CN210067394U - High altitude construction hanging flower basket for building site - Google Patents

High altitude construction hanging flower basket for building site Download PDF

Info

Publication number
CN210067394U
CN210067394U CN201920242540.9U CN201920242540U CN210067394U CN 210067394 U CN210067394 U CN 210067394U CN 201920242540 U CN201920242540 U CN 201920242540U CN 210067394 U CN210067394 U CN 210067394U
Authority
CN
China
Prior art keywords
flower basket
hanging flower
round
construction
vacuum valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920242540.9U
Other languages
Chinese (zh)
Inventor
陈沐春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shantou Chaoyang No 1 Jianan General Corp
Original Assignee
Shantou Chaoyang No 1 Jianan General Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shantou Chaoyang No 1 Jianan General Corp filed Critical Shantou Chaoyang No 1 Jianan General Corp
Priority to CN201920242540.9U priority Critical patent/CN210067394U/en
Application granted granted Critical
Publication of CN210067394U publication Critical patent/CN210067394U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model relates to a construction hanging flower basket technical field just discloses a high altitude construction hanging flower basket for building site, including the hanging flower basket body, the equal fixed mounting in top of hanging flower basket body both sides has the circle piece, the outer fixed surface of circle piece has cup jointed the circle cover piece, and the top fixed mounting of circle cover piece has the montant, the quantity of montant is two, two the top of montant is fixed mounting first shielding plate and second shielding plate respectively. This hanging flower basket is under construction with high altitude for building site, through setting up the pneumatic cylinder, vacuum valve and sucking disc, when the pneumatic cylinder operation, will drive vacuum valve concertina movement, and then make the laminating of sucking disc and mansion's glass curtain wall, when the vacuum valve operation, will extract the air between sucking disc and the glass curtain wall, and then make the sucking disc firmly adsorb the surface at glass curtain wall, and realized the stability of construction hanging flower basket, the effectual construction hanging flower basket production of having avoided is rocked, consequently, the security of this construction hanging flower basket has been increased.

Description

High altitude construction hanging flower basket for building site
Technical Field
The utility model relates to a construction hanging flower basket technical field specifically is a high altitude construction hanging flower basket for building site.
Background
The hanging flower basket is the construction machinery of building engineering high altitude construction, acts on curtain installation and outer wall cleaning, and the hanging flower basket is one kind and can replaces traditional scaffold frame, can alleviate intensity of labour and improve work efficiency to novel aerial working equipment that can used repeatedly.
When the glass curtain wall of a building is cleaned by the conventional hanging basket, the hanging basket is suspended in the high altitude and is not provided with a corresponding fixing device, so that when a constructor walks on the hanging basket, the hanging basket is driven to shake, the safety of the constructor is further influenced, the top of the conventional hanging basket is not provided with a shielding device, the constructor still needs to bear the irradiation of rain, snow and sunlight, and the working environment of high-altitude operation is more severe.
SUMMERY OF THE UTILITY MODEL
The utility model is not enough to prior art, the utility model provides a high altitude construction hanging flower basket for building site, possess and prevent to rock and the advantage that shelters from, solved current hanging flower basket when wasing the glass curtain wall of mansion, because it suspends in midair in the high altitude, and there is not corresponding fixing device, when constructor walks about on the hanging flower basket, will drive the hanging flower basket and produce and rock, and then influence constructor's safety, and current hanging flower basket top does not shelter from the device, constructor still need bear the shining of sleet and sun highlight in the work, make the more serious problem of high altitude construction operational environment.
The utility model provides a following technical scheme: the high-altitude construction hanging basket for the construction site comprises a hanging basket body, wherein round blocks are fixedly mounted at the top ends of two sides of the hanging basket body, a round sleeve block is fixedly sleeved on the outer surface of each round block, vertical rods are fixedly mounted at the top parts of the round sleeve blocks, the number of the vertical rods is two, a first baffle plate and a second baffle plate are fixedly mounted at the top parts of the two vertical rods respectively, a clamping joint is formed between the first baffle plate and the second baffle plate, bottom blocks are fixedly mounted at the bottom part of the hanging basket body, the number of the bottom blocks is two, the two bottom blocks are symmetrical about the center of the hanging basket body, side blocks are fixedly mounted at two sides of each bottom block, a pneumatic cylinder is fixedly sleeved in the bottom block, the top end of the pneumatic cylinder penetrates through the bottom block and extends to the position above the bottom block, a vacuum valve is fixedly connected at the top end of the pneumatic cylinder, and an, the top of the vacuum valve is fixedly communicated with a connecting pipe, and the top end of the connecting pipe is fixedly communicated with a sucker.
Preferably, the inside activity of side piece is cup jointed the telescopic link, the top of telescopic link runs through the side piece and extends to the top of side piece and with the outside fixed connection of vacuum valve.
Preferably, threaded holes are formed in the bottoms of the round block and the round sleeve block, and short blocks located below the round sleeve block are fixedly mounted on the two sides of the hanging basket body.
Preferably, the internal thread of short piece has cup jointed the threaded rod, the one end of threaded rod runs through short piece and extends to the below of short piece and fixed mounting has the round button, the top of round button passes the screw hole and extends to the inside of round piece.
Preferably, the threaded hole is internally provided with threads, and the threads inside the threaded hole are matched with the threads on the outer surface of the threaded rod.
Preferably, the sum of the areas of the first shielding plate and the second shielding plate is larger than the whole area of the hanging basket body, and high-temperature-resistant paint is smeared on the outer surfaces of the first shielding plate and the second shielding plate.
Compared with the prior art, the utility model discloses possess following beneficial effect:
1. this hanging flower basket is under construction with high altitude for building site, through setting up the pneumatic cylinder, vacuum valve and sucking disc, when the pneumatic cylinder operation, will drive vacuum valve concertina movement, and then make the laminating of sucking disc and mansion's glass curtain wall, when the vacuum valve operation, will extract the air between sucking disc and the glass curtain wall, and then make the sucking disc firmly adsorb the surface at glass curtain wall, and realized the stability of construction hanging flower basket, the effectual construction hanging flower basket production of having avoided is rocked, consequently, the security of this construction hanging flower basket has been increased.
2. This high altitude construction hanging flower basket for building site through setting up first shielding plate, second shielding plate, screw hole and threaded rod, because cooperation between first shielding plate and the second shielding plate will block the shining of sleet and sun highlight to through the cooperation between threaded rod and the screw hole, when need not use sheltering from the device, can follow the surface of circle piece and dismantle first shielding plate and second shielding plate, easy to assemble and use, consequently improved the practicality of this construction hanging flower basket.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic top view of the bottom block of the present invention;
fig. 3 is a schematic side view of the round block of the present invention.
In the figure: 1. a basket body; 2. a round block; 3. a round sleeve block; 4. a vertical rod; 5. a first shielding plate; 6. a second shielding plate; 7. a bottom block; 8. a side block; 9. a pneumatic cylinder; 10. a vacuum valve; 11. a connecting pipe; 12. a suction cup; 13. a telescopic rod; 14. an exhaust pipe; 15. short blocks; 16. a threaded hole; 17. a threaded rod; 18. round buttons.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a high-altitude construction hanging basket for a construction site comprises a hanging basket body 1, round blocks 2 are fixedly mounted at the top ends of two sides of the hanging basket body 1, threaded holes 16 are formed in the bottoms of the round blocks 2 and the round sleeve blocks 3, threads are arranged in the threaded holes 16, the threads in the threaded holes 16 are matched with the threads on the outer surfaces of the threaded rods 17, so that the threaded rods 17 can be screwed into the threaded holes 16 and enter the round blocks 2, a fixing effect on the first baffle plate 5 and the second baffle plate 6 is formed, short blocks 15 positioned below the round sleeve blocks 3 are fixedly mounted at two sides of the hanging basket body 1, the threaded rods 17 are sleeved on the internal threads of the short blocks 15, one ends of the threaded rods 17 penetrate through the short blocks 15 and extend to the lower parts of the short blocks 15, round buttons 18 are fixedly mounted on the two sides of the hanging basket body 1, the top ends of the round buttons 18 penetrate through the, the outer surface of the round block 2 is fixedly sleeved with a round sleeve block 3, the top of the round sleeve block 3 is fixedly provided with two vertical rods 4, the number of the vertical rods 4 is two, the top of each of the two vertical rods 4 is respectively fixedly provided with a first baffle plate 5 and a second baffle plate 6, the sum of the areas of the first baffle plate 5 and the second baffle plate 6 is larger than the integral area of the hanging basket body 1, the outer surfaces of the first baffle plate 5 and the second baffle plate 6 are respectively coated with high-temperature-resistant paint, the first baffle plate 5 and the second baffle plate 6 can shield constructors standing inside the hanging basket body 1, because the first baffle plate 5 and the second baffle plate 6 are irradiated by external sunlight for a long time, the outer surfaces of the first baffle plate 5 and the second baffle plate 6 need to be coated with the high-temperature-resistant paint, the first baffle plate 5 and the second baffle plate 6 are clamped, the bottom block 7 is fixedly arranged at the bottom of the hanging basket body 1, two bottom blocks 7 are symmetrical about the center of the hanging basket body 1, side blocks 8 are fixedly mounted on two sides of each bottom block 7, an expansion link 13 is movably sleeved inside each side block 8, the expansion links 13 are used for enabling the vacuum valve 10 to be more stable in the motion process, the top end of each expansion link 13 penetrates through the side blocks 8 and extends to the upper portion of each side block 8 and is fixedly connected with the outer side of the vacuum valve 10, a pneumatic cylinder 9 is fixedly sleeved inside each bottom block 7, the pneumatic cylinder 9 is a conventional device and is used for controlling the vacuum valve 10 and a connecting pipe 11 to stretch, the type of each pneumatic cylinder 9 is FSC-G02-A3, the top end of each pneumatic cylinder 9 penetrates through the bottom blocks 7 and extends to the upper portions of the bottom blocks 7, the top end of each pneumatic cylinder 9 is fixedly connected with the vacuum valve 10, the vacuum valve 10 is a conventional device and is used for extracting air between each suction cup 12 and a glass curtain wall and enabling the suction cups 12 to be tightly attached to, the model of the vacuum valve 10 is GDC-Q5, the front of the vacuum valve 10 is fixedly communicated with an exhaust pipe 14, the top of the vacuum valve 10 is fixedly communicated with a connecting pipe 11, and the top of the connecting pipe 11 is fixedly communicated with a sucker 12.
When the hanging basket works, when a constructor stands inside the hanging basket body 1 and cleans a glass curtain wall of a building, the pneumatic cylinder 9 can be started at the moment, the operation of the pneumatic cylinder 9 can drive the vacuum valve 10 and the suction cup 12 to extend out, when the suction cup 12 is attached to the outer surface of the glass curtain wall, the pneumatic cylinder 9 is closed at the moment, the exhaust pipe 14 is started, the exhaust pipe 14 is operated to extract air between the suction cup 12 and the glass curtain wall through the connecting pipe 11, and further the suction cup 12 is tightly attached to the glass curtain wall, so that the hanging basket body 1 is more stable during construction, the first shielding plate 5 and the second shielding plate 6 can block rain, snow and sunlight strong light irradiation, when the first shielding plate 5 and the second shielding plate 6 are not needed to be used, the constructor can rotate out the threaded rod 17 from the inside of the threaded hole 16, and then can take down the sleeve block 3 from the outer surface of the round block 2, and the work of detaching the first shielding plate 5 and the second shielding plate 6 is completed.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a high altitude construction hanging flower basket for building site, includes hanging flower basket body (1), its characterized in that: the hanging basket is characterized in that round blocks (2) are fixedly mounted on the top ends of two sides of the hanging basket body (1), a round sleeve block (3) is fixedly sleeved on the outer surface of the round block (2), vertical rods (4) are fixedly mounted on the top of the round sleeve block (3), the number of the vertical rods (4) is two, a first baffle plate (5) and a second baffle plate (6) are fixedly mounted on the top of each vertical rod (4) respectively, the first baffle plate (5) and the second baffle plate (6) are connected in a clamping manner, a bottom block (7) is fixedly mounted on the bottom of the hanging basket body (1), the number of the bottom block (7) is two, the bottom block (7) is symmetrical about the center of the hanging basket body (1), side blocks (8) are fixedly mounted on the two sides of the bottom block (7), a pneumatic cylinder (9) is connected inside the bottom block (7), and the top end of the pneumatic cylinder (9) penetrates through the bottom block (7) and extends to the top of the bottom block (7), the top fixedly connected with vacuum valve (10) of pneumatic cylinder (9), the fixed intercommunication in front of vacuum valve (10) has blast pipe (14), the fixed intercommunication in top of vacuum valve (10) has connecting pipe (11), the fixed intercommunication in top of connecting pipe (11) has sucking disc (12).
2. An overhead construction basket for a construction site according to claim 1, wherein: the inside activity of side piece (8) is cup jointed telescopic link (13), the top of telescopic link (13) runs through side piece (8) and extends to the top of side piece (8) and with the outside fixed connection of vacuum valve (10).
3. An overhead construction basket for a construction site according to claim 1, wherein: threaded holes (16) are formed in the bottoms of the round blocks (2) and the round sleeve blocks (3), and short blocks (15) located below the round sleeve blocks (3) are fixedly mounted on the two sides of the hanging basket body (1).
4. An overhead construction basket for a construction site according to claim 3, wherein: the inside screw thread of short piece (15) has cup jointed threaded rod (17), the one end of threaded rod (17) runs through short piece (15) and extends to the below of short piece (15) and fixed mounting has round button (18), screw hole (16) are passed and extend to the inside of round piece (2) on the top of round button (18).
5. An overhead construction basket for a construction site according to claim 3, wherein: the interior of the threaded hole (16) is provided with threads, and the threads inside the threaded hole (16) are matched with the threads on the outer surface of the threaded rod (17).
6. An overhead construction basket for a construction site according to claim 1, wherein: the sum of the areas of the first shielding plate (5) and the second shielding plate (6) is larger than the whole area of the hanging basket body (1), and high-temperature-resistant paint is smeared on the outer surfaces of the first shielding plate (5) and the second shielding plate (6).
CN201920242540.9U 2019-02-26 2019-02-26 High altitude construction hanging flower basket for building site Expired - Fee Related CN210067394U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920242540.9U CN210067394U (en) 2019-02-26 2019-02-26 High altitude construction hanging flower basket for building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920242540.9U CN210067394U (en) 2019-02-26 2019-02-26 High altitude construction hanging flower basket for building site

Publications (1)

Publication Number Publication Date
CN210067394U true CN210067394U (en) 2020-02-14

Family

ID=69433052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920242540.9U Expired - Fee Related CN210067394U (en) 2019-02-26 2019-02-26 High altitude construction hanging flower basket for building site

Country Status (1)

Country Link
CN (1) CN210067394U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112938845A (en) * 2021-01-26 2021-06-11 彭述明 Mechanical limiting locking mechanism and aerial work platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112938845A (en) * 2021-01-26 2021-06-11 彭述明 Mechanical limiting locking mechanism and aerial work platform

Similar Documents

Publication Publication Date Title
CN207755226U (en) A kind of high building cleaning climbing robot
CN207023998U (en) A kind of building glass curtain wall automatic cleaning device
CN108005374A (en) Clear up the hanging basket construction method of glass curtain wall
CN106901645A (en) A kind of robot for outside Wall Cleaning
CN210067394U (en) High altitude construction hanging flower basket for building site
CN114623852B (en) Supplementary protective equipment based on survey and drawing is total powerstation monitoring for engineering
CN210144604U (en) Glass curtain wall robot
CN106073617A (en) High-building glass cleaning intelligent robot and method of work thereof
CN103610420B (en) Curtain wall of glass for high building Environment protection cleaning device
CN205777437U (en) A kind of novel architecture hanging basket
CN210814488U (en) Dust collector for house construction
CN204950830U (en) Intelligence wall is capable to clean machine people
CN207970059U (en) A kind of injecting type high-rise outer wall cleaning device
CN109720659A (en) A kind of mobile phone shell automatic packaging equipment
CN207484933U (en) A kind of hanging basket for building
CN206938904U (en) A kind of Internet of Things spider robot for cleaning and safeguarding for high building exterior wall
CN207545028U (en) A kind of suspension lifting cleaning device of outdoor architecture curtain wall
CN211143703U (en) Construction hanging basket
CN205531079U (en) Sunshade canopy
CN108104431A (en) A kind of wall plaster device
CN106725082A (en) A kind of cleaning glass machine people
CN208849731U (en) A kind of solar panel system for washing intelligently
CN202891010U (en) Novel glass brush
CN214862267U (en) BIM is with effectual architectural equipment of dust fall
CN108018803B (en) Environment-friendly self-cleaning safety guardrail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200214

Termination date: 20210226