CN209907910U - Novel scaffold connecting device for building engineering - Google Patents

Novel scaffold connecting device for building engineering Download PDF

Info

Publication number
CN209907910U
CN209907910U CN201920604033.5U CN201920604033U CN209907910U CN 209907910 U CN209907910 U CN 209907910U CN 201920604033 U CN201920604033 U CN 201920604033U CN 209907910 U CN209907910 U CN 209907910U
Authority
CN
China
Prior art keywords
screw hole
groove
apron
steel pipe
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920604033.5U
Other languages
Chinese (zh)
Inventor
李忠亮
齐珍珍
李萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920604033.5U priority Critical patent/CN209907910U/en
Application granted granted Critical
Publication of CN209907910U publication Critical patent/CN209907910U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a novel building engineering scaffold puts up connecting device relates to scaffold technical field, this novel building engineering scaffold puts up connecting device, which comprises a body, the both sides fixedly connected with mounting panel of body, two backup pads of top fixedly connected with of mounting panel, first circular slot has been seted up to one side of backup pad, first recess has been seted up to one side of mounting panel, first screw hole has been seted up to the inner wall of first recess, the second screw hole has all been seted up to one side of body and mounting panel. This novel building engineering scaffold puts up connecting device through set up the third screw hole on the body to set up the fourth screw hole on first apron, can install second screw thread post, be convenient for with body and first apron more firm with the steel pipe of erectting, scaffold spalling when having avoided leading to the construction because of the connection insecure causes constructor injured's the condition to appear, has realized firm body and the purpose of erectting the steel pipe.

Description

Novel scaffold connecting device for building engineering
Technical Field
The utility model relates to a scaffold technical field specifically is novel building engineering scaffold puts up connecting device.
Background
Scaffold frame has become indispensable engineering tool in engineering such as building engineering and equipment engineering, and the insecure of scaffold steel pipe connection causes building engineering scaffold frame not hard up to collapse easily, injures the staff by a crashing object, brings the potential safety hazard for the staff, so proposes novel building engineering scaffold frame connecting device and solves the problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a novel building engineering scaffold puts up connecting device has solved scaffold steel pipe and has connected insecure problem.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes:
the novel connecting device for the scaffold in the building engineering comprises a body, wherein mounting plates are fixedly connected to two sides of the body, two supporting plates are fixedly connected to the top of each mounting plate, a first circular groove is formed in one side of each supporting plate, a first groove is formed in one side of each mounting plate, a first screw hole is formed in the inner wall of each first groove, second screw holes are formed in one sides of the body and the mounting plates, a second groove is formed in one side of the body, a third screw hole is formed in the center of one side of the body, a first cover plate is arranged on one side of the body, a third groove is formed in one side of the first cover plate, and a fourth screw hole is formed in the inner wall of the third groove;
one side of mounting panel is provided with the second apron, fifth screw hole has all been seted up to one side of first apron and second apron, the inside threaded connection of fifth screw hole has first screw thread post, sixth screw hole has been seted up to one side of second apron, the top fixedly connected with supporting shoe of second apron, the second circular slot has been seted up to the one end that the second apron was kept away from to the supporting shoe, the inside swing joint of second circular slot has the pivot, the fourth recess has been seted up to one side of second apron.
Optionally, the inside of third screw hole is provided with second screw thread post, second screw thread post runs through the inside of third screw hole and is connected with the inside screw thread of fourth screw hole.
Optionally, the inside of sixth screw hole is provided with third screw thread post, third screw thread post runs through the inside of sixth screw hole and the inner wall threaded connection of first screw hole.
Optionally, the first threaded column penetrates through the inner wall of the fifth screw hole and is connected with the inner thread of the second screw hole, and the rotating shaft penetrates through the inner part of the second circular groove and is movably connected with the inner wall of the first circular groove.
Optionally, the first groove and the fourth groove are combined to form a first clamping groove, and the second groove and the third groove are combined to form a second clamping groove.
Optionally, the number of the second screw holes and the number of the fifth screw holes are twelve.
(III) advantageous effects
The utility model provides a novel building engineering scaffold puts up connecting device possesses following beneficial effect:
(1) the novel scaffold connecting device for building engineering is characterized in that the body and the mounting plate can be fixed on a vertical steel pipe by arranging the second groove on the body and arranging the third groove on the first cover plate, the transverse steel pipe and the vertical steel pipe can be connected to form a scaffold by matching the mounting plate and the second cover plate, the body and the mounting plate can be fixed with the vertical steel pipe by fixing the body and the mounting plate with the vertical steel pipe, the transverse steel pipe can be fixed on the mounting plate by arranging the second cover plate on the mounting plate and arranging the first clamping groove on the mounting plate and the second cover plate, the transverse steel pipe is connected with the vertical steel pipe, the transverse steel pipe and the vertical steel pipe can be connected to form the scaffold, the body and the first cover plate can be fixed more firmly with the vertical steel pipe by arranging the third screw hole on the body and the fourth screw hole on the first cover plate, the condition that constructors are injured due to scaffold spalling during construction caused by insecure connection is avoided, and the purposes of fixing the body and erecting the steel pipe are achieved.
(2) This novel building engineering scaffold puts up connecting device, through set up first screw hole on the mounting panel, and set up the sixth screw hole on the second apron, can install third screw thread post, it is fixed with the mounting panel to be convenient for violently upright steel pipe, thereby reach the purpose of fixing violently upright steel pipe and the steel pipe of erectting, the condition of having avoided violently upright steel pipe to drop from the scaffold frame when the construction and causing the construction accident appears, the effect of fixing violently upright steel pipe and mounting panel has been played, through setting up the backup pad at the mounting panel, and set up the pivot in the backup pad, can install and activity supporting shoe, be convenient for install the second apron on the mounting panel, thereby the installation time of scaffold frame has been reduced, the effect of installation and activity supporting shoe has been played.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural diagram of the mounting plate of the present invention;
fig. 3 is a schematic structural view of the first cover plate of the present invention;
fig. 4 is a schematic structural view of a second cover plate of the present invention;
fig. 5 is a schematic view of the internal structure of the present invention.
In the figure: 1-body, 2-mounting plate, 3-support plate, 4-first circular groove, 5-first groove, 6-first screw hole, 7-second screw hole, 8-second groove, 9-third screw hole, 10-first cover plate, 11-third groove, 12-fourth screw hole, 13-second cover plate, 14-fifth screw hole, 15-first threaded column, 16-sixth screw hole, 17-support block, 18-second circular groove, 19-rotating shaft, 20-fourth groove, 21-second threaded column, 22-third threaded column, 23-first clamping groove and 24-second clamping groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like, indicate the orientation or positional relationship indicated based on the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "disposed," "mounted," "connected," and "fixed" are to be construed broadly, e.g., as meaning either a fixed connection or a removable connection; may be a mechanical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature.
Referring to fig. 1-4, the present invention provides a technical solution:
a novel scaffold connecting device for building engineering comprises a body 1, wherein mounting plates 2 are fixedly connected to two sides of the body 1, two supporting plates 3 are fixedly connected to the top of the mounting plates 2, the supporting plates 3 are arranged on the mounting plates 2, a rotating shaft 19 is arranged on the supporting plates 3, supporting blocks 17 can be installed and moved, a second cover plate 13 is conveniently installed on the mounting plates 2, so that the installation time of the scaffold is reduced, the mounting and moving functions of the supporting blocks 17 are achieved, a first circular groove 4 is formed in one side of each supporting plate 3, a first groove 5 is formed in one side of each mounting plate 2, a first screw hole 6 is formed in the inner wall of each first groove 5, second screw holes 7 are formed in the body 1 and one side of each mounting plate 2, a second groove 8 is formed in one side of the body 1, a second groove 8 is formed in the body 1, and a third groove 11 is formed in the first cover, the body 1 and the mounting plate 2 can be fixed on the vertical steel pipe, the transverse steel pipe and the vertical steel pipe are connected to form a scaffold by matching the mounting plate 2 and the second cover plate 13, the body 1 and the mounting plate 2 are fixed with the vertical steel pipe, a third screw hole 9 is arranged at the center of one side of the body 1, a first cover plate 10 is arranged at one side of the body 1, a third groove 11 is arranged at one side of the first cover plate 10, a fourth screw hole 12 is arranged on the inner wall of the third groove 11, the third screw hole 9 is formed in the body 1, the fourth screw hole 12 is formed in the first cover plate 10, and the second threaded column 21 can be installed, so that the body 1 and the first cover plate 10 can be fixed with the erected steel pipe more firmly, the condition that constructors are injured due to scaffold spalling during construction due to insecure connection is avoided, and the purpose of fixing the body 1 and the erected steel pipe is achieved;
a second cover plate 13 is arranged on one side of the mounting plate 2, the second cover plate 13 is arranged on the mounting plate 2, the mounting plate 2 and the second cover plate 13 are provided with first clamping grooves 23, the transverse and vertical steel pipes can be fixed on the mounting plate 2, the transverse and vertical steel pipes are connected with the vertical steel pipes to form a scaffold, one side of the first cover plate 10 and one side of the second cover plate 13 are both provided with fifth screw holes 14, the inner threads of the fifth screw holes 14 are connected with first threaded columns 15, one side of the second cover plate 13 is provided with sixth threaded holes 16, the mounting plate 2 is provided with first screw holes 6, the second cover plate 13 is provided with sixth threaded holes 16, third threaded columns 22 can be mounted, the transverse and vertical steel pipes are convenient to be fixed with the mounting plate 2, and the purpose of fixing the transverse and vertical steel pipes is achieved, avoided the condition that the violently upright steel pipe dropped from the scaffold frame and caused the construction accident to appear when the construction, played the effect of fixing violently upright steel pipe and mounting panel 2, the top fixedly connected with supporting shoe 17 of second apron 13, second circular slot 18 has been seted up to the one end that second apron 13 was kept away from to supporting shoe 17, and the inside swing joint of second circular slot 18 has pivot 19, and fourth recess 20 has been seted up to one side of second apron 13.
As the utility model discloses an optional technical scheme:
the inside of third screw hole 9 is provided with second screw thread post 21, and second screw thread post 21 runs through the inside of third screw hole 9 and is connected with the inside screw thread of fourth screw hole 12.
As the utility model discloses an optional technical scheme:
a third threaded column 22 is arranged inside the sixth threaded hole 16, and the third threaded column 22 penetrates through the inside of the sixth threaded hole 16 and is in threaded connection with the inner wall of the first threaded hole 6.
As the utility model discloses an optional technical scheme:
the first threaded column 15 penetrates through the inner wall of the fifth screw hole 14 to be in threaded connection with the inner part of the second screw hole 7, and the rotating shaft 19 penetrates through the inner part of the second circular groove 18 to be movably connected with the inner wall of the first circular groove 4.
As the utility model discloses an optional technical scheme:
the first groove 5 and the fourth groove 20 combine to form a first clamping groove 23, and the second groove 8 and the third groove 11 combine to form a second clamping groove 24.
As the utility model discloses an optional technical scheme:
the number of the second screw holes 7 and the number of the fifth screw holes 14 are twelve.
When the steel pipe fixing device is used, the second groove 8 on the body 1 is clamped at the joint of a scaffold, the third groove 11 on the first cover plate 10 is opposite to the second groove 8, the body 1 and a steel pipe erected by the scaffold are fixed through the first threaded column 15 and the second threaded column 21, the steel pipe erected transversely by the scaffold is clamped in the first groove 5 on the mounting plate 2, the second cover plate 13 and the mounting plate 2 are fixed through the first threaded column 15 and the third threaded column 22, and the transversely erected steel pipe and the erected steel pipe are fixed.
To sum up, when the novel scaffold connecting device for building engineering is used, the body 1 and the mounting plate 2 can be fixed on the vertical steel pipe by arranging the second groove 8 on the body 1 and arranging the third groove 11 on the first cover plate 10, the horizontal steel pipe and the vertical steel pipe can be connected to form a scaffold by matching the mounting plate 2 and the second cover plate 13, the effect of fixing the body 1 and the mounting plate 2 with the vertical steel pipe is achieved, the horizontal steel pipe and the vertical steel pipe can be fixed on the mounting plate 2 by arranging the second cover plate 13 on the mounting plate 2 and arranging the first clamping groove 23 on the mounting plate 2 and the second cover plate 13, the horizontal steel pipe and the vertical steel pipe are connected to form the scaffold, the effect of connecting the horizontal steel pipe and the vertical steel pipe to form the scaffold is achieved by arranging the third screw hole 9 on the body 1 and arranging the fourth screw hole 12 on the first cover plate 10, the second threaded post 21 can be installed, so that the body 1 and the first cover plate 10 can be fixed with the vertical steel pipe more firmly, the condition that constructors are injured due to scaffold spalling during construction caused by insecure connection is avoided, the purpose of fixing the body 1 with the vertical steel pipe is realized, the third threaded post 22 can be installed by arranging the first threaded hole 6 on the mounting plate 2 and arranging the sixth threaded hole 16 on the second cover plate 13, so that the horizontal steel pipe and the mounting plate 2 can be fixed conveniently, the purpose of fixing the horizontal steel pipe and the vertical steel pipe is achieved, the condition that the horizontal steel pipe falls off from the scaffold during construction to cause construction accidents is avoided, the function of fixing the horizontal steel pipe and the mounting plate 2 is realized, the support plate 3 is arranged on the mounting plate 2, the rotating shaft 19 is arranged on the support plate 3, and the support block 17 can be installed and moved, it is convenient to mount the second cover plate 13 on the mounting plate 2, thereby reducing the mounting time of the scaffold and functioning as a mounting and movable support block 17.
It is noted that in the present disclosure, unless otherwise explicitly specified or limited, a first feature "on" or "under" a second feature may be directly contacting the first and second features or indirectly contacting the first and second features through an intermediate. Also, a first feature "on," "over," and "above" a second feature may be directly or diagonally above the second feature, or may simply indicate that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature may be directly under or obliquely under the first feature, or may simply mean that the first feature is at a lesser elevation than the second feature.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. Novel building engineering scaffold connecting device, including body (1), its characterized in that:
the two sides of the body (1) are fixedly connected with mounting plates (2), the top of the mounting plates (2) is fixedly connected with two supporting plates (3), a first circular groove (4) is arranged on one side of the supporting plate (3), a first groove (5) is arranged on one side of the mounting plate (2), a first screw hole (6) is arranged on the inner wall of the first groove (5), a second screw hole (7) is arranged on one side of the body (1) and one side of the mounting plate (2), a second groove (8) is arranged on one side of the body (1), a third screw hole (9) is arranged in the center of one side of the body (1), a first cover plate (10) is arranged on one side of the body (1), a third groove (11) is formed in one side of the first cover plate (10), a fourth screw hole (12) is formed in the inner wall of the third groove (11);
one side of mounting panel (2) is provided with second apron (13), fifth screw hole (14) have all been seted up to one side of first apron (10) and second apron (13), the internal thread of fifth screw hole (14) is connected with first screw thread post (15), sixth screw hole (16) have been seted up to one side of second apron (13), the top fixedly connected with supporting shoe (17) of second apron (13), second circular slot (18) have been seted up to the one end that second apron (13) were kept away from in supporting shoe (17), the inside swing joint of second circular slot (18) has pivot (19), fourth recess (20) have been seted up to one side of second apron (13).
2. A new construction scaffolding connector as claimed in claim 1,
the inside of third screw hole (9) is provided with second screw thread post (21), inside and the inside threaded connection of fourth screw hole (12) that third screw hole (9) are run through to second screw thread post (21).
3. A new construction scaffolding connector as claimed in claim 1,
the inside of sixth screw hole (16) is provided with third screw thread post (22), third screw thread post (22) run through the inside and the inner wall threaded connection of first screw hole (6) of sixth screw hole (16).
4. A new construction scaffolding connector as claimed in claim 1,
the inner wall that first screw thread post (15) run through fifth screw hole (14) is connected with the inside screw thread of second screw hole (7), pivot (19) run through the inside of second circular slot (18) and the inner wall swing joint of first circular slot (4).
5. A new construction scaffolding connector as claimed in claim 1,
the first groove (5) and the fourth groove (20) are combined to form a first clamping groove (23), and the second groove (8) and the third groove (11) are combined to form a second clamping groove (24).
6. A new construction scaffolding connector as claimed in claim 1,
the number of the second screw holes (7) and the number of the fifth screw holes (14) are twelve.
CN201920604033.5U 2019-04-29 2019-04-29 Novel scaffold connecting device for building engineering Expired - Fee Related CN209907910U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920604033.5U CN209907910U (en) 2019-04-29 2019-04-29 Novel scaffold connecting device for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920604033.5U CN209907910U (en) 2019-04-29 2019-04-29 Novel scaffold connecting device for building engineering

Publications (1)

Publication Number Publication Date
CN209907910U true CN209907910U (en) 2020-01-07

Family

ID=69046174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920604033.5U Expired - Fee Related CN209907910U (en) 2019-04-29 2019-04-29 Novel scaffold connecting device for building engineering

Country Status (1)

Country Link
CN (1) CN209907910U (en)

Similar Documents

Publication Publication Date Title
CN217379719U (en) Scalable instrument formula safety protection platform of elevator well
CN215107335U (en) Small-size entrance to a cave template system of consolidating
CN209907910U (en) Novel scaffold connecting device for building engineering
CN210715610U (en) Bearing convenient to fix
CN211313306U (en) Movable scaffold for constructional engineering
CN210086491U (en) Supporting device is strengthened in building jacking control
CN215290164U (en) Slope supporting system
CN212957556U (en) Scaffold for building engineering convenient to build
CN210773970U (en) Bridge monitoring devices based on big dipper satellite
CN210105278U (en) Straight insertion type wheel buckle type steel pipe support
CN210031468U (en) Steel plate bridge support frame convenient to adjust
CN214006444U (en) Scaffold frame for building bridge convenient to installation
CN221256109U (en) Square steel pipe outer scaffold wall connecting piece and square steel pipe outer scaffold
CN212835929U (en) Connecting structure of prefabricated part and building main body
CN220278873U (en) Gantry bracket of gantry machining center
CN217420574U (en) Prefabricated component of assembled building with remove function
CN212154139U (en) Building aluminum alloy template balcony integrated configuration
CN218581153U (en) Detachable girder steel bracket support
CN207944783U (en) A kind of construction fixture type protective fence
CN213626566U (en) Building steel structure of high antidetonation type
CN214942278U (en) Supporting and connecting device for assembly type building external hanging rack
CN220768812U (en) Flower basket type cantilever I-steel connecting device for corners
CN220978043U (en) Novel steel corbel suitable for deep basal pit supports
CN213626596U (en) Anti-falling device for building climbing frame
CN220521991U (en) High formwork corner brace structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200107

CF01 Termination of patent right due to non-payment of annual fee