CN210067381U - Scaffold frame that engineering construction operation was used is built in room - Google Patents
Scaffold frame that engineering construction operation was used is built in room Download PDFInfo
- Publication number
- CN210067381U CN210067381U CN201920846853.5U CN201920846853U CN210067381U CN 210067381 U CN210067381 U CN 210067381U CN 201920846853 U CN201920846853 U CN 201920846853U CN 210067381 U CN210067381 U CN 210067381U
- Authority
- CN
- China
- Prior art keywords
- wall
- welded
- sliding
- scaffold
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a scaffold frame that engineering construction operation was used is built in room, include: a support and an operation table; the quantity of support is four, four the lantern ring, adjacent two all welding of both sides vertical direction outer wall of support is connected through the joint of connecting rod with the lantern ring between the support, the operation panel sets up and is being located two with one side on the support outer wall welded slide bar. The utility model discloses in, this scaffold frame is through the scalable expansion's that sets up operation panel, can increase the working area of operation panel according to the user demand of reality, thereby satisfy the operation demand that construction was built in the room of wider within range, and the locating place of the regulation operation panel that also can be freely nimble under the sliding action of slide and slide bar, very big satisfied the operation demand that constructor was built in the room, the climbing frame makes things convenient for the quick safe climbing of constructor to carry out the construction operation on the scaffold frame simultaneously, the safety in utilization of scaffold frame has been improved.
Description
Technical Field
The utility model relates to a construction technical field is built in the room, especially relates to a scaffold frame that engineering construction operation was used is built in room.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out, and is divided into an outer scaffold and an inner scaffold according to the erected position; can divide into wood scaffold, bamboo scaffold, steel pipe scaffold according to the material difference, especially when current building construction is under construction rapid development, more need use the scaffold to build the construction and provide necessary additional action to the room.
However, the overall structure of the scaffold for the existing building engineering construction operation is relatively fixed, the operation space area of the scaffold for constructors cannot be adjusted, the operation range of the constructors is reduced, the building construction operation on a large scale cannot be performed, the safe unloading and collecting measures for the objects on the scaffold are also lacked, the situation that the objects fall off and accidentally injure the constructors on the scaffold is easy to occur, and the use safety of the scaffold is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a scaffold for building engineering construction operation.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a scaffold frame that engineering construction operation was used is built in room includes: a support and an operation table;
the number of the supports is four, and lantern rings are welded on the outer walls of the two sides of the four supports in the vertical direction;
two adjacent brackets are connected through the clamping connection of a connecting rod and a lantern ring;
the operation panel is arranged on two sliding rods welded on the outer walls of the two brackets and positioned on the same side.
As a further description of the above technical solution:
the bottom welding of support has the card post, the top welding of support has the card pipe, and the inner wall diameter of card pipe equals with the outer wall diameter size of card post.
As a further description of the above technical solution:
the outer wall welding of card post has the stopper, the spacing groove has been seted up to the inner wall of card pipe, and corresponds sliding connection between spacing groove and the stopper.
As a further description of the above technical solution:
the device also comprises a sliding seat;
the number of the sliding seats is two, and the two sliding seats are respectively welded on two sides of the bottom of the operating platform;
the bottom of two slide has all seted up the spout, and spout and slide bar sliding contact.
As a further description of the above technical solution:
also comprises a storage groove;
the number of the storage grooves is two, and the two storage grooves are symmetrically arranged on two sides of the interior of the operation table;
the inner walls of the two storage grooves are in rolling connection with the expansion plate through welded roll shafts;
the inner wall of the storage groove is hinged with the outer wall of the expansion plate through an anti-falling rope.
As a further description of the above technical solution:
the climbing frame is also included;
the top of the climbing frame is fixedly clamped on the outer wall of one of the connecting rods on the upper layer;
the inner wall welding of climbing frame has the foot bar, and the outer wall parcel of foot bar has the rubber gasket.
Advantageous effects
The utility model provides a scaffold frame that engineering construction operation was used is built in room. The method has the following beneficial effects:
(1): this scaffold frame can increase the working area of operation panel through the scalable operation panel that expands that sets up according to the user demand of reality to satisfy the operation demand that the construction was built in the room of wider within range, and also can be free nimble adjusting operation panel's locating place under the sliding action of slide and slide bar, very big satisfied the operation demand that constructor was built in the room.
(2): this scaffold frame is through the climbing frame that sets up, makes things convenient for the building constructor to be constructed the operation of being under construction on the scaffold frame fast safe, cooperates the structure of rubber gasket simultaneously for article on the scaffold frame can be collected at the quick landing of freedom on the rubber gasket, has avoided the object directly to throw away and has taken place to damage or cause the phenomenon of injury to irrelevant personnel, the effectual safety in utilization that has strengthened the scaffold frame.
Drawings
Fig. 1 is a schematic view of the overall structure of a scaffold for construction work of building construction;
FIG. 2 is a schematic structural view of the bracket of the present invention;
FIG. 3 is a schematic cross-sectional view of the joint between the clamp tube and the clamp post;
FIG. 4 is a schematic view of a partial structure of the console of the present invention;
fig. 5 is a schematic structural view of the middle climbing frame of the present invention.
Illustration of the drawings:
1. a collar; 2. a connecting rod; 3. a support; 31. clamping the pipe; 311. a limiting groove; 32. clamping the column; 321. a limiting block; 4. a slide bar; 5. an operation table; 51. a storage tank; 52. a retractable plate; 53. a roll shaft; 54. an anti-drop rope; 55. a slide base; 56. a chute; 6. a climbing frame; 61. a rubber gasket; 62. a pedal lever.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
As shown in fig. 1, a scaffold for construction work of a building construction project includes: a support 3 and a console 5;
the number of the brackets 3 is four, and the lantern rings 1 are welded on the outer walls of the two sides of the four brackets 3 in the vertical direction;
two adjacent brackets 3 are connected with the lantern ring 1 through the clamping connection of the connecting rod 2;
the operation table 5 is arranged on the sliding rods 4 welded on the outer walls of the two brackets 3 positioned on the same side.
The working principle is as follows: all the welding has lantern ring 1 on four supports 3 to it is fixed to carry out the joint through connecting rod 2 between the lantern ring 1 on two adjacent supports 3, has ensured that four supports 3 can form a comparatively complete fixed whole, forms the bearing structure of scaffold frame, and fixed connection can be carried out to 5 cooperation slide bars 4 of operation panel, plays to support to operation panel 5 and prevents the phenomenon of rocking, also makes things convenient for the room to build the personnel and stand and carry out the room construction operation on operation panel 5.
As shown in fig. 2 and 3, the bottom welding of support 3 has the card post 32, the top welding of support 3 has card pipe 31, and the inner wall diameter of card pipe 31 equals with the outer wall diameter size of card post 32, the outer wall welding of card post 32 has stopper 321, spacing groove 311 has been seted up to the inner wall of card pipe 31, and correspond sliding connection between spacing groove 311 and the stopper 321, when the overall height of scaffold frame is increased to needs, insert another support 3 card post 32 in the card pipe 31 on the next layer of support 3, spacing groove 311 in the card pipe 31 this moment can with the embedded sliding connection of stopper 321 on the card post 32, play the effect of spacing centre gripping to upper and lower two-layer support 3, ensure the stability of support 3.
As shown in fig. 4, the building construction equipment further comprises two sliding seats 55, the number of the sliding seats 55 is two, the two sliding seats 55 are respectively welded on two sides of the bottom of the operating platform 5, sliding grooves 56 are formed in the bottoms of the two sliding seats 55, and the sliding grooves 56 are in sliding contact with the sliding rod 4, so that the sliding seats 55 are in sliding connection with the sliding rod 4 through the sliding grooves 56, the position of the operating platform 5 can be adjusted on the sliding rod 4, and the building construction operation requirements of different positions are met.
As shown in fig. 4, the operation table further comprises two storage grooves 51, the two storage grooves 51 are symmetrically arranged on two sides of the inside of the operation table 5, inner walls of the two storage grooves 51 are connected with the expansion plate 52 in a rolling manner through welded roller shafts 53, the inner wall of the storage groove 51 is hinged to the outer wall of the expansion plate 52 through an anti-falling rope 54, when the expansion plate 52 is pulled to move outwards, the expansion plate 52 can move in the storage groove 51 in a rolling manner under the rolling action of the roller shafts 53, so that the overall area of the operation table 5 is increased, and the expansion plate 52 is hinged to the inner wall of the storage groove 51 through the anti-falling rope 54, so that the anti-falling protection effect can be achieved on the expansion range of the expansion plate 52, and the expansion plate 52 is prevented from slipping from the storage groove 51.
As shown in fig. 5, still include climbing frame 6, the outer wall at one of them connecting rod 2 that is located the upper strata is fixed to climbing frame 6's top joint, the inner wall welding of climbing frame 6 has foot bar 62, and foot bar 62's outer wall parcel has rubber gasket 61, foot bar 62 makes things convenient for the quick safe climbing of building constructor to carry out the construction operation on the scaffold, cooperate rubber gasket 61 simultaneously, make article on the scaffold can be collected at the quick landing of freedom on rubber gasket 61, avoided the object directly to throw down and take place to damage or cause the phenomenon of injury to irrelevant personnel, the effectual safety in utilization that strengthens the scaffold.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a scaffold frame that engineering construction operation was used is built in room which characterized in that includes: a bracket (3) and an operation table (5);
the number of the supports (3) is four, and lantern rings (1) are welded on the outer walls of the two sides of the four supports (3) in the vertical direction;
the two adjacent brackets (3) are connected with each other through the clamping connection of the connecting rod (2) and the lantern ring (1);
the operating platform (5) is arranged on two sliding rods (4) which are positioned on the same side and welded on the outer walls of the two brackets (3).
2. The scaffold for building construction work according to claim 1, wherein the clamping columns (32) are welded at the bottom of the support (3), the clamping pipes (31) are welded at the top of the support (3), and the diameter of the inner wall of each clamping pipe (31) is equal to the diameter of the outer wall of each clamping column (32).
3. The scaffold for building engineering construction operation according to claim 2, wherein the outer wall of the clamping column (32) is welded with a limiting block (321), the inner wall of the clamping tube (31) is provided with a limiting groove (311), and the limiting groove (311) is in sliding connection with the limiting block (321).
4. A scaffolding for use in house construction work according to claim 1 further including a slide carriage (55);
the number of the sliding seats (55) is two, and the two sliding seats (55) are respectively welded on two sides of the bottom of the operating platform (5);
the bottoms of the two sliding seats (55) are provided with sliding grooves (56), and the sliding grooves (56) are in sliding contact with the sliding rod (4).
5. A scaffolding for use in construction work of building construction works according to claim 1, further comprising a storage tank (51);
the number of the storage grooves (51) is two, and the two storage grooves (51) are symmetrically arranged on two sides of the interior of the operating platform (5);
the inner walls of the two storage grooves (51) are in rolling connection with the expansion plate (52) through welded roll shafts (53);
the inner wall of the storage groove (51) is hinged with the outer wall of the expansion plate (52) through an anti-falling rope (54).
6. The scaffold for house construction work according to claim 1, further comprising a climbing frame (6);
the top of the climbing frame (6) is fixedly clamped on the outer wall of one of the connecting rods (2) on the upper layer;
the inner wall of the climbing frame (6) is welded with a pedal rod (62), and the outer wall of the pedal rod (62) is wrapped with a rubber gasket (61).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920846853.5U CN210067381U (en) | 2019-06-06 | 2019-06-06 | Scaffold frame that engineering construction operation was used is built in room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920846853.5U CN210067381U (en) | 2019-06-06 | 2019-06-06 | Scaffold frame that engineering construction operation was used is built in room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210067381U true CN210067381U (en) | 2020-02-14 |
Family
ID=69456557
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920846853.5U Expired - Fee Related CN210067381U (en) | 2019-06-06 | 2019-06-06 | Scaffold frame that engineering construction operation was used is built in room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210067381U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112523484A (en) * | 2020-11-23 | 2021-03-19 | 田炳军 | Indoor decoration scaffold |
-
2019
- 2019-06-06 CN CN201920846853.5U patent/CN210067381U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112523484A (en) * | 2020-11-23 | 2021-03-19 | 田炳军 | Indoor decoration scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103206074A (en) | Elevator shaft template construction method, platform and support | |
CN210067381U (en) | Scaffold frame that engineering construction operation was used is built in room | |
CN107119904A (en) | A kind of cantilevered structure truss combined support system | |
CN206309129U (en) | A kind of novel portable safety warning fence for ocean engineering | |
CN103953081A (en) | Ballasting system for pile foundation detection of engineering | |
CN210195192U (en) | Scaffold frame that construction was used | |
CN207647137U (en) | A kind of movable operation platform for indoor high-rise working | |
CN207177249U (en) | A kind of safety-type convenient scaffold in construction site | |
CN201660323U (en) | Bracket special for unrolling rolling plate | |
CN211473327U (en) | Building external climbing type building construction operation platform | |
CN211108516U (en) | Civil engineering pipe fitting rack | |
CN104453243B (en) | Cast-in-situ concrete beam steadily enters the erection device and method of mould | |
CN107696005A (en) | A kind of construction lifting operating platform | |
CN207420098U (en) | A kind of garden architecture supporting rack | |
CN2853976Y (en) | Jacket auto-lifting radial expansion structural hanging-up for hollow-shaped building construction | |
CN206205414U (en) | A kind of elevator multilayer operating platform | |
CN209261194U (en) | A kind of fixed bracket of collapsible quick overturn-preventing for movable Scaffold | |
CN211597633U (en) | Scaffold for building engineering that can install fast | |
CN203866869U (en) | Ballasting system for detecting engineering pile foundation | |
CN210503881U (en) | Assembled shear force wall piling bin | |
CN207131074U (en) | A kind of lower drop in beam pouring molding device set based on hydraulic climbing die block system | |
CN206581578U (en) | Double-layer basket constructing device for overhanging scaffold | |
CN205476386U (en) | Novel mobile operation platform | |
CN204282839U (en) | The frame that cast-in-situ concrete beam steadily enters mould founds device | |
CN206174434U (en) | Scaffold cart |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200214 Termination date: 20210606 |
|
CF01 | Termination of patent right due to non-payment of annual fee |