CN218581153U - Detachable girder steel bracket support - Google Patents
Detachable girder steel bracket support Download PDFInfo
- Publication number
- CN218581153U CN218581153U CN202222765688.5U CN202222765688U CN218581153U CN 218581153 U CN218581153 U CN 218581153U CN 202222765688 U CN202222765688 U CN 202222765688U CN 218581153 U CN218581153 U CN 218581153U
- Authority
- CN
- China
- Prior art keywords
- support
- steel beam
- mounting plate
- support frame
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to the technical field of building construction, in particular to a detachable steel beam bracket support, which comprises a steel beam, a first support and a second support; the first support is used for supporting the steel beam and consists of a first mounting plate which is vertically arranged and a first support frame which is arranged on the side end face of the first mounting plate; the second support is used for supporting the steel beam and consists of a second mounting plate which is transversely arranged and a second support frame which is arranged on the top end face of the second mounting plate; the steel beam bracket support is fixed by using a connecting bolt in a mode of pre-embedding a bolt sleeve in advance, and a steel beam only needs to be hung into a groove of a support frame; in addition, the connecting holes in the middle of the support frame and the through holes of the steel beam can be connected and locked through bolts or pin shafts as required, and the structure and the connection are simple; this design provides the bracket for the scaffold frame that uses the girder steel as the basis and supports, and not only the installation annex is less, and simple to operate is swift moreover, has improved the efficiency of installation, and the later stage of being convenient for carries out the dismouting.
Description
Technical Field
The utility model relates to a construction technical field specifically is a detachable girder steel bracket support.
Background
At present, when building construction operation is carried out in a structural well, a template bracket, a construction frame and a suspension operation platform steel beam are required to be installed in the structural well and used for providing an operation platform for construction of construction workers, and a scaffold based on the placed steel beam is one of the common scaffolds at present;
the utility model patent with the grant publication number of CN202122417952.1 discloses a steel beam with a sliding support, which comprises two steel beam columns, wherein the top surfaces of the two steel beam columns are provided with positioning grooves, positioning blocks are clamped inside the positioning grooves, supporting steel plates are welded on the upper surfaces of the positioning blocks, two supporting side plates are welded on the two sides of the upper surfaces of the supporting steel plates, a bearing beam mounting groove is arranged between the two supporting side plates, a bearing beam is mounted in the bearing beam mounting groove, an i-shaped chute is formed in the upper surface of the bearing beam, and first rolling grooves are formed in the two sides of the upper surface of the bearing beam; the gravity center of the support is effectively reduced, the steel beam can move more smoothly by the roller, the position deviation of the steel beam during movement can be effectively prevented by the I-shaped sliding groove, the steel beam does not need to be adjusted in position, and the steel beam is more convenient and rapid to mount;
although this girder steel with support that slides conveniently removes the girder steel and installs, the device is used for the installation annex of girder steel more, and the operation is comparatively complicated and time-consuming when the installation, has influenced the installation effectiveness of girder steel, in view of this, we provide a detachable girder steel bracket support.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a detachable girder steel bracket support to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme:
a detachable steel beam bracket support comprises a steel beam, a first support and a second support;
the steel beam is arranged between the first support and the second support;
the first support is used for supporting the steel beam and consists of a first mounting plate which is vertically arranged and a first support frame which is arranged on the side end face of the first mounting plate; a plurality of first connecting bolts are arranged on the first mounting plate at two sides, and the tail ends of the first connecting bolts are in threaded connection with first embedded bolt sleeves; the first support frame is provided with a first groove for placing the end part of the steel beam;
the second support is used for supporting the steel beam and consists of a second mounting plate which is transversely arranged and a second support frame which is arranged on the top end face of the second mounting plate; a plurality of second connecting bolts are arranged on the second mounting plate at two sides, and the tail ends of the second connecting bolts are in threaded connection with second embedded bolt sleeves; and a second groove for placing the end part of the steel beam is formed in the second support frame.
As the utility model discloses preferred technical scheme, first connecting hole has been seted up on the first support frame, the second connecting hole has been seted up on the second support frame, the through-hole has been seted up on the girder steel, accessible round pin axle or bolted connection between first connecting hole and second connecting hole and the through-hole.
As the utility model discloses preferred technical scheme, first mounting panel with the junction of first support frame is equipped with a plurality of first strengthening ribs that are used for increasing structural strength.
As the utility model discloses preferred technical scheme, the second mounting panel with the junction of second support frame is equipped with a plurality of second strengthening ribs that are used for increasing structural strength.
As the utility model discloses preferred technical scheme, first mounting panel with first support frame is the integrated into one piece structure, the second mounting panel with the second support frame is the integrated into one piece structure.
As the utility model discloses preferred technical scheme, the girder steel can be I-steel or channel-section steel.
As the utility model discloses preferred technical scheme, first buried bolt sleeve in advance with the buried bolt sleeve in advance of second is for installing the built-in fitting in the preformed hole on wall, post or roof beam.
Compared with the prior art, the beneficial effects of the utility model are that:
the steel beam bracket support is fixed by using connecting bolts in a mode of pre-embedding bolt sleeves, and a steel beam only needs to be hung in a groove of a support frame; in addition, the connecting hole in the middle of the support frame and the steel beam through hole can be connected and locked through a bolt or a pin shaft according to requirements, the structure and the connection are simple, the bearing capacity, the tensile strength and the shearing strength are high, and the assembly and disassembly are quick; this design provides the bracket for the scaffold frame that uses the girder steel as the basis and supports, and the support commonality is good, and the security is high, and not only the installation annex is less, and simple to operate is swift moreover, has improved the efficiency of installation, and the later stage of being convenient for carries out the dismouting.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the installation state of the present invention;
FIG. 3 is a schematic view of the overall explosion structure of the present invention;
fig. 4 is a schematic structural view of the first support of the present invention;
fig. 5 is a schematic view of a part of the structure of the first support of the present invention;
fig. 6 is a schematic structural view of the second support of the present invention.
In the figure:
1. a steel beam; 11. a through hole;
2. a first support; 21. a first mounting plate; 22. a first connecting bolt; 23. a first embedded bolt sleeve; 24. a first support frame; 241. a first connection hole; 25. a first reinforcing rib;
3. a second support; 31. a second mounting plate; 32. a second connecting bolt; 33. a second embedded bolt sleeve; 34. a second support frame; 341. a second connection hole; 35. and a second reinforcing rib.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The embodiment provides a technical scheme:
referring to fig. 1-6, a detachable steel beam bracket support comprises a steel beam 1, a first support 2 and a second support 3, wherein the steel beam 1 is arranged between the first support 2 and the second support 3; the first support 2 is used for supporting the steel beam 1 and consists of a first mounting plate 21 which is vertically arranged and a first support frame 24 which is arranged on the end face of the first mounting plate 21; a plurality of first connecting bolts 22 are arranged on the first mounting plate 21 at two sides, and the tail ends of the first connecting bolts 22 are in threaded connection with first embedded bolt sleeves 23; a first groove for placing the end part of the steel beam 1 is formed in the first support frame 24; the second support 3 is used for supporting the steel beam 1 and consists of a second mounting plate 31 arranged transversely and a second support frame 34 arranged on the top end face of the second mounting plate 31; a plurality of second connecting bolts 32 are respectively arranged at two sides of the second mounting plate 31, and the tail ends of the second connecting bolts 32 are in threaded connection with second embedded bolt sleeves 33; a second groove for placing the end part of the steel beam 1 is formed in the second support frame 34;
in this embodiment, the first support frame 24 has a first connection hole 241, the second support frame 34 has a second connection hole 341, the steel beam 1 has a through hole 11, the first connection hole 241, the second connection hole 341 and the through hole 11 are connected by a pin or a bolt, and the first connection hole 241 and the through hole 11 are connected by a pin or a bolt, so that the connection stability and the firmness of the steel beam 1 and the first support frame 24 and the second support frame 34 can be improved, and the use safety of the steel beam is improved.
In this embodiment, a plurality of first reinforcing ribs 25 for increasing structural strength are arranged at the joints of the first mounting plate 21 and the first support frame 24, and the arrangement of the first reinforcing ribs 25 can increase the joint strength of the first mounting plate 21 and the first support frame 24, thereby improving the stability and the firmness of the first support 2.
In this embodiment, the joint of the second mounting plate 31 and the second support bracket 34 is provided with a plurality of second reinforcing ribs 35 for increasing the structural strength, and the arrangement of the second reinforcing ribs 35 can increase the joint strength of the second mounting plate 31 and the second support bracket 34, thereby improving the stability and the firmness of the second support 3.
In this embodiment, the first mounting plate 21 and the first support frame 24 are integrally formed, the second mounting plate 31 and the second support frame 34 are integrally formed, and the integrally formed structure has better structural strength and rigidity, so that the stability and the firmness of the first support 2 and the second support 3 are improved, and the mounting stability of the steel beam 1 is improved.
In this embodiment, the steel beam 1 may be an i-steel or a channel steel, which has higher structural strength, and the scaffold based on the i-steel or the channel steel has higher safety.
In this embodiment, first buried bolt sleeve 23 and second buried bolt sleeve 33 are for installing the built-in fitting in the preformed hole on wall, post or roof beam, through buried bolt telescopic form in advance, use connecting bolt fixing support, the girder steel only need hang into the support frame recess in can, use finish even take connecting bolt to demolish the recovery only consume buried sleeve, the all kinds of steel sheet of greatly reduced, reinforcing bar buried part loss quantity.
It should be added that, referring to fig. 2, in this embodiment, the first embedded bolt sleeve 23 and the second embedded bolt sleeve 33 are respectively installed in the preformed holes on the wall, the column or the beam, and when the first support 2 and the second support 3 are installed, the first connecting bolt 22 and the second connecting bolt 32 are screwed into the corresponding first embedded bolt sleeve 23 and the second embedded bolt sleeve 33, so as to complete installation and fixation, and thus, the steel beam 1 can be conveniently installed.
When the steel beam connecting device is used specifically, a user firstly installs the first embedded bolt sleeves 23 and the second embedded bolt sleeves 33 on two sides in the reserved holes in the walls, columns or beams on the two sides respectively, then the user screws the first connecting bolts 22 into the first embedded bolt sleeves 23, the first support 2 completes installation, meanwhile, the user screws the second connecting bolts 32 into the second embedded bolt sleeves 33, the second support 3 completes installation, then the user lifts the steel beam by using a crane, the two ends of the steel beam are respectively placed into the first grooves of the first support 24 and the second grooves of the second support 34, and finally the user penetrates the bolts or the pin shafts through the first connecting holes 241 and the through holes 11, the second connecting holes 341 and the through holes 11, so that the connection and the fixation of the steel beam 1 and the first support 2 and the second support 3 can be completed.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only the preferred embodiments of the present invention, and is not intended to limit the present invention, and that there may be various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall within the scope of the present invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (7)
1. The utility model provides a detachable girder steel bracket support, includes girder steel (1), first support (2) and second support (3), its characterized in that:
the steel beam (1) is arranged between the first support (2) and the second support (3);
the first support (2) is used for supporting the steel beam (1) and consists of a first mounting plate (21) which is vertically arranged and a first support frame (24) which is arranged on the end face of the first mounting plate (21); a plurality of first connecting bolts (22) are arranged on the first mounting plate (21) at two sides, and the tail ends of the first connecting bolts (22) are in threaded connection with first embedded bolt sleeves (23);
a first groove for placing the end part of the steel beam (1) is formed in the first support frame (24);
the second support (3) is used for supporting the steel beam (1) and consists of a second mounting plate (31) which is transversely arranged and a second support frame (34) which is arranged on the top end face of the second mounting plate (31); a plurality of second connecting bolts (32) are respectively arranged on the two sides of the second mounting plate (31), and the tail ends of the second connecting bolts (32) are in threaded connection with second embedded bolt sleeves (33); and a second groove for placing the end part of the steel beam (1) is formed in the second support frame (34).
2. The removable steel beam corbel support according to claim 1, wherein: the first support frame (24) is provided with a first connecting hole (241), the second support frame (34) is provided with a second connecting hole (341), the steel beam (1) is provided with a through hole (11), and the first connecting hole (241), the second connecting hole (341) and the through hole (11) can be connected through a pin shaft or a bolt.
3. The removable steel beam corbel bracket of claim 1, wherein: the joint of the first mounting plate (21) and the first support frame (24) is provided with a plurality of first reinforcing ribs (25) for increasing structural strength.
4. The removable steel beam corbel support according to claim 1, wherein: and a plurality of second reinforcing ribs (35) for increasing the structural strength are arranged at the joint of the second mounting plate (31) and the second support frame (34).
5. The removable steel beam corbel bracket of claim 1, wherein: the first mounting plate (21) and the first support frame (24) are of an integrated structure, and the second mounting plate (31) and the second support frame (34) are of an integrated structure.
6. The removable steel beam corbel bracket of claim 1, wherein: the steel beam (1) can be I-shaped steel or channel steel.
7. The removable steel beam corbel support according to claim 1, wherein: the first embedded bolt sleeve (23) and the second embedded bolt sleeve (33) are embedded parts arranged in a preformed hole in a wall, a column or a beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222765688.5U CN218581153U (en) | 2022-10-20 | 2022-10-20 | Detachable girder steel bracket support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222765688.5U CN218581153U (en) | 2022-10-20 | 2022-10-20 | Detachable girder steel bracket support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218581153U true CN218581153U (en) | 2023-03-07 |
Family
ID=85374532
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222765688.5U Active CN218581153U (en) | 2022-10-20 | 2022-10-20 | Detachable girder steel bracket support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218581153U (en) |
-
2022
- 2022-10-20 CN CN202222765688.5U patent/CN218581153U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105275203A (en) | Telescopic beam, adjustable mold base system made by using same and mold base construction method | |
CN101280625A (en) | Non-welding assembly shuttering system | |
CN212802454U (en) | Scaffold frame of encorbelmenting that building engineering used | |
CN218581153U (en) | Detachable girder steel bracket support | |
CN210659232U (en) | Top-hung type horizontal formwork system | |
CN216517187U (en) | A BIM assembled antidetonation shear force wall for residential building engineering | |
CN110630035A (en) | Steel column supporting structure for bottom of reinforced concrete floor beam | |
CN212836642U (en) | Cantilever beam structure | |
CN211114959U (en) | Welding-free steel structure support frame | |
CN212317547U (en) | Novel shear force wall reinforcing and supporting system | |
CN216042552U (en) | Local device of strengthening of scaffold frame for construction | |
CN210151938U (en) | Column top supporting device for low-position jacking formwork system | |
CN215830054U (en) | A positioning tool for I-steel roof beam | |
CN201588414U (en) | Supporting structure for framework scaffolds | |
CN213391146U (en) | Anti-falling support mounting structure for elevator shaft steel structure frame | |
CN111155657A (en) | Beam-plate connecting node structure of fabricated framework plate building and connecting method thereof | |
CN205840326U (en) | A kind of stair template fixing device | |
CN220058310U (en) | Assembled steel structure frame | |
CN213062862U (en) | Civil engineering construction support | |
CN220504481U (en) | Integral lifting scaffold for steel in core tube well | |
CN219931859U (en) | Recyclable steel member | |
CN216810947U (en) | Pier stud connects high light modularization equipment template under confined space | |
CN216476314U (en) | Assembly type formwork system of cast-in-place plate of steel structure building | |
CN219824867U (en) | River-crossing steel structure bridge | |
CN219840200U (en) | Assembled steel structure frame for frame building construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |