CN204456015U - Short protection-apron type power station absorption basin structure - Google Patents

Short protection-apron type power station absorption basin structure Download PDF

Info

Publication number
CN204456015U
CN204456015U CN201520115339.6U CN201520115339U CN204456015U CN 204456015 U CN204456015 U CN 204456015U CN 201520115339 U CN201520115339 U CN 201520115339U CN 204456015 U CN204456015 U CN 204456015U
Authority
CN
China
Prior art keywords
slow
energy dissipating
water
groove
bank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520115339.6U
Other languages
Chinese (zh)
Inventor
吴舒艺
李德尹
梁爱媚
胡苏平
汪汝俊
张嘉楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Meiyan Jixiang Hydropower Co Ltd
Original Assignee
Guangdong Meiyan Jixiang Hydropower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Meiyan Jixiang Hydropower Co Ltd filed Critical Guangdong Meiyan Jixiang Hydropower Co Ltd
Priority to CN201520115339.6U priority Critical patent/CN204456015U/en
Application granted granted Critical
Publication of CN204456015U publication Critical patent/CN204456015U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a kind of short protection-apron type power station absorption basin structure, comprise the absorption basin being arranged at outlet structure escape works downstream, absorption basin is with energy dissipating tooth bank and the slow water section and the energy dissipating tail bank that are positioned at energy dissipating tooth bank both sides, slow water section is connected with outlet structure escape works, the top of energy dissipating tooth bank is provided with slow water cover, slow water cover is installed on absorption basin by many root posts, delays with diversion space between water cover and energy dissipating tooth bank, and the two ends of slow water cover are stretched out downwards to the both sides of energy dissipating tooth bank; The side that meets water of energy dissipating tooth bank is with the slow groove that meets water, and its land side delays groove with itself and backwater, and meet water slow groove and slow water section seamlessly transit, and backwater delays groove and seamlessly transits the groove that meets water to energy dissipating tail bank.The structure that the utility model adopts energy dissipating tooth bank to match with slow water cover, realize repeatedly concentrating energy dissipating, effect of energy dissipation is good; Its compact conformation, without the need to building longer protection-apron, reduces construction cost, not by the restriction in narrow place, and wide accommodation.

Description

Short protection-apron type power station absorption basin structure
Technical field
The utility model relates to hydraulic engineering technical field, particularly the absorption basin in power station.
Background technology
In the Energy Dissipation Modes in power station, absorption basin is comparatively common one, and it is arranged on the downstream part of outlet structure escape works.By forming hydraulic jump in absorption basin, the torrent gushed by outlet structure escape works is transformed into unhurried current, to eliminate unnecessary kinetic energy.Absorption basin often has fluid stable, feature that effect of energy dissipation is good.But in existing absorption basin, it needs to build longer protection-apron, according to multistage energy-dissipating structure, its overall length is longer, causes the arrangement space of building not enough, earthwork evacuation amount and concrete square amount larger, construction costs is higher, is more not suitable for for narrow region.
Utility model content
The applicant, for the above-mentioned shortcoming of prior art, carries out studying and improving, and provides a kind of short protection-apron type power station absorption basin structure, and it substantially reduces protection-apron length, is adapted to the use of various region, has low, the convenient feature of arranging of cost.
In order to solve the problem, the utility model adopts following scheme:
A kind of short protection-apron type power station absorption basin structure, comprise the absorption basin being arranged at outlet structure escape works downstream, absorption basin is with energy dissipating tooth bank and the slow water section and the energy dissipating tail bank that are positioned at energy dissipating tooth bank both sides, slow water section is connected with outlet structure escape works, the top of energy dissipating tooth bank is provided with slow water cover, slow water cover is installed on absorption basin by many root posts, delays with diversion space between water cover and energy dissipating tooth bank, and the two ends of slow water cover are stretched out downwards to the both sides of energy dissipating tooth bank; The side that meets water of energy dissipating tooth bank is with the slow groove that meets water, and its land side delays groove with itself and backwater, and meet water slow groove and slow water section seamlessly transit, and backwater delays groove and seamlessly transits the groove that meets water to energy dissipating tail bank.
Further improvement as technique scheme:
Described slow water cover is arcuate structure, and its two ends are respectively to lower bending, and the arc-shaped concave at two ends delays groove towards meet water slow groove and backwater, slow water cover and meet water between slow groove and form the diversion space that raises up that meets water, and backwater delays between groove and forms backwater sinking diversion space.
The slow groove that meets water of described energy dissipating tooth bank tilts to slow water section.
Described energy dissipating tail bank rolls to downstream and tiltedly arranges.
Technique effect of the present utility model is:
The structure that the utility model adopts energy dissipating tooth bank to match with slow water cover, realize repeatedly concentrating energy dissipating, effect of energy dissipation is good; Its compact conformation, without the need to building longer protection-apron, reduces construction cost, not by the restriction in narrow place, and wide accommodation.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1, outlet structure escape works; 2, absorption basin; 21, slow water section; 22, energy dissipating tail bank; 221, meet water groove; 23, energy dissipating tooth bank; 231, meet water slow groove; 232, backwater delays groove; 3, slow water cover; 4, diversion space; 5, column; 6, meet water the diversion space that raises up; 7, backwater sinking diversion space.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described further.
As shown in Figure 1, the short protection-apron type power station absorption basin structure of the present embodiment, comprise the absorption basin 2 being arranged at outlet structure escape works 1 downstream, absorption basin 2 is with energy dissipating tooth bank 23 and the slow water section 21 and the energy dissipating tail bank 22 that are positioned at energy dissipating tooth bank 23 both sides, slow water section 21 is connected with outlet structure escape works 1, the top of energy dissipating tooth bank 23 is provided with slow water cover 3, slow water cover 3 is installed on absorption basin 2 by many root posts 5, delay with diversion space 4 between water cover 3 and energy dissipating tooth bank 23, the two ends of slow water cover 3 are stretched out downwards to the both sides of energy dissipating tooth bank 23; The side that meets water of energy dissipating tooth bank 23 is with the slow groove 231 that meets water, and its land side delays groove 232 with itself and backwater, and the slow groove 231 that meets water seamlessly transits with slow water section 21, and backwater delays groove 232 and seamlessly transits the groove 221 that meets water to energy dissipating tail bank 22.
Slow water cover 3 is arcuate structure, its two ends are respectively to lower bending, the arc-shaped concave at two ends delays groove 232 towards meet water slow groove 231 and backwater, slow water cover 3 and meet water between slow groove 231 and form the diversion space 6 that raises up that meets water, and backwater delays between groove 232 and forms backwater sinking diversion space 7.
The slow groove 231 that meets water of energy dissipating tooth bank 23 tilts to slow water section 21, and energy dissipating tail bank 22 rolls to downstream and tiltedly arranges.
In the utility model, the torrent of outlet structure escape works 1 earial drainage is through slow water section 21 first time energy dissipating; To raise up the diversion space 6 that to raise up to meeting water through the slow groove 231 that meets water, realizing second time energy dissipating; Transit to backwater sinking diversion space 7 through diversion space 4, impact the land side to slow water cover 3, realize third time energy dissipating; Water impact to the backwater that water cover 3 land side of postponing recoils back delays in groove 232, realizes the 4th energy dissipating; Realize the 5th energy dissipating through energy dissipating tail bank 22, final torrent changes into unhurried current and flows out.
The structure that the utility model adopts energy dissipating tooth bank to match with slow water cover, realize repeatedly concentrating energy dissipating, effect of energy dissipation is good; Its compact conformation, without the need to building longer protection-apron, reduces construction cost, not by the restriction in narrow place, and wide accommodation.
Above illustrated embodiment is better embodiment of the present utility model, only be used for conveniently the utility model being described, not any pro forma restriction is done to the utility model, have in any art and usually know the knowledgeable, if do not depart from the utility model carry in the scope of technical characteristic, utilize the utility model disclose the Equivalent embodiments changed or modify in the done local of technology contents, and do not depart from technical characteristic content of the present utility model, all still belong in the scope of the utility model technical characteristic.

Claims (4)

1. one kind short protection-apron type power station absorption basin structure, comprise the absorption basin (2) being arranged at outlet structure escape works (1) downstream, absorption basin (2) is with energy dissipating tooth bank (23) and the slow water section (21) and the energy dissipating tail bank (22) that are positioned at energy dissipating tooth bank (23) both sides, slow water section (21) is connected with outlet structure escape works (1), it is characterized in that: the top of energy dissipating tooth bank (23) is provided with slow water cover (3), slow water cover (3) is installed on absorption basin (2) by many root posts (5), delay between water cover (3) and energy dissipating tooth bank (23) with diversion space (4), the two ends of slow water cover (3) are stretched out downwards to the both sides of energy dissipating tooth bank (23), the side that meets water of energy dissipating tooth bank (23) is with the slow groove (231) that meets water, its land side delays groove (232) with itself and backwater, meet water slow groove (231) and slow water section (21) seamlessly transits, and backwater delays groove (232) and seamlessly transits the groove that meets water (221) to energy dissipating tail bank (22).
2. according to short protection-apron type power station according to claim 1 absorption basin structure, it is characterized in that: described slow water cover (3) is arcuate structure, its two ends are respectively to lower bending, the arc-shaped concave at two ends delays groove (232) towards meet water slow groove (231) and backwater, slow water cover (3) and meet water between slow groove (231) and form the diversion space (6) that raises up that meets water, and backwater delays between groove (232) and forms backwater sinking diversion space (7).
3. according to short protection-apron type power station according to claim 1 absorption basin structure, it is characterized in that: the slow groove (231) that meets water of described energy dissipating tooth bank (23) tilts to slow water section (21).
4. according to short protection-apron type power station according to claim 1 absorption basin structure, it is characterized in that: described energy dissipating tail bank (22) rolls to downstream and tiltedly arranges.
CN201520115339.6U 2015-02-18 2015-02-18 Short protection-apron type power station absorption basin structure Expired - Fee Related CN204456015U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520115339.6U CN204456015U (en) 2015-02-18 2015-02-18 Short protection-apron type power station absorption basin structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520115339.6U CN204456015U (en) 2015-02-18 2015-02-18 Short protection-apron type power station absorption basin structure

Publications (1)

Publication Number Publication Date
CN204456015U true CN204456015U (en) 2015-07-08

Family

ID=53662924

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520115339.6U Expired - Fee Related CN204456015U (en) 2015-02-18 2015-02-18 Short protection-apron type power station absorption basin structure

Country Status (1)

Country Link
CN (1) CN204456015U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107513986A (en) * 2017-10-09 2017-12-26 安徽理工大学 A kind of multi-level cone shape sand discharge energy dissipator
CN109098155A (en) * 2018-09-19 2018-12-28 华北水利水电大学 Hydraulic engineering curved surface energy dissipating wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107513986A (en) * 2017-10-09 2017-12-26 安徽理工大学 A kind of multi-level cone shape sand discharge energy dissipator
CN109098155A (en) * 2018-09-19 2018-12-28 华北水利水电大学 Hydraulic engineering curved surface energy dissipating wall
CN109098155B (en) * 2018-09-19 2024-03-15 华北水利水电大学 Hydraulic engineering curved surface energy dissipation wall

Similar Documents

Publication Publication Date Title
CN103498452B (en) The slit structure of high steep Narrow Valleys outlet structure escape works
CN202559320U (en) Side aeration ramp for reducing water surface fluctuation of stilling pool
CN204456015U (en) Short protection-apron type power station absorption basin structure
CN202181543U (en) Spillway tunnel structure
CN103410129B (en) Multistage step drop energy dissipater structure
CN104120901B (en) Hydropower plant of staggered layer type water turbine layer structure
CN204456016U (en) The novel absorption basin structure in power station
CN203960991U (en) Rainwater-collecting TRT
CN203373735U (en) Prefabricated concrete tubular pile with external longitudinal webs
CN103821112B (en) Side goes out to flow spillway on bank along journey
CN204608732U (en) Novel swing board-like power station delivery port energy-dissipating structure
CN210049213U (en) Spillway layering energy dissipation chute
CN204475286U (en) Novel hydropower absorption basin structure
CN204491826U (en) Can restore funcitons tube structure system
CN204238190U (en) A kind of Novel T-shaped pier energy dissipator
CN102797242A (en) Arrangement structure of overflow surface holes of arch dam
CN202899398U (en) Steel penetrating brick and wall body
CN204225062U (en) The inner gallery structure of bulb turbine hydropower station factory building
CN204000796U (en) Power station in river channel's structure
CN204753533U (en) From power consumption absorption basin
CN201746823U (en) Water inlet eddy eliminating structure
CN204163061U (en) Water power catch-drain energy-dissipating structure
CN204097976U (en) Stilling pool
CN203175615U (en) Tunnel rain sewage drainage system
CN203807958U (en) Hollow box-type buried culvert structure used for drainage and flood discharge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150708