CN212715397U - Novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff - Google Patents
Novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff Download PDFInfo
- Publication number
- CN212715397U CN212715397U CN202021521105.9U CN202021521105U CN212715397U CN 212715397 U CN212715397 U CN 212715397U CN 202021521105 U CN202021521105 U CN 202021521105U CN 212715397 U CN212715397 U CN 212715397U
- Authority
- CN
- China
- Prior art keywords
- arc layer
- arc
- layer board
- riser
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff, including two arc layer board supporting mechanism, floor and riser, the surface of riser is located to two arc layer board covers, the top of arc layer board and the bottom contact of floor to all be provided with the cushion between arc layer board and floor and the riser, the equal fixedly connected with installation piece in both sides of two arc layer boards to the mounting hole has been seted up at the middle part of installation piece, the inside threaded connection of mounting hole has the bolt to two arc layer boards pass through bolt fixed connection, supporting mechanism sets up in the bottom of arc layer board and is connected with the fixed surface of riser, the utility model relates to a construction pipeline entrance to a cave shutoff equipment technical field. This novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff has solved the problem that when current equipment baffle used, the contact with the floor is inseparable enough easily produces the gap, influences the effect of pouring.
Description
Technical Field
The utility model relates to a construction pipeline entrance to a cave shutoff equipment technical field specifically is a novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff.
Background
The concrete is needed to be poured into the pipeline opening in the building construction, the common mould used for concrete pouring is a hanging mould, the hanging mould construction is widely applied to various civil engineering, such as large-scale equipment foundation, valve well pouring and the like, and the reserved opening of the water supply, drainage and hot water vertical pipe in the bathroom is needed to be blocked in the process of construction of dormitory and research and development building factory buildings.
When the existing mould hanging tool is used for plugging the hole, when the hole is blocked by the baffle, the baffle is not contacted with the floor tightly enough, gaps are easy to generate, and when the floor around the hole is uneven, gaps are easy to form between the baffle and the floor, so that the pouring effect is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a novel special hanging die instrument of construction pipeline entrance to a cave shutoff has solved the problem that when current equipment baffle used, closely easily produced the gap inadequately with the contact of floor.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff, includes two arc layer board supporting mechanism, floor and riser, the surface of riser is located to two arc layer board covers, the top of arc layer board and the bottom contact of floor to all be provided with the cushion between arc layer board and floor and the riser, the equal fixedly connected with installation piece in both sides of two arc layer boards to the mounting hole has been seted up at the middle part of installation piece, the inside threaded connection of mounting hole has the bolt to two arc layer boards pass through bolt fixed connection, supporting mechanism set up in the bottom of arc layer board and be connected with the fixed surface of riser.
Preferably: the supporting mechanism comprises two arc-shaped pipe clamps, and the two arc-shaped pipe clamps are fastened and fastened on the surface of the vertical pipe.
Preferably: the top fixedly connected with connecting block of arc pipe strap to the middle part of connecting block rotates through rotating and is connected with the bracing piece.
Preferably: the top of the supporting rod is fixedly connected with a base plate, and the top of the base plate is fixedly connected with the bottom of the arc-shaped supporting plate.
Preferably: the outside fixedly connected with sleeve at arc pipe strap top to telescopic inside threaded connection has the threaded rod.
Preferably: the top fixedly connected with of threaded rod turns round to the top fixedly connected with cushion of turning round, the upper surface of cushion is the arc.
Advantageous effects
The utility model provides a novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff. The method has the following beneficial effects:
(1) this novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff makes it be triangle-shaped bearing structure more stable through setting up the bracing piece into the slope form to the arc layer board when the floor contact with the unevenness, the cushion is under the extrusion of arc layer board, fills the gap between arc layer board and the floor, thereby makes the gap by the cushion separation, thereby avoids the concrete of pouring to fall out through the gap, promotes the effect of pouring of entrance to a cave.
(2) This novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff, simple structure is reasonable, convenient to use, and easy operation is easy to learn, and low repetitious utilization many times of manufacturing cost.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a top view of the present invention;
fig. 3 is a schematic structural view of the arc-shaped supporting plate and the cushion of the present invention.
In the figure: 1 arc layer board, 2 riser, 3 floors, 4 cushions, 5 installation pieces, 6 mounting holes, 7 bolts, 8 arc pipe clamps, 9 buckles, 10 connecting blocks, 11 rotation pieces, 12 supporting rods, 13 backing plates, 14 sleeves, 15 threaded rods, 16 rotation pieces and 17 cushion blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff, including 1 supporting mechanism of two arc layer boards, floor 3 and riser 2, the surface of riser 2 is located to 1 covers of two arc layer boards, the top of arc layer board 1 and the bottom contact of floor 3, and all be provided with cushion 4 between arc layer board 1 and floor 3 and the riser 2, the equal fixedly connected with installation piece 5 in both sides of two arc layer boards 1, and mounting hole 6 has been seted up at the middle part of installation piece 5, the inside threaded connection of mounting hole 6 has bolt 7, and two arc layer boards 1 pass through bolt 7 fixed connection, supporting mechanism sets up in the bottom of arc layer board 1 and is connected with the fixed surface of riser 2.
Further: the support mechanism comprises two arc pipe clamps 8, and the two arc pipe clamps 8 are fixed on the surface of the riser 2 through fastening bolts 9.
Further: the top fixedly connected with connecting block 10 of arc pipe strap 8 to the middle part of connecting block 10 rotates through rotating 11 and is connected with bracing piece 12.
Further: the top of the support rod 12 is fixedly connected with a backing plate 13, and the top of the backing plate 13 is fixedly connected with the bottom of the arc-shaped supporting plate 1.
Further: the outer side of the top of the arc-shaped pipe clamp 8 is fixedly connected with a sleeve 14, and the inner thread of the sleeve 14 is connected with a threaded rod 15.
Further: the top of threaded rod 15 is fixedly connected with turn-knob 16 to the top fixedly connected with cushion 17 of turn-knob 16, the upper surface of cushion 17 is the arc.
Working principle; when plugging the pipeline entrance to a cave, at first locate riser 2's surface through bolt 7 and 6 covers of mounting hole with two arc layer boards 1, and ensure that cushion 4 contacts with floor 3, then be fixed in riser 2's surface through pintle 9 with two arc pipe strap 8, rotate the turn-knob 16 again and make threaded rod 15 begin to shift up, promote the bull stick 12 and rotate, thereby it is inseparable with floor 3 contact to extrude arc layer board 1, bracing piece 12 slope is triangle-shaped bearing structure more stable, and arc layer board 1 is when contacting with the floor 3 of unevenness, cushion 4 is under arc layer board 1's extrusion, fill the gap between arc layer board 1 and floor 3, thereby make the gap by cushion 4 separation, thereby avoid the concrete of pouring to fall out through the gap, promote the effect of pouring of entrance to a cave.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff, includes two arc layer boards (1) supporting mechanism, floor (3) and riser (2), its characterized in that: the surface of riser (2) is located to two arc layer board (1) covers, the top of arc layer board (1) and the bottom contact of floor (3) to all be provided with cushion (4) between arc layer board (1) and floor (3) and riser (2), the equal fixedly connected with installation piece (5) in both sides of two arc layer board (1) to mounting hole (6) have been seted up at the middle part of installation piece (5), the inside threaded connection of mounting hole (6) has bolt (7) to two arc layer board (1) are through bolt (7) fixed connection, supporting mechanism sets up in the bottom of arc layer board (1) and is connected with the fixed surface of riser (2).
2. The novel special mould hanging tool for plugging the pipeline opening in the building construction according to claim 1, which is characterized in that: the supporting mechanism comprises two arc-shaped pipe clamps (8), and the two arc-shaped pipe clamps (8) are fixed on the surface of the vertical pipe (2) through fastening bolts (9).
3. The novel special mould hanging tool for plugging the pipeline opening in the building construction according to claim 2, is characterized in that: the top fixedly connected with connecting block (10) of arc pipe strap (8) to the middle part of connecting block (10) rotates through rotating piece (11) and is connected with bracing piece (12).
4. The novel special mould hanging tool for plugging the pipeline opening in the building construction according to claim 3, wherein the mould hanging tool comprises: the top of the supporting rod (12) is fixedly connected with a backing plate (13), and the top of the backing plate (13) is fixedly connected with the bottom of the arc-shaped supporting plate (1).
5. The novel special mould hanging tool for plugging the pipeline opening in the building construction according to claim 2, is characterized in that: the outside fixedly connected with sleeve (14) at arc pipe strap (8) top to the inside threaded connection of sleeve (14) has threaded rod (15).
6. The novel special mould hanging tool for plugging the pipeline opening in the building construction according to claim 5, wherein the mould hanging tool comprises: the top fixedly connected with of threaded rod (15) turns round (16) to the top fixedly connected with cushion (17) of turning round (16), the upper surface of cushion (17) is the arc.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021521105.9U CN212715397U (en) | 2020-07-28 | 2020-07-28 | Novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021521105.9U CN212715397U (en) | 2020-07-28 | 2020-07-28 | Novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212715397U true CN212715397U (en) | 2021-03-16 |
Family
ID=74909958
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021521105.9U Expired - Fee Related CN212715397U (en) | 2020-07-28 | 2020-07-28 | Novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212715397U (en) |
-
2020
- 2020-07-28 CN CN202021521105.9U patent/CN212715397U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207194619U (en) | A kind of assembled regeneration concrete enclosure wall | |
CN212715397U (en) | Novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff | |
CN209837689U (en) | Novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff | |
CN107246147A (en) | A kind of method of vertical duct sealing hole | |
CN211773838U (en) | Detachable steel pipe concrete column base structure | |
CN204690801U (en) | Formwork erecting structure is hung in basement roof ater-casting | |
CN213174794U (en) | Novel reserved hole formwork tool | |
CN110094578B (en) | Waterproof casing pipe and construction method thereof | |
CN204491953U (en) | Floor slab structure between architecture pipe | |
CN206625561U (en) | A kind of novel building engineering forming module support meanss | |
CN208415810U (en) | A kind of caisson type accomodation ground assembling mounting structure | |
CN207714372U (en) | Pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail | |
CN201420394Y (en) | Die for making pipeline reserved holes | |
CN206538909U (en) | A kind of spliced plant curtain wall support | |
CN201180309Y (en) | Metal threaded steel pipe inspection shaft | |
CN112343183A (en) | Connection structure of assembled building wallboard and floor | |
CN206538951U (en) | A kind of steelframe precast stair | |
CN209508773U (en) | Drain the installation tool of floor tile | |
CN216339924U (en) | Infiltration reflux unit | |
CN220704798U (en) | Vertical post-cast strip shutoff frock in advance | |
CN212002279U (en) | Hang hole and support reinforcing template | |
CN212271596U (en) | Sinking type hanging mould structure of toilet | |
CN214220713U (en) | Template bracket of stagnant water | |
CN220499469U (en) | Prefabricated bathroom forming die | |
CN215254586U (en) | Construction structure of line drips |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210316 Termination date: 20210728 |
|
CF01 | Termination of patent right due to non-payment of annual fee |