CN210064941U - Equipment transportation trolley - Google Patents
Equipment transportation trolley Download PDFInfo
- Publication number
- CN210064941U CN210064941U CN201920899529.XU CN201920899529U CN210064941U CN 210064941 U CN210064941 U CN 210064941U CN 201920899529 U CN201920899529 U CN 201920899529U CN 210064941 U CN210064941 U CN 210064941U
- Authority
- CN
- China
- Prior art keywords
- equipment
- girder
- crossbeam
- equipment transportation
- transportation trolley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses an equipment transportation dolly, including two girders and crossbeam, the girder bottom is provided with removes the wheel, and two girder parallel are placed, and the crossbeam can be dismantled to stride and establish in two girder tops, and the crossbeam is used for the bearing by haulage equipment, offers the through-hole that is used for connecting draw gear on the girder. The problem of among the prior art inconvenient construction when erection equipment in the chemical industry factory building has effectively been solved.
Description
Technical Field
The utility model belongs to the technical field of the transportation equipment, more specifically, the utility model relates to an equipment travelling bogie.
Background
In chemical engineering construction, the equipment needs to be installed and dismantled in a plant frame, but because the plant frame has smaller interlayer spacing and the channel is also provided with obstacles such as an equipment foundation, pipelines and the like, large hoisting machinery cannot enter the plant frame for construction, and the equipment is difficult to install.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an equipment transportation trolley to solve the inconvenient problem of construction when erection equipment in the chemical industry factory building among the prior art.
In order to achieve the purpose, the utility model provides an equipment transportation trolley, including two girders and crossbeam, the girder bottom is provided with removes the wheel, and two girder parallel are placed, and the crossbeam can be dismantled to stride and establish in two girder tops, and the crossbeam is used for the bearing by haulage equipment, offers the through-hole that is used for connecting draw gear on the girder.
Further, the moving wheels adopt straight ground cows which are welded at the bottoms of the main beams.
Further, the lateral part of the beam is provided with a limit plate.
Further, the crossbeam passes through high strength bolt and is connected with the girder.
Further, the cross beam is arranged perpendicular to the main beam.
Further, the main beams and the cross beams are both made of I-shaped steel.
Further, the upper surface of the cross beam is paved with a cushion plate.
Further, the backing plate is a wood plate.
Use the technical scheme of the utility model, the crossbeam forms stable in structure's simple beam with the girder, place on the crossbeam by the front end of haulage equipment, the rear end is hoisted through hoisting equipment, draw gear is connected to the through-hole on the crossbeam, pull through draw gear, will be removed to mounted position department by haulage equipment, then will be hoisted by haulage equipment's front end through predetermined chain fall again, take out equipment travelling bogie from being taken out under the haulage equipment, will be placed on the installation base station by haulage equipment at last, the transportation and the installation of equipment have just so been accomplished, the inconvenient problem of construction when effectively having solved erection equipment in the chemical industry factory building among the prior art.
Drawings
The accompanying drawings, which form a part of the present application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 shows a schematic structural view of an embodiment of an equipment transportation trolley according to the invention;
fig. 2 shows an installation schematic of an embodiment of the equipment transportation trolley according to the invention;
FIG. 3 shows a schematic right-view of the structure of FIG. 1;
fig. 4 shows a schematic top view of fig. 1.
Detailed Description
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
It is noted that, unless otherwise indicated, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs.
In the present invention, unless stated to the contrary, directional terms such as "upper, lower, top, bottom" are used with respect to the orientation shown in the drawings, or with respect to itself in the vertical, perpendicular, or gravitational direction; likewise, for ease of understanding and description, "inner and outer" are inner and outer relative to the profile of the components themselves, but the above directional terms are not intended to limit the invention.
In order to solve the inconvenient problem of construction when erection equipment among the prior art in the chemical industry factory building, the utility model provides an equipment transportation dolly.
As shown in fig. 1-4, an equipment transportation trolley comprises two main beams 1 and a cross beam 2, wherein the bottom of the main beam 1 is provided with a moving wheel 6, the two main beams 1 are placed in parallel, the cross beam 2 is detachably arranged above the two main beams 1 in a straddling manner, the cross beam 2 is used for supporting transported equipment 9, and the main beam 1 is provided with a through hole 8 for connecting a traction device.
Use the technical scheme of this embodiment, crossbeam 2 forms stable in structure's simple beam with girder 1, place on crossbeam 2 by the front end of haulage equipment 9, the rear end is hoisted through hoisting equipment, draw gear is connected to through-hole 8 on crossbeam 2, pull through draw gear, will be removed to mounted position department by haulage equipment 9, then will be hoisted by the front end of haulage equipment 9 through predetermined chain block again, take out equipment travelling bogie from being taken out under haulage equipment 9, will be placed on the installation base station by haulage equipment 9 at last, the transportation and the installation of equipment have just so been accomplished, the inconvenient problem of construction when effectively having solved erection equipment in the chemical industry factory building among the prior art.
In this embodiment, the removal wheel 6 adopts the ground cattle of going straight, the ground cattle of going straight passes through the connecting plate 7 welding in the bottom of girder 1, 2 lateral parts of crossbeam are provided with two limiting plates 4, the lower extreme welding of limiting plate 4 is at the upper surface of girder 1, the vertical butt of limiting plate 4 is in one side of crossbeam 2, limiting plate 4 can be made by the angle steel, crossbeam 2 passes through high strength bolt 3 and is connected with girder 1, and crossbeam 2 is placed perpendicular to girder 1, girder 1 and crossbeam 2 are made by the I-steel, in order to protect by haulage equipment 9, lay backing plate 5 at the upper surface of crossbeam 2, backing plate 5 is the optional plank.
The during operation will the utility model discloses a dolly prevents to have the loop wheel machine to hoist in equipment fixing base station A department, and the front end of equipment is moved to base station B under draw gear's drive, and when the saddle 10 of the front end of equipment removed base station B department, stopped the dolly, hoists the front end of equipment through predetermined chain block, takes out the dolly, and equipment lifts by crane down with the chain block jointly at the loop wheel machine this moment, removes to base station A and base station B on, the transportation and the installation of the equipment of just accomplishing like this.
From the above description, it can be seen that the above-mentioned embodiments of the present invention achieve the following technical effects: the problem of among the prior art inconvenient construction when erection equipment in the chemical industry factory building has effectively been solved.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (8)
1. The utility model provides an equipment transportation dolly which characterized in that, includes two girders and crossbeam, the girder bottom is provided with removes the wheel, two girder parallel placement, the crossbeam can be dismantled to stride to establish two the girder top, the crossbeam is used for the bearing by haulage equipment, set up the through-hole that is used for connecting draw gear on the girder.
2. The equipment transportation trolley of claim 1, wherein the moving wheels are straight ground bulls welded to the bottom of the main beam.
3. The equipment transportation trolley according to claim 1, wherein the lateral beam is provided with a limit plate.
4. The equipment transportation trolley according to claim 1, wherein the cross beam is connected to the main beam by a high-strength bolt.
5. The equipment transportation trolley of claim 1, wherein the cross beam is disposed perpendicular to the main beam.
6. The equipment transportation trolley of claim 1, wherein the main beams and cross beams are each made of i-steel.
7. The equipment transportation cart of claim 1, wherein a dunnage plate is laid on an upper surface of the cross-beam.
8. The equipment transportation cart of claim 7, wherein the skid is a wooden board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920899529.XU CN210064941U (en) | 2019-06-15 | 2019-06-15 | Equipment transportation trolley |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920899529.XU CN210064941U (en) | 2019-06-15 | 2019-06-15 | Equipment transportation trolley |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210064941U true CN210064941U (en) | 2020-02-14 |
Family
ID=69426785
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920899529.XU Active CN210064941U (en) | 2019-06-15 | 2019-06-15 | Equipment transportation trolley |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210064941U (en) |
-
2019
- 2019-06-15 CN CN201920899529.XU patent/CN210064941U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105421249A (en) | Novel dragging- hoisting combined type hanging basket structure and construction method | |
CN203529768U (en) | Portal crane walking for operation on building surface | |
CN203269274U (en) | Slope section rail type conveying device | |
CN105484162B (en) | Suspension bridge construction stiff girder secondary on the bank swings moving device and method | |
CN108560927A (en) | A kind of Lift-on/Lift-off System and its application method of reinforced concrete column | |
CN102837705B (en) | Traveling bogie in steel box | |
CN111038940A (en) | Rail mounted is used for hoist and mount traction system of transportation | |
CN202879487U (en) | Transfer carriage in steel box | |
CN210288140U (en) | Simple and easy prefabricated decking hoist and mount platform truck | |
CN104060543A (en) | Installation device of prefabricated bridge deck | |
CN108625270A (en) | Nose girder gantry crane installs bridge prefabrication box girder construction method | |
CN210064941U (en) | Equipment transportation trolley | |
CN108946467A (en) | A kind of cart for 7.65m four-cart track installation | |
CN202220400U (en) | Lap-joint type formwork support beam | |
CN106320190A (en) | Platform of bridge maintenance, consolidation and suspension construction | |
CN215055466U (en) | Discharging platform for high-rise building | |
CN205369040U (en) | Suspension bridge is under construction on bank stiffening beam secondary and is swung and move device | |
CN213738242U (en) | Horizontal installation utility tool for internal parts of large tower | |
JP6873435B2 (en) | Suspended scaffolding and its erection method | |
CN205474639U (en) | A rail travelling bogie that is used for bridge floor railway to lay rail welding rail production line | |
JP6137103B2 (en) | Overhead crane traveling girder reinforcement method and suspension jig used in this method | |
CN103287986A (en) | Curtain board transport lifting device and method for mounting curtain board by using device | |
CN216625115U (en) | Cable vehicle-mounted transportation and laying integrated device | |
CN212893519U (en) | Front girder lengthening structure applied to shore bridge | |
CN211342958U (en) | Subway shield pipe wall walking device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |