CN209975573U - Assembled many cabins underground rectangle utility tunnel - Google Patents
Assembled many cabins underground rectangle utility tunnel Download PDFInfo
- Publication number
- CN209975573U CN209975573U CN201920437927.XU CN201920437927U CN209975573U CN 209975573 U CN209975573 U CN 209975573U CN 201920437927 U CN201920437927 U CN 201920437927U CN 209975573 U CN209975573 U CN 209975573U
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- frame body
- shaped pipe
- gallery frame
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model belongs to the technical field of the underground pipe gallery, especially, relate to an assembled many cabins underground rectangle utility tunnel. Including E font piping lane support body, wang font piping lane support body, pre-buried screw rod that excels in, steel sheet connecting piece and the nut that excels in, E font piping lane support body symmetry sets up in many cabins of assembled underground rectangle utility tunnel top and bottom, and wang font piping lane support body sets up in the middle part of many cabins of an assembled underground rectangle utility tunnel, and the three tip of E font piping lane support body all is equipped with the spill tongue-and-groove, the beneficial effects of the utility model are that the structure is simple, and the atress performance is good, and processing is convenient, and the component can the volume production change, improves the efficiency of construction, saves the engineering time, can effectively solve city spider web phenomenon simultaneously, and the management of the various circuits of being convenient for improves work efficiency, realizes high-efficient.
Description
Technical Field
The utility model belongs to the technical field of the underground pipe gallery, especially, relate to an assembled many cabins underground rectangle utility tunnel.
Background
The utility model relates to a comprehensive pipe gallery, which is a structure and accessory facilities built under the city for containing two or more than two types of city engineering pipelines. A tunnel is built in an underground space of a city, various engineering pipelines such as electric power, communication, gas, heat supply, water supply and drainage and the like are integrated, a special overhaul port, a special hoisting port and a special detection system are arranged, unified planning, unified design, unified construction and management are implemented, and the tunnel is an important infrastructure and a 'life line' for guaranteeing the operation of the city. The urban public facility is a municipal public facility which is constructed under the city and used for laying municipal public pipelines.
At present, pipe gallery facilities are few, and are not popularized in a large number, so that the phenomenon of urban spider web exists in a large number, the pipeline maintenance and management efficiency is low, and inconvenience is brought to urban management.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem that exists, the utility model provides a many cabins of assembled underground rectangle utility tunnel has effectually alleviated city spider web phenomenon, the management and the maintenance of various pipelines improve the management of pipeline and the efficiency of maintenance, improve underground space resource utilization, efficient operation and management city pipeline.
The utility model adopts the technical scheme as follows:
an assembled multi-cabin underground rectangular comprehensive pipe gallery comprises an E-shaped pipe gallery frame body, a V-shaped pipe gallery frame body, embedded high-strength screws, steel plate connecting pieces and high-strength nuts, wherein the E-shaped pipe gallery frame body is symmetrically arranged at the top and the bottom of an assembled multi-cabin underground rectangular comprehensive pipe gallery, the V-shaped pipe gallery frame body is arranged in the middle of the assembled multi-cabin underground rectangular comprehensive pipe gallery, concave rabbets are arranged at three ends of the E-shaped pipe gallery frame body, the size of each concave rabbet is 1/2 ~ 1/3 of the end section width of the E-shaped pipe gallery frame body, the E-shaped pipe gallery frame body is arranged in the middle of the end section width of the E-shaped pipe gallery frame body, the left side cross section and the right side cross section of the E-shaped pipe gallery frame body are respectively provided with a concave rabbet A and a convex rabbet A, the rabbet A is matched with the position of the convex rabbet A, the E-shaped pipe gallery frame body is used for splicing 2E-shaped pipe gallery frame bodies, 4 high-strength screws are embedded at the plane 15-20cm away from the concave rabbet frame body, the left side wall rabbet frame body is arranged at the left side cross section of the E-right side cross section of the E-shaped pipe gallery frame body, the E-20-shaped pipe gallery frame body is provided with the convex rabbet frame body, the E-shaped pipe gallery frame body, the convex pipe gallery frame body, the E-shaped pipe gallery frame body is provided with the embedded high-shaped pipe gallery frame body, the E-shaped pipe gallery frame body is provided with the embedded high-shaped pipe gallery frame body, the embedded high-shaped pipe gallery frame body is provided with the embedded high-convex rabbet screw bolts, the embedded high-shaped pipe gallery frame body, the embedded high-shaped pipe rack body is provided with the embedded high-shaped pipe gallery frame body, the embedded high-shaped pipe rack body, the embedded high-shaped pipe gallery frame body, the embedded high-shaped pipe rack body is provided with the embedded high-shaped pipe rack, the embedded high-shaped pipe rack body, the embedded high.
Further, E font piping lane support body and wang font piping lane support body adopt the stagger joint concatenation installation.
Further, pre-buried high strength screw rod link together with the vertical frame steel reinforcement cage A in the E font pipe gallery support body, the vertical frame steel reinforcement cage B ligature in the wang font pipe gallery support body.
The utility model has the advantages that:
the utility model discloses an effect and advantage can effectually alleviate city spider web phenomenon, make things convenient for the management and the maintenance of various pipelines, improve the management of pipeline and the efficiency of maintenance, improve underground space resource utilization, efficient operation and management city pipeline, simple structure, the atress performance is good, and processing is convenient, but the component volume productization improves the efficiency of construction, saves the engineering time, promotes the high-efficient development in city.
Drawings
Fig. 1 is a schematic cross-sectional view of an assembled multi-cabin underground rectangular comprehensive pipe gallery.
Fig. 2 is a schematic cross-sectional view of an E-shaped pipe rack body.
FIG. 3 is a schematic view of a concave slot of a frame body of an E-shaped pipe gallery
FIG. 4 is a schematic view of a convex opening groove of an E-shaped pipe gallery frame body
FIG. 5 is a schematic cross-sectional view of a frame body of a pipe rack shaped like a Chinese character' wang
FIG. 6 is a schematic view of a concave slot of a frame body of a pipe rack shaped like a Chinese character' wang
FIG. 7 is a schematic view of a convex opening groove of a frame body of a pipe rack shaped like the Chinese character' wang
FIG. 8 is a schematic diagram of the connection of the pre-buried high-strength screw rod and the reinforcement cage in the E-shaped pipe gallery frame body
FIG. 9 is a schematic diagram of the connection between the positions of the high-strength screw rod and the reinforcement cage embedded in the frame body of the pipe gallery shaped like the Chinese character' wang
FIG. 10 is a cross-sectional view of the connection node of the E-shaped pipe rack body and the E-shaped pipe rack body
FIG. 11 is a sectional view taken along line A-A
In the figure, 1 is an E-shaped pipe gallery frame body, 1-1 is a concave rabbet, 1-2 is a concave rabbet A, 1-3 is a convex rabbet A, 1-4 is a vertical frame reinforcement cage A, 2 is a king-shaped pipe gallery frame body, 2-1 is a convex rabbet, 2-2 is a concave rabbet B, 2-3 is a convex rabbet B, 2-4 is a vertical frame reinforcement cage B, 3 is a pre-embedded high-strength screw, 4 is a steel plate connecting piece, and 5 is a high-strength nut.
Detailed Description
For further explanation of the present invention, the following detailed description of the present invention is provided with reference to the drawings and examples, which should not be construed as limiting the scope of the present invention.
The embodiment is that as shown in figure 1 ~, an assembled multi-cabin underground rectangular comprehensive pipe gallery comprises an E-shaped pipe gallery frame body 1, a V-shaped pipe gallery frame body 2, embedded high-strength screws 3, steel plate connecting pieces 4 and high-strength nuts 5, wherein the E-shaped pipe gallery frame body 1 is symmetrically arranged at the top and the bottom of an assembled multi-cabin underground rectangular comprehensive pipe gallery, the V-shaped pipe gallery frame body 2 is arranged in the middle of the assembled multi-cabin underground rectangular comprehensive pipe gallery, three end parts of the E-shaped pipe gallery frame body 1 are respectively provided with concave rabbets 1-1, concave rabbets 1-1 are 1/2 ~ 1/3 of the end section width of the E-shaped pipe gallery frame body 1 and are arranged in the middle of the end section width of the E-shaped pipe gallery frame body 1, the left and right cross sections of the E-shaped pipe gallery frame body 1 are respectively provided with concave rabbets A1-2, 829A 7-3, the concave groove A1-2 is matched with the position of the convex groove A1-3 for 2 splicing 2, 2E-2 is used for 2-2 splicing installation of 2E-2 pipe gallery frames, the E-2 pipe gallery frame body, the E-2-type pipe gallery frame body is provided with concave groove-2-shaped pipe gallery frame body, the E-2-shaped pipe-2-shaped pipe-type pipe gallery frame body is arranged in the E-shaped groove-type groove-2 groove-type groove-2 groove-type.
E font piping lane support body 1 and wang font piping lane support body 2 adopt the stagger joint concatenation installation.
The embedded high-strength screw 3 is bound and connected with a vertical frame reinforcement cage A1-4 in the E-shaped pipe gallery frame body 1 and a vertical frame reinforcement cage B2-4 in the king-shaped pipe gallery frame body 2.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.
Claims (3)
1. An assembled multi-cabin underground rectangular comprehensive pipe gallery is characterized by comprising an E-shaped pipe gallery frame body (1), a V-shaped pipe gallery frame body (2), embedded high-strength screws (3), steel plate connecting pieces (4) and high-strength nuts (5), wherein the E-shaped pipe gallery frame body (1) is symmetrically arranged at the top and the bottom of the assembled multi-cabin underground rectangular comprehensive pipe gallery, the V-shaped pipe gallery frame body (2) is arranged in the middle of the assembled multi-cabin underground rectangular comprehensive pipe gallery, three end parts of the E-shaped pipe gallery frame body (1) are respectively provided with concave rabbet (1-1), the size of the concave rabbet (1-1) is 1/2 ~ 1/3 of the end section width of the E-shaped pipe gallery frame body (1) and is centrally arranged on the end section width of the E-shaped pipe gallery frame body (1), the left and right side cross sections of the E-shaped pipe gallery frame body (1-2) and the convex rabbet (2) are respectively arranged at the upper end part of the E-2, the E-shaped pipe gallery frame body (1-2) is arranged at the central groove of the E-2, the E-2-shaped pipe gallery frame body is arranged at the central groove of the E-2, the E-2-shaped pipe gallery frame body, the E-2-shaped pipe gallery frame body is arranged at the central groove, the E-2 groove-2 groove-1 groove-2 groove-2 groove-.
2. The assembled multi-cabin underground rectangular comprehensive pipe gallery according to claim 1, characterized in that: e font piping lane support body (1) and wang font piping lane support body (2) adopt the stagger joint concatenation installation.
3. The assembled multi-cabin underground rectangular comprehensive pipe gallery according to claim 1, characterized in that: the embedded high-strength screw (3) is bound and connected with a vertical frame reinforcement cage A (1-4) in the E-shaped pipe gallery frame body (1) and a vertical frame reinforcement cage B (2-4) in the king-shaped pipe gallery frame body (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920437927.XU CN209975573U (en) | 2019-04-02 | 2019-04-02 | Assembled many cabins underground rectangle utility tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920437927.XU CN209975573U (en) | 2019-04-02 | 2019-04-02 | Assembled many cabins underground rectangle utility tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209975573U true CN209975573U (en) | 2020-01-21 |
Family
ID=69256487
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920437927.XU Expired - Fee Related CN209975573U (en) | 2019-04-02 | 2019-04-02 | Assembled many cabins underground rectangle utility tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209975573U (en) |
-
2019
- 2019-04-02 CN CN201920437927.XU patent/CN209975573U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203281085U (en) | Water treatment sedimentation equipment | |
CN209975573U (en) | Assembled many cabins underground rectangle utility tunnel | |
CN210423992U (en) | Building pipe for building water supply and drainage pipeline | |
CN205259361U (en) | Connected node of reinforced concrete column and light -duty girder steel | |
CN204041365U (en) | The special pylon of a kind of wind-driven generator | |
CN206754588U (en) | A kind of telescopic underground pipe gallery combined bracket | |
CN204225062U (en) | The inner gallery structure of bulb turbine hydropower station factory building | |
CN204456015U (en) | Short protection-apron type power station absorption basin structure | |
CN213741523U (en) | Novel urban waterlogging prevention and drainage mechanical power device | |
CN204825820U (en) | Utilize traffic hole to make pressure regulating well structure that goes up room | |
CN205371830U (en) | Heating power pipeline direct -burried fixed establishment | |
CN209482614U (en) | A kind of light steel building-drainage system | |
CN215568474U (en) | A quick installation component for green building construction | |
CN207032966U (en) | Main support frame for vertical circulating parking equipment | |
CN210684773U (en) | Cross connection pivot cabin of comprehensive pipe gallery | |
CN204554194U (en) | A kind of reinforced bend pipe | |
CN203856260U (en) | Three-loop tangent tower made of high-strength and large-section angle steel | |
CN204793910U (en) | Large -span cable testing bridge | |
CN216276037U (en) | Low-noise siphon drainage system | |
CN204475286U (en) | Novel hydropower absorption basin structure | |
CN204692771U (en) | A kind of integrated steel pipe | |
CN210887298U (en) | Underground comprehensive pipe gallery die carrier | |
CN219072147U (en) | Wastewater treatment system for grouting engineering | |
CN213572046U (en) | Sponge city underground pipe gallery splicing mechanism | |
CN214144000U (en) | Building machine electric water supply and drainage pipeline with sealing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200121 |