CN210066726U - Solid pile with high post-pouring forming stability - Google Patents

Solid pile with high post-pouring forming stability Download PDF

Info

Publication number
CN210066726U
CN210066726U CN201920680848.1U CN201920680848U CN210066726U CN 210066726 U CN210066726 U CN 210066726U CN 201920680848 U CN201920680848 U CN 201920680848U CN 210066726 U CN210066726 U CN 210066726U
Authority
CN
China
Prior art keywords
solid pile
pile body
solid
pile
spacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920680848.1U
Other languages
Chinese (zh)
Inventor
王聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hanlong Building Material Technology Co Ltd
Original Assignee
Jiangsu Hanlong Building Material Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Hanlong Building Material Technology Co Ltd filed Critical Jiangsu Hanlong Building Material Technology Co Ltd
Priority to CN201920680848.1U priority Critical patent/CN210066726U/en
Application granted granted Critical
Publication of CN210066726U publication Critical patent/CN210066726U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a solid pile with high post-pouring forming stability, which belongs to the technical field of solid piles, and comprises a solid pile body, wherein the bottom of the solid pile body is connected with a pile foundation cap, the bottom of the pile foundation cap is connected with a pile head pad, the outer walls of four sides of the pile head pad are all provided with limiting pile columns, the middle position of the inner cavity of the solid pile body is provided with a limiting steel ring, the limiting steel ring is movably spliced with fixed steel bars, the top of the limiting steel ring is connected with a pouring pipeline, the outer walls of the left side and the right side of the middle part of the solid pile body are all provided with concrete steel plates, the other end of the concrete steel plate is connected with a lantern ring, the outer wall of the solid pile body close to the top is provided with a through hole, the movable clamping cover plate at the top of the solid pile body can conveniently control the flow rate when the concrete is poured, the structure, therefore, the overall strength and stability of the solid pile body are further enhanced.

Description

Solid pile with high post-pouring forming stability
Technical Field
The utility model relates to a solid pile technical field specifically is a solid pile that shaping stability is high is pour to back.
Background
The existing solid pile has various forms, the appearance and the inner core of the solid pile have different styles, an inner cavity is formed in the solid pile and is half of a solid body, the solid pile is difficult to place in a limiting mode in the existing production technology, and meanwhile, when concrete is poured into the inner cavity of the solid pile, the solid pile is in a semi-solid state in specification, so that pouring operation is complicated. Therefore, a solid pile with high post-pouring forming stability is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a solid pile that shaping stability is high is pour to back to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a solid pile that back pouring shaping stability is high, includes the solid pile body, the pile foundation cushion cap is connected to the bottom of solid pile body, pile bolck pad is connected to the bottom of pile foundation cushion cap, four side outer walls of pile bolck pad all set up spacing stake, the middle part position of solid pile body inner chamber sets up spacing steel ring, the fixed reinforcing bar of pegging graft in the activity on the spacing steel ring, the pouring pipeline is connected at the top of spacing steel ring, the solid pile body middle part left and right sides outer wall all sets up the concrete steel sheet, the lantern ring is connected to the other end of concrete steel sheet, the outer wall that the solid pile body is close to the top sets up the through-hole, the top activity block apron of solid pile body.
Furthermore, the pouring pipeline comprises a main pipeline integrally formed with the solid pile body, a through groove is formed in the top of the main pipeline, a main flow pipe is arranged at the left end of the main pipeline, an auxiliary flow pipe is arranged at the lower end of the left end of the main pipeline, and the auxiliary flow pipe is arranged below the main flow pipe.
Furthermore, the periphery of the top of the limiting steel ring is uniformly provided with a first limiting through hole matched with the fixed steel bar, and the middle of the top of the limiting steel ring is provided with a second limiting through hole matched with the pouring pipeline.
Further, the port of the secondary pipe in the inner cavity of the main pipe is set to be an inclined port, and the inclined angle between the inclined port of the secondary pipe and the inner wall of the main pipe is forty-five degrees.
Furthermore, the bottom of apron sets up the spacing cardboard that matches with solid pile body top through-hole, and four side outer walls of spacing cardboard evenly set up the sealed plastic lantern ring.
Furthermore, the pile head pad and the four groups of limiting pile columns are all limiting steel columns with conical columns at the head ends.
Compared with the prior art, the beneficial effects of the utility model are that:
1. when the utility model discloses when pouring concrete, the concrete flows in from the mainstream pipe in the pouring pipeline, flows in the lower half of solid pile body through spacing through-hole on the spacing steel ring, and when concrete pouring was half to solid pile body inner chamber, unnecessary concrete directly flowed out from the side flow pipe, then stop to continue to carry the concrete in the inner chamber of solid pile body can, flow when can convenient control concrete pouring, simple structure, convenient operation;
2. the utility model discloses prevent spacing steel ring at solid pile body middle part position, evenly set up spacing through-hole two on the spacing steel ring, can be convenient carry out spacing placing in the solid pile body to the bulk strength and the stability of further enhancement solid pile body.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the limiting steel ring of the present invention;
fig. 3 is the structure diagram of the pouring pipeline of the present invention.
In the figure: 1. a solid pile body; 2. pile foundation bearing platforms; 3. pile head pad; 4. a limiting steel ring; 5. fixing the steel bars; 6. pouring a pipeline; 61. a main body duct; 62. a through groove; 63. a main flow pipe; 64. a secondary tube; 7. a concrete steel plate; 8. a collar; 9. a through hole; 10. a cover plate; 11. a second limiting through hole; 12. a first limiting through hole; 13. limiting the pile.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a solid pile with high post-pouring forming stability comprises a solid pile body 1, a pile foundation cushion 2 is connected to the bottom of the solid pile body 1, a pile head pad 3 is connected to the bottom of the pile foundation cushion 2, limiting piles 13 are arranged on the outer walls of four sides of the pile head pad 3, a limiting steel ring 4 is arranged in the middle of an inner cavity of the solid pile body 1, the limiting steel ring 4 and the solid pile body 1 can be processed in an integrated forming mode or movably clamped with a pouring pipeline 6 in a follow-up mounting mode, a fixed steel bar 5 is movably inserted and connected onto the limiting steel ring 4, the top of the limiting steel ring 4 is connected with the pouring pipeline 6, concrete steel plates 7 are arranged on the outer walls of the left side and the right side of the middle of the solid pile body 1, a lantern ring 8 is connected to the other end of each concrete steel plate 7, the solid pile body 1 is convenient to be carried by a crane through the concrete steel plates 7 and the lantern, the through holes 9 can ventilate to accelerate the condensation speed of concrete in the solid pile body 1, and simultaneously reduce the wind resistance, the top of the solid pile body 1 is movably clamped with the cover plate 10.
The pouring pipeline 6 comprises a main pipeline 61 integrally formed with the solid pile body 1, a through groove 62 is formed in the top of the main pipeline 61, a main flow pipe 63 is arranged at the left end of the main pipeline 61, an auxiliary flow pipe 64 is arranged at the lower end of the left end of the main pipeline 61, the auxiliary flow pipe 64 is arranged below the main flow pipe 63, when concrete is poured, the concrete is poured through the main flow pipe 63, when the concrete is about to be poured fully, redundant concrete flows out through the auxiliary flow pipe 64, and therefore the pouring flow rate of the concrete is convenient to control;
the periphery of the top of the limiting steel ring 4 is uniformly provided with a first limiting through hole 12 matched with the fixed steel bar 5, and the middle of the top of the limiting steel ring 4 is provided with a second limiting through hole 11 matched with the pouring pipeline 6, so that the fixed steel bar 5 is in limiting insertion through the first limiting through hole 12, the fixed steel bar 5 is conveniently and uniformly arranged, the stability of the fixed steel bar is enhanced, and meanwhile, the second limiting through hole 11 is matched with the pouring pipeline 6, and the pouring of concrete is facilitated;
the port of the auxiliary pipe 64 in the inner cavity of the main body pipeline 61 is set to be an inclined port, the inclined angle between the inclined port of the auxiliary pipe 64 and the inner wall of the main body pipeline 61 is forty-five degrees, and the inclined port is arranged at the port of the auxiliary pipe 64, so that the concrete can not easily overflow in the process of pouring the concrete;
the bottom of the cover plate 10 is provided with a limiting clamping plate matched with a through hole at the top of the solid pile body 1, the outer walls of four sides of the limiting clamping plate are uniformly provided with sealing plastic lantern rings, and the top of the solid pile body 1 is packaged through the cover plate 10 to ensure the sealing of the top of the solid pile body 1;
pile head pad 3 and four spacing piles 13 of group all are the spacing steel column that the head end is the toper post, and stability when strengthening solid pile body 1 installation.
Example (b): when the solid pile is poured, firstly, the fixed steel bar 5 is put in from the top of the solid pile body 1, the limited insertion is carried out through the first limit through hole 12 at the top of the limit steel ring 4, then directly pouring concrete into the solid pile body 1 from the pouring pipeline 6 on the solid pile body, wherein the concrete flows into the pouring pipeline 6 from the main flow pipe 63 and flows into the lower half part of the solid pile body 1 through the second limiting through hole 11 on the limiting steel ring 4, when concrete is poured into the half of the inner cavity of the solid pile body 1, the excess concrete directly flows out of the auxiliary flow pipe 64, and then, stopping continuously conveying concrete into the inner cavity of the solid pile body 1, condensing the concrete in the inner cavity of the solid pile body 1, clamping the cover plate 10 at the top of the solid pile body 1, and finally, fixedly installing the solid pile body 1 through the pile foundation bearing platform 2, the pile head pad 3 and the limiting pile column 13.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a solid pile that back pouring shaping stability is high, includes solid pile body (1), its characterized in that: pile foundation cushion (2) is connected to the bottom of solid pile body (1), pile head pad (3) is connected to the bottom of pile foundation cushion (2), four side outer walls of pile head pad (3) all set up spacing stake (13), the middle part position of solid pile body (1) inner chamber sets up spacing steel ring (4), spacing steel ring (4) are gone up the activity and are pegged graft fixed reinforcement (5), pouring pipeline (6) are connected at the top of spacing steel ring (4), solid pile body (1) middle part left and right sides outer wall all sets up concrete steel sheet (7), the lantern ring (8) is connected to the other end of concrete steel sheet (7), the outer wall that solid pile body (1) is close to the top sets up through-hole (9), top activity block apron (10) of solid pile body (1).
2. The post-cast solid pile with high stability according to claim 1, wherein: the pouring pipeline (6) comprises a main pipeline (61) integrally formed with the solid pile body (1), a through groove (62) is formed in the top of the main pipeline (61), a main flow pipe (63) is arranged at the left end of the main pipeline (61), an auxiliary flow pipe (64) is arranged at the lower end of the left end of the main pipeline (61), and the auxiliary flow pipe (64) is arranged below the main flow pipe (63).
3. The post-cast solid pile with high stability according to claim 1, wherein: the top of spacing steel ring (4) evenly sets up all around with spacing through-hole one (12) that fixed steel bar (5) match, the middle part at spacing steel ring (4) top sets up with pouring pipeline (6) the spacing through-hole two (11) that match.
4. The post-cast solid pile with high stability according to claim 2, wherein: the port of the auxiliary pipe (64) in the inner cavity of the main body pipeline (61) is set to be an inclined port, and the inclined angle between the inclined port of the auxiliary pipe (64) and the inner wall of the main body pipeline (61) is forty-five degrees.
5. The post-cast solid pile with high stability according to claim 1, wherein: the bottom of apron (10) sets up the spacing cardboard that matches with solid pile body (1) top through-hole, and four side outer walls of spacing cardboard evenly set up sealed plastic lantern ring.
6. The post-cast solid pile with high stability according to claim 1, wherein: the pile head pad (3) and the four groups of limiting pile columns (13) are all limiting steel columns with conical columns at the head ends.
CN201920680848.1U 2019-05-14 2019-05-14 Solid pile with high post-pouring forming stability Active CN210066726U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920680848.1U CN210066726U (en) 2019-05-14 2019-05-14 Solid pile with high post-pouring forming stability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920680848.1U CN210066726U (en) 2019-05-14 2019-05-14 Solid pile with high post-pouring forming stability

Publications (1)

Publication Number Publication Date
CN210066726U true CN210066726U (en) 2020-02-14

Family

ID=69451906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920680848.1U Active CN210066726U (en) 2019-05-14 2019-05-14 Solid pile with high post-pouring forming stability

Country Status (1)

Country Link
CN (1) CN210066726U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335213A (en) * 2020-03-07 2020-06-26 佛山舒宜添科技有限公司 Bridge construction is with safe isolating device that stability is good

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335213A (en) * 2020-03-07 2020-06-26 佛山舒宜添科技有限公司 Bridge construction is with safe isolating device that stability is good

Similar Documents

Publication Publication Date Title
CN106968381A (en) With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection
CN210066726U (en) Solid pile with high post-pouring forming stability
CN205976072U (en) Assembly type structure wall body and prefabricated concrete structure
CN201377141Y (en) Reinforcing steel bar positioning clamp of reinforced concrete column
CN209837848U (en) Integral casting concrete supporting structure of inverted cone water tower water tank
CN207747197U (en) A kind of prefabricated wind power tower equipmentization mold of high-precision
CN210482090U (en) Reinforcing device for reinforcing pier by cofferdam-free underwater section increasing method
CN105155838B (en) A kind of quick detachable high-strength building formwork
CN106545038A (en) A kind of static load test device
CN207750651U (en) A kind of concrete pump pipe temporary blocking device
CN103669389A (en) Corrugated pipe fixing method for positioning foundation bolt
CN217175793U (en) Movable assembly type box column grouting device
CN205975996U (en) Thick liquid anchor lap joint structure and wall body
CN207376649U (en) U-type groove side wall no pulling rod formwork integrated with barricade and the faced wall being made of the template
CN213440883U (en) Lid beam mold board forming device with injection molding performance
CN205976532U (en) Sleeve grout connection structure and wall body
CN105648991B (en) The construction method of power station bulb-type tubular hydro set flow passage gradual change section
CN204899949U (en) Bow -shaped steel pipe back up support
CN207018008U (en) A kind of shield duct piece
CN209874074U (en) Porous inclined plane slip casting embedded pipe
CN104264668B (en) Stake mould of X-shaped Model Pile and preparation method thereof
CN207003462U (en) A kind of special-shaped assembled ground beam template
CN104989103A (en) Concrete filled steel tube pumping lifting-up stop valve installation method
CN206702167U (en) A kind of twin elbow mould
CN221850627U (en) Concrete integral pouring guide device for prefabricating box culvert sections

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant