CN209778042U - high brick device of carrying for building of anti-falling security - Google Patents

high brick device of carrying for building of anti-falling security Download PDF

Info

Publication number
CN209778042U
CN209778042U CN201920633894.6U CN201920633894U CN209778042U CN 209778042 U CN209778042 U CN 209778042U CN 201920633894 U CN201920633894 U CN 201920633894U CN 209778042 U CN209778042 U CN 209778042U
Authority
CN
China
Prior art keywords
frame
fixedly connected
roof
sides
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920633894.6U
Other languages
Chinese (zh)
Inventor
张茂军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongqi Jiaojian Group Corp Ltd
Original Assignee
Zhongqi Jiaojian Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongqi Jiaojian Group Corp Ltd filed Critical Zhongqi Jiaojian Group Corp Ltd
Priority to CN201920633894.6U priority Critical patent/CN209778042U/en
Application granted granted Critical
Publication of CN209778042U publication Critical patent/CN209778042U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a high brick device of carrying for building of anti-drop security, including frame and roof, the top fixedly connected with montant of roof, the top of montant runs through the frame and extends to the top of frame, the one end fixedly connected with link that the montant extends to the frame top, the equal fixedly connected with support frame in both sides of roof bottom to the board is placed to the bottom fixedly connected with of support frame, the front and the equal fixedly connected with baffle in the back of roof bottom, the utility model relates to a construction technical field. This prevent high brick device for building of security that falls, through the equal fixedly connected with support frame in both sides of roof bottom, fix the position-limiting to the fragment of brick at the in-process that promotes the fragment of brick, improved the stability and the security that have promoted, there is the horizontal pole through the equal sliding connection in both sides of frame, and is multiple fixed, has improved fixed stability, does benefit to the workman and operates, has improved holistic work efficiency.

Description

High brick device of carrying for building of anti-falling security
Technical Field
The utility model relates to a construction technical field specifically is a high brick device is carried to high building of anti-falling security.
Background
The building construction refers to the production activities in the construction implementation stage of engineering construction, is the construction process of various buildings, also can be said to be the process of changing various lines on the design drawing into real objects in the appointed place, and comprises the processes of foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, the place of construction operation is called as a building construction site or a construction site, also called as a construction site, the building is a general name of the building and the structure, and is an artificial environment created by people by using the grasped material technical means and applying certain scientific laws, wind and water concepts and aesthetic rules in order to meet the social life needs.
Need carry the brick among the building construction process, current carry the brick device when using, can take place the condition that the fragment of brick dropped, can cause the casualties under the serious condition, cause the unnecessary loss, relatively poor to the fixity of fragment of brick moreover, inconvenient operation.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a high brick device is carried to building of anti-falling security has solved the condition that can take place the fragment of brick and drop, can cause the casualties under the serious condition, causes the unnecessary loss, moreover relatively poor to the fixity of fragment of brick, the inconvenient problem of operating of carrying out.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a brick lifting device for buildings, which has high anti-falling safety and high safety, comprises an outer frame and a top plate, wherein the top of the top plate is fixedly connected with a vertical rod, the top end of the vertical rod penetrates through the outer frame and extends to the top of the outer frame, one end of the vertical rod, which extends to the top of the outer frame, is fixedly connected with a hanging ring, the two sides of the bottom of the top plate are fixedly connected with a supporting frame, the bottom of the supporting frame is fixedly connected with a placing plate, the front side and the back side of the bottom of the top plate are fixedly connected with a baffle plate, the bottom of the baffle plate is fixedly connected with the top of the placing plate, the tops of the two sides of the inner wall of the outer frame are fixedly connected with a fixed plate, the two sides of the top plate are respectively provided with a through groove matched with the fixed plate, the two sides, and a first spring is fixedly connected between the top of the inner wall of the outer frame and the top of the top plate on the surface of the sliding rod.
Preferably, the top end of the sliding rod is fixedly connected with a stop block, the number of the supporting frames is four, and the number of the baffle plates is six.
Preferably, both sides of the outer frame are respectively connected with a cross rod in a sliding manner, one ends, opposite to the cross rods, of the cross rods respectively penetrate through the outer frame and extend to the inside of the outer frame, and one ends, extending to the inside of the outer frame, of the cross rods are fixedly connected with vertical plates.
Preferably, two the equal fixedly connected with movable rod in top and the bottom of riser back to one side, the one end of movable rod runs through the frame and extends to the outside of frame, the surface of horizontal pole and be located fixedly connected with second spring between one side of frame inner wall and one side of riser.
Preferably, the bottom of the placing plate is fixedly connected with a sliding rail, and two sides of the bottom of the sliding rail are both connected with sliding blocks in a sliding mode.
Preferably, the bottoms of the two sliding blocks are movably connected with connecting rods, the bottom ends of the connecting rods are movably connected with the bottom of the inner wall of the outer frame, and an electric telescopic rod is movably connected between the two opposite sides of the surfaces of the connecting rods.
Advantageous effects
The utility model provides a high brick device is carried to high building of anti-falling security. Compared with the prior art, the method has the following beneficial effects:
(1) The brick lifting device for the building with high anti-falling safety is characterized in that the two sides of the bottom of the top plate are fixedly connected with the supporting frames, the bottom of the supporting frame is fixedly connected with a placing plate, the front and the back of the bottom of the top plate are both fixedly connected with a baffle plate, the bottom of the baffle is fixedly connected with the top of the placing plate, the tops of the two sides of the inner wall of the outer frame are fixedly connected with the fixing plates, and the two sides of the top plate are respectively provided with a through groove matched with the fixing plate, the two sides of the top of the outer frame are respectively connected with a sliding rod in a sliding way, the bottom end of the sliding rod penetrates through the outer frame and the top plate and extends to the bottom of the top plate, one end of the sliding rod extending to the bottom of the top plate is fixedly connected with a transverse plate, a first spring is fixedly connected between the top of the inner wall of the outer frame and the top of the top plate on, just fix spacingly to the fragment of brick at the in-process that promotes the fragment of brick, improved stability and security that have promoted.
(2) this prevent high brick device for building of security that falls, there is the horizontal pole through the equal sliding connection in both sides of frame, the inside of frame and extending to the frame is all run through to the one end that two horizontal poles are relative, the horizontal pole extends to the inside one end fixedly connected with riser of frame, two risers are back to each other from the top of one side and the equal fixedly connected with movable rod in bottom, the one end of movable rod runs through the frame and extends to the outside of frame, the surface of horizontal pole and be located fixedly connected with second spring between one side of frame inner wall and one side of riser, it is multiple fixed, fixed stability has been improved, do benefit to the workman and operate, whole work efficiency has been improved.
Drawings
FIG. 1 is a perspective view of the structure of the present invention;
FIG. 2 is a perspective view of the placement board structure of the present invention;
Fig. 3 is a front view of the structure of the present invention.
In the figure: 1 frame, 2 roofs, 3 montants, 4 link, 5 supports, 6 place board, 7 baffles, 8 fixed plates, 9 logical grooves, 10 slide bars, 11 diaphragm, 12 first spring, 13 horizontal poles, 14 risers, 15 movable rods, 16 second spring, 17 slide rails, 18 slider, 19 connecting rods, 20 electric telescopic handle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a brick lifting device for a building, which has high anti-falling safety, comprises an outer frame 1 and a top plate 2, wherein two sides of the outer frame 1 are both connected with cross rods 13 in a sliding manner, opposite ends of the two cross rods 13 both penetrate through the outer frame 1 and extend into the outer frame 1, one ends of the cross rods 13 extending to the outer part of the outer frame 1 are also fixedly connected with check blocks, one ends of the cross rods 13 extending to the inner part of the outer frame 1 are fixedly connected with vertical plates 14 for multiple fixation, the stability of fixation is improved, the operation of workers is facilitated, the integral working efficiency is improved, the top parts and the bottom parts of the two vertical plates 14 opposite to each other sides are both fixedly connected with movable rods 15, one ends of the movable rods 15 penetrate through the outer frame 1 and extend to the outer part of the outer frame 1, a second spring 16 is fixedly connected between the surface of the cross rods 13 and one side of the inner wall of the outer frame 1 and one side of the vertical, one end of the vertical rod 3 extending to the top of the outer frame 1 is fixedly connected with a hanging ring 4, two sides of the bottom of the top plate 2 are both fixedly connected with a supporting frame 5, the bottom of the supporting frame 5 is fixedly connected with a placing plate 6, the bottom of the placing plate 6 is fixedly connected with a sliding rail 17, two sides of the bottom of the sliding rail 17 are both slidably connected with sliding blocks 18, the bottoms of the two sliding blocks 18 are both movably connected with a connecting rod 19, the bottom end of the connecting rod 19 is movably connected with the bottom of the inner wall of the outer frame 1, an electric telescopic rod 20 is movably connected between the opposite sides of the surfaces of the two connecting rods 19, the front side and the back side of the bottom of the top plate 2 are both fixedly connected with baffle plates 7, the baffle plates 7 can limit and fix bricks, the bottoms of the baffle plates 7 are fixedly connected with the top of the placing plate 6, improved stability and the security that has promoted, and the logical groove 9 with the 8 looks adaptations of fixed plate is all seted up to the both sides at 2 tops of roof, the equal sliding connection in both sides at 1 top of frame has slide bar 10, the top fixedly connected with dog of slide bar 10, and the quantity of support frame 5 is four, the quantity of baffle 7 is six, frame 1 and roof 2 and the bottom that extends to roof 2 are run through to the bottom of slide bar 10, slide bar 10 extends to the one end fixedly connected with diaphragm 11 of 2 bottoms of roof, the logical groove 9 has also been seted up with the 8 looks adaptations of fixed plate to the both sides of diaphragm 11, in order not to block the removal of fixed plate 8, play fixed effect again simultaneously, the first spring 12 of fixedly connected with between the top of frame 1 inner wall and the top of roof 2 is just located to the surface of.
During the use, place the fragment of brick on placing board 6, hoist link 4 through hanging device, will drive roof 2 and rise, start electric telescopic handle 20 through external switch, electric telescopic handle 20 stimulates connecting rod 19 and carries out relative motion, promote and place the distance between board 6 and the 1 inner wall bottom of frame, fixed plate 8 will hug closely the top of fragment of brick through leading to groove 9, carry out spacing fixed to the top of fragment of brick, the both sides of fragment of brick will be hugged closely under the elasticity of second spring 16 to the riser 14 on both sides, the top of fragment of brick is hugged closely to diaphragm 11 under the elasticity of first spring 12, carry out spacing fixed all around to the fragment of brick.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a high brick device is carried to high for building of anti-falling security, includes frame (1) and roof (2), the top fixedly connected with montant (3) of roof (2), the top of montant (3) runs through frame (1) and extends to the top of frame (1), montant (3) extend to one end fixedly connected with link (4) at frame (1) top, its characterized in that: equal fixedly connected with support frame (5) in both sides of roof (2) bottom to the board (6) is placed to the bottom fixedly connected with of support frame (5), the front of roof (2) bottom and the equal fixedly connected with baffle (7) in the back, and the bottom of baffle (7) and the top fixed connection who places board (6), the equal fixedly connected with fixed plate (8) in top of frame (1) inner wall both sides, and logical groove (9) with fixed plate (8) looks adaptation is all seted up to the both sides at roof (2) top, the equal sliding connection in both sides at frame (1) top has slide bar (10), the bottom of slide bar (10) runs through frame (1) and roof (2) and extends to the bottom of roof (2), the one end fixedly connected with diaphragm (11) that slide bar (10) extended to roof (2) bottom, the surface of slide bar (10) just is located between the top of frame (1) inner wall and the top of roof (2) fixed connection There is a first spring (12).
2. the brick lifting device for the building, which is high in falling prevention and safety, according to claim 1, is characterized in that: the top end of the sliding rod (10) is fixedly connected with a stop block, the number of the supporting frames (5) is four, and the number of the baffle plates (7) is six.
3. The brick lifting device for the building, which is high in falling prevention and safety, according to claim 1, is characterized in that: the equal sliding connection in both sides of frame (1) has horizontal pole (13), two the relative one end of horizontal pole (13) all runs through frame (1) and extends to the inside of frame (1), horizontal pole (13) extend to the inside one end fixedly connected with riser (14) of frame (1).
4. The brick lifting device for the building, which is high in falling prevention and safety, according to claim 3, is characterized in that: two top and the equal fixedly connected with movable rod in bottom (15) of riser (14) one side of keeping away from mutually, the one end of movable rod (15) runs through frame (1) and extends to the outside of frame (1), fixedly connected with second spring (16) between the surface of horizontal pole (13) and the one side that is located frame (1) inner wall and riser (14).
5. The brick lifting device for the building, which is high in falling prevention and safety, according to claim 1, is characterized in that: the bottom of the placing plate (6) is fixedly connected with a sliding rail (17), and two sides of the bottom of the sliding rail (17) are both connected with sliding blocks (18) in a sliding mode.
6. The brick lifting device for the building, which is high in falling prevention and safety, according to claim 5, is characterized in that: the bottom of two slider (18) all swing joint has connecting rod (19) to the bottom of connecting rod (19) and the bottom swing joint of frame (1) inner wall, two swing joint has electric telescopic handle (20) between the relative one side in connecting rod (19) surface.
CN201920633894.6U 2019-05-06 2019-05-06 high brick device of carrying for building of anti-falling security Expired - Fee Related CN209778042U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920633894.6U CN209778042U (en) 2019-05-06 2019-05-06 high brick device of carrying for building of anti-falling security

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920633894.6U CN209778042U (en) 2019-05-06 2019-05-06 high brick device of carrying for building of anti-falling security

Publications (1)

Publication Number Publication Date
CN209778042U true CN209778042U (en) 2019-12-13

Family

ID=68804752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920633894.6U Expired - Fee Related CN209778042U (en) 2019-05-06 2019-05-06 high brick device of carrying for building of anti-falling security

Country Status (1)

Country Link
CN (1) CN209778042U (en)

Similar Documents

Publication Publication Date Title
CN209778042U (en) high brick device of carrying for building of anti-falling security
CN213742197U (en) Scaffold frame for construction convenient to adjust
CN214034830U (en) Net rack plate mounting device
CN210263829U (en) Building wall scaffold
CN213391110U (en) Building brick device for building house
CN210369844U (en) Simple hanging basket
CN210263824U (en) Scaffold frame of building engineering construction usefulness
CN205100543U (en) Novel construction system of commercial mansion
CN207776399U (en) A kind of construction platform for preventing from falling
CN209924411U (en) Hanging flower basket for construction
CN214299021U (en) Safety device for tower crane climbing
CN206844646U (en) A kind of high flexible assembly type elevator its support reinforcement mechanism of applicability
CN2527942Y (en) Masonry equipment for roasting furnace monolithic hot wall
CN110284598A (en) The installation method and device of spherical net brace roof structure
CN101597956A (en) Suspended scaffold
CN206041337U (en) Power communication cable conductor high altitude construction device
CN204163367U (en) Cat ladder frame operating platform
CN217924774U (en) Attached protective platform lifting structure
CN216517251U (en) Fence for building construction safety
CN214658636U (en) Building outer wall fitment hanging flower basket
CN218264856U (en) Outer wall painting protection hanging basket for high-rise building construction
CN103359625A (en) Automatic construction equipment for building hoisting and platform elevating of new rural construction
CN211336020U (en) Shallow for multi-use architecture
CN217000764U (en) Building platform for outdoor building and indoor decoration
CN220645072U (en) Steel structure scaffold for engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191213

Termination date: 20200506