CN209990142U - Prevent leaking concrete construction template - Google Patents

Prevent leaking concrete construction template Download PDF

Info

Publication number
CN209990142U
CN209990142U CN201920429996.6U CN201920429996U CN209990142U CN 209990142 U CN209990142 U CN 209990142U CN 201920429996 U CN201920429996 U CN 201920429996U CN 209990142 U CN209990142 U CN 209990142U
Authority
CN
China
Prior art keywords
main part
concrete construction
rod
shaped hinge
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920429996.6U
Other languages
Chinese (zh)
Inventor
李祥霖
任柏桥
李艳宾
马虔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201920429996.6U priority Critical patent/CN209990142U/en
Application granted granted Critical
Publication of CN209990142U publication Critical patent/CN209990142U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a leakage-proof concrete construction template, which comprises an integrally formed L-shaped template main body, wherein one end of the outer side of the L-shaped template main body is provided with a slot, the middle part of the slot is fixedly provided with two studs, the two studs are provided with nuts by equal threads, the other end of the L-shaped template main body is provided with two strip-shaped openings, the other end of the inner side of the L-shaped template main body is provided with a slot, the inner wall of the slot and one end of the L-shaped template main body are both fixedly provided with sealing gaskets, and the outer side of the L-shaped template main body is fixedly provided with two supporting devices, meanwhile, the sealing performance of the splicing part can be improved through the sealing gasket, leakage is prevented, and the sealing performance of the splicing part can be further improved through clamping of the clamping groove and the L-shaped template main body with one grooved end.

Description

Prevent leaking concrete construction template
Technical Field
The utility model relates to a construction formwork, in particular to prevent leaking concrete construction formwork.
Background
The building formwork is a temporary supporting structure, which is manufactured according to the design requirements, so that the concrete structure and the members are formed according to the specified positions and geometric dimensions, the correct positions of the concrete structure and the members are kept, and the self weight of the building formwork and the external load acting on the building formwork are borne. Concrete forms are forms used in the construction of buildings. Wood, bamboo plywood forms and metal forms coated with adhesive paper are commonly used.
The existing concrete construction template has the following defects: 1. the existing concrete construction template has gaps in the splicing process, so that leakage is easy to occur in the concrete pouring process, waste is caused, and the pouring quality is influenced; 2. the existing concrete construction formwork is poor in stability, does not have a supporting structure, is prone to toppling under stress, and influences pouring quality.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a prevent leaking concrete construction template to the problem of leakage and poor stability takes place easily in the concatenation gap of the current concrete construction template that proposes in solving above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a prevent leaking concrete construction formwork, includes integrated into one piece's L section mould board main part, the fluting has been seted up to the one end in the L section mould board main part outside, the fixed two double-screw bolts that are equipped with in grooved middle part, two equal threaded mounting has the nut on the double-screw bolt, two bar openings have been seted up to the other end of L section mould board main part, the draw-in groove has been seted up to the inboard other end of L section mould board main part, the equal fixed sealed pad that is equipped with in one end of grooved inner wall and L section mould board main part, the fixed two strutting arrangement that are equipped.
As a preferred technical scheme of the utility model, strutting arrangement includes telescopic link, first U type hinge and second U type hinge, the fixed axle that is equipped with is all fixed in the inside of first U type hinge and the inside of second U type hinge, the both ends of telescopic link are connected with two fixed axle activities interlude respectively.
As a preferred technical scheme of the utility model, the telescopic link includes outer pole, interior pole and telescopic link fixer, the outside of pole one end is established in the one end slip cover of outer pole, the fixed one end that is equipped with at the outer pole of telescopic link fixer, the one end fixed connection of telescopic link fixer and interior pole is passed through to the one end of outer pole, the other end of interior pole alternates with the inside fixed axle of first U type hinge and is connected, the other end of outer pole alternates with the inside fixed axle of second U type hinge and is connected.
As an optimal technical scheme of the utility model, one side of first U type hinge and the bottom of second U type hinge are fixed respectively and are equipped with first mounting panel and second mounting panel, first mounting panel passes through the outside of screw fixed mounting in L section template main part.
As an optimal technical scheme of the utility model, the size of L section mould template main part one end and the size phase-match of draw-in groove.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model relates to a prevent leaking concrete construction template has following beneficial effect:
1) the two L-shaped template main bodies are convenient to splice through the matching of the studs and the strip-shaped openings, meanwhile, the sealing performance of the spliced position can be improved through the sealing gasket, leakage is prevented, and the sealing performance of the spliced position can be further improved through the clamping of the clamping grooves and the end, provided with the grooves, of the L-shaped template main body;
2) the stability of construction formwork can be improved through the supporting device, the construction formwork is prevented from toppling over when stressed, the supporting angle can be adjusted according to the field condition, and the construction formwork or the supporting device can be replaced singly when damaged, so that the construction formwork is more economical.
Drawings
FIG. 1 is a schematic front view of the present invention;
fig. 2 is an enlarged schematic view of a portion a of fig. 1 according to the present invention.
In the figure: 1. an L-shaped template body; 2. grooving; 3. a stud; 4. a strip-shaped opening; 5. a nut; 6. a card slot; 7. a gasket; 8. a telescopic rod; 9. a first U-shaped hinge; 10. a second U-shaped hinge; 11. a fixed shaft; 12. a first mounting plate; 13. a second mounting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1-2, the utility model provides a prevent leaking concrete construction template, including integrated into one piece's L section mould board main part 1, fluting 2 has been seted up to the one end in the L section mould board main part 1 outside, fluting 2's middle part is fixed to be equipped with two double-screw bolts 3, equal threaded mounting has nut 5 on two double-screw bolts 3, two bar openings 4 have been seted up to the other end of L section mould board main part 1, draw-in groove 6 has been seted up to the other end of L section mould board main part 1 inboard, fluting 2's inner wall and the one end of L section mould board main part 1 are all fixed to be equipped with sealed 7 of filling up, two strutting.
Preferably, strutting arrangement includes telescopic link 8, first U type hinge 9 and second U type hinge 10, and the inside of first U type hinge 9 and the inside of second U type hinge 10 are all fixed and are equipped with fixed axle 11, and the both ends of telescopic link 8 are connected with 11 activities of two fixed axles interlude respectively, can play the effect of support to L section template main part 1 through strutting arrangement, improve the stability of L section template main part 1.
Preferably, the telescopic link 8 includes the outer pole, interior pole and telescopic link fixer, the outside at interior pole one end is established to the one end slip cover of outer pole, the fixed one end that is equipped with at the outer pole of telescopic link fixer, the one end fixed connection of telescopic link fixer and interior pole is passed through to the one end of outer pole, the other end of interior pole alternates with the inside fixed axle 11 of first U type hinge 9 and is connected, the other end of outer pole alternates with the inside fixed axle 11 of second U type hinge 10 and is connected, adjust the support angle that strutting arrangement can be adjusted to telescopic link 8.
Preferably, a first mounting plate 12 and a second mounting plate 13 are fixedly arranged on one side of the first U-shaped hinge 9 and the bottom end of the second U-shaped hinge 10 respectively, the first mounting plate 12 is fixedly mounted on the outer side of the L-shaped template main body 1 through screws, the supporting device is conveniently mounted on the L-shaped template main body 1 through the first mounting plate 12, and then the supporting device is convenient to replace when damaged.
Preferably, the size of one end of the L-shaped template main body 1 is matched with that of the clamping groove 6, and the sealing performance of the joint between the L-shaped template main bodies 1 can be further improved by clamping the clamping groove 6 and one end of the other L-shaped template main body 1, so that leakage is prevented.
When specifically using, the utility model relates to a prevent leaking concrete construction template, at first during 1 concatenation of two L section template main parts, open the other end that has bar opening 4 with another L section template main part 1 earlier one end that has fluting 2 with one of them L section template main part 1 and cooperate, at this moment, it couples together to alternate bar opening 4 and double-screw bolt 3 earlier, then slide one of them L section template main part 1 and drive one of them L section template main part 1 and open the draw-in groove 6 looks block that has fluting 2's one end and another L section template main part 1, after that, two L section template main parts 1 of 5 locking of rethread nut 5, can realize the concatenation of two L section template main parts 1, at this moment, cooperate two concatenation of L section template main part 1 of being convenient for through double-screw bolt 3 and bar opening 4, can improve the leakproofness of concatenation department through sealed 7 that fills up simultaneously, prevent to take place to leak, and open the one end looks block that has fluting 2 through draw-in The leakproofness of junction, the back is accomplished in the concatenation of whole construction form, rethread screw is installed strutting arrangement in the outside of L section mould board main part 1 with first mounting panel 12, then adjust 8 rethread screws of telescopic link and install second mounting panel 13 subaerial, play the effect of support to L section mould board main part 1 through telescopic link 8, can improve the stability of construction form through strutting arrangement, take place to empty when preventing the construction form atress, the length of adjusting 8 telescopic links simultaneously can be according to the on-the-spot condition regulation support angle, and can single change when construction form damages or strutting arrangement damages, and save more.
In the description of the present invention, it should be understood that the indicated orientation or positional relationship is based on the orientation or positional relationship shown in the drawings, and is only for convenience of description and simplification of description, and does not indicate or imply that the indicated device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present invention.
In the present invention, unless otherwise explicitly specified or limited, for example, it may be fixedly connected, detachably connected, or integrated; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a prevent leaking concrete construction formwork, includes integrated into one piece's L section mould board main part (1), its characterized in that, fluting (2) has been seted up to the one end in L section mould board main part (1) outside, the fixed two double-screw bolts (3) that are equipped with in middle part of fluting (2), two equal threaded mounting has nut (5) on double-screw bolt (3), two bar openings (4) have been seted up to the other end of L section mould board main part (1), draw-in groove (6) have been seted up to the other end of L section mould board main part (1) inboard, the inner wall of fluting (2) and the one end of L section mould board main part (1) are all fixed and are equipped with sealed (7), the fixed two strutting arrangement that are equipped with.
2. A leak resistant concrete construction form as recited in claim 1, further comprising: the supporting device comprises a telescopic rod (8), a first U-shaped hinge (9) and a second U-shaped hinge (10), fixed shafts (11) are fixedly arranged inside the first U-shaped hinge (9) and inside the second U-shaped hinge (10), and two ends of the telescopic rod (8) are movably connected with the two fixed shafts (11) in an alternating mode respectively.
3. A leak resistant concrete construction form as recited in claim 2, further comprising: the telescopic rod (8) comprises an outer rod, an inner rod and a telescopic rod fixer, wherein one end of the outer rod is slidably sleeved outside one end of the inner rod, the telescopic rod fixer is fixedly arranged at one end of the outer rod, one end of the outer rod is fixedly connected with one end of the inner rod through the telescopic rod fixer, the other end of the inner rod is alternately connected with a fixed shaft (11) inside a first U-shaped hinge (9), and the other end of the outer rod is alternately connected with a fixed shaft (11) inside a second U-shaped hinge (10).
4. A leak resistant concrete construction form as recited in claim 2, further comprising: one side of the first U-shaped hinge (9) and the bottom end of the second U-shaped hinge (10) are respectively fixedly provided with a first mounting plate (12) and a second mounting plate (13), and the first mounting plate (12) is fixedly mounted on the outer side of the L-shaped template main body (1) through screws.
5. A leak resistant concrete construction form as recited in claim 1, further comprising: the size of one end of the L-shaped template main body (1) is matched with the size of the clamping groove (6).
CN201920429996.6U 2019-04-01 2019-04-01 Prevent leaking concrete construction template Expired - Fee Related CN209990142U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920429996.6U CN209990142U (en) 2019-04-01 2019-04-01 Prevent leaking concrete construction template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920429996.6U CN209990142U (en) 2019-04-01 2019-04-01 Prevent leaking concrete construction template

Publications (1)

Publication Number Publication Date
CN209990142U true CN209990142U (en) 2020-01-24

Family

ID=69290671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920429996.6U Expired - Fee Related CN209990142U (en) 2019-04-01 2019-04-01 Prevent leaking concrete construction template

Country Status (1)

Country Link
CN (1) CN209990142U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111873164A (en) * 2020-07-29 2020-11-03 江苏蓝海住宅工业有限公司 Production system of concrete prefabricated part and production process of production system
CN112031397A (en) * 2020-09-09 2020-12-04 中国十七冶集团有限公司 Fixed template structure of pouring frame for construction engineering construction
CN113062593A (en) * 2021-04-06 2021-07-02 张文郡 Building splicing template

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111873164A (en) * 2020-07-29 2020-11-03 江苏蓝海住宅工业有限公司 Production system of concrete prefabricated part and production process of production system
CN111873164B (en) * 2020-07-29 2021-08-10 江苏蓝海住宅工业有限公司 Production system of concrete prefabricated part and production process of production system
CN112031397A (en) * 2020-09-09 2020-12-04 中国十七冶集团有限公司 Fixed template structure of pouring frame for construction engineering construction
CN113062593A (en) * 2021-04-06 2021-07-02 张文郡 Building splicing template

Similar Documents

Publication Publication Date Title
CN209990142U (en) Prevent leaking concrete construction template
CN210111402U (en) Concatenation formula block terminal
CN210659762U (en) Combined energy-saving safe aluminum alloy door and window
CN106760087B (en) Rectangular steel pipe curtain wall cross beam column linked system
CN217580674U (en) Assembled steel construction building wallboard
CN216766420U (en) Seamless formula aluminium veneer that splices
CN213185381U (en) Pre-buried formula electronic box inner support subassembly
CN214329270U (en) Box steel column butt joint auxiliary structure
CN213572984U (en) Building templates that leakproofness is strong
CN212053772U (en) Aluminum mould root clearance plugging device
CN210685361U (en) Template connection structure for building
CN211200119U (en) Splicing clamp for new and old bridge plates
CN210507154U (en) Concrete splicing formwork for road and bridge construction
CN213115011U (en) Connecting piece of prefabricated building
CN218288515U (en) Side plate structure of wooden packing box
CN215443080U (en) Building templates convenient to connect locking
CN216516902U (en) Building engineering construction template device
CN212897532U (en) Reinforcement type template for building engineering
CN209637221U (en) Civil engineering building template attachment device
CN218322377U (en) Protective structure
CN210508096U (en) Photovoltaic building integrated drainage piece, drainage assembly and photovoltaic drainage assembly
CN217680475U (en) Aluminum alloy building templates of quick fixation
CN221119616U (en) Aluminum alloy energy-saving door and window section bar
CN211143715U (en) House building engineering adds stationary form
CN211923506U (en) Flat template section bar for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200124

Termination date: 20210401