CN209977558U - Pipe cover - Google Patents
Pipe cover Download PDFInfo
- Publication number
- CN209977558U CN209977558U CN201920544000.6U CN201920544000U CN209977558U CN 209977558 U CN209977558 U CN 209977558U CN 201920544000 U CN201920544000 U CN 201920544000U CN 209977558 U CN209977558 U CN 209977558U
- Authority
- CN
- China
- Prior art keywords
- nesting
- embedded part
- assembly
- embedded
- parts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
- 238000010276 construction Methods 0.000 abstract description 17
- 238000009434 installation Methods 0.000 abstract description 10
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 abstract description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 4
- 238000005034 decoration Methods 0.000 abstract description 3
- 239000003345 natural gas Substances 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract 1
- 238000005192 partition Methods 0.000 abstract 1
- 230000007115 recruitment Effects 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 7
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 7
- 229910052782 aluminium Inorganic materials 0.000 description 7
- 239000010959 steel Substances 0.000 description 7
- 238000000034 method Methods 0.000 description 6
- 239000002023 wood Substances 0.000 description 5
- 239000002390 adhesive tape Substances 0.000 description 2
- 238000004134 energy conservation Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 239000010410 layer Substances 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 239000002344 surface layer Substances 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Abstract
A pipe cover comprises a nesting assembly, an embedded part and an end cover, wherein the end cover is arranged on the nesting assembly through the embedded part, and the nesting assembly is of a structure with two open ends; the embedded part is sleeved on the outer surface of the nesting component, and the shape of the embedded part is matched with that of the nesting component; the embedded parts are arranged at two ends of the nesting assembly, and the embedded parts are provided with fixing parts; use this sleeve pipe for reserve the time when water supply, air conditioner, natural gas etc. cross the board wall, the pre-buried installation of beam sleeve pipe greatly reduce in the building decoration room roof beam, simplified work flow, not only reduced the recruitment and still alleviateed workman's construction pressure, and it is more pleasing to the eye after the installation, reduced construction cost, the tube cap still plays the effect of interim shutoff sleeve pipe hole, airtight partition space.
Description
Technical Field
The utility model belongs to the technical field of the building and specifically relates to a tube cap.
Background
With the continuous emergence of the finish-finished commodity house, the number of sleeves such as water supply, air conditioning, drainage and the like reserved in a beam of the finish-finished house is more and more, 20-30 sleeves and 40-50 sleeves are reserved in each family, common workers are required to perform on the amount of labor, the sleeves need to be placed by the common workers during installation, one common worker and one welder are required during welding, and the sleeves need to be found and repaired by the common workers; in the construction process, the elevation of the steel bar in the beam has deviation, after construction is finished, the sleeve cannot be exposed after pouring because the sleeve is shorter than the beam, searching is needed, the concrete surface beside the sleeve can be damaged in the searching process, finished products can be damaged, the periphery is not smooth after the sleeve is found out, repairing is needed, the knocked-out garbage needs to be cleaned, two ends of the existing sleeve need to be sealed by adhesive tapes manually, the adhesive tapes are firmly adhered one by one, and much manpower and material resources are consumed; when the construction time is very short before the floor concrete is poured, great pressure is brought to electromechanical constructors, wood molds are used, a lot of work is carried out, prefabrication, line marking and sleeve positioning are carried out in advance, constructors need to be increased in a short time during construction, great difficulty and trouble are brought to construction arrangement, and therefore a new pipe cover needs to be designed again.
The present invention is an improvement to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a simple structure, convenient to use have alleviateed workman's construction pressure, and is more pleasing to the eye after the installation, have reduced construction cost and have improved work efficiency's tube cap.
The utility model discloses a solve the technical scheme that its technical problem adopted and be:
a pipe cover comprises a nesting assembly, an embedded part and an end cover, wherein the end cover is arranged on the nesting assembly through the embedded part, and the nesting assembly is of a structure with two open ends;
the embedded part is sleeved on the outer surface of the nesting component, and the shape of the embedded part is matched with that of the nesting component;
the embedded parts are arranged at two ends of the nesting assembly, and the embedded parts are provided with fixing parts;
the end covers are arranged on the embedded parts and are arranged at the two open ends of the nested assembly through the embedded parts;
the surface area of the end cover is equal to the surface area formed by the embedded part sleeved on the nested assembly;
the end area of the nested assembly is less than the surface area of the end cap;
further, the nesting component is in a shape of a cylinder;
furthermore, the embedded part is in a circular shape;
the nesting component is square;
the number of the fixing pieces is at least 2, and the fixing pieces are uniformly distributed on the outer ring of the embedded part.
The working principle is as follows: during installation, the end covers are only required to be covered at two ends of the nested assembly, the nested assembly is placed into the beam when the beam steel bars are bound, and then the fixing piece is fixed by using a screw; when the device is not used, the end cover can also play a role in sealing and separating the space;
the wood die for fixing the fixing piece is changed into an aluminum die, each component can be installed at the same position during installation, when the die plate is disassembled, the fixing piece and the screw can still be adhered to the aluminum die, and when the lower-layer sleeve is installed, the fixing piece screw is loosened in situ, and a new component is installed newly.
The beneficial effects of the utility model reside in that: by using the casing pipe, the time for pre-embedding and installing the water supply, air conditioner, natural gas and the like in the building decoration room beam through the plate wall and the beam casing pipe is greatly shortened, the casing pipe does not need to be blocked by a rubber belt in advance, the working process is simplified, the problem that the height of the casing pipe is influenced by the height adjustment of the steel bar is not needed to be considered, the problem that the main steel bar is damaged is also not needed to be considered, the construction pressure of workers is reduced, the casing pipe is attractive after installation, the casing pipe is not needed to be searched, the damage to the finished product concrete surface layer at the periphery of the casing pipe is avoided when the concrete is knocked in the casing pipe searching process, the high-altitude operation is avoided, the construction safety risk is avoided, the construction link is reduced, the labor amount is reduced, the working efficiency is; the wood mold is changed into the aluminum mold which can be reused, so that the work of pre-scribing and positioning the sleeve is saved, the construction steps are simplified, the labor is saved, the cost is reduced, and the requirements of energy conservation and environmental protection are met.
Drawings
Fig. 1 is a schematic structural diagram of a tube cover provided by the present invention.
FIG. 2 is a schematic view of the embedment of FIG. 1 mounted on a nest assembly.
FIG. 3 is a schematic view of the end cap and embedment of FIG. 1 mounted together.
Fig. 4 is a schematic structural view of the pipe cover installed on the aluminum mold before the floor concrete is poured.
Fig. 5 is a schematic structural view of the pipe cover installed after the floor concrete is poured.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention will be further described with reference to the drawings and the specific embodiments.
Referring to fig. 1, 2, 3, 4 and 5, the casing comprises a nesting assembly 1, an embedded part 2 and an end cover 3, wherein the end cover 3 is mounted on the nesting assembly 1 through the embedded part 2, and the nesting assembly 1 is a structure with two open ends;
the embedded part 2 is sleeved on the outer surface of the nesting component 1, and the embedded part 2 is matched with the nesting component 1 in shape;
the embedded parts 2 are arranged at two ends of the nesting assembly 1, and the embedded parts 2 are provided with fixing parts 4;
the end covers 3 are arranged on the embedded parts 2, and the end covers 3 are arranged at the two open ends of the nested assembly 1 through the embedded parts 2;
the surface area of the end cover 3 is equal to the surface area formed by the embedded part 2 sleeved on the nested component 1;
the end area of the nest assembly 1 is less than the surface area of the end cap 3;
further, the nesting component 1 is in a shape of a tube;
furthermore, the embedded part 2 is in a circular shape;
the nesting component 1 is square;
the number of the fixing pieces 4 is at least 2, and the fixing pieces 4 are uniformly distributed on the outer ring of the embedded part 2.
During installation, the end covers are only required to be covered at two ends of the nested assembly, the nested assembly is placed into the beam when the beam steel bars are bound, and then the fixing piece is fixed by using a screw; when the device is not used, the end cover can also play a role in sealing and separating the space;
the wood die for fixing the fixing piece is changed into the aluminum die 5, each component can be installed at the same position during installation, when the template is disassembled, the fixing piece and the screw can still be stuck on the aluminum die, and when the lower-layer sleeve is installed, the fixing piece screw is loosened in the original position, and a new component is installed newly.
By using the casing pipe, the time for pre-embedding and installing the water supply, air conditioner, natural gas and the like in the building decoration room beam through the plate wall and the beam casing pipe is greatly shortened, the casing pipe does not need to be blocked by a rubber belt in advance, the working process is simplified, the problem that the height of the casing pipe is influenced by the height adjustment of the steel bar is not needed to be considered, the problem that the main steel bar is damaged is also not needed to be considered, the construction pressure of workers is reduced, the casing pipe is attractive after installation, the casing pipe is not needed to be searched, the damage to the finished product concrete surface layer at the periphery of the casing pipe is avoided when the concrete is knocked in the casing pipe searching process, the high-altitude operation is avoided, the construction safety risk is avoided, the construction link is reduced, the labor amount is reduced, the working efficiency is; the wood mold is changed into the aluminum mold which can be reused, so that the work of pre-scribing and positioning the sleeve is saved, the construction steps are simplified, the labor is saved, the cost is reduced, and the requirements of energy conservation and environmental protection are met.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (5)
1. A tube cover comprises a nesting assembly (1), an embedded part (2) and an end cover (3), wherein the end cover (3) is installed on the nesting assembly (1) through the embedded part (2), and is characterized in that:
the nested component (1) is of a structure with two open ends;
the embedded part (2) is sleeved on the outer surface of the nested assembly (1), and the embedded part (2) is matched with the nested assembly (1) in shape;
the embedded parts (2) are arranged at two ends of the nested assembly (1), and the embedded parts (2) are provided with fixing parts (4);
the end covers (3) are arranged on the embedded parts (2), and the end covers (3) are arranged at the two open ends of the nested assembly (1) through the embedded parts (2);
the surface area of the end cover (3) is equal to the surface area formed by the embedded part (2) sleeved on the nested assembly (1);
the end area of the nesting component (1) is smaller than the surface area of the end cover (3).
2. A tube cover according to claim 1, characterized in that the nest member (1) is tubular.
3. A pipe cover according to claim 2, characterised in that the embedment (2) is circular in shape.
4. A tube cover according to claim 1, characterized in that the nest member (1) is square-shaped.
5. A pipe cover according to claim 1, characterised in that the number of fixing elements (4) is at least 2, the fixing elements (4) being evenly distributed on the outer ring of the embedment (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920544000.6U CN209977558U (en) | 2019-04-19 | 2019-04-19 | Pipe cover |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920544000.6U CN209977558U (en) | 2019-04-19 | 2019-04-19 | Pipe cover |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209977558U true CN209977558U (en) | 2020-01-21 |
Family
ID=69258635
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920544000.6U Ceased CN209977558U (en) | 2019-04-19 | 2019-04-19 | Pipe cover |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209977558U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109945008A (en) * | 2019-04-19 | 2019-06-28 | 刘伟 | A kind of pipe lid |
CN112413231A (en) * | 2020-11-12 | 2021-02-26 | 刘伟 | End cover fixing seat, end cover and pre-embedding process of beam/wall penetrating pipe fitting |
-
2019
- 2019-04-19 CN CN201920544000.6U patent/CN209977558U/en not_active Ceased
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109945008A (en) * | 2019-04-19 | 2019-06-28 | 刘伟 | A kind of pipe lid |
CN112413231A (en) * | 2020-11-12 | 2021-02-26 | 刘伟 | End cover fixing seat, end cover and pre-embedding process of beam/wall penetrating pipe fitting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103061504B (en) | Concrete slab Pipe installing hole to be provided construction mould and construction method | |
CN103498523B (en) | Floor system | |
CN209977558U (en) | Pipe cover | |
CN110821156A (en) | Sinking type toilet hanging die structure and construction method thereof | |
CN106049862A (en) | Inflatable adjustable type construction mold for reserved hole in concrete structure plate, and construction method | |
CN203856202U (en) | Simple pullable sizing device of reserved holes | |
CN215760469U (en) | Building structure movement joint position shear force wall aluminum mould board location reinforcement device | |
CN116379248A (en) | Construction method of reserved sleeve | |
CN1086435C (en) | A set of parts for use in building and a method of using same | |
CN204609293U (en) | Portablely locate buttress casting mold | |
CN209799022U (en) | semicircular bolt clamping ring component | |
CN204455779U (en) | Combined type channel-section steel formwork leverage | |
CN109176841A (en) | A kind of automatic control precast concrete device | |
CN213927514U (en) | Plug for two end parts of oppositely-pulling screw rod of building template | |
CN114576459A (en) | Construction method of reserved sleeve | |
CN104499712A (en) | Building formwork pull rod | |
CN210003941U (en) | Detachable anti-seepage sleeve assembly | |
CN109760178B (en) | Method for manufacturing assembled integral floor slab | |
CN108081448B (en) | Production process of integrally decorated and electromechanical prefabricated GRC formwork structural column | |
CN204435867U (en) | Air-conditioning duct preformed hole exempts from form removal tool | |
CN110965766A (en) | Template for construction of deformation joint of shear wall structure, construction structure and construction method | |
CN110548619A (en) | Device for preventing metal surface from being polluted by spraying and using method thereof | |
CN206903189U (en) | A kind of connecting structure of wall of dual-raw external scaffold | |
CN204059725U (en) | A kind of multi-use architecture module and combination thereof | |
CN210976668U (en) | Simple device capable of preventing concrete tailing pollution |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
IW01 | Full invalidation of patent right |
Decision date of declaring invalidation: 20220902 Decision number of declaring invalidation: 57771 Granted publication date: 20200121 |
|
IW01 | Full invalidation of patent right |