CN210713251U - Supporting structure of assembled concrete filled steel tube beam column node - Google Patents
Supporting structure of assembled concrete filled steel tube beam column node Download PDFInfo
- Publication number
- CN210713251U CN210713251U CN201921209660.5U CN201921209660U CN210713251U CN 210713251 U CN210713251 U CN 210713251U CN 201921209660 U CN201921209660 U CN 201921209660U CN 210713251 U CN210713251 U CN 210713251U
- Authority
- CN
- China
- Prior art keywords
- column
- connecting plate
- plate
- steel pipe
- assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑结构构件领域,具体而言,涉及一种装配式钢管混凝土梁柱节点的支撑结构。The utility model relates to the field of building structural components, in particular to a support structure of an assembled concrete-filled steel tube beam-column joint.
背景技术Background technique
传统高层钢结构住宅中,钢管支撑连接节点的做法通常是采用直接焊接或者栓焊连接的连接方式,这种连接方式首先需要在钢管的上部开洞,然后对侧壁进行用螺栓连接或者焊接,最后再把洞口用钢板补上,这种方式的缺点是构造复杂,加工及安装难度大,现场焊接量大,质量可控性差。In traditional high-rise steel structure houses, the method of steel pipe supporting and connecting nodes is usually direct welding or bolt welding connection. This connection method first requires opening a hole in the upper part of the steel pipe, and then bolting or welding the side wall. Finally, the hole is filled with steel plates. The disadvantage of this method is that the structure is complex, the processing and installation are difficult, the on-site welding volume is large, and the quality controllability is poor.
随着钢结构建筑的普及和高度的增加,对其支撑节点区域的承载能力、施工速度、项目成本及抗震性能提出了更高的要求,支撑节点区域的连接应满足如下要求:1、要有足够的刚度,满足“强节点、弱构件”的要求;2、实现所有构件工厂制作,现场安装,避免现场焊接;3、施工方便,缩短施工周期,节约项目成本。With the popularity and height of steel structure buildings, higher requirements are put forward for the bearing capacity, construction speed, project cost and seismic performance of the support node area. The connection of the support node area should meet the following requirements: 1. There must be Sufficient rigidity to meet the requirements of "strong joints and weak components"; 2. Realize all components factory-made, installed on site, and avoid on-site welding; 3. Convenient construction, shorten the construction period, and save project costs.
实用新型内容Utility model content
本实用新型的主要目的在于提供一种满足上述要求的装配式钢管混凝土梁柱节点的支撑结构。The main purpose of the present utility model is to provide a support structure for an assembled concrete-filled steel tube beam-column joint that meets the above requirements.
为了实现上述目的,本实用新型的装配式钢管混凝土梁柱节点的支撑结构,包括钢管混凝土组合柱和H型钢梁,钢管混凝土组合柱包括中心钢管柱和端部钢管柱;In order to achieve the above purpose, the support structure of the assembled CFST beam-column joint of the present invention includes a CFST composite column and an H-shaped steel beam, and the CFST composite column includes a central steel tube column and an end steel tube column;
H型钢梁与端部钢管柱连接,呈对角线的梁柱节点之间设置有斜撑组件;The H-shaped steel beam is connected with the steel pipe column at the end, and diagonal bracing components are arranged between the diagonal beam-column nodes;
斜撑组件包括斜撑和斜撑两端的安装组件,安装组件包括组件Ⅰ和组件Ⅱ;The diagonal bracing components include diagonal bracing and installation components at both ends of the diagonal bracing, and the installation components include component I and component II;
组件Ⅰ包括连接板Ⅰ和侧板Ⅰ,连接板Ⅰ为对称结构,其相互垂直的两个侧边分别固定在端部钢管柱和H型钢梁上,另外两个对称的侧边上均固定有侧板Ⅰ;The component I includes a connecting plate I and a side plate I. The connecting plate I is a symmetrical structure, and its two mutually perpendicular sides are respectively fixed on the end steel pipe column and the H-shaped steel beam, and the other two symmetrical sides are fixed. With side plate I;
组件Ⅱ包括连接板Ⅱ和侧板Ⅱ,连接板Ⅱ为对称结构,一端的宽度大于另一端,较宽一端的对称的两个侧边上均固定有侧板Ⅱ;Component II includes a connecting plate II and a side plate II, the connecting plate II is a symmetrical structure, the width of one end is larger than the other end, and the two symmetrical sides of the wider end are fixed with the side plate II;
连接板Ⅰ和连接板Ⅱ可拆卸连接,侧板Ⅰ和侧板Ⅱ通过分别与之搭接的搭接板连接;The connecting plate I and the connecting plate II are detachably connected, and the side plate I and the side plate II are connected through the overlapping plates respectively overlapped with them;
斜撑为方钢管,斜撑两端设置有开口,斜撑通过开口插在连接板Ⅱ上,斜撑两端的开口处设置有封板,封板垂直固定在连接板Ⅱ上并堵住斜撑的开口。The diagonal bracing is a square steel pipe. There are openings at both ends of the diagonal bracing. The diagonal bracing is inserted into the connecting plate II through the opening. The openings at both ends of the diagonal bracing are provided with sealing plates. The sealing plates are vertically fixed on the connecting plate II and block the diagonal bracing. opening.
进一步的,连接板Ⅰ和连接板Ⅱ相邻的一端均设置有螺栓孔,连接板Ⅰ上的螺栓孔与连接板Ⅱ上的螺栓孔相重合,通过高强螺栓连接;Further, the adjacent ends of the connecting plate I and the connecting plate II are provided with bolt holes, and the bolt holes on the connecting plate I coincide with the bolt holes on the connecting plate II, and are connected by high-strength bolts;
进一步的,斜撑两端与封板焊接固定;Further, both ends of the diagonal brace are welded and fixed with the sealing plate;
进一步的,搭接板与侧板Ⅰ和侧板Ⅱ均通过高强螺栓连接;Further, the lap plate is connected with the side plate I and the side plate II by high-strength bolts;
进一步的,中心钢管柱和端部钢管柱通过两块平行的连接板Ⅲ连接,内侧的连接板Ⅲ与中心钢管柱和端部钢管柱的内侧面在同一平面,外侧的连接板Ⅲ与中心钢管柱和端部钢管柱的外侧面在同一平面;Further, the central steel pipe column and the end steel pipe columns are connected by two parallel connecting plates III, the inner connecting plate III is on the same plane as the inner surface of the central steel pipe column and the end steel pipe column, and the outer connecting plate III and the central steel pipe are in the same plane. The outer sides of the column and the end steel column are in the same plane;
进一步的,H型钢梁垂直固定在端部钢管柱上,H型钢梁的翼缘板的两侧边与端部钢管柱的内外侧面在同一水平面上,端部钢管柱内外两侧均固定设置有加劲板,加劲板两端分别与连接板Ⅲ和H型钢梁的翼缘板固定连接;Further, the H-shaped steel beam is vertically fixed on the end steel pipe column, the two sides of the flange plate of the H-shaped steel beam and the inner and outer sides of the end steel pipe column are on the same horizontal plane, and the inner and outer sides of the end steel pipe column are fixed. A stiffening plate is provided, and the two ends of the stiffening plate are respectively fixedly connected with the flange plates of the connecting plate III and H-shaped steel beams;
进一步的,加劲板包括相互平行的上下两组,分别与H型钢梁的上下翼缘板固定连接;Further, the stiffening plate comprises two sets of upper and lower parallels, which are respectively fixedly connected with the upper and lower flange plates of the H-shaped steel beam;
进一步的,中心钢管柱和端部钢管柱组成“L”型、“T”型或十字型结构。Further, the central steel tube column and the end steel tube columns form an "L"-shaped, "T"-shaped or cross-shaped structure.
本实用新型具有以下有益效果:The utility model has the following beneficial effects:
(1)本实用新型能够满足“强节点、弱构件”的要求,提高了钢管混凝土组合柱支撑节点区域连接的可靠性;(1) The utility model can meet the requirements of "strong nodes and weak members", and improves the reliability of the connection of the support node area of the concrete-filled steel tube composite column;
(2)本实用新型完全实现工厂预制,现场只需螺栓连接,避免了现场焊接,保证了连接的质量;(2) The utility model completely realizes the factory prefabrication, and only needs to be connected by bolts on site, which avoids on-site welding and ensures the quality of the connection;
(3)本实用新型避免了钢管现场开洞,施工方便,缩短了工期,节约了项目成本。(3) The utility model avoids the on-site opening of the steel pipe, the construction is convenient, the construction period is shortened, and the project cost is saved.
附图说明Description of drawings
图1是本实用新型结构示意图;Fig. 1 is the structural representation of the present utility model;
图2是本实用新型中斜撑组件结构分解图;2 is an exploded view of the structure of the diagonal brace assembly in the present utility model;
图3是本实用新型中组件Ⅰ结构示意图;Fig. 3 is the structural schematic diagram of component I in the present invention;
图4是本实用新型中组件Ⅱ结构示意图;4 is a schematic structural diagram of component II in the present invention;
图5是本实用新型中斜撑结构示意图;Fig. 5 is the structural schematic diagram of the diagonal bracing in the present utility model;
图6是本实用新型中斜撑组件组装后平面结构示意图;6 is a schematic diagram of the plane structure of the diagonal brace assembly of the present invention after assembly;
图7是本实用新型中斜撑组件组装后立体结构示意图;Figure 7 is a schematic diagram of the three-dimensional structure of the diagonal brace assembly of the present invention after assembly;
图8是本实用新型中钢管混凝土组合柱结构示意图;Figure 8 is a schematic diagram of the structure of the concrete-filled steel tubular composite column in the present invention;
图9是T型钢管混凝土组合柱平面示意图;Figure 9 is a schematic plan view of a T-shaped concrete-filled steel tubular composite column;
图10是十字型钢管混凝土组合柱平面示意图;Figure 10 is a schematic plan view of a cross-shaped CFST composite column;
其中,上述附图包括以下附图标记:1、H型钢梁;2、中心钢管柱;3、端部钢管柱;4、斜撑组件;5、斜撑;6、组件Ⅰ;7、组件Ⅱ;8、连接板Ⅰ;9、侧板Ⅰ;10、连接板Ⅱ;11、侧板Ⅱ;12、搭接板;13、封板;14、连接板Ⅲ;15、加劲板。Wherein, the above drawings include the following reference signs: 1. H-shaped steel beam; 2. Central steel pipe column; 3. End steel pipe column; 4. Diagonal bracing assembly; 5. Diagonal bracing; 6. Component I; II; 8, connecting plate I; 9, side plate I; 10, connecting plate II; 11, side plate II; 12, lap plate; 13, sealing plate; 14, connecting plate III; 15, stiffening plate.
具体实施方式Detailed ways
下面结合附图对本实用新型作进一步说明。The utility model will be further described below in conjunction with the accompanying drawings.
如图1所示,本实用新型的装配式钢管混凝土梁柱节点的支撑结构,包括钢管混凝土组合柱和H型钢梁1,钢管混凝土组合柱包括中心钢管柱2和端部钢管柱3,H型钢梁与端部钢管柱连接,梁柱围成框架结构,呈对角线的梁柱节点之间设置有斜撑组件4;As shown in FIG. 1, the support structure of the assembled concrete-filled steel tube beam-column joint of the present invention includes a concrete-filled steel tube composite column and an H-
如图2所示,斜撑组件包括斜撑5和斜撑两端的安装组件,安装组件包括组件Ⅰ6和组件Ⅱ7;As shown in Figure 2, the diagonal brace assembly includes the
如图3所示,组件Ⅰ包括连接板Ⅰ8和侧板Ⅰ9,连接板Ⅰ为对称结构,其相互垂直的两个侧边分别固定在端部钢管柱和H型钢梁上,另外两个对称的侧边上均固定有侧板Ⅰ;As shown in Figure 3, the component I includes a connecting plate I8 and a side plate I9. The connecting plate I is a symmetrical structure, and its two mutually perpendicular sides are respectively fixed on the end steel pipe column and the H-shaped steel beam, and the other two symmetrical Side plates I are fixed on the sides of the
如图4所示,组件Ⅱ包括连接板Ⅱ10和侧板Ⅱ11,连接板Ⅱ为对称结构,一端的宽度大于另一端,较宽一端对称的两个侧边上均固定有侧板Ⅱ;As shown in Figure 4, the component II includes a connecting plate II10 and a side plate II11, the connecting plate II is a symmetrical structure, the width of one end is larger than the other end, and the side plate II is fixed on the two symmetrical sides of the wider end;
连接板Ⅰ与连接板Ⅱ可拆卸连接,连接板Ⅰ和连接板Ⅱ相邻的一端上均设置有螺栓孔,将连接板Ⅰ和连接板Ⅱ搭接,使两者的螺栓孔相重合,两者通过高强螺栓连接;侧板Ⅰ和侧板Ⅱ通过分别与之搭接的搭接板12连接,搭接板与侧板Ⅰ和侧板Ⅱ均通过高强螺栓连接。The connecting plate I and the connecting plate II are detachably connected, and the adjacent ends of the connecting plate I and the connecting plate II are provided with bolt holes. The two are connected by high-strength bolts; the side plate I and the side plate II are connected by the
如图5所示,斜撑为方钢管,斜撑两端的中间位置设置有开口,斜撑通过开口插在连接板Ⅱ上,斜撑两端的开口处设置有封板13,封板垂直固定在连接板Ⅱ上并堵住斜撑的开口,封板与斜撑焊接固定。这样能够增强斜撑端部的整体刚度,有效避免钢管开口处发生屈曲破坏。As shown in Figure 5, the diagonal bracing is a square steel pipe, an opening is provided in the middle of both ends of the diagonal bracing, the diagonal bracing is inserted on the connecting plate II through the opening, and the openings at both ends of the diagonal bracing are provided with sealing
上述各结构的连接除了搭接板与侧板Ⅰ、侧板Ⅱ的连接以及连接板Ⅰ与连接板Ⅱ的连接之外,其他连接均采用焊接。焊接部分均在工厂完成,即组件Ⅰ、组件Ⅱ、组件Ⅰ与梁柱的连接、组件Ⅱ与封板和斜撑的连接均在工厂提前完成,现场只需要将几部分组装起来,即将连接板Ⅰ和连接板Ⅱ通过螺栓连接,搭接板与侧板Ⅰ和侧板Ⅱ通过螺栓连接。组装完成后如图6和图7所示。Except for the connection between the lap plate and the side plate I, the side plate II, and the connection between the connection plate I and the connection plate II, the connections of the above structures are all welded. The welding parts are all completed in the factory, that is, the connection between component I, component II, the connection between component I and the beam and column, and the connection between component II and the sealing plate and diagonal brace are all completed in advance in the factory, and only a few parts need to be assembled on site. I and the connecting plate II are connected by bolts, and the lap plate is connected with the side plate I and the side plate II by bolts. After the assembly is completed, as shown in Figure 6 and Figure 7.
如图8所示,中心钢管柱和端部钢管柱通过两块平行的连接板Ⅲ14连接,内侧的连接板Ⅲ与中心钢管柱和端部钢管柱的内侧面在同一平面,外侧的连接板Ⅲ与中心钢管柱和端部钢管柱的外侧面在同一平面。As shown in Figure 8, the central steel pipe column and the end steel pipe columns are connected by two parallel connecting plates III14. The inner connecting plate III is on the same plane as the inner surface of the central steel pipe column and the end steel pipe column, and the outer connecting plate III is on the same plane. In the same plane as the outer sides of the central steel column and the end steel column.
H型钢梁垂直固定在端部钢管柱上,H型钢梁的翼缘板的两侧边与端部钢管柱的内外侧面在同一水平面上,端部钢管柱内外两侧均固定设置有加劲板15,加劲板两端分别与连接板Ⅲ和H型钢梁的翼缘板固定连接。加劲板包括相互平行的上下两组,分别与H型钢梁的上下翼缘板固定连接。The H-shaped steel beam is vertically fixed on the end steel pipe column. The two sides of the flange plate of the H-shaped steel beam are on the same horizontal plane as the inner and outer sides of the end steel pipe column. The inner and outer sides of the end steel pipe column are fixed with stiffeners.
除了图8的“L”型结构,钢管混凝土组合柱还可以为图9的“T”型结构或图10的十字型结构。In addition to the "L"-shaped structure in Fig. 8 , the CFST composite column can also be the "T"-shaped structure in Fig. 9 or the cross-shaped structure in Fig. 10 .
以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. For those skilled in the art, the present utility model may have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921209660.5U CN210713251U (en) | 2019-07-30 | 2019-07-30 | Supporting structure of assembled concrete filled steel tube beam column node |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921209660.5U CN210713251U (en) | 2019-07-30 | 2019-07-30 | Supporting structure of assembled concrete filled steel tube beam column node |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210713251U true CN210713251U (en) | 2020-06-09 |
Family
ID=70935290
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921209660.5U Expired - Fee Related CN210713251U (en) | 2019-07-30 | 2019-07-30 | Supporting structure of assembled concrete filled steel tube beam column node |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210713251U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117403773A (en) * | 2023-09-28 | 2024-01-16 | 山东电力工程咨询院有限公司 | Top-level retractable assembly nodes and methods used in pipeline steel supports of thermal power plants |
-
2019
- 2019-07-30 CN CN201921209660.5U patent/CN210713251U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117403773A (en) * | 2023-09-28 | 2024-01-16 | 山东电力工程咨询院有限公司 | Top-level retractable assembly nodes and methods used in pipeline steel supports of thermal power plants |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103469933B (en) | Double-layer plate built-in support complex heat-preservation shear wall and preparation method thereof | |
| CN110878587A (en) | Module assembly type building beam column node connection structure | |
| CN108193771A (en) | A kind of assembling rectangular steel-tube concrete column-girder steel partition board perforation node | |
| CN213038987U (en) | A kind of square steel tube concrete column-steel beam upper welded and lower bolted clapboard through node | |
| CN208056293U (en) | A kind of assembling rectangular steel-tube concrete column-girder steel partition board perforation node | |
| CN207063140U (en) | A kind of shear wall house for the shear wall slab assembling being made up of steel square tube and steel plate | |
| CN106703192A (en) | Steel-supported equivalent wall unit and composite wall unit | |
| CN216108977U (en) | Assembled square steel pipe column-H shaped steel roof beam-baffle link up node | |
| CN211548221U (en) | A prefabricated concrete shear wall with H-beam diagonal braces | |
| CN116290367A (en) | A separate beam-column joint and its system of a prefabricated steel structure | |
| CN206800796U (en) | A kind of full multi-cavity steel tube concrete coupled column of the solder type with side plate | |
| CN103206012B (en) | A kind of industrialization assembling is many, Tall Frameworks support system | |
| CN104674949A (en) | Portable shelter | |
| CN112049257B (en) | H-shaped steel beam-column connection flange node and preparation method | |
| CN204456438U (en) | Prefabricated house | |
| CN210713250U (en) | Prefabricated CFST composite column node area connection structure | |
| CN105821976B (en) | A kind of support plug-in type beam column supporting bilateral plate node | |
| CN222862579U (en) | A combined double-layer corrugated steel plate viscoelastic damping wall | |
| CN211447349U (en) | A prefabricated shear wall with X-shaped concrete-filled steel tubular braces | |
| CN113605541A (en) | Outer ring type beam column rigid connection node | |
| CN211396107U (en) | A prefabricated shear wall with steel plate bolt combined diagonal bracing | |
| CN104775521A (en) | Assembled integral type orthogonal-diagonal mixed type steel grid box type structure | |
| CN219431008U (en) | Assembled special-shaped column steel frame-supporting structure system capable of recovering functions | |
| CN218814403U (en) | Semi-rigid node of hollow sandwich steel tube concrete column and steel beam | |
| CN206800653U (en) | A kind of concrete filled steel tube pole steel beam end plate type bolt connection node |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200609 |