CN209974095U - Assembled double-beam hoisting structure - Google Patents

Assembled double-beam hoisting structure Download PDF

Info

Publication number
CN209974095U
CN209974095U CN201920715896.XU CN201920715896U CN209974095U CN 209974095 U CN209974095 U CN 209974095U CN 201920715896 U CN201920715896 U CN 201920715896U CN 209974095 U CN209974095 U CN 209974095U
Authority
CN
China
Prior art keywords
hoisted
balance
wire rope
steel wire
hoisting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920715896.XU
Other languages
Chinese (zh)
Inventor
田景杨
张文
杨炳尧
方梅
胡小琲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU HOUSES DEVELOPMENT CONSTRUCTION CO LTD
Original Assignee
GUANGZHOU HOUSES DEVELOPMENT CONSTRUCTION CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU HOUSES DEVELOPMENT CONSTRUCTION CO LTD filed Critical GUANGZHOU HOUSES DEVELOPMENT CONSTRUCTION CO LTD
Priority to CN201920715896.XU priority Critical patent/CN209974095U/en
Application granted granted Critical
Publication of CN209974095U publication Critical patent/CN209974095U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an assembled two roof beam hoisting structure, it can want to hoist the roof beam to carry out the balance to the twice and stabilize to have set up compensating beam and rope group, the balance among the hoist and mount process has been guaranteed, the regulation rope group that sets up simultaneously makes constructor can adjust the height that wherein one roof beam keeps unanimous with another roof beam in hoist and mount process, thereby the efficiency of hoist and mount has been improved greatly, and simultaneously, want to hoist the roof beam with the twice and carry out the pre-connection, and hoist and mount simultaneously to the twice roof beam, the efficiency of construction has also been improved, design complexity and construction complexity have been reduced, manpower and materials have been saved.

Description

Assembled double-beam hoisting structure
Technical Field
The utility model belongs to assembled construction field, concretely relates to two roof beam hoisting structure of assembled.
Background
In traditional assembly type building construction, to the deepening of assembly type roof beam, generally adopt the roof beam to meet the technical thinking of post disconnection, each precast beam can use the precast column to separately construct the hoist and mount as the node when being under construction promptly, uses the precast column to carry out operations such as ligature connection to adjacent precast beam as the center after the hoist and mount again.
However, the technical idea of the beam breaking when meeting the column has the following defects:
1. in the design process, two beams are designed separately, so that the number of components is increased, and the deepened design task is increased;
2. the two roof beams are separately constructed, need carry out twice hoist and mount, have increased hoisting structure's turnover number of times, have also improved the engineering time greatly, if this type of condition is many, will influence the construction progress certainly, consume manpower and materials.
SUMMERY OF THE UTILITY MODEL
In order to overcome the technical defect, the utility model provides a two roof beam hoisting structure of assembled has improved the efficiency of construction, has reduced design complexity and construction complexity, has saved manpower and materials.
In order to solve the above problem, the utility model discloses realize according to following technical scheme:
an assembled double-beam hoisting structure comprises a first beam to be hoisted, a second beam to be hoisted, a balance beam, an upper steel wire rope group, a lower steel wire rope group and an adjusting rope group;
the upper side of the balance beam is connected with a lifting hook of a crane through the upper steel wire rope group;
the lower side of the balance beam is connected with a first beam to be hoisted through the lower steel wire rope group and is connected with a second beam to be hoisted through the adjusting rope group; the first beam to be hoisted and the second beam to be hoisted are fixedly connected;
the adjusting rope set is used for adjusting the height of the second beam to be hoisted.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses an assembled two roof beam hoisting structure, it can want to hoist the roof beam to carry out the balance to the twice and stabilize to have set up compensating beam and rope group, the balance among the hoist and mount process has been guaranteed, the regulation rope group that sets up simultaneously makes constructor can adjust the height that wherein one roof beam keeps unanimous with another roof beam in hoist and mount process, thereby the efficiency of hoist and mount has been improved greatly, and simultaneously, want to hoist the roof beam with the twice and carry out the pre-connection, and hoist and mount simultaneously to the twice roof beam, the efficiency of construction has also been improved, design complexity and construction complexity have been reduced, manpower and materials have been saved.
Further, go up wire rope group including a plurality of wire ropes, a plurality of one ends of going up wire rope all with the lifting hook is connected, and the other end is connected to respectively the different positions of compensating beam upside are in order to keep the balance of compensating beam connects compensating beam and lifting hook through many last wire ropes, has kept the firm balance of compensating beam, also plays stabilizing effect to whole hoisting structure.
Furthermore, the lower steel wire rope group comprises a plurality of lower steel wire ropes, one ends of the lower steel wire ropes are connected with the lower side of the balance beam, the other ends of the lower steel wire ropes are connected to the first beam to be hoisted, and the balance beam and the first beam to be hoisted are connected through the plurality of lower steel wire ropes, so that the stability of the first beam to be hoisted in the hoisting process can be improved.
Furthermore, the adjusting rope group comprises a plurality of adjusting ropes, one end of each adjusting rope is connected with the lower side of the balance beam, the other end of each adjusting rope is connected to the beam to be hoisted by the second, and the balance beam and the beam to be hoisted by the second are connected through the plurality of adjusting rope groups, so that a constructor can adjust the height of the beam to be hoisted by the second more accurately and timely in the hoisting process to enable the height to be the same as that of the beam to be hoisted by the first constructor, and the hoisting efficiency is improved.
Furthermore, the upper steel wire rope group is connected with the upper side of the balance beam and a lifting hook of the crane through a lock catch, the lower steel wire rope group is connected with the lower side of the balance beam and the first beam to be hoisted through a lock catch, and the adjusting rope group is connected with the lower side of the balance beam and the first beam to be hoisted through a lock catch; the lock catch can reinforce the connection among all parts, so that the stability and the safety of the whole structure are guaranteed.
Furthermore, the adjusting rope is a chain block, the height of the beam is adjusted by using the chain block, and the device has the advantages of safety, reliability, simplicity and convenience in maintenance, high mechanical efficiency, small hand chain tension and durability.
Further, the weight that the second wants to hoist the roof beam is less than the first roof beam that wants to hoist, so set up, constructor uses and adjusts the rope group and adjusts lighter one roof beam in the two roof beams that hoist, has alleviateed the manpower burden for the cost of construction reduces, has also guaranteed the efficiency of construction.
Further, first want hoist and mount roof beam with the second is wanted to use the steel bar connection between the hoist and mount roof beam, and is firm reliable, the subsequent beam column construction of being convenient for, simultaneously first want hoist and mount roof beam with the second is wanted to be provided with shaped steel under the hoist and mount roof beam to hoist at the bottom of carrying on the pocket.
Drawings
Fig. 1 is a schematic structural diagram of an assembled double-beam hoisting structure according to an embodiment of the present invention;
in the figure:
1-connecting reinforcing steel bars; 2. 21-chain of chain block; 3. 20-chain block; 4-a balance beam; 5. 8, 14,15, 25-steel wire ropes; 6. 9, 10, 17, 18, 19, 23, 24-locking; 7. 11, 13, 22-beam hoisting points; 16-a crane hook; 26-a first beam to be hoisted; 27-the second beam to be hoisted.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
As shown in fig. 1, the utility model discloses an assembled double-beam hoisting structure, which comprises a first beam 26 to be hoisted, a second beam 27 to be hoisted and a balance beam 4; the first beam 26 to be hoisted and the second beam 27 to be hoisted are fixedly connected through the connecting steel bars 1, so that the beam is stable and reliable, and subsequent beam column construction is facilitated.
The upper side of the balance beam 4 is connected with a lifting hook 16 of the crane through an upper steel wire rope group; specifically, go up wire rope group and include wire rope 14 and wire rope 15, two wire rope's one end all is connected with lifting hook 16, and the other end is connected to the different positions of the 4 upside of compensating beam through hasp 18, 19 respectively, connects compensating beam 4 and lifting hook 16 through two wire rope 14,15, has kept the firm balance of compensating beam 4, also plays stabilizing effect to whole hoisting structure.
The lower side of the balance beam 4 is connected with a first beam 26 to be hoisted through a lower steel wire rope set, and specifically, the lower steel wire rope set comprises a steel wire rope 5 and a steel wire rope 8; one end of a steel wire rope 5 is connected with the lower side of the balance beam 4 through a lock catch 6, and the other end of the steel wire rope is connected to a lifting point 7 of a first beam 26 to be lifted through a lock catch 12; one end of the steel wire rope 8 is connected with the lower side of the balance beam 4 through the lock catch 9, the other end of the steel wire rope is connected to the lifting point 11 of the first beam 26 to be lifted through the lock catch 10, the balance beam 4 and the first beam 26 to be lifted are connected through the two steel wire ropes, and the stability of the first beam 26 to be lifted in the lifting process can be improved.
The lower side of the balance beam 4 is also connected with a second beam 27 to be hoisted through an adjusting rope group; this adjust rope group includes many regulation ropes, and the regulation rope can be chain block, also can be the combination of chain block and wire rope, and in this embodiment, adjusts the rope group and includes two regulation ropes, and one of them is chain block 20, and another is formed by chain block 3 and wire rope 25 combination. Specifically, one end of the chain block 20 is connected with the lower side of the balance beam 4, and the tail end of the chain 21 at the other end is connected to the lifting point 22 of the second beam 27 to be lifted through the lock 23; the chain block is used for adjusting the height of the hoisting beam, and the chain block has the characteristics of safety, reliability, simple and convenient maintenance, high mechanical efficiency, small hand chain tension and durability. One end of a steel wire rope 25 is connected with the lower side of the balance beam 4 through a lock catch 24, and the other end of the steel wire rope is connected with the chain block 3; the tail end of the chain 2 of the chain block 3 is connected to a lifting point 13 of a second beam 27 to be lifted through a lock catch 17; by adopting the mode of combining the chain block and the steel wire rope, the problem that the chain length of the chain block is not enough in part of construction sites can be solved, and the construction efficiency is improved.
The balance beam and the second beam to be hoisted are connected through the adjusting rope set, so that the height of the second beam to be hoisted can be adjusted more accurately and more timely by constructors in the hoisting process, the height of the second beam to be hoisted is the same as that of the first beam to be hoisted, and the hoisting efficiency is improved.
Specifically, in the above embodiment, the weight of the second beam 27 to be hoisted is smaller than that of the first beam 26 to be hoisted, and thus the constructor adjusts the lighter one of the two beams to be hoisted by using the adjusting rope set, so as to reduce the labor burden, reduce the construction cost, and ensure the construction efficiency.
The utility model discloses a two roof beam hoisting structure of assembled, it can carry out the equilibrium to two to want hoist the roof beam to have set up compensating beam and rope group and stabilize, the balance in the hoist and mount process has been guaranteed, the regulation rope group that sets up simultaneously makes constructor can adjust the height that one of them roof beam and keep unanimous with another roof beam in hoist and mount process, thereby the efficiency of hoist and mount has been improved greatly, and simultaneously, with two to want hoist the roof beam and connect in advance, and hoist two roof beams simultaneously, the efficiency of construction has also been improved, design complexity and construction complexity have been reduced, manpower and materials have been saved.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in any way, so that any modification, equivalent change and modification made by the technical spirit of the present invention to the above embodiments do not depart from the technical solution of the present invention, and still fall within the scope of the technical solution of the present invention.

Claims (10)

1. An assembled double-beam hoisting structure is characterized by comprising a first beam to be hoisted, a second beam to be hoisted, a balance beam, an upper steel wire rope group, a lower steel wire rope group and an adjusting rope group;
the upper side of the balance beam is connected with a lifting hook of a crane through the upper steel wire rope group;
the lower side of the balance beam is connected with a first beam to be hoisted through the lower steel wire rope group and is connected with a second beam to be hoisted through the adjusting rope group; the first beam to be hoisted and the second beam to be hoisted are fixedly connected;
the adjusting rope set is used for adjusting the height of the second beam to be hoisted.
2. The assembled double-beam hoisting structure of claim 1, wherein the upper wire rope set comprises a plurality of upper wire ropes, one ends of the upper wire ropes are connected with the lifting hook, and the other ends of the upper wire ropes are respectively connected to different positions on the upper side of the balance beam to keep the balance of the balance beam.
3. The assembled double-beam hoisting structure of claim 1, wherein the lower steel wire rope set comprises a plurality of lower steel wire ropes, one end of each lower steel wire rope is connected with the lower side of the balance beam, and the other end of each lower steel wire rope is connected to the first beam to be hoisted.
4. The assembly type double-beam hoisting structure of claim 1, wherein the adjusting rope set comprises a plurality of adjusting ropes, one end of each adjusting rope is connected with the lower side of the balance beam, and the other end of each adjusting rope is connected to the second beam to be hoisted.
5. The assembled double-beam hoisting structure of claim 4, wherein the adjusting rope is a chain block or a combination of the chain block and a steel wire rope.
6. The assembled double-beam hoisting structure of claim 1, wherein the second beam to be hoisted has a weight smaller than that of the first beam to be hoisted.
7. The assembled double-beam hoisting structure of claim 1, wherein the first beam to be hoisted and the second beam to be hoisted are connected by steel bars, and section steel is arranged under the first beam to be hoisted and the second beam to be hoisted.
8. The assembled double-beam hoisting structure of claim 1, wherein the upper wire rope set is connected with the upper side of the balance beam and the lifting hook of the crane through a lock catch.
9. The assembled double-beam hoisting structure of claim 1, wherein the lower wire rope set is connected with the lower side of the balance beam and the first beam to be hoisted through a lock catch.
10. The assembled double-beam hoisting structure of claim 9, wherein the adjusting rope set is connected with the lower side of the balance beam and the first beam to be hoisted through a lock catch.
CN201920715896.XU 2019-05-16 2019-05-16 Assembled double-beam hoisting structure Expired - Fee Related CN209974095U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920715896.XU CN209974095U (en) 2019-05-16 2019-05-16 Assembled double-beam hoisting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920715896.XU CN209974095U (en) 2019-05-16 2019-05-16 Assembled double-beam hoisting structure

Publications (1)

Publication Number Publication Date
CN209974095U true CN209974095U (en) 2020-01-21

Family

ID=69262934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920715896.XU Expired - Fee Related CN209974095U (en) 2019-05-16 2019-05-16 Assembled double-beam hoisting structure

Country Status (1)

Country Link
CN (1) CN209974095U (en)

Similar Documents

Publication Publication Date Title
US7469882B2 (en) Hook-type bottom block
US20210221656A1 (en) Crane
US20200361753A1 (en) Rotary Tower Crane
CN111794529A (en) Modular construction hoisting method for arch type space pipe truss steel structure system
CN209974095U (en) Assembled double-beam hoisting structure
CN101811646A (en) Crawler crane with lateral reinforcement structure
CN201647810U (en) Large-tonnage combined lifting hook and hoisting machine provided with same
CN111424561A (en) Layered suspension structure of single-side double-main-cable steel truss stiffening beam suspension bridge
CN210163792U (en) High mound pier stud reinforcing bar mounting platform
CN213011542U (en) Multifunctional combined adjustable hanging frame
CN104085832A (en) Flexible component lifting device and lifting method thereof
CN116216481A (en) Multi-point lifting balance assembly for steel beam lifting
CN105384054B (en) A kind of steel-reinforcement cage hanger
CN212669031U (en) Novel split type jib loading boom of tower machine
CN212358014U (en) Single-span cable hoisting device for hoisting suspension bridge girder
CN209635744U (en) A kind of large-span prestressed girder portal crane
CN205222442U (en) Steel -reinforcement cage hanger
CN216072688U (en) Integral hoisting tool for bottom web top steel bar framework of hollow slab beam
CN220596810U (en) Precast T roof beam hoist device
CN108928729B (en) Lifting appliance and lifting device using same
CN216586201U (en) A hoist that is arranged in cable-stay bridge construction to stride to close
CN214780232U (en) Large-scale superposed beam hoisting device
CN219408855U (en) Bridge deck crane hoist device of adaptation different beam lengths
CN214399489U (en) Four-point hoisting eight-point hoisting beam
CN109607378A (en) A kind of large-span prestressed girder portal crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200121

CF01 Termination of patent right due to non-payment of annual fee