulley (37) on the first fixed frame (11), is fixed on one side of the moving platform (30) far away from the winch (40).
2. The ceiling construction platform with ultra-high-rise hollowed-out interlayer of claim 1, wherein: the first fixing frame (11) and the second fixing frame (12) respectively comprise frameworks formed by two upright posts (101) and two cross rods (102), two ends of a first steel wire rope (21) are fixed on opposite side faces of each upright post (101), and the bidirectional fixed pulleys (37) are mounted on the cross rods (102) at lower positions.
3. The ceiling construction platform with the ultra-high-rise hollowed-out interlayer as claimed in claim 1 or 2, wherein: moving platform (30) include base (31) and surround in base (31) guardrail (32) all around, base (31) go up with two sides that first wire rope (21) are parallel are equipped with hangers (34) respectively, chain block (35) hang and arrange in the couple of coaster (33) with between hangers (34).
4. The ceiling construction platform with ultra-high-rise hollowed-out interlayer of claim 3, characterized in that: a steel wire rope sleeve (36) is further sleeved between the hook of the pulley (33) and the framework of the base (31).
5. The ceiling construction platform with ultra-high-rise hollowed-out interlayer of claim 2, characterized in that: and a third steel wire rope (23) for hanging safety belts of construction personnel is connected between the cross rods (102) at the upper positions of the first fixing frame (11) and the second fixing frame (12).
6. The ceiling construction platform with ultra-high-rise hollowed-out interlayer of claim 1, wherein: and the side of the first fixing frame (11) and the side of the second fixing frame (12) departing from the fixing frames are respectively fixed with a diagonal draw bar (13).
CN201920645591.6U 2019-05-06 2019-05-06 Ceiling construction platform with super high-rise hollowed-out interlayer Active CN210067482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920645591.6U CN210067482U (en) 2019-05-06 2019-05-06 Ceiling construction platform with super high-rise hollowed-out interlayer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920645591.6U CN210067482U (en) 2019-05-06 2019-05-06 Ceiling construction platform with super high-rise hollowed-out interlayer

Publications (1)

Publication Number Publication Date
CN210067482U true CN210067482U (en) 2020-02-14

Family

ID=69450709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920645591.6U Active CN210067482U (en) 2019-05-06 2019-05-06 Ceiling construction platform with super high-rise hollowed-out interlayer

Country Status (1)

Country Link
CN (1) CN210067482U (en)

Similar Documents

Publication Publication Date Title
CN104074349B (en) A kind of new-type protection type attachment type raise scaffold
CN202324571U (en) Overhanging type double-row scaffold
CN201649678U (en) Semi-automatic safety protective shed for high-rise building construction
CN109488038B (en) Method for installing beam string flexible inhaul cable spanning existing building
CN208056596U (en) A kind of Novel engineering exterior wall scaffold
CN116136122A (en) Integrated attached type inclined lifting climbing frame system and use method thereof
CN108996421B (en) Finished furniture hoisting machine and finished furniture hoisting method
CN210067482U (en) Ceiling construction platform with super high-rise hollowed-out interlayer
CN203895813U (en) Power transformer equipment maintenance rack
CN112982943A (en) Wall-attached multi-layer all-steel climbing frame structure of building
CN104652803B (en) Attached electric lifting guide rail scaffold
CN216196742U (en) A wallboard installation device for position is striden to height
CN205955164U (en) Portable steel truss operation platform
CN206328110U (en) One kind customization hanging basket apparatus
CN212689494U (en) Construction platform for building construction
CN115306137A (en) Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof
CN210419022U (en) Tower crane standard knot with safety performance
CN209468987U (en) A kind of portable operating platform for assembled main cable and girder
CN218759820U (en) Vertical shaft wellhead maintenance platform
CN211470594U (en) Anti-falling and anti-climbing device for tower crane
CN219060826U (en) Construction protection frame for building edge structural column
CN219585686U (en) Safe telescopic channel for suspended tower crane driver
CN216157124U (en) High altitude faces limit post construction operating means
CN220150833U (en) Anti-falling hanging basket for constructional engineering
CN215167838U (en) Movable overhung suspension type operating platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant