CN209907900U - Central hoisting point climbing frame - Google Patents

Central hoisting point climbing frame Download PDF

Info

Publication number
CN209907900U
CN209907900U CN201920541671.7U CN201920541671U CN209907900U CN 209907900 U CN209907900 U CN 209907900U CN 201920541671 U CN201920541671 U CN 201920541671U CN 209907900 U CN209907900 U CN 209907900U
Authority
CN
China
Prior art keywords
connecting plate
fixing plate
frame
dismantled
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920541671.7U
Other languages
Chinese (zh)
Inventor
宋伦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Deep Sea Shelf Industry Co Ltd
Original Assignee
Wuhu Deep Sea Shelf Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Deep Sea Shelf Industry Co Ltd filed Critical Wuhu Deep Sea Shelf Industry Co Ltd
Priority to CN201920541671.7U priority Critical patent/CN209907900U/en
Application granted granted Critical
Publication of CN209907900U publication Critical patent/CN209907900U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a center hoisting point climbs frame, including a plurality of support frames, it is a plurality of the support frame can be dismantled through first connecting piece and connect the shear force wall, and is a plurality of can be dismantled respectively to support frame one side and connect a plurality of leading trucks, it is a plurality of the leading truck can be dismantled and connect the main frame, be equipped with electric block on the main frame, the main frame below is equipped with conduction structure, below be equipped with the electric hoist hook on the support frame, the electric hoist hook passes through wire rope and connects electric block. The utility model discloses a can dismantle electric block and connect the main frame, then be equipped with electronic lifting hook on the support frame, need not adjust electric block when realizing climbing the adjustment promptly, increase the pulling force simultaneously to realize increasing the effect of support through first connecting piece.

Description

Central hoisting point climbing frame
Technical Field
The utility model relates to a scaffold frame technical field mainly relates to a central hoisting point climbs frame.
Background
Scaffolding (scaffold) refers to the various supports erected on a construction site for workers to handle and address vertical and horizontal transport. The general term of the building industry refers to the places which cannot be directly constructed on the building site and are used for exterior wall, interior decoration or high floor height. Mainly for constructors to live up and down or for peripheral safety net enclosure, overhead installation components and the like, the scaffold is said to be made of bamboo, wood, steel pipes or synthetic materials. Some projects also use scaffolds as templates, and in addition, the scaffold is widely used in advertising, municipal administration, traffic roads and bridges, mines and other departments.
The existing climbing frame is convenient for transporting building materials by arranging the electric hoist on one side of the supporting structure.
However, since the supporting structure is fixed when the climbing frame is used, the position of the climbing frame is adjusted by moving the climbing frame on the guiding structure, and since the electric hoist is arranged on the supporting structure, after the position of the climbing frame is adjusted, the electric hoist needs to be adjusted, and further, the labor is wasted.
SUMMERY OF THE UTILITY MODEL
The utility model provides a central hoisting point climbs frame is for solving the use that proposes in the background art because the bearing structure is fixed when climbing the use of frame, moves on guide structure through climbing the frame, adjusts the position, and because electric block is on bearing structure, after climbing frame position adjustment, electric block also need adjust, and then extravagant manual work.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a center hoisting point climbs frame, includes a plurality of support frames, and is a plurality of the support frame can be dismantled through first connecting piece and connect the shear force wall, and is a plurality of support frame one side can be dismantled respectively and connect a plurality of leading trucks, and is a plurality of the main frame can be dismantled to the leading truck, be equipped with electric block on the main frame, the main frame below is equipped with conduction structure, below be equipped with the electric lifting hook on the support frame, the electric lifting hook passes through wire rope and connects electric block.
Preferably, first connecting piece includes the embedded pipe, and a plurality of embedded pipes of telling set up in the shear force wall, and is a plurality of all be equipped with first locating lever in the embedded pipe, first locating lever screwed connection the support frame, its other end are the bolt fastening together, and one side of bolt can dismantle the connection buckle structure on the first locating lever.
Preferably, first locating lever both ends all are equipped with first helicitic texture, and the bolt corresponds threaded connection first helicitic texture, just buckle structure includes two card strips, two equal symmetry is equipped with two at least semicircle arcs on the card strip, two card strip one end is corresponding can dismantle the first axis of rotation of connection, and its other end passes through the bolt fastening, and two the semicircle internal orifice all is equipped with second helicitic texture, second helicitic texture corresponds the connection first helicitic texture.
Preferably, the leading truck includes two first connecting plates, two first connecting plate is connected, two through two second connecting plates the second connecting plate is "L" type setting, the support frame includes first fixed plate, first fixed plate one side is equipped with second fixed plate and third fixed plate, the second fixed plate is the level setting, the slope of third fixed plate sets up, just the second fixed plate with third fixed plate one end fixed connection fourth fixed plate, the second fixed plate with between the third fixed plate, the connection can be dismantled to the fourth fixed plate first locating lever, just be equipped with a plurality of spacing holes on the second connecting plate, it is a plurality of be equipped with first spacer pin in the spacing hole, first spacer pin sliding connection first fixed plate.
Preferably, two the symmetry is equipped with four movable pulleys between the first connecting plate, the main frame includes the third connecting plate, be equipped with first spout on the third connecting plate, two first connecting plate sliding connection first spout, just the inside second lug that is equipped with of first spout, the corresponding sliding connection of second lug inner wall is four the movable pulley, just be equipped with a plurality of locating holes on the third connecting plate, first connecting plate with the connection can be dismantled through the second spacer pin to the third connecting plate.
Preferably, third connecting plate one side is equipped with the fourth connecting plate, the third connecting plate with through many first bracing piece fixed connection between the fourth connecting plate, and many first bracing piece is "W" type setting, and below first bracing piece can dismantle the connection electric block.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses a support frame one side is equipped with a plurality of first connecting pieces, can dismantle through first connecting piece and connect the shear force wall, then can dismantle joint support frame through first connecting piece, and the connection leading truck can be dismantled to the support frame, and the connection main frame can be dismantled to the leading truck.
Meanwhile, the supporting frame is provided with the electric lifting hook which is connected with the electric hoist through the steel wire rope, so that the electric hoist does not need to be adjusted after the climbing frame is adjusted, and the lifting capacity of the material is improved through the dual functions of the electric lifting hook and the electric hoist.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of a first connecting member of the present invention;
FIG. 3 is a schematic structural view of the guide frame of the present invention;
fig. 4 is a schematic diagram of a third connecting plate structure of the present invention;
fig. 5 is a schematic view of the back structure of the guide frame of the present invention;
fig. 6 is a schematic view of the supporting frame of the present invention.
In the figure: 1-a support frame, 11-a first fixing plate, 12-a second fixing plate, 13-a third fixing plate, 14-a fourth fixing plate, 15-a first limit pin, 2-a first connecting piece, 21-a pre-buried pipe, 22-a first locating rod, 221-a first thread structure, 23-a buckle structure, 231-a clamping strip, 232-a semicircle, 233-a first rotating shaft, 234-a second thread structure, 3-a guide frame, 31-a first connecting plate, 32-a second connecting plate, 321-a limit hole, 33-a sliding wheel, 34-a second limit pin, 4-a main frame, 41-a third connecting plate, 411-a first sliding chute, 42-a second bump, 43-a locating hole, 44-a fourth connecting plate, 45-a first supporting rod, 5-electric hoist, 6-conduction structure, 7-electric lifting hook and 8-steel wire rope.
Detailed Description
In order to facilitate understanding of the present invention, the present invention will be described more fully with reference to the accompanying drawings, in which several embodiments of the present invention are shown, but the present invention can be implemented in different forms, and is not limited to the embodiments described in the text, but rather, these embodiments are provided to make the disclosure of the present invention more thorough and comprehensive.
The embodiment of the invention refers to fig. 1-6, a center hoisting point climbing frame comprises a plurality of supporting frames 1, a plurality of supporting frames 1 are detachably connected with a shear wall through first connecting pieces 2, a plurality of supporting frames 1 are detachably connected with a plurality of guide frames 3 on one side respectively, a plurality of guide frames 3 are detachably connected with a main frame 4, an electric hoist 5 is arranged on the main frame 4, a conducting structure 6 is arranged below the main frame 4, an electric hoisting hook 7 is arranged below the supporting frames 1, and the electric hoisting hook 7 is connected with the electric hoist 5 through a steel wire rope 8.
In an embodiment, referring to fig. 1-2, the first connecting member 2 includes a plurality of embedded pipes 21, the embedded pipes 21 are disposed in the shear wall, and a plurality of embedded pipes 21 are each provided with a first positioning rod 22, the first positioning rod 22 is spirally connected to the supporting frame 1, the other end of the supporting frame is fixed by a bolt, and a fastening structure 23 is detachably connected to the first positioning rod 22 on one side of the bolt.
In an embodiment, referring to fig. 1-2, two ends of the first positioning rod 22 are respectively provided with a first threaded structure 221, a bolt is correspondingly and spirally connected to the first threaded structure 221, the fastening structure 23 includes two fastening strips 231, at least two semicircular arcs 232 are symmetrically arranged on the two fastening strips 231, one end of each fastening strip 231 is correspondingly detachably connected to the first rotating shaft 233, the other end of each fastening strip is fixed by the bolt, inner openings of the two semicircular arcs 232 are respectively provided with a second threaded structure 234, and the second threaded structures 234 are correspondingly connected to the first threaded structures 221.
In an embodiment, referring to fig. 3-6, the guiding frame 3 includes two first connecting plates 31, the two first connecting plates 31 are connected by two second connecting plates 32, the two second connecting plates 32 are disposed in an "L" shape, the supporting frame 1 comprises a first fixing plate 11, a second fixing plate 12 and a third fixing plate 13 are arranged on one side of the first fixing plate 11, the second fixing plate 12 is horizontally arranged, the third fixing plate 13 is obliquely arranged, one end of the second fixing plate 12 and one end of the third fixing plate 13 are fixedly connected with a fourth fixing plate 14, between the second fixing plate 12 and the third fixing plate 13, the fourth fixing plate 14 is detachably connected to the first positioning rod 22, and the second connecting plate 32 is provided with a plurality of limiting holes 321, a plurality of limiting holes 321 are provided with first limiting pins 15, and the first limiting pins 15 are slidably connected with the first fixing plate 11.
In an embodiment, referring to fig. 3 to 6, four sliding wheels 33 are symmetrically disposed between two first connecting plates 31, the main frame 4 includes a third connecting plate 41, a first sliding slot 411 is disposed on the third connecting plate 41, the two first connecting plates 31 are slidably connected to the first sliding slot 411, a second protrusion 42 is disposed inside the first sliding slot 411, an inner wall of the second protrusion 42 is correspondingly slidably connected to the four sliding wheels 33, a plurality of positioning holes 43 are disposed on the third connecting plate 41, and the first connecting plate 31 and the third connecting plate 41 are detachably connected by a second limit pin 34.
In an embodiment, referring to fig. 1, a fourth connecting plate 44 is disposed on one side of the third connecting plate 41, the third connecting plate 41 and the fourth connecting plate 44 are fixedly connected by a plurality of first supporting rods 45, the plurality of first supporting rods 45 are arranged in a W shape, and the first supporting rods 45 below are detachably connected to the electric hoist 5.
The operation principle is as follows: the utility model discloses at first correspond respectively through two first locating levers and connect the embedded pipe, then the buckle structure is connected all can be dismantled at first locating lever both ends, utilizes the first semicircle arc of buckle structure, the lock, the first helicitic texture interlock on its inboard second helicitic texture and the first locating lever reaches nut anti-drop's effect.
Then, the support frame passes through first fixed plate and connects in the dismantlement of second connecting plate, utilizes first spacer pin to realize that whole structure installation follows the easy of doing.
Meanwhile, the first sliding grooves are formed in the third connecting plate, the first sliding grooves are used for being in sliding connection with the two first connecting plates, and the groove-shaped structures formed by the first protruding blocks at the inner openings of the first sliding grooves of the bronze drums are in sliding connection with the four idler wheels, so that the climbing frame is more convenient to adjust.
And the first bracing piece of below is horizontal setting, can dismantle the connection electric block on it, and is equipped with electronic promotion hook on the support frame to do not need adjustment electric block alone when climbing the adjustment of frame, simultaneously, electronic promotion hook and electric block's dual function strengthen the pulling force to the material, and more save the manual work when climbing the adjustment of frame.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents, and thus the embodiments of the invention are intended only as illustrative examples of the invention and no limitation of the invention is intended whatsoever to be construed by the embodiments of the invention.

Claims (6)

1. The utility model provides a frame is climbed to center hoisting point, includes a plurality of support frames (1), its characterized in that: it is a plurality of connection shear force wall can be dismantled through first connecting piece (2) in support frame (1), and is a plurality of support frame (1) one side can be dismantled respectively and connect a plurality of leading truck (3), and is a plurality of leading truck (3) can be dismantled and connect main frame (4), be equipped with electric block (5) on main frame (4), main frame (4) below is equipped with conducting structure (6), the below be equipped with electric lifting hook (7) on support frame (1), electric lifting hook (7) are connected through wire rope (8) electric block (5).
2. The center hanging point climbing frame according to claim 1, characterized in that: first connecting piece (2) are including buried pipe (21) in advance, and a plurality of buried pipe (21) of telling set up in the shear force wall, and are a plurality of all be equipped with first locating lever (22) in buried pipe (21) in advance, first locating lever (22) screwed connection support frame (1), its other end are the bolt fastening together, and one side of bolt can dismantle connection buckle structure (23) on first locating lever (22).
3. The center hanging point climbing frame according to claim 2, characterized in that: first locating lever (22) both ends all are equipped with first helicitic texture (221), and the bolt corresponds threaded connection first helicitic texture (221), just buckle structure (23) are including two card strips (231), two equal symmetry is equipped with two at least semicircle (232) on card strip (231), two card strip (231) one end correspondence can be dismantled and connect first axis of rotation (233), and its other end passes through the bolt fastening, and two semicircle (232) internal orifice all is equipped with second helicitic texture (234), second helicitic texture (234) correspond and connect first helicitic texture (221).
4. The center hanging point climbing frame according to claim 2, characterized in that: the guide frame (3) comprises two first connecting plates (31), the two first connecting plates (31) are connected through two second connecting plates (32), the two second connecting plates (32) are arranged in an L shape, the support frame (1) comprises a first fixing plate (11), a second fixing plate (12) and a third fixing plate (13) are arranged on one side of the first fixing plate (11), the second fixing plate (12) is horizontally arranged, the third fixing plate (13) is obliquely arranged, one ends of the second fixing plate (12) and the third fixing plate (13) are fixedly connected with a fourth fixing plate (14), a plurality of limiting holes (321) are formed in the second connecting plate (32), the fourth fixing plate (14) is detachably connected with the first positioning rod (22), a first limiting pin (15) is arranged in the limiting holes (321), and the first limiting pin (15) is connected with the first fixing plate (11) in a sliding mode.
5. The center hanging point climbing frame according to claim 4, wherein: two the symmetry is equipped with four movable pulleys (33) between first connecting plate (31), main frame (4) include third connecting plate (41), be equipped with first spout (411), two on third connecting plate (41) first connecting plate (31) sliding connection first spout (411), just first spout (411) inside is equipped with second lug (42), second lug (42) inner wall corresponds four sliding connection movable pulleys (33), just be equipped with a plurality of locating holes (43) on third connecting plate (41), first connecting plate (31) with third connecting plate (41) can be dismantled the connection through second spacer pin (34).
6. The center hanging point climbing frame according to claim 5, wherein: third connecting plate (41) one side is equipped with fourth connecting plate (44), third connecting plate (41) with through many first bracing piece (45) fixed connection between fourth connecting plate (44), and many first bracing piece (45) are "W" type setting, and below first bracing piece (45) can dismantle the connection electric block (5).
CN201920541671.7U 2019-04-20 2019-04-20 Central hoisting point climbing frame Expired - Fee Related CN209907900U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920541671.7U CN209907900U (en) 2019-04-20 2019-04-20 Central hoisting point climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920541671.7U CN209907900U (en) 2019-04-20 2019-04-20 Central hoisting point climbing frame

Publications (1)

Publication Number Publication Date
CN209907900U true CN209907900U (en) 2020-01-07

Family

ID=69044786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920541671.7U Expired - Fee Related CN209907900U (en) 2019-04-20 2019-04-20 Central hoisting point climbing frame

Country Status (1)

Country Link
CN (1) CN209907900U (en)

Similar Documents

Publication Publication Date Title
CN211114718U (en) Scaffold for building construction
CN111502215A (en) Movable scaffold
CN113789948A (en) Large-span house roof atrium side wall sliding rail hanging basket and construction method thereof
CN106698208A (en) Hoisting equipment and hoisting method for external transportation of super high-rise building
CN209907900U (en) Central hoisting point climbing frame
CN204754160U (en) Rail mounted removes work platform
CN206987381U (en) A kind of tool-type hoistway formwork platform
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN210795539U (en) Movable hoisting device support
CN209907895U (en) Climbing frame attachment device
CN105858488A (en) Indoor and outdoor moving hoisting frame for buildings
CN208380058U (en) Removable hanging basket suspension scaffold
CN105600686A (en) Portable mobile crane boom
CN212534978U (en) Movable scaffold
CN205348720U (en) Take hoisting device's removal scaffold
CN109838099B (en) Method for mounting double-span bolt ball net frame walking frame
CN107313597A (en) Modularization ready-package discharging platform for assembled architecture
CN211775618U (en) Assembled folding walkways system
CN208456101U (en) A kind of housing construction scaffold
CN214220569U (en) Climb a passageway plate turnover
CN219840355U (en) Hanging basket device suitable for arc-shaped structure
CN108824792A (en) A kind of elevator combination lifting device
CN218088644U (en) Hoisting device for hoisting indoor large-scale equipment
CN213654174U (en) Removal type scaffold frame body structure convenient to dismantle
CN205531262U (en) Steel construction construction platform can rise automatically

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200107

Termination date: 20210420