CN210029824U - Novel tower crane is adhered to device - Google Patents
Novel tower crane is adhered to device Download PDFInfo
- Publication number
- CN210029824U CN210029824U CN201920686104.0U CN201920686104U CN210029824U CN 210029824 U CN210029824 U CN 210029824U CN 201920686104 U CN201920686104 U CN 201920686104U CN 210029824 U CN210029824 U CN 210029824U
- Authority
- CN
- China
- Prior art keywords
- supporting rod
- bracing piece
- tower crane
- rod
- adhering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a novel tower crane is adhered to device, include with the adhering to pole that the tower crane is connected, still include with the rack that the other end of adhering to the pole is connected, the utility model discloses simple structure, the setting of rack can satisfy tower crane and building apart from needs far away, and the length of steelframe can set up according to on-the-spot actual conditions, arranges in a flexible way, simple manufacture, and application range is wide.
Description
Technical Field
The utility model relates to a building technical field, concretely relates to novel tower crane adheres to device.
Background
With the continuous development of national economic construction and the continuous increase of super high-rise building construction projects, the tower crane serves as a main vertical transportation machine for high and large building construction and plays an irreplaceable role in construction operation. The tower crane attachment is a device for fixing a designed frame on a building by using an attachment pull rod when the use height of the tower crane exceeds the independent height, can increase the firmness degree of the tower crane, cannot cause safety accidents in the hoisting process due to overhigh height, plays a decisive role in the installation height and the stability of the tower crane, however, the attachment of the common tower crane is generally about 4.5 meters, the attachment device consists of four sets of frame beams and three attachment support rods, the four sets of frame beams are fastened into an attachment frame by 24 sets of M24 bolts, nuts and gaskets, the three attachment support rods are hinged with the tower crane at the top of the attachment frame, connecting lug seats are hinged with the attachment positions of the building at the end parts of the three attachment support rods, when the distance from the building is larger, when the length of the attached stay bar is insufficient, the frame beam cannot be connected with a building, so that the tower crane cannot be fixed with the building, and potential safety hazards exist in the process of use.
Therefore, the problem that the attachment device can be connected with a building and can fix the tower crane when the distance between the tower crane and the building is large is worth researching.
Disclosure of Invention
In order to solve the defects existing in the prior art, the utility model provides a novel tower crane attachment device with simple structure and convenient use.
The purpose of the utility model is realized like this:
the utility model provides a novel tower crane is adhered to device, include with the adhering to the pole that the tower crane is connected, still include with the rack that the other end of adhering to the pole is connected, the rack includes first bracing piece, second bracing piece, third bracing piece, fourth bracing piece, fifth bracing piece and sixth bracing piece, the sixth bracing piece is located the one end of first bracing piece, second bracing piece, third bracing piece, fourth bracing piece and fifth bracing piece and with first bracing piece, second bracing piece, third bracing piece, fourth bracing piece and fifth bracing piece are perpendicular, the other end of first bracing piece, second bracing piece, third bracing piece, fourth bracing piece and fifth bracing piece passes through clamp plate and building structure board fixed connection, and the adhering to the pole passes through the connecting piece and is connected with the sixth bracing piece.
The first supporting rod, the second supporting rod, the third supporting rod, the fourth supporting rod and the fifth supporting rod are sequentially arranged from left to right, and connecting rods for reinforcing are arranged among the first supporting rod, the second supporting rod, the third supporting rod, the fourth supporting rod and the fifth supporting rod.
The first supporting rod, the second supporting rod, the third supporting rod, the fourth supporting rod and the fifth supporting rod are Q235-220mm multiplied by 8mm channel steel, the connecting rod adopts Q235-250-6mm channel steel, and the connecting rod is welded with the first supporting rod, the second supporting rod, the third supporting rod, the fourth supporting rod and the fifth supporting rod.
The connecting rod is located between the building structure panel and the attachment rod.
Adhere to the pole and pass through adhere to the piece respectively with sixth bracing piece and tower crane swing joint, sixth bracing piece and tower crane all with adhere to piece fixed connection.
The attaching bar includes a first attaching bar, a second attaching bar, and a third attaching bar.
And the left end and the right end of the pressing plate are respectively provided with a fixing hole for a bolt to pass through.
Has the positive and beneficial effects that: the utility model discloses simple structure, the setting of rack can satisfy tower crane and building apart from the needs far away, and the length of steelframe can set up according to on-the-spot actual conditions, arranges in a flexible way, simple manufacture, and application range is wide.
Drawings
Fig. 1 is a schematic structural view of the present invention;
in the figure, the following steps are carried out: the tower crane comprises a tower crane 1, a first attachment rod 2, a second attachment rod 3, a third attachment rod 4, a connecting piece 5, a net rack 6, a first support rod 7, a second support rod 8, a third support rod 9, a fourth support rod 10, a fifth support rod 11, a sixth support rod 12, a connecting rod 13 and a pressing plate 14.
Detailed Description
The present invention will be further explained with reference to the drawings and examples.
As shown in fig. 1, a novel tower crane attachment device comprises an attachment rod connected with the tower crane 1, and further comprises a net rack 6 connected with the other end of the attachment rod, wherein the net rack 6 comprises a first support rod 7, a second support rod 8, a third support rod 9, a fourth support rod 10, a fifth support rod 11 and a sixth support rod 12, the sixth support rod 12 is positioned at one end of the first support rod 7, the second support rod 8, the third support rod 9, the fourth support rod 10 and the fifth support rod 11 and is perpendicular to and welded with the first support rod 7, the second support rod 8, the third support rod 9, the fourth support rod 0 and the fifth support rod 11, the other end of the first support rod 7, the second support rod 8, the third support rod 9, the fourth support rod 10 and the fifth support rod 11 is fixedly connected with a building structural plate through a pressing plate 14, the left end and the right end of the pressing plate 14 are respectively provided with a fixing hole for a bolt to pass through, the attachment rod is connected with a sixth supporting rod 12 through a connecting piece 5, a first supporting rod 7, a second supporting rod 8, a third supporting rod 9, a fourth supporting rod 10 and a fifth supporting rod 11 which extend into the part of the building structure plate are firmly pressed by a steel pressing plate 14, the joints of the first supporting rod 7, the second supporting rod 8, the third supporting rod 9, the fourth supporting rod 0 and the fifth supporting rod 11 and the pressing plate 14 must be welded firmly, and a high-strength bolt penetrates through the building structure plate through a fixing hole, so that the net rack 6 is fixedly connected with the building structure plate.
Example 1
The first supporting rod 7, the second supporting rod 8, the third supporting rod 9, the fourth supporting rod 10 and the fifth supporting rod 11 are sequentially arranged from left to right and are arranged in parallel, a connecting rod 13 for reinforcement is arranged between the first supporting rod 7, the second supporting rod 8, the third supporting rod 9, the fourth supporting rod 10 and the fifth supporting rod 11, the first supporting rod 7, the second supporting rod 8, the third supporting rod 9, the fourth supporting rod 10 and the fifth supporting rod 11 are Q235-220mm multiplied by 8mm channel steel, the first supporting rod 7, the second supporting rod 8, the third supporting rod 9, the fourth supporting rod 10 and the fifth supporting rod 11 with different lengths can be selected at any time according to the distance between the site tower crane 1 and a building, the use is flexible, the requirements of different sites are met, or the prefabrication can be carried out in advance, the connecting rod 13 adopts Q235-250-6mm channel steel, connecting rod 13 with first bracing piece 7, second bracing piece 8, third bracing piece 9, fourth bracing piece 10 and fifth bracing piece 11 all weld, connecting rod 13 is located between building structure board and the anchorage bar, and connecting rod 13 differs in size, and welding between connecting rod 13 and first bracing piece 7, second bracing piece 8, third bracing piece 9, fourth bracing piece 10 and the fifth bracing piece 11 increases rack 6's fastness, makes tower crane 1 and the outer facade firm in connection of building superstructure through wire rope at last, ensures the security.
Adhere to the pole and pass through adnexed part 5 respectively with 1 swing joint of sixth bracing piece 12 and tower crane, adhere to pole and 5 pin hub connections of adnexed part, sixth bracing piece 12 and tower crane 1 all with adnexed part 5 welding, it includes that first adnexed rod 2, second adnexed rod 3 and third adhere to pole 4 to adhere to the pole.
The utility model discloses simple structure, the setting of rack can satisfy tower crane and building apart from the needs far away, and the length of steelframe can set up according to on-the-spot actual conditions, arranges in a flexible way, simple manufacture, and application range is wide.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.
Claims (7)
1. The utility model provides a novel tower crane is adhered to device, include with the adhering to pole that the tower crane is connected, its characterized in that: still include with the rack that the other end of adhering to the pole is connected, the rack includes first bracing piece, second bracing piece, third bracing piece, fourth bracing piece, fifth bracing piece and sixth bracing piece, the sixth bracing piece is located the one end of first bracing piece, second bracing piece, third bracing piece, fourth bracing piece and fifth bracing piece and with first bracing piece, second bracing piece, third bracing piece, fourth bracing piece and fifth bracing piece are perpendicular, the other end of first bracing piece, second bracing piece, third bracing piece, fourth bracing piece and fifth bracing piece passes through clamp plate and building structural slab fixed connection, and the adhering to the pole passes through the connecting piece and is connected with the sixth bracing piece.
2. The novel tower crane attachment device of claim 1, wherein: the first supporting rod, the second supporting rod, the third supporting rod, the fourth supporting rod and the fifth supporting rod are sequentially arranged from left to right, and connecting rods for reinforcing are arranged among the first supporting rod, the second supporting rod, the third supporting rod, the fourth supporting rod and the fifth supporting rod.
3. The novel tower crane attachment device of claim 2, wherein: the first supporting rod, the second supporting rod, the third supporting rod, the fourth supporting rod and the fifth supporting rod are Q235-220mm multiplied by 8mm channel steel, the connecting rod adopts Q235-250-6mm channel steel, and the connecting rod is welded with the first supporting rod, the second supporting rod, the third supporting rod, the fourth supporting rod and the fifth supporting rod.
4. The novel tower crane attachment device of claim 3, wherein: the connecting rod is located between the building structure panel and the attachment rod.
5. The novel tower crane attachment device of claim 1, wherein: the adhering rod is respectively and movably connected with a sixth supporting rod and a tower crane through an adhering piece, and the sixth supporting rod and the tower crane are fixedly connected with the adhering piece.
6. The novel tower crane attachment device of claim 1, wherein: the attaching bar includes a first attaching bar, a second attaching bar, and a third attaching bar.
7. The novel tower crane attachment device of claim 1, wherein: and the left end and the right end of the pressing plate are respectively provided with a fixing hole for a bolt to pass through.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920686104.0U CN210029824U (en) | 2019-05-14 | 2019-05-14 | Novel tower crane is adhered to device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920686104.0U CN210029824U (en) | 2019-05-14 | 2019-05-14 | Novel tower crane is adhered to device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210029824U true CN210029824U (en) | 2020-02-07 |
Family
ID=69365274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920686104.0U Expired - Fee Related CN210029824U (en) | 2019-05-14 | 2019-05-14 | Novel tower crane is adhered to device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210029824U (en) |
-
2019
- 2019-05-14 CN CN201920686104.0U patent/CN210029824U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107100187B (en) | Tower crane steel girder erection structure and installation method | |
CN108316557B (en) | V-shaped circular tube column structure and mounting method thereof | |
CN112695952A (en) | Building roof truss support structure and construction method | |
CN214995799U (en) | Tool type wall hanging cantilever frame | |
CN214498388U (en) | Assembled overhanging formwork support bent | |
CN206345617U (en) | Building tower crane attachment device is received in a kind of | |
CN210029824U (en) | Novel tower crane is adhered to device | |
CN206319597U (en) | A kind of cantilever steel girder erecting device | |
CN212376021U (en) | Steel corbel and support-free installation connecting node comprising same | |
CN208516837U (en) | One kind is for borehole filling pile cage of reinforcement overlapped hanging apparatus | |
CN203347204U (en) | Overhung scaffold | |
CN202766974U (en) | Bent cap bearing frame without full framing | |
CN211920714U (en) | Support system of pull-up and pull-down type external hanging self-climbing tower crane | |
CN215107164U (en) | Novel construction handling frame of encorbelmenting that can provide high position post to consolidate and use | |
CN209228053U (en) | Large cantilever combined type anchor curable type steel operation platform | |
CN213538700U (en) | Supporting structure for concrete construction of cantilever end of steel-concrete composite beam bridge | |
CN107700824A (en) | Bar type wall-attached frame | |
CN204850068U (en) | Connection structure of side column and crane beam tip in steel construction | |
CN212224677U (en) | Temporary fixing adjusting system for drop position of section steel beam | |
CN209228054U (en) | Large cantilever combined type anchors Bailey beam operation platform | |
CN220620679U (en) | Steel beam suspender structure device | |
CN207032671U (en) | Steel and concrete post and the attachment structure of steel and concrete post and Vierendeel girder | |
CN201605583U (en) | Connecting node of steel structure trussed beam and prestressed concrete tubular pile | |
CN111794485A (en) | Assembled type outer frame-free construction protection platform structure for shear wall structure and manufacturing method | |
CN201296995Y (en) | Combined connecting structure of corrugated steel web plate in box beam bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200207 |
|
CF01 | Termination of patent right due to non-payment of annual fee |