CN210013513U - Assembled case room - Google Patents

Assembled case room Download PDF

Info

Publication number
CN210013513U
CN210013513U CN201920215185.6U CN201920215185U CN210013513U CN 210013513 U CN210013513 U CN 210013513U CN 201920215185 U CN201920215185 U CN 201920215185U CN 210013513 U CN210013513 U CN 210013513U
Authority
CN
China
Prior art keywords
top surface
plate
steel
short
long
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920215185.6U
Other languages
Chinese (zh)
Inventor
窦向峰
贺康峰
赵银龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Dongfang Freshwater River Steel Structure Engineering Co Ltd
Original Assignee
Beijing Dongfang Freshwater River Steel Structure Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Dongfang Freshwater River Steel Structure Engineering Co Ltd filed Critical Beijing Dongfang Freshwater River Steel Structure Engineering Co Ltd
Priority to CN201920215185.6U priority Critical patent/CN210013513U/en
Application granted granted Critical
Publication of CN210013513U publication Critical patent/CN210013513U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to an assembled box house, which relates to the house field for construction sites and comprises a steel structure chassis, a steel structure top plate and steel support columns, wherein a composite wall body is arranged between the adjacent steel support columns; the steel structure chassis comprises a bottom surface long beam and a bottom surface short beam; the steel structure top plate comprises a top surface long beam and a top surface short beam; the steel structure top disc is provided with a top surface light steel keel, and the top surface light steel keel comprises a top surface vertical keel and a top surface transverse keel; on the vertical fossil fragments of top surface, the both ends of the vertical fossil fragments of top surface are provided with the vaulting pole connecting piece, and the horizontal fossil fragments overlap joint of top surface is on the vertical fossil fragments of top surface, and the both ends overlap joint of the horizontal fossil fragments of top surface is on the top surface short beam moreover. The utility model discloses have and to let the staff can finish the installation of top surface light gauge steel fast when installing top surface light gauge steel, still need not carry out the effect of lifting top surface light gauge steel when docking top surface light gauge steel and top surface long beam with the top surface short beam.

Description

Assembled case room
Technical Field
The utility model belongs to the technical field of the room for the building site and specifically relates to an assembled case room is related to.
Background
The container house, also called container house, container prefabricated house and container house is a house with windows and doors, which is mainly made of containers as basic materials and is slightly modified. The container house is commonly used as a dormitory of workers on a construction site, and is also used as a renting house by people, so that the container house is firm and durable and is convenient to build. Thus, the container house is also referred to as a people container.
Chinese patent with grant publication number CN207526174U discloses a house box house, is in including steel construction chassis, steel construction roof tray and setting the steel support column in steel construction chassis and steel construction roof tray four corners, be provided with the cotton compound bottom surface of glass on the steel construction chassis, be provided with the rock wool board on the steel construction roof tray, be provided with the PVC veneer on the rock wool board, be provided with the cotton compound wall body of glass between the adjacent steel support column, the steel construction chassis is connected with the bottom of steel support column through lower corner fittings, the steel construction roof tray is connected with the top of steel support column through last corner fittings.
The above prior art solutions have the following drawbacks: still mentioned in the above-mentioned patent and be provided with top surface light gauge steel on the steel construction top dish, steel construction top dish includes two top surface long beams and two top surface short beams, and the top surface long beam passes through the upper corner fittings to be connected with the top surface short beam, and top surface light gauge steel includes the vertical fossil fragments of top surface and sets up the horizontal fossil fragments of top surface on the vertical fossil fragments of top surface, and whole top surface fossil fragments all use bolted connection, and the top of top surface long beam and top surface short beam is provided with sunken top surface escape canal.
However, in actual installation, the top surface vertical keels and the top surface transverse keels are arranged together in a grid shape, and the top surface vertical keels and the top surface transverse keels are arranged on the same plane, so that a plurality of top surface vertical keels and top surface transverse keels which are fixedly connected in a crossed manner exist on the top surface light gauge steel, therefore, when an operator arranges the top surface light gauge steel, the top surface vertical keels and the top surface transverse keels need to be fixedly connected together firstly, the top surface vertical keels and the top surface transverse keels are connected together through bolts, when the top surface light gauge steel is installed, the operator needs to fixedly connect the top surface vertical keels and the top surface transverse keels together one by one, and when the top surface light gauge steel is connected, the operator needs to butt joint the top surface light gauge steel, the top surface long beam and the top surface short beam, and needs to lift the top surface light gauge steel for a, the supporting of the top surface light steel keel is released after the butt joint fixing is completed, so that the working personnel need to spend more time to install the top surface light steel keel when assembling the box room, and the assembly efficiency of the working personnel is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an assembled case room, it can let the staff can finish the installation of top surface light gauge steel fast when installing top surface light gauge steel, still need not lift top surface light gauge steel when will dock top surface light gauge steel and top surface long beam with the top surface short beam.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
an assembled box house comprises a steel structure chassis, a steel structure top plate and steel support columns arranged at four corners of the steel structure chassis and the steel structure top plate, wherein a composite wall body is arranged between every two adjacent steel support columns;
the steel structure chassis comprises two bottom surface long beams and two bottom surface short beams, and the bottom surface long beams are connected with the bottom surface short beams through lower corner pieces; the steel structure top plate comprises two top surface long beams and two top surface short beams, and the top surface long beams are connected with the top surface short beams through upper corner pieces;
the steel structure top disc is provided with a top surface light steel keel, and the top surface light steel keel comprises a top surface vertical keel and a top surface transverse keel arranged on the top surface vertical keel;
the top surface vertical keel is provided with a support rod connecting piece at two ends, the support rod connecting piece comprises a lap joint plate and a connecting plate fixedly connected with the lap joint plate to form a T shape, two fixing plates are vertically and fixedly connected with two sides of the connecting plate, the fixing plates are provided with first through holes, and the fixing plates are provided with second through holes;
the top surface vertical keel is lapped on the top surface long beam;
the top surface horizontal keel overlap joint is on the vertical keel of top surface, and the both ends overlap joint of top surface horizontal keel is on the top surface short-beam moreover.
Through adopting above-mentioned technical scheme, when installing the vaulting pole connecting piece on the vertical fossil fragments of top surface, the opening direction of the vertical fossil fragments of top surface is downward, and the bolt passes and penetrates on the vertical fossil fragments of top surface from the first through-hole on the overlap joint board of vaulting pole connecting piece for vaulting pole connecting piece and top surface vertical fossil fragments fixed connection are in the same place.
When the vertical fossil fragments of installation top surface, the vaulting pole connecting piece and the contact of the long roof beam of top surface at the vertical fossil fragments both ends of top surface, the fixed plate overlap joint of vaulting pole connecting piece is on the long roof beam of top surface, and the staff passes the bolt from the second through-hole on the fixed plate of vaulting pole connecting piece and penetrates on the long roof beam of top surface moreover for the vertical fossil fragments of top surface is in the same place with the long roof beam fixed connection of top surface. Through setting up the vaulting pole connecting piece for the staff is when installing the vertical fossil fragments of top surface, and the staff only need install the vaulting pole connecting piece at the both ends of the vertical fossil fragments of top surface, just can pass through the lapped mode with the vertical fossil fragments of top surface and connect on the long roof beam of top surface, is calibrating, wears to establish the bolt, makes things convenient for fixed connection on the long roof beam of top surface with the vertical fossil fragments of top surface, thereby need not let the staff lift the vertical fossil fragments of top surface always. When the top surface transverse keel is installed, the top surface transverse keel is lapped on the top surface vertical keel, and two ends of the top surface transverse keel are lapped on the top surface short beam. Through with the horizontal fossil fragments overlap joint of top surface on the vertical fossil fragments of top surface, when the staff is installing the horizontal fossil fragments of top surface together with the vertical fossil fragments of top surface, the staff can be quick install the horizontal fossil fragments of top surface on the vertical fossil fragments of top surface.
To sum up, when installing top surface light gauge steel, let the staff can finish the installation of top surface light gauge steel fast when installing top surface light gauge steel, still need not lift top surface light gauge steel when will butt joint top surface light gauge steel and top surface long beam with the top surface short beam.
The utility model discloses further set up to: and the lower side of the top surface light steel keel is fixedly connected with a ceiling board.
Through adopting above-mentioned technical scheme, prevent that the people in the case room from directly seeing top surface horizontal fossil fragments and top surface vertical keel.
The utility model discloses further set up to: a top surface long matching plate and a top surface short matching plate which are equal in length to the top surface long beam and the top surface short beam are fixedly connected above the top surface long beam and the top surface short beam; a long matching plate drainage groove is formed on the top surface long matching plate through bending, and a short matching plate drainage groove is formed on the top surface short matching plate through bending; a plurality of outer roof plates are arranged between the long top plate and the short top plate;
the roof outer plates are arranged side by side, and the edges of the roof outer plates are lapped on the top surface long distribution plate and the top surface short distribution plate and are positioned on the upper sides of the long distribution plate drainage grooves and the short distribution plate drainage grooves.
Through adopting above-mentioned technical scheme, both can press down top surface light gauge steel with the long board of joining in marriage of top surface and the short board of joining in marriage of top surface for top surface light gauge steel arranges more firmly, also can hide the box room top with the roofing planking, prevents that the rainwater from flowing into in the box room. In addition, a plurality of roofing planks are butted and fixedly connected with each other, are convenient to seal the roof, and set up the edge of roofing planks at the upside of long distribution plate water drainage tank and short distribution plate water drainage tank in addition for the rainwater that falls on roofing planks is convenient for flow into and is discharged in long distribution plate water drainage tank and the short distribution plate water drainage tank.
The utility model discloses further set up to: and support plates for supporting the top surface short matching plate are fixedly connected to two ends of the top surface transverse matching plate.
Through adopting above-mentioned technical scheme, let the top surface transversely join in marriage the board and receive the support of backup plate for the top surface transversely joins in marriage the more firm stability that the board was arranged.
The utility model discloses further set up to: the two ends of the top surface long matching plate and the top surface short matching plate are provided with drain pipes, and the drain pipes penetrate into the upper corner fittings;
the other end of the drain pipe penetrates into the lower corner fitting, and a hole for rainwater to flow out is formed in the lower corner fitting.
Through adopting above-mentioned technical scheme, get into the rainwater in long joining in marriage board water drainage tank and the short joining in marriage board water drainage tank and flow into the drain pipe to arrange to the external world via the drain pipe.
The utility model discloses further set up to: the bottoms of the long distribution plate drainage grooves and the short distribution plate drainage grooves are of structures with high middle parts and low two sides.
Through adopting above-mentioned technical scheme, when the rainwater fell on long joining in marriage board water drainage tank and short joining in marriage board water drainage tank, the rainwater flows to the drain pipe more easily for the rainwater in long joining in marriage board water drainage tank and the short joining in marriage board water drainage tank is convenient for flow to the drain pipe in, flows away from the drain pipe.
The utility model discloses further set up to: the drain pipe is arranged on the steel support column and is fixedly connected with the steel support column.
Through adopting above-mentioned technical scheme, can select the drain pipe as the tubular metal resonator, with the steel support post welding together, also can hoop the steel support post with the drain pipe together through the clamp for the arrangement of drain pipe is more firm stable.
The utility model discloses further set up to: the composite wall body shields the drain pipe.
Through adopting above-mentioned technical scheme, let the drain pipe can not directly expose outside.
The utility model discloses further set up to: each roof outer plate is provided with a supporting plate and a lap joint part which are integrally formed with the roof outer plate, and the supporting plate part and the lap joint part are positioned on the same surface of the roof outer plate and are vertically arranged on two sides of the width direction of the roof outer plate;
the lap joint part comprises a vertical plate vertically connected with the outer roof plate and a transverse plate vertically connected with the vertical plate, and the transverse plate and the outer roof plate are arranged on the same side of the vertical plate;
the supporting plate is perpendicular to the outer roof plate.
Through adopting above-mentioned technical scheme, when the installation roofing planking, the staff with a roofing planking overlap joint on the board is joined in marriage to the top surface length and the board is joined in marriage to the top surface short, the staff is again with the overlap joint on another roofing planking in the backup pad. Butt joint position department between two roofing planking has backup pad and overlap joint portion that the overlap joint is in the same place, and backup pad and overlap joint portion seal the butt joint position between two roofing planking, and when the rainwater fell on the roofing planking, the rainwater that flows can receive blockking of backup pad and overlap joint portion to make the rainwater can't flow to the roof via the contact position between two roofing planking on.
To sum up, the utility model discloses a beneficial technological effect does:
1. when the top surface light steel keel is installed, workers can quickly finish the installation of the top surface light steel keel when installing the top surface light steel keel, and the top surface light steel keel does not need to be lifted when the top surface light steel keel, the top surface long beam and the top surface short beam are butted;
2. the drainage pipe is arranged, so that rainwater on the roof can be conveniently drained;
3. by improving the outer roof plates, rainwater cannot flow onto the top plate through the contact position between the two outer roof plates.
Drawings
FIG. 1 is a schematic view of an assembled housing of the present embodiment;
FIG. 2 is a schematic view of the present embodiment with the top cross runners overlapping the top vertical runners;
FIG. 3 is a schematic view of the upper corner of the box house in this embodiment;
FIG. 4 is a schematic view of the outer roof panel of this embodiment;
fig. 5 is a schematic view of the strut connector of this embodiment.
In the figure, 1, a steel structure chassis; 11. a bottom surface long beam; 12. a bottom short beam; 2. a steel structure top plate; 21. a top long beam; 22. a top short beam; 23. a top vertical keel; 24. a top surface transverse keel; 25. a top surface long matching plate; 251. a long distribution plate drainage groove; 26. a top short matching plate; 261. a short distribution plate drainage groove; 27. a strut connecting member; 271. a lap plate; 272. a connecting plate; 273. a fixing plate; 274. a first through hole; 275. a second through hole; 28. a support plate; 29. a roof outer panel; 291. a support plate; 292. a lap joint section; 3. a steel support column; 4. a composite wall; 5. a lower corner fitting; 6. an upper corner fitting; 7. a ceiling plate; 8. and a water discharge pipe.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses an assembled box house, including steel structure chassis 1, steel structure roof dish 2 and the steel support column 3 of setting in steel structure chassis 1 and steel structure roof dish 2 four corners, be provided with the cotton compound bottom surface of glass on the steel structure chassis 1, be provided with the cotton compound wall body 4 of glass between the adjacent steel support column 3, the wall adopts the design of no fossil fragments, and steel structure chassis 1 is connected with steel support column 3's bottom through lower corner fittings 5, and steel structure roof dish 2 is connected with steel support column 3's top through last corner fittings 6.
Specifically, the steel structure chassis 1 includes two bottom surface long beams 11 and two bottom surface short beams 12, the bottom surface long beam 11 is connected with the bottom surface short beam 12 through the lower corner fitting 5, and the bottom surface long beam 11 is connected with the bottom surface short beam 12 through the lower corner fitting 5.
As shown in fig. 1 and 2, the steel structure top plate 2 is provided with a top surface light steel keel, the steel structure top plate 2 comprises two top surface long beams 21 and two top surface short beams 22, the top surface long beams 21 are connected with the top surface short beams 22 through upper corner pieces 6, and the top surface light steel keel comprises a top surface vertical keel 23 and a top surface transverse keel 24 arranged on the top surface vertical keel 23. A top long matching plate 25 and a top short matching plate 26 which have the same length as the top long beam 21 and the top short beam 22 are fixedly connected above the top long beam 21 and the top short beam 22. Wherein, the top surface vertical keel 23 and the top surface horizontal keel 24 are both omega-shaped steel. The two ends of the top surface vertical keel 23 are lapped on the top surface long beam 21.
As shown in fig. 2 and 5, the brace connecting members 27 are disposed at two ends of the top vertical keel 23 on the top vertical keel 23, each brace connecting member 27 includes a bridging plate 271 and a connecting plate 272 fixedly connected to the bridging plate 271 to form a T-shape, each of the bridging plate 271 and the connecting plate 272 is a quadrilateral plate, two fixing plates 273 are vertically and fixedly connected to two sides of the connecting plate 272, the width of the fixing plate 273 is the same as that of the connecting plate 272, a first through hole 274 is formed in each fixing plate 273, a second through hole 275 is formed in each fixing plate 273, the distance between the two fixing plates 273 is the same as that of the top vertical keel 23, the brace connecting members 27 are mounted at two ends of the top vertical keel 23, when the brace connecting member 27 is mounted on the top vertical keel 23, the opening direction of the top vertical keel 23 is downward, a bolt passes through the second through hole 275 formed in the fixing plate 273 of the brace connecting member 27 and penetrates through, so that the brace connector 27 is fixedly connected with the top vertical keel 23.
When installing top surface vertical keel 23, the vaulting pole connecting piece 27 at top surface vertical keel 23 both ends contacts with top surface long beam 21, specifically is the overlap plate 271 fixed connection of vaulting pole connecting piece 27 on top surface vertical keel, and the staff passes and penetrates the top surface vertical keel with the bolt on the first through-hole 274 on the overlap plate 271 of vaulting pole connecting piece 27 for top surface vertical keel 23 is in the same place with vaulting pole connecting piece fixed connection, then passes bolt fixed connection on the top surface long beam with the fixed plate 273 of vaulting pole connecting piece. Through setting up vaulting pole connecting piece 27 for the staff is when installing top surface vertical keel 23, and the staff only need install vaulting pole connecting piece 27 at the both ends of top surface vertical keel 23, just can connect top surface vertical keel 23 on top surface long beam 21 through the lapped mode, is calibrating, wears to establish the bolt, makes the convenient fixed connection of top surface vertical keel 23 on top surface long beam 21, thereby need not let the staff lift top surface vertical keel 23 always.
After the top vertical keel 23 is completed, the worker installs the top cross keel 24. When the top surface cross keel 24 is installed, the top surface cross keel 24 is lapped on the top surface vertical keel 23, and both ends of the top surface cross keel 24 are lapped on the top surface short girder 22. Through overlapping the top surface cross keel 24 on the top surface vertical keel 23, when the staff installs the top surface cross keel 24 together with the top surface vertical keel 23, the staff can install the top surface cross keel 24 on the top surface vertical keel 23 fast.
The ceiling plate 7 is fixedly connected to the lower side of the top light steel keel, so that people in the box room can be prevented from directly seeing the top transverse keel 24 and the top vertical keel 23.
As shown in fig. 2 and 3, the top long matching plate 25 is bent to form a long matching plate drain groove 251, and the top short matching plate 26 is bent to form a short matching plate drain groove 261. The top long matching plate 25 is lapped on two ends of the top vertical keel 23 and contacts with the brace rod connecting piece 27, and two ends of the top transverse matching plate are fixedly connected with the support plates 28 for supporting the top short matching plate 26. In order to allow the top long matching plate 25 and the top short matching plate 26 to be firmly mounted on the top long beam 21 and the top short beam 22, both ends of the top long matching plate 25 and the top short matching plate 26 penetrate into the upper corner fitting 6.
A plurality of external roof panels 29 are arranged between the long top panel 25 and the short top panel 26, the external roof panels 29 are arranged side by side, and the edges of the external roof panels 29 are lapped on the long top panel 25 and the short top panel 26 and are positioned on the upper sides of the long panel drain grooves 251 and the short panel drain grooves 261. The drain pipes 8 are provided at both ends of the top surface long matching plate 25 and the top surface short matching plate 26, and the drain pipes 8 penetrate into the upper corner fitting 6, and rainwater entering the long matching plate drain groove 251 and the short matching plate drain groove 261 flows into the drain pipes 8. The other end of the drain pipe 8 penetrates into the lower corner fitting 5 and flows to the outside from the hole in the lower corner fitting 5.
Wherein, the tank bottoms of the long distribution board water draining groove 251 and the short distribution board water draining groove 261 are set to be of a structure with high middle and low two sides, when rainwater falls into the long distribution board water draining groove 251 and the short distribution board water draining groove 261, the rainwater flows into the drain pipe 8 more easily, so that the rainwater in the long distribution board water draining groove 251 and the short distribution board water draining groove 261 can flow into the drain pipe 8 conveniently and flow away from the drain pipe 8.
The drain pipe 8 is arranged on the steel support column 3, and is fixedly connected with the steel support column 3, so that the drain pipe 8 can be selected as a metal pipe and welded with the steel support column 3, and the steel support column 3 and the drain pipe 8 can be hooped together through a hoop. The composite wall 4 shields the drain pipe 8, so that the drain pipe 8 is not directly exposed outside.
In order to prevent rainwater falling on the outer roof panel 29 from flowing into the box room from the contact position between the two outer roof panels 29, as shown in fig. 1 and 4, a support plate 291 and a lap portion 292 formed integrally with the outer roof panel 29 are provided on each outer roof panel 29, and the stay plate 28 and the lap portion 292 are provided on the same surface of the outer roof panel 29 and are provided vertically on both sides in the width direction of the outer roof panel 29. The overlapping portion 292 includes a vertical plate vertically connected to the outer roof panel 29 and a horizontal plate vertically connected to the vertical plate, and the horizontal plate is disposed on the same side of the vertical plate as the outer roof panel 29. The support plate 291 is perpendicular to the outer roof panel 29. When installing the outer roof panels 29, the worker overlaps one outer roof panel 29 with the top long panel 25 and the top short panel 26, and then overlaps the overlapping portion 292 of the other outer roof panel 29 with the support plate 291. The butt joint position between two external roof plates 29 has the supporting plate 291 and the lap joint portion 292 which are lapped together, the supporting plate 291 and the lap joint portion 292 close the butt joint position between two external roof plates 29, and when rainwater falls on the external roof plates 29, the flowing rainwater can be blocked by the supporting plate 291 and the lap joint portion 292, so that the rainwater cannot flow to the top plate through the contact position between the two external roof plates 29.
In order to make the connection of the outer roof panel 29 more firm, the outer roof panel 29 can be connected to the top long matching plate 25 and the top short matching plate 26 by means of bolts, or can be connected to the top long matching plate 25 and the top short matching plate 26 by means of welding.
The implementation principle of the embodiment is as follows: the staff only need install vaulting pole connecting piece 27 at the both ends of top surface vertical keel 23, just can connect top surface vertical keel 23 on top surface long beam 21 through the lapped mode, calibrate, wear to establish the bolt, make the convenient fixed connection of top surface vertical keel 23 on top surface long beam 21, thereby need not let the staff lift top surface vertical keel 23 always, the staff is when installing top surface horizontal keel 24 and top surface vertical keel 23 together, the staff can be quick installs top surface horizontal keel 24 on top surface vertical keel 23.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (9)

1. An assembled box house comprises a steel structure chassis (1), a steel structure top plate (2) and steel support columns (3) arranged at four corners of the steel structure chassis (1) and the steel structure top plate (2), wherein a composite wall body (4) is arranged between every two adjacent steel support columns (3), the steel structure chassis (1) is connected with the bottom ends of the steel support columns (3) through lower corner pieces (5), and the steel structure top plate (2) is connected with the top ends of the steel support columns (3) through upper corner pieces (6);
the steel structure chassis (1) comprises two bottom surface long beams (11) and two bottom surface short beams (12), wherein the bottom surface long beams (11) are connected with the bottom surface short beams (12) through lower corner pieces (5); the steel structure top plate (2) comprises two top surface long beams (21) and two top surface short beams (22), wherein the top surface long beams (21) are connected with the top surface short beams (22) through upper corner pieces (6);
the method is characterized in that: a top surface light steel keel is arranged on the steel structure top plate (2), and the top surface light steel keel comprises a top surface vertical keel (23) and a top surface transverse keel (24) arranged on the top surface vertical keel (23);
on the top surface vertical keel (23), two ends of the top surface vertical keel (23) are provided with strut connecting pieces (27), each strut connecting piece (27) comprises a lapping plate (271) and a connecting plate (272) fixedly connected with the lapping plate (271) to form a T shape, two fixing plates (273) are vertically and fixedly connected to two sides of the connecting plate (272), a first through hole (274) is formed in each fixing plate (273), and a second through hole (275) is formed in each fixing plate (273);
the top surface vertical keel (23) is lapped on the top surface long beam (21);
the top surface transverse keel (24) is lapped on the top surface vertical keel (23), and two ends of the top surface transverse keel (24) are lapped on the top surface short beam (22).
2. The prefabricated box house of claim 1, wherein: and a ceiling plate (7) is fixedly connected to the lower side of the top surface light steel keel.
3. The prefabricated box house of claim 1, wherein: a top surface long matching plate (25) and a top surface short matching plate (26) which are as long as the top surface long beam (21) and the top surface short beam (22) are fixedly connected above the top surface long beam (21) and the top surface short beam (22); a long matching plate drainage groove (251) is formed on the top surface long matching plate (25) through bending, and a short matching plate drainage groove (261) is formed on the top surface short matching plate (26) through bending; a plurality of outer roof plates (29) are arranged between the long top plate (25) and the short top plate (26);
a plurality of the external roof panels (29) are arranged side by side, and the edges of the external roof panels (29) are lapped on the top long distribution plate (25) and the top short distribution plate (26) and are positioned at the upper sides of the long distribution plate drainage grooves (251) and the short distribution plate drainage grooves (261).
4. A fabricated box house according to claim 3, wherein: and support plates (28) for supporting the top surface short matching plate (26) are fixedly connected to two ends of the top surface transverse matching plate.
5. The prefabricated box house of claim 4, wherein: the two ends of the top surface long matching plate (25) and the top surface short matching plate (26) are provided with drain pipes (9), and the drain pipes (9) penetrate into the upper corner fittings (6);
the other end of the drain pipe (9) penetrates into the lower corner fitting (5), and a hole for rainwater to flow out is formed in the lower corner fitting (5).
6. The prefabricated box house of claim 5, wherein: the bottoms of the long distribution plate drainage grooves (251) and the short distribution plate drainage grooves (261) are both of a structure with a high middle part and two low sides.
7. The prefabricated box house of claim 6, wherein: the drain pipe (9) is arranged on the steel support column (3) and is fixedly connected with the steel support column (3).
8. The prefabricated box house of claim 7, wherein: the composite wall body (4) shields the drain pipe (9).
9. The prefabricated box house of claim 8, wherein: each outer roof panel (29) is provided with a supporting plate (291) and a lap joint part (292) which are integrally formed with the outer roof panel (29), and the supporting plate (28) part and the lap joint part (292) are positioned on the same surface of the outer roof panel (29) and are vertically arranged on two sides of the outer roof panel (29) in the width direction;
the lap joint part (292) comprises a vertical plate vertically connected with the outer roof plate (29) and a transverse plate vertically connected with the vertical plate, and the transverse plate and the outer roof plate (29) are arranged on the same side of the vertical plate;
the supporting plate (291) is perpendicular to the outer roof plate (29).
CN201920215185.6U 2019-02-19 2019-02-19 Assembled case room Expired - Fee Related CN210013513U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920215185.6U CN210013513U (en) 2019-02-19 2019-02-19 Assembled case room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920215185.6U CN210013513U (en) 2019-02-19 2019-02-19 Assembled case room

Publications (1)

Publication Number Publication Date
CN210013513U true CN210013513U (en) 2020-02-04

Family

ID=69312868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920215185.6U Expired - Fee Related CN210013513U (en) 2019-02-19 2019-02-19 Assembled case room

Country Status (1)

Country Link
CN (1) CN210013513U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115262872A (en) * 2022-08-29 2022-11-01 北京诚栋国际营地集成房屋股份有限公司 Full-detachable box-type house waterproof roof structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115262872A (en) * 2022-08-29 2022-11-01 北京诚栋国际营地集成房屋股份有限公司 Full-detachable box-type house waterproof roof structure
CN115262872B (en) * 2022-08-29 2023-09-05 北京诚栋国际营地集成房屋股份有限公司 Waterproof roofing structure of case-like room of tearing open entirely

Similar Documents

Publication Publication Date Title
CN109779015B (en) Assembly type steel structure integrated green building and design and installation process thereof
CN113136940A (en) Prefabricated building unit, assembly type building with roof and construction method
CN206752676U (en) Assembled architecture agent structure
KR20110013731A (en) Set-up constructions for construction architecture
CN110359556A (en) The bean column node of assembling type steel structure built-in inserted plate quadrate steel pipe column end plate connection
CN108867869A (en) A kind of separate type bracket node structure and production method, Housing Structure System for beam column of steel structure connection
CN210013513U (en) Assembled case room
CN219316021U (en) Steel construction building plate body structure and connected node
CN108265827A (en) A kind of quick assembled type steel house
CN107700840A (en) Formwork structure
CN111155709A (en) Assembled roof truss system
CN209114604U (en) One kind is for rolling girder steel and the rigidly connected node structure of steel column and Housing Structure System
CN109356338A (en) Steel skeleton daughter's wall construction
KR102149128B1 (en) Pre-fabricated column with angle-type reinforcing bar
CN210316016U (en) Quick assembling joint structure with steel skeleton structure
KR20190126530A (en) Pre-fabricated column with angle-type reinforcing bar
CN212001905U (en) Assembled roof truss system
CN210828545U (en) High canned type assembled concrete water tank
CN211818417U (en) Assembled concrete pond
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure
CN209799462U (en) Assembly box house convenient to drainage
CN205348384U (en) Antidetonation local -style dwelling houses steel framework
CN207633655U (en) Outer gutter formwork structure
CN210713251U (en) Supporting structure of assembled concrete filled steel tube beam column node
JP5174786B2 (en) Rafter unit for roof construction, roof construction block and roof construction method of building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200204

Termination date: 20210219

CF01 Termination of patent right due to non-payment of annual fee