CN209837027U - Foundation construction is with pile equipment - Google Patents

Foundation construction is with pile equipment Download PDF

Info

Publication number
CN209837027U
CN209837027U CN201920105896.8U CN201920105896U CN209837027U CN 209837027 U CN209837027 U CN 209837027U CN 201920105896 U CN201920105896 U CN 201920105896U CN 209837027 U CN209837027 U CN 209837027U
Authority
CN
China
Prior art keywords
pile
fixed
piling
plate
pile driving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920105896.8U
Other languages
Chinese (zh)
Inventor
张力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yuanfeng Underground Engineering Technology Co Ltd
Original Assignee
Shanghai Yuanfeng Underground Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yuanfeng Underground Engineering Technology Co Ltd filed Critical Shanghai Yuanfeng Underground Engineering Technology Co Ltd
Priority to CN201920105896.8U priority Critical patent/CN209837027U/en
Application granted granted Critical
Publication of CN209837027U publication Critical patent/CN209837027U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a foundation construction is with pile equipment, including pile driving frame and stake pole, pile driving frame includes the piling board and is fixed in the supporting leg of piling board bottom four corners department, stake pole vertical slip pegs graft on the piling board, pile driving board top is equipped with the through-hole with stake pole matched with, the fixed cylinder that is equipped with on the piling board of the radial both sides of through-hole, the fixed deflector that is equipped with between two cylinder axle heads, the deflector cooperation slides and cup joints the outside at the stake pole, the relative both sides edge of piling board is the fixed cylinder two that is equipped with the perpendicular to piling board respectively, the fixed plate that is equipped with in cylinder two axle heads, the fixed motor that is equipped with in fixed plate top, the motor axle head is connected and is equipped with the line wheel, the fixed engaging lug corresponding with the line wheel that is equipped with on the radial lateral wall of stake pole upper end respectively, it is equipped. Compared with the prior art, the utility model the advantage lies in: reasonable structure, no overlarge noise and strong applicability.

Description

Foundation construction is with pile equipment
Technical Field
The utility model relates to a pile equipment technical field, in particular to ground foundation construction is with pile equipment.
Background
Since the ground of the building is reinforced or the bearing way of the ground is improved if the building is built on the ground and the ground bears a great pressure, the ground has to have enough strength to resist the pressure, which is difficult to achieve, so that the ground bearing the building has to be reinforced or the bearing way of the ground is improved, and therefore, the pile is constructed on the ground, most of the weight of the building is transmitted to a position deep below the ground through the pile, and the ground bearing capacity of the position is much larger than that of the ground.
The existing pile driving modes include a spiral pile driving mode and a hammering mode, the spiral pile driving mode is a pile driving mode for forming a hole in an underground drilling machine by using a drill rod drill bit, but the problems of overhigh temperature and blockage of a pouring opening exist, a pile in the hammering mode is generally continuously hammered into the ground from a high position by using a heavy object, the noise is high, the normal life of residents nearby a construction site is influenced, the pile driving modes are an anchor rod static pressure pile driving method and a tree root pile driving method, and the methods are usually constructed by means of large-scale mechanical equipment; however, these large machines are often limited by the height of the construction site and cannot be installed and laid, so that the construction cannot be performed.
In addition, the height of the existing frame for piling is often fixed, and only pile rods with the length smaller than the height of the frame can be used for piling, so that the applicability is poor.
SUMMERY OF THE UTILITY MODEL
Not enough to the above-mentioned among the prior art, the utility model provides a foundation construction is with pile equipment, its is rational in infrastructure, does not have too big noise, and the suitability is strong.
In order to achieve the above object, the utility model adopts the following technical scheme: a pile driving device for foundation construction comprises a pile driving frame and a pile rod, wherein the pile driving frame comprises a pile driving plate and supporting legs fixed at four corners of the bottom of the pile driving plate, the pile rod is vertically inserted on the piling plate in a sliding way, a through hole matched with the pile rod is arranged above the piling plate, a first air cylinder is fixedly arranged on the piling plate at the radial two sides of the through hole, a guide plate is fixedly arranged between the shaft ends of the first two air cylinders, the guide plate is matched and sleeved outside the pile rod in a sliding manner, two air cylinders perpendicular to the pile driving plate are respectively and fixedly arranged at the edges of two opposite sides of the pile driving plate, a fixed plate is fixedly arranged at the two shaft ends of the air cylinder, a motor is fixedly arranged above the fixed plate, the shaft end of the motor is connected with a wire wheel, the radial side walls of the upper end of the pile rod are respectively fixedly provided with a connecting lug corresponding to the wire wheel, and a pull wire is connected between the wire wheel and the connecting lug.
As an improvement: and scales are arranged on the circumferential side wall of the pile rod.
As an improvement: and the lower side walls of the piling plates on the two sides of the through hole are respectively and fixedly provided with a guide block for guiding the pile rod.
As an improvement: the supporting leg bottom is equipped with the recess, the inside fixed vertical electric putter that is equipped with of recess, the electric putter axle head is fixed and is equipped with the universal wheel.
As an improvement: and two sides of the bottom end of the supporting leg are respectively and fixedly provided with a second fixing plate, and the end part of the second fixing plate, far away from the supporting leg, is provided with a fixing hole.
Compared with the prior art, the utility model the advantage lies in: utilize the motor to rise the stake pole, then fall and realize the pile operation, restrict the stake pole through deflector and guide block simultaneously, this kind of mode sound is little, and the stake pole can not be overheated, utilizes the up-and-down motion of cylinder two to adjust the height of motor, applicable in the stake pole of different length, in addition, is equipped with the scale on the stake pole, can observe the pile depth degree at any time.
Drawings
Fig. 1 is a schematic structural view of the pile driving equipment for foundation construction of the present invention;
reference symbol comparison table:
the pile driving device comprises a pile driving frame 1, a pile rod 2, a pile driving plate 3, a supporting leg 4, a through hole 5, a cylinder I6, a guide plate 7, a cylinder II 8, a fixing plate 9, a motor 10, a wire wheel 11, a connecting lug 12, a pull wire 13, a scale 14, a guide block 15, a groove 16, an electric push rod 17, a universal wheel 18, a fixing plate II 19 and a fixing hole 20.
Detailed Description
The following describes the present invention with reference to the accompanying drawings.
As shown in fig. 1, a pile driving device for foundation construction comprises a pile driving frame 1 and a pile rod 2, wherein the pile driving frame 1 comprises a pile driving plate 3 and supporting legs 4 fixed at four corners of the bottom of the pile driving plate 3, the pile rod 2 is vertically inserted on the pile driving plate 3 in a sliding manner, a through hole 5 matched with the pile rod 2 is arranged above the pile driving plate 3, a first cylinder 6 is fixedly arranged on the pile driving plate 3 at two radial sides of the through hole 5, a guide plate 7 is fixedly arranged between the shaft ends of the first cylinders 6, the guide plate 7 is sleeved outside the pile rod 2 in a sliding manner in a matching manner, a second cylinder 8 vertical to the pile driving plate 3 is fixedly arranged at the edge of each of two opposite sides of the pile driving plate 3, a fixing plate 9 is fixedly arranged at the shaft end of the second cylinder 8, a motor 10 is fixedly arranged above the fixing plate 9, the shaft end of the motor 10 is connected with a wire wheel 11, connecting lugs 12 corresponding to the wire wheel 11 are fixedly arranged on the radial side wall at, a pull wire 13 is connected between the wire wheel 11 and the connecting lug 12.
The side wall of the circumference of the pile rod 2 is provided with scales 14.
And guide blocks 15 for guiding the pile rod 2 are respectively and fixedly arranged on the lower side walls of the pile driving plates 3 on the two sides of the through hole 5.
The bottom of the supporting leg 4 is provided with a groove 16, a vertical electric push rod 17 is fixedly arranged in the groove 16, and a universal wheel 18 is fixedly arranged at the shaft end of the electric push rod 17.
Two sides of the bottom end of the supporting leg 4 are respectively and fixedly provided with a second fixing plate 19, and the end part, far away from the supporting leg 4, of the second fixing plate 19 is provided with a fixing hole 20.
The utility model discloses when concrete implementation, the engaging lug 12 is fixed on stake pole 2, according to the length of stake pole 2 of difference, insert deflector 7 and through-hole 5 with stake pole 2, adjust suitable height with two 8 cylinders, link to each other line wheel 11 on the motor 10 with the connection 12 on stake pole 2 through acting as go-between 13, adjustment cylinder 6, make deflector 7 be located suitable position, fix fixed plate two 19 subaerial, starter motor 10, motor 10 rotates and drives line wheel 11 and rotate, thereby will act as go-between 13 rolling and lift up stake pole 2, then motor 10 stops, stake pole 2 is pile downwards under the gravity of self, the degree of depth of pile can be observed at any time through scale 14 on stake pole 2, after finishing using, take off stake pole 2, control electric putter 17, stretch out universal wheel 18, convenient the removal.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not intended to limit the present invention, and all modifications, equivalents, improvements and the like that are made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (5)

1. The utility model provides a foundation construction is with pile equipment, includes pile driving frame (1) and stake pole (2), pile driving frame (1) is including driving sheet (3) and be fixed in supporting leg (4) of driving sheet (3) bottom four corners department, stake pole (2) vertical sliding peg graft on driving sheet (3), its characterized in that: a through hole (5) matched with the pile rod (2) is arranged above the piling plate (3), a first air cylinder (6) is fixedly arranged on the piling plate (3) at the radial two sides of the through hole (5), a guide plate (7) is fixedly arranged between the shaft ends of the two first air cylinders (6), the guide plate (7) is matched and slidably sleeved outside the pile rod (2), two air cylinders (8) vertical to the pile driving plate (3) are respectively and fixedly arranged at the edges of two opposite sides of the pile driving plate (3), a fixing plate (9) is fixedly arranged at the shaft end of the second air cylinder (8), a motor (10) is fixedly arranged above the fixing plate (9), the shaft end of the motor (10) is connected with a wire wheel (11), the radial side walls of the upper end of the pile rod (2) are respectively and fixedly provided with a connecting lug (12) corresponding to the wire wheel (11), and a pull wire (13) is connected between the wire wheel (11) and the connecting lug (12).
2. The piling device for foundation construction according to claim 1, wherein: and scales (14) are arranged on the circumferential side wall of the pile rod (2).
3. The piling device for foundation construction according to claim 1, wherein: and guide blocks (15) for guiding the pile rod (2) are respectively fixedly arranged on the lower side walls of the pile driving plates (3) on the two sides of the through hole (5).
4. The piling device for foundation construction according to claim 1, wherein: supporting leg (4) bottom is equipped with recess (16), recess (16) inside fixed vertical electric putter (17) that are equipped with, electric putter (17) axle head is fixed and is equipped with universal wheel (18).
5. The piling device for foundation construction according to claim 1, wherein: and two sides of the bottom end of the supporting leg (4) are respectively and fixedly provided with a second fixing plate (19), and the end part of the second fixing plate (19) far away from the supporting leg (4) is provided with a fixing hole (20).
CN201920105896.8U 2019-01-22 2019-01-22 Foundation construction is with pile equipment Active CN209837027U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920105896.8U CN209837027U (en) 2019-01-22 2019-01-22 Foundation construction is with pile equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920105896.8U CN209837027U (en) 2019-01-22 2019-01-22 Foundation construction is with pile equipment

Publications (1)

Publication Number Publication Date
CN209837027U true CN209837027U (en) 2019-12-24

Family

ID=68902341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920105896.8U Active CN209837027U (en) 2019-01-22 2019-01-22 Foundation construction is with pile equipment

Country Status (1)

Country Link
CN (1) CN209837027U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113174950A (en) * 2021-04-26 2021-07-27 中铧正鑫路桥有限公司 Construction machinery and construction method for building foundation engineering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113174950A (en) * 2021-04-26 2021-07-27 中铧正鑫路桥有限公司 Construction machinery and construction method for building foundation engineering

Similar Documents

Publication Publication Date Title
CN112177027B (en) Pile foundation structure and construction method thereof
CN209837027U (en) Foundation construction is with pile equipment
CN207362841U (en) A kind of construction piling machine
CN109930624A (en) A kind of embedding petrographic province blower foundation of offshore wind farm and construction method
CN211395670U (en) Piling device for building construction
CN210507399U (en) Small-sized rammed and expanded lime-soil compacted pile complete equipment
CN210395351U (en) Combined sheet pile construction guide frame
CN220433635U (en) Piling device convenient to fix
CN220285673U (en) Drilling machine for engineering
CN220789697U (en) Novel equipment for improving roadbed solidity detection efficiency
CN205975614U (en) Steel lattice column guiding orientation device on post
CN215804389U (en) Temporary casing for offshore wind power foundation drilling machine
CN217204213U (en) Steel structure base for factory building
CN220284806U (en) Bored pile construction device for foundation pit support
CN214005640U (en) Foundation bearing capacity detection device
CN218757502U (en) Rock-socketed pile hole construction equipment without mud retaining wall
CN212508383U (en) Foundation pile strutting arrangement that underground space undercut adds layer construction usefulness
CN218437034U (en) Hammering device for foundation pile sinking
CN211898365U (en) Pile drilling device for highway engineering
CN213267871U (en) Pile pulling equipment for hydraulic engineering
CN217231813U (en) Pile driver convenient to dismouting
CN219825404U (en) Foundation reinforcing structure for building
CN108914921B (en) Tamping equipment with material limiting mechanism for electric power engineering construction
CN220433639U (en) Auxiliary pile sinking device for miniature steel pipe pile
CN219471053U (en) Soil planing device for burying boundary piles

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 201600 Building 1, 1128 Wenhui Road, Songjiang District, Shanghai

Patentee after: SHANGHAI YUANFENG UNDERGROUND ENGINEERING TECHNOLOGY Co.,Ltd.

Patentee after: Zhang Li

Address before: Room 307, Building 16, No. 4588 Honghai Road, Sanxing Town, Chongming District, Shanghai, 202150 (Shanghai Sanxing Economic Community)

Patentee before: SHANGHAI YUANFENG UNDERGROUND ENGINEERING TECHNOLOGY Co.,Ltd.

Patentee before: Zhang Li

CP02 Change in the address of a patent holder