CN209799037U - Building wall insulation structure - Google Patents

Building wall insulation structure Download PDF

Info

Publication number
CN209799037U
CN209799037U CN201920301287.XU CN201920301287U CN209799037U CN 209799037 U CN209799037 U CN 209799037U CN 201920301287 U CN201920301287 U CN 201920301287U CN 209799037 U CN209799037 U CN 209799037U
Authority
CN
China
Prior art keywords
layer
heated board
insulation structure
building wall
wall body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920301287.XU
Other languages
Chinese (zh)
Inventor
张丽红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Huayi Construction Engineering Co Ltd
Original Assignee
Beijing Huayi Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Huayi Construction Engineering Co Ltd filed Critical Beijing Huayi Construction Engineering Co Ltd
Priority to CN201920301287.XU priority Critical patent/CN209799037U/en
Application granted granted Critical
Publication of CN209799037U publication Critical patent/CN209799037U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a building wall insulation structure belongs to wall insulation structure field, and its technical scheme main points are including basic unit's wall body, heated board, mesh canvas, priming paint layer and dope layer, basic unit's wall body is provided with vertically and horizontally staggered's fossil fragments girder steel on the surface, the heated board sets up in the square between the fossil fragments girder steel, mesh canvas sets up on the heated board surface, be provided with a plurality of fixing bolt on the mesh canvas, fixing bolt passes mesh canvas and the heated board is fixed on basic unit's wall body, the priming paint layer sets up the surface at mesh canvas, the dope layer sets up the surface at the priming paint layer, and this kind of building wall insulation structure's advantage lies in that insulation structure is more firm, long service life.

Description

Building wall insulation structure
Technical Field
The utility model relates to a wall body insulation construction, in particular to building wall body insulation construction.
Background
The novel heat-insulation and decoration integrated plate for on-site bonding construction is produced by a flow line, integrates the functions of heat insulation, water resistance, facing and the like, is a preferred material for meeting the energy-saving requirement of the current house building and improving the heat insulation level of the outer wall of industrial and civil buildings, and is also a preferred material for energy-saving reconstruction of the existing buildings.
Chinese patent No. CN202273322U discloses a heat-insulating wall structure for buildings, which comprises a wall base layer, a heat-insulating layer, a protective layer and a decorative layer in sequence from inside to outside, wherein the heat-insulating layer is made of fiber felt.
This kind of building thermal insulation wall body keeps warm generally adopts sticky mode to fix wall body basic unit, heat preservation, protective layer and finish coat in proper order, but in the in-service use process, because wall body insulation structure is provided with outdoors, can experience different weather changes such as wind-blown, solarization, rain, the temperature also can be along with weather changes together simultaneously, leads to gluing the condition that viscidity descends to appear, insulation structure's fixed strength descends, insulation structure's life descends.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a building wall insulation construction, its advantage lies in that insulation construction is more firm, long service life.
The above technical purpose of the present invention can be achieved by the following technical solutions:
The utility model provides a building wall insulation construction, includes basic unit's wall body, heated board, mesh canvas, priming paint layer and dope layer, basic unit's wall body is provided with vertically and horizontally staggered's fossil fragments girder steel on the surface, the heated board sets up in the square between the fossil fragments girder steel, the mesh canvas sets up on the heated board surface, be provided with a plurality of fixing bolt on the mesh canvas, fixing bolt passes mesh canvas and heated board and fixes on basic unit's wall body, the priming paint layer sets up on the surface of mesh canvas, the dope layer sets up the surface on the priming paint layer.
Through adopting above-mentioned technical scheme, the heated board uses polystyrene resin's the thing of gathering to make, because it has good heat preservation ability, fossil fragments girder steel mainly used supports fixed heated board, the condition that the heated board accident drops appears in the reduction, the mesh canvas is for further retraining the surface of heated board, and through fixing bolt with the mesh canvas, heated board and basic unit's wall body fixed connection together, further increase the structural strength of heated board, the priming paint layer has good viscidity, be favorable to further fixed mesh canvas, the dope layer mainly plays the decorative effect, insulation construction is not only rely on sticky mode alone fixed, insulation construction is more firm, and service life is prolonged.
Furthermore, the base wall body bottom level is provided with the bearing plate that is used for bearing fossil fragments girder steel.
Through adopting above-mentioned technical scheme, because the effect of gravity, the bottom of fossil fragments girder steel is the place that bears the load the biggest, and bearing plate mainly used bearing fossil fragments girder steel improves structural stability.
Furthermore, reinforcing ribs are obliquely arranged between the bottom surface of the bearing plate and the base layer wall body.
Through adopting above-mentioned technical scheme, the stiffening rib can be towards the bearing capacity that the bottom sprag bearing plate further improved the bearing plate, makes the fossil fragments girder steel more stable, and heated board structure is more stable promptly.
Further, a layer of adhesion mortar is arranged between the heat insulation board and the base wall.
By adopting the technical scheme, the adhesion mortar is formed by uniformly mixing cement, quartz sand and polymer cementing materials with various additives through machinery, and the insulation board is more tightly fixedly connected with the base wall body due to good viscosity of the adhesion mortar.
Further, a layer of anti-crack mortar is arranged between the heat insulation plate and the mesh canvas.
Through adopting above-mentioned technical scheme, anti-crack mortar is the mortar that crack resistance agent, cement and sand that the polymer emulsion and the additive were made are added water according to a certain proportion and are stirred and make, and it keeps certain viscidity to the condition of fracture can not appear easily, on the one hand with heated board and mesh canvas firm fixed connection more, on the other hand anti-crack mortar heated board improves the roughness on surface, more pleasing to the eye.
Furthermore, the thickness of the heat preservation plate is greater than that of the keel steel beam, and sealant is filled in a gap between the adjacent heat preservation plates.
Through adopting above-mentioned technical scheme, the thickness that the thickness of heated board is greater than the fossil fragments girder steel is in order to leave the machining allowance, and is different when constructor discovers the heated board thickness, and the heated board surface is not when being located same plane, and the convenience is cut in the constructor and is repaiied, and sealed clearance between the glue mainly used sealed heated board improves the wholeness of heated board.
Further, the fixing bolt is sleeved with a round gasket, the radius of the gasket is larger than that of the fixing bolt, and the gasket is abutted to the heat insulation plate.
Through adopting above-mentioned technical scheme, the packing ring is in order to increase the area of contact with the heated board, reduces the pressure on the unit area, avoids appearing because local pressure is too big, leads to the sunken condition to appear in the heated board surface.
Further, a putty layer is arranged between the coating layer and the primer layer.
Through adopting above-mentioned technical scheme, putty is mainly in order to level the surface of priming paint layer, reduces the defect that too much height is uneven to appear.
To sum up, the utility model discloses following beneficial effect has:
1. Through the arrangement of the keel steel beams and the mesh canvas, the structure is firmer, and the service life of the heat insulation structure is further prolonged;
2. Through the arrangement of the bearing plate and the reinforcing ribs, the bearing plate is mainly used for bearing the keel steel beam, and the structural stability is improved;
3. Through the arrangement of the adhesion mortar and the anti-crack mortar, the insulation board and the base wall are fixedly connected firmly due to the good viscosity of the adhesion mortar and the anti-crack mortar.
Drawings
FIG. 1 is a schematic structural view of a thermal insulation structure of a building wall;
Fig. 2 is an exploded view of a building wall insulation structure.
in the figure, 1, a base layer wall body; 11. a keel beam; 12. a bearing plate; 13. reinforcing ribs; 2. a thermal insulation board; 21. adhering mortar; 22. anti-crack mortar; 23. sealing glue; 3. mesh canvas; 31. fixing the bolt; 32. a gasket; 4. a primer layer; 41. a putty layer; 5. and (5) coating the layer.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
in which like parts are designated by like reference numerals. It should be noted that the terms "front," "back," "left," "right," "upper" and "lower" used in the following description refer to directions in the drawings, and the terms "bottom" and "top," "inner" and "outer" refer to directions toward and away from, respectively, the geometric center of a particular component.
Example (b): the utility model provides a building wall insulation construction, combines fig. 1 and fig. 2 to show, including basic unit's wall 1, a plurality of fossil fragments girder steels 11 of fixedly connected with on the 1 upper surface of basic unit's wall, fossil fragments girder steel 11 are vertically and horizontally staggered and arrange, and the preferred stainless steel of fossil fragments girder steel 11 is as raw and other materials, because the stainless steel has good structural strength and has outstanding anticorrosive performance to building wall insulation construction is in the open air environment, can improve fossil fragments girder steel 11's life.
Referring to fig. 1 and 2, a bearing plate 12 is horizontally arranged at the bottom of the base wall 1, and the bearing plate 12 abuts against a keel steel beam 11 close to the ground and is used for supporting the keel steel beam 11. Because the effect of gravity, the bottom of fossil fragments girder steel 11 is the place that bears the load the biggest, and bearing plate 12 mainly used bearing fossil fragments girder steel 11 improves structural stability to improve whole insulation construction's stability. Reinforcing ribs 13 are obliquely arranged between the bottom surface of the bearing plate 12 and the base layer wall body 1, the reinforcing ribs 13 are uniformly arranged along the length direction of the bearing plate 12, and the bearing plate 12 is further supported by the reinforcing ribs 13.
Combine figure 1 and figure 2 to show, fixedly connected with heated board 2 in the square that fossil fragments girder steel 11 enclose, heated board 2 is even array arrangement promptly, and heated board 2 uses polystyrene resin's polymer to make, because it has good heat preservation ability. Be provided with one deck adhesion mortar 21 between heated board 2 and the basic unit wall body 1, adhesion mortar 21 is the mortar that is equipped with multiple additive by cement, quartz sand, the cementing material of polymer and forms through mechanical mixing, and adhesion mortar 21 has good viscidity, through adhesion mortar 21 with both more firm fixed connection.
combine figure 1 and figure 2 to show, the thickness of heated board 2 is greater than the thickness of fossil fragments girder steel 11, leaves certain machining allowance, if constructor discovers that heated board 2 thickness is different, 2 surfaces of heated board when not being located same plane, conveniently cuts in constructor and levels, guarantees the roughness.
Referring to fig. 1 and 2, the gaps between the insulation boards 2 are sealed by using a sealant 23, so that all the insulation boards 2 form a whole.
Referring to fig. 1 and 2, mesh canvas 3 is fixed on the surface of an insulation board 2, a layer of anti-crack mortar 22 is arranged between the insulation board 2 and the mesh canvas 3, the anti-crack mortar 22 is made of an anti-crack agent made of polymer emulsion and an additive, cement and sand, and mortar prepared by adding water and stirring according to a certain proportion, has certain viscosity, is not easy to crack, and is high in surface flatness of the anti-crack mortar 22 while being tightly and fixedly connected with the mesh canvas 3.
referring to fig. 1 and 2, a plurality of fixing bolts 31 are arranged on the mesh canvas 3, the fixing bolts 31 penetrate through the mesh canvas 3 and the heat insulation board 2 and are fixed on the base layer wall 1, a circular gasket 32 is sleeved on each fixing bolt 31, the gasket 32 abuts against the surface of the heat insulation board 2, the gasket 32 is made of rubber with good elasticity, and the radius of the gasket 32 is larger than that of the fixing bolts 31. Fixing bolt 31 further fixes heated board 2, makes heated board 2 installation more firm. The gasket 32 reduces the pressure on the unit area for increasing the contact area with the insulation board 2, and avoids the situation that the surface of the insulation board 2 is sunken due to overlarge local pressure.
As shown in fig. 1 and 2, the surface of the insulation board 2 is coated with a primer layer 4 made of emulsion paint, and the primer layer 4 has a compact structure, so that the insulation board 2 is protected and the thermal insulation performance of the insulation board 2 is improved to a certain extent. The surface of priming paint layer 4 is provided with putty layer 41, and putty layer 41 is mainly in order to fill up the defect of high unevenness on priming paint layer 4, improves the roughness.
Referring to fig. 1 and 2, the surface of the putty layer 41 is provided with a paint layer 5, the paint layer 5 can be made of a corresponding color paint according to the color of a building, and patterns or patterns thereof can be drawn according to requirements, so that the overall aesthetic degree is improved.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications to the present embodiment without inventive contribution as required after reading the present specification, but all of them are protected by patent laws within the scope of the claims of the present invention.

Claims (8)

1. The utility model provides a building wall insulation construction which characterized in that: including basic unit's wall body (1), heated board (2), mesh canvas (3), priming paint layer (4) and dope layer (5), basic unit's wall body (1) is provided with vertically and horizontally staggered's fossil fragments girder steel (11) on the surface, heated board (2) set up in the square between fossil fragments girder steel (11), mesh canvas (3) set up on heated board (2) surface, be provided with a plurality of fixing bolt (31) on mesh canvas (3), fixing bolt (31) pass mesh canvas (3) and heated board (2) and fix on basic unit's wall body (1), priming paint layer (4) set up the surface at mesh canvas (3), dope layer (5) set up the surface in priming paint layer (4).
2. The building wall insulation structure according to claim 1, wherein: the base layer wall body (1) is horizontally provided with a bearing plate (12) used for bearing the keel steel beam (11).
3. The building wall insulation structure according to claim 2, wherein: and reinforcing ribs (13) are obliquely arranged between the bottom surface of the bearing plate (12) and the base layer wall body (1).
4. The building wall insulation structure according to claim 1, wherein: and a layer of adhesion mortar (21) is arranged between the heat insulation board (2) and the base layer wall body (1).
5. the building wall insulation structure according to claim 4, wherein: and a layer of anti-crack mortar (22) is arranged between the heat insulation plate (2) and the mesh canvas (3).
6. The building wall insulation structure according to claim 5, wherein: the thickness of heated board (2) is greater than the thickness of fossil fragments girder steel (11), and it has sealed glue (23) to fill in the clearance between adjacent heated board (2).
7. The building wall insulation structure according to claim 1, wherein: the cover of fixing bolt (31) is equipped with circular shape packing ring (32), packing ring (32) radius is greater than the radius of fixing bolt (31), packing ring (32) offset with heated board (2).
8. The building wall insulation structure according to claim 1, wherein: a putty layer (41) is arranged between the coating layer (5) and the primer layer (4).
CN201920301287.XU 2019-03-09 2019-03-09 Building wall insulation structure Active CN209799037U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920301287.XU CN209799037U (en) 2019-03-09 2019-03-09 Building wall insulation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920301287.XU CN209799037U (en) 2019-03-09 2019-03-09 Building wall insulation structure

Publications (1)

Publication Number Publication Date
CN209799037U true CN209799037U (en) 2019-12-17

Family

ID=68824175

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920301287.XU Active CN209799037U (en) 2019-03-09 2019-03-09 Building wall insulation structure

Country Status (1)

Country Link
CN (1) CN209799037U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113775082A (en) * 2021-09-16 2021-12-10 福建省世新工程营造有限公司 Building heat-insulating wall and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113775082A (en) * 2021-09-16 2021-12-10 福建省世新工程营造有限公司 Building heat-insulating wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN210239001U (en) Rock wool board composite decoration component
CN201826405U (en) Environment-friendly wall insulating structure for prefabricated buildings
CN205712537U (en) A kind of MC composite fireproof heat preservation board
CN201128990Y (en) Composite environment-friendly thermal insulation material for wall
CN111042362A (en) Gel non-combustible heat-insulation decorative plate external wall external heat-insulation system and construction method
CN209799037U (en) Building wall insulation structure
CN100585111C (en) Heat-resistant insulating brick for roofing wall
CN101424117B (en) Gypsum insulation plate and connection method thereof with major structure of construction
CN105239745B (en) Integrated wallboard and its plate stitch processing method
CN109339327A (en) A kind of roof of light steel structure house
CN212926549U (en) Low energy consumption building outer wall watertight fittings
KR102088283B1 (en) Primer for shingle waterproof sheet and manufacturing method thereof and constructing method using thereof
CN201554133U (en) Composite rock-wool board for assembled keel structure or slope roof
CN102061750A (en) Template disassembly-free pouring polyurethane external wall heat insulation system
CN207812706U (en) A kind of structure-integrated template system of AS composite phase-changes insulation and decoration
CN106245860A (en) A kind of building board
CN208023808U (en) A kind of floor plates and its production line
CN112064870A (en) Gypsum board butt joint cracking-preventing structure and construction process thereof
KR200189604Y1 (en) Composite floor construction
CN211899376U (en) Building outer wall finished product component with heat preservation and decoration effect and grade-A fire prevention function
CN216740121U (en) Wall body assembling joint
CN209723262U (en) A kind of outer wall of floor building structure
CN211080752U (en) Heat-insulating noise-reducing composite board for building
CN211396254U (en) Composite board for building
CN214498145U (en) Rock wool area composite sheet thin plastering external thermal insulation system for external wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant