CN209837689U CN201920564544.9U CN201920564544U CN209837689U CN 209837689 U CN209837689 U CN 209837689U CN 201920564544 U CN201920564544 U CN 201920564544U CN 209837689 U CN209837689 U CN 209837689U
Authority
CN
China
Prior art keywords
supporting plate
baffle
supporting
seat
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920564544.9U
Other languages
Chinese (zh)
Inventor
高伟涛
蔺泽全
张彦军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Road & Bridge Group Co Ltd
Original Assignee
Beijing Urban Construction Road & Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Road & Bridge Group Co Ltd filed Critical Beijing Urban Construction Road & Bridge Group Co Ltd
Priority to CN201920564544.9U priority Critical patent/CN209837689U/en
Application granted granted Critical
Publication of CN209837689U publication Critical patent/CN209837689U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a novel special mould lifting tool for plugging a building construction pipeline opening, which comprises a supporting plate component, a supporting component and a baffle component, wherein the supporting plate component comprises an arc-shaped supporting plate, a supporting plate clamping seat and a first bolt buckle, the supporting component comprises a supporting plate, a threaded sleeve, a threaded rod, a handle, a supporting rod, a supporting seat and a rotating seat, the outer side wall of the arc-shaped supporting plate is fixedly connected with the supporting plate, and the top of the supporting plate is fixedly connected with the threaded sleeve; the bracing piece removes in rotating the seat, rises to make the ascending floor of extrusion top of semicircle baffle, and set up the cushion at the upper surface of semicircle baffle, make semicircle baffle when the floor face contact with the unevenness, the cushion is under the extrusion of semicircle baffle, fills the gap between semicircle baffle and the floor, thereby makes the gap by the cushion separation, thereby effectively avoids the concrete of pouring to fall out through the gap, promotes the effect of pouring of entrance to a cave.

Description

Novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff
Technical Field
The utility model relates to a construction pipeline entrance to a cave shutoff technical field specifically is a novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff.
Background
Along with the increase of the building to the matching systems of intellectualization, comfort, humanization, green energy conservation and the like, more and more professional pipelines are arranged in the building, more and more holes are reserved for floor slabs which are vertically arranged on the pipelines or holes with rear holes, as is well known, the pipeline holes are required to be subjected to concrete later-stage plugging in the building construction, the formwork lifting construction is widely applied to various civil engineering, such as large-scale equipment foundation, valve well pouring and the like, the reserved holes of the pipelines of the toilet water supply, drainage and hot water vertical pipes are required to be subjected to plugging in the construction process of dormitories and research and development building plants, the existing formwork lifting tool is used for supporting the baffle plate through the arc-shaped supporting plate and blocking the bottom of the hole when the baffle plate blocks the hole, if the floor slabs around the hole are uneven, gaps are easily formed between the baffle plate and the floor slabs, so that the poured concrete flows out from the gaps, influence the effect of pouring, for this reason, provide a novel special mould lifting tool of construction pipeline entrance to a cave shutoff.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a novel special mould hanging tool for plugging a pipeline opening in building construction comprises a supporting plate component, a supporting component and a baffle component, wherein the supporting plate component comprises an arc-shaped supporting plate, a supporting plate clamping seat and a first bolt buckle, the supporting component comprises a supporting plate, a threaded sleeve, a threaded rod, a handle, a supporting rod, a supporting seat and a rotating seat, the outer side wall of the arc-shaped supporting plate is fixedly connected with the supporting plate, the top of the supporting plate is fixedly connected with the threaded sleeve, the inner side wall of the threaded sleeve is in threaded connection with the threaded rod, the outer side wall of the threaded rod is fixedly connected with the handle, the top of the threaded rod is fixedly connected with the supporting rod, the top of the supporting rod is fixedly connected with the supporting seat, the top of the supporting seat is rotatably connected with the rotating seat, the baffle component comprises a semicircular baffle, the top of the semicircular baffle is fixedly connected with the flexible pad.
As further preferable in the present technical solution: the outer side wall of the arc-shaped supporting plate is provided with the supporting plate clamping seat, and the outer surface of the supporting plate clamping seat is fixedly connected with the first bolt buckle.
As further preferable in the present technical solution: the outer side wall of the semicircular baffle is provided with the baffle clamping seat, and the outer surface of the baffle clamping seat is fixedly connected with the second bolt buckle.
As further preferable in the present technical solution: the semicircular baffle is provided with a rotating shaft and an anti-slip gasket, the semicircular baffle is hinged to the rotating shaft, and the inner side wall of the semicircular baffle is provided with the anti-slip gasket.
As further preferable in the present technical solution: the rotating seat is located at the bottom of the semicircular baffle, a bearing is arranged inside the rotating seat, and an inner ring of the bearing is fixedly connected with the outer side wall of the supporting seat.
As further preferable in the present technical solution: the arc-shaped supporting plate and the semicircular baffle are both positioned on the outer side wall of the pipeline.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model arranges a support plate on the outer side wall of the arc-shaped support plate, the upper surface of the support plate is provided with a threaded sleeve, the threaded sleeve is internally provided with a threaded rod, the threaded rod is meshed in the threaded sleeve to be lifted, and a handle is arranged on the outer side wall of the threaded rod, so that a user can rotate the threaded rod, the top of the threaded rod is provided with a support rod, the support rod is connected with a support seat and a rotating seat at the bottom of a semicircular baffle plate, so that the support rod moves in the rotating seat to be lifted, thereby the semicircular baffle plate is lifted to extrude a floor above, and the upper surface of the semicircular baffle plate is provided with a flexible cushion, when the semicircular baffle plate is contacted with an uneven floor surface, the flexible cushion is extruded by the semicircular baffle plate to fill the gap between the semicircular baffle plate and the floor, thereby the gap is blocked by the flexible cushion, thereby effectively avoiding the, the pouring effect of the hole is improved.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a top view of the semicircular baffle plate of the present invention;
fig. 3 is a schematic structural view of the support assembly of the present invention.
In the figure: 10. a pallet assembly; 11. an arc-shaped supporting plate; 12. a pallet clamp seat; 13. a first latch; 20. a support assembly; 21. a support plate; 22. a threaded sleeve; 23. a threaded rod; 24. a handle; 25. a support bar; 26. a supporting seat; 27. a rotating seat; 30. a baffle assembly; 31. a semicircular baffle plate; 311. a rotating shaft; 312. an anti-slip washer; 32. a baffle plate clamping seat; 33. a second latch; 34. a flexible pad; 4. a pipeline.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides a technical solution: a novel special mould hanging tool for plugging a pipeline opening in building construction comprises a supporting plate component 10, a supporting component 20 and a baffle component 30, wherein the supporting plate component 10 comprises an arc-shaped supporting plate 11, a supporting plate clamping seat 12 and a first bolt 13, the supporting component 20 comprises a supporting plate 21, a threaded sleeve 22, a threaded rod 23, a handle 24, a supporting rod 25, a supporting seat 26 and a rotating seat 27, the outer side wall of the arc-shaped supporting plate 11 is fixedly connected with the supporting plate 21, the top of the supporting plate 21 is fixedly connected with the threaded sleeve 22, the inner side wall of the threaded sleeve 22 is in threaded connection with the threaded rod 23, the outer side wall of the threaded rod 23 is fixedly connected with the handle 24, the top of the threaded rod 23 is fixedly connected with the supporting rod 25, the top end of the supporting rod 25 is fixedly connected with the supporting seat 26, the top of the, the baffle assembly 30 comprises a semicircular baffle 31, a baffle clamping seat 32, a second bolt 33 and a flexible pad 34, wherein the flexible pad 34 is fixedly connected to the top of the semicircular baffle 31.
In this embodiment, the flexible pad 34 is a flexible object formed by wrapping flexible soil with a plastic film, so that the flexible pad 34 has flexibility, and can fill the gap to prevent slurry leakage.
In this embodiment, specifically: the outer side wall of the arc-shaped supporting plate 11 is provided with the supporting plate clamping seat 12, and the outer surface of the supporting plate clamping seat 12 is fixedly connected with the first bolt buckle 13; the supporting plate clamping seat 12 is fixed through the first bolt buckle 13, and the two arc-shaped supporting plates 11 are assembled and installed.
In this embodiment, specifically: the outer side wall of the semicircular baffle 31 is provided with the baffle clamping seat 32, and the outer surface of the baffle clamping seat 32 is fixedly connected with the second bolt buckle 33; the baffle clamping seat 32 is fixed through the second bolt buckle 33, and the two semicircular baffles 31 are assembled and installed.
In this embodiment, specifically: the semicircular baffles 31 are provided with rotating shafts 311 and anti-slip gaskets 312, the two semicircular baffles 31 are hinged through the rotating shafts 311, and the anti-slip gaskets 312 are arranged on the inner side walls of the semicircular baffles 31; the two semicircular baffles 31 rotate through the rotating shaft 311, and the anti-slip washer 312 is provided with anti-slip lines to improve the friction force between the semicircular baffles 31 and the pipeline 4.
In this embodiment, specifically: the rotating seat 27 is positioned at the bottom of the semicircular baffle 31, a bearing is arranged inside the rotating seat 27, and an inner ring of the bearing is fixedly connected with the outer side wall of the supporting seat 26; the support base 26 is rotated on the rotary base 27 by a bearing.
In this embodiment, specifically: the arc-shaped supporting plate 11 and the semicircular baffle 31 are both positioned on the outer side wall of the pipeline 4; the pipe 4 supports the arc pallet 11 and the semicircular baffle 31.
Working principle or structure principle, when plugging the pipeline opening of dormitory, research and development building factory building, firstly, two arc-shaped supporting plates 11 are clamped on the outer side wall of the pipeline 4 at the toilet for water supply, drainage and hot water, the first bolt buckle 13 is tightly twisted to firmly fix the arc-shaped supporting plates 11 on the pipeline 4, then the semicircular baffle plate 31 is placed on the pipeline 4, the threaded rod 23 is rotated by rotating the handle 24, the threaded rod 23 is rotated in the threaded sleeve 22 to be lifted, so that the threaded rod 23 drives the supporting rod 25 above to be lifted, the supporting rod 25 drives the semicircular baffle plate 31 to be lifted, the semicircular baffle plate 31 is propped against the floor surface, thereby the semicircular baffle plate 31 is clamped at the reserved opening, then the second bolt buckle 33 on the semicircular baffle plate 31 is clamped, the semicircular baffle plate 31 is fixed on the pipeline 4, when the semicircular baffle plate 31 is contacted with the uneven floor surface, the flexible pad 34 is filled in the gap between semi-circular baffle 31 and the floor under the extrusion of semicircle baffle 31 to make the gap by the separation of flexible pad 34, thereby avoid the concrete of pouring to fall out through the gap, promote the effect of pouring of entrance to a cave.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff which characterized in that: comprises a supporting plate component (10), a supporting component (20) and a baffle component (30), wherein the supporting plate component (10) comprises an arc-shaped supporting plate (11), a supporting plate clamping seat (12) and a first bolt buckle (13), the supporting component (20) comprises a supporting plate (21), a threaded sleeve (22), a threaded rod (23), a handle (24), a supporting rod (25), a supporting seat (26) and a rotating seat (27), the outer side wall of the arc-shaped supporting plate (11) is fixedly connected with the supporting plate (21), the top of the supporting plate (21) is fixedly connected with the threaded sleeve (22), the inner side wall of the threaded sleeve (22) is in threaded connection with the threaded rod (23), the outer side wall of the threaded rod (23) is fixedly connected with the handle (24), the top of the threaded rod (23) is fixedly connected with the supporting rod (25), the top end of the supporting rod (25) is fixedly, the top of supporting seat (26) rotates and is connected with rotate seat (27), baffle subassembly (30) include semicircle baffle (31), baffle cassette (32), second bolt buckle (33) and flexible pad (34), the top fixedly connected with of semicircle baffle (31) flexible pad (34).
2. The novel special mould hanging tool for plugging the pipeline opening in the building construction according to claim 1, which is characterized in that: the outer side wall of the arc-shaped supporting plate (11) is provided with the supporting plate clamping seat (12), and the outer surface of the supporting plate clamping seat (12) is fixedly connected with the first bolt buckle (13).
3. The novel special mould hanging tool for plugging the pipeline opening in the building construction according to claim 1, which is characterized in that: the outer side wall of the semicircular baffle (31) is provided with the baffle clamping seat (32), and the outer surface of the baffle clamping seat (32) is fixedly connected with the second bolt buckle (33).
4. The novel special mould hanging tool for plugging the pipeline opening in the building construction according to claim 1, which is characterized in that: be equipped with pivot (311) and anti-skidding packing ring (312), two on semicircle baffle (31) pass through pivot (311) are articulated, the inside wall of semicircle baffle (31) is equipped with anti-skidding packing ring (312).
5. The novel special mould hanging tool for plugging the pipeline opening in the building construction according to claim 1, which is characterized in that: the rotating seat (27) is located at the bottom of the semicircular baffle (31), a bearing is arranged inside the rotating seat (27), and an inner ring of the bearing is fixedly connected with the outer side wall of the supporting seat (26).
6. The novel special mould hanging tool for plugging the pipeline opening in the building construction according to claim 1, which is characterized in that: the arc-shaped supporting plate (11) and the semicircular baffle (31) are both positioned on the outer side wall of the pipeline (4).
CN201920564544.9U 2019-04-24 2019-04-24 Novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff Active CN209837689U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920564544.9U CN209837689U (en) 2019-04-24 2019-04-24 Novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920564544.9U CN209837689U (en) 2019-04-24 2019-04-24 Novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff

Publications (1)

Publication Number Publication Date
CN209837689U true CN209837689U (en) 2019-12-24

Family

ID=68913443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920564544.9U Active CN209837689U (en) 2019-04-24 2019-04-24 Novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff

Country Status (1)

Country Link
CN (1) CN209837689U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113108132A (en) * 2021-03-25 2021-07-13 中国一冶集团有限公司 Pipe clamp type floor hole plugging and supporting device and using method thereof
CN115306148A (en) * 2022-08-01 2022-11-08 上海二十冶建设有限公司 Template supporting device for water and electricity pipeline reserved holes and construction method of template supporting device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113108132A (en) * 2021-03-25 2021-07-13 中国一冶集团有限公司 Pipe clamp type floor hole plugging and supporting device and using method thereof
CN115306148A (en) * 2022-08-01 2022-11-08 上海二十冶建设有限公司 Template supporting device for water and electricity pipeline reserved holes and construction method of template supporting device
CN115306148B (en) * 2022-08-01 2023-10-03 上海二十冶建设有限公司 Hydropower pipeline reserved hole template supporting device and construction method thereof

Similar Documents

Publication Publication Date Title
CN209837689U (en) Novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff
CN203258205U (en) Anti-leakage structure of floor-penetrating pipeline without sleeve
WO2022147999A1 (en) Waterproof structure and method for underground foundation pit dewatering well
CN202510847U (en) Hole-plugging construction structure for pipeline passing through floor slab in waterish room
CN204187141U (en) A kind of through-flooring tube circumference leakage preventing structure
CN202227694U (en) Embedded sleeve for concrete pouring construction of bathroom floor
CN213267961U (en) Deep basal pit is from waterproof bottom plate steel pipe precipitation well shutoff construction structures of wearing
CN212801447U (en) Hinge dam is with stagnant water structure of being convenient for maintenance
CN201708511U (en) Horizontal cable trench
CN214994356U (en) Spiral-flow type caisson drainage concentrator
CN211901861U (en) PVC drainage pipe passes entrance to a cave shutoff piece of floor department
CN214329198U (en) Waterproof chassis floor drain structure
CN206607873U (en) A kind of pre-buried structure of anti-dropout
CN212715397U (en) Novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff
CN212801603U (en) Foundation pit bottom plate reserved precipitation plugging device
CN211923600U (en) High-rise residential building outer wall interlude construction system of intercepting water
CN110094578B (en) Waterproof casing pipe and construction method thereof
CN211006895U (en) Pre-buried formula cast iron is with layer drainage connecting device
CN201144424Y (en) Fast plugging device for deep foundation pit dewatering well
CN201420394Y (en) Die for making pipeline reserved holes
CN110777742A (en) Integral horizontal rotary dam
CN218322989U (en) Drainage riser part and drainage structures of subside formula bathroom
CN218378149U (en) Tongue-and-groove type flexible interface reinforced concrete drain pipe
CN212582931U (en) Node structure of shutoff when assembled building shear force wall erection joint department is in milk
CN213897228U (en) Basement waterproofing steel plate structure