CN206041337U - Power communication cable conductor high altitude construction device - Google Patents
Power communication cable conductor high altitude construction device Download PDFInfo
- Publication number
- CN206041337U CN206041337U CN201620746237.9U CN201620746237U CN206041337U CN 206041337 U CN206041337 U CN 206041337U CN 201620746237 U CN201620746237 U CN 201620746237U CN 206041337 U CN206041337 U CN 206041337U
- Authority
- CN
- China
- Prior art keywords
- upper portion
- chamber
- storage chamber
- pedestal
- stores
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a power communication cable conductor high altitude construction device, including the base, base upper portion left side is provided with stores the chamber, stores intracavity portion and is provided with a plurality of first chambeies of depositing, stores chamber upper portion and is provided with the show shelf, and the show shelf side is provided with the show board, base upper portion intermediate position is provided with the hydraulic press, and hydraulic press upper portion is connected with the hydraulic stretching post, and hydraulic stretching post upper portion is connected with the backup pad, and the backup pad left side is connected with the baffle, and backup pad lower part left side is provided with climbing ladder, and climbing ladder inside is provided with a plurality of horizontal poles, base upper portion right side is provided with stores the frame, stores frame inside and is provided with a plurality of baffles, and baffle upper portion all is provided with the second and deposits the chamber, it is provided with the dust remover to store the frame right side. The utility model discloses a device can be stored to power communication cable conductor and electric power device effectively to can ascend a height as personnel by auxiliary worker, make the staff can carry out cable conductor high altitude construction better.
Description
Technical field
This utility model belongs to technical field of electric power communication, and in particular to a kind of power communication cable work high above the ground dress
Put.
Background technology
Power telecom network is arisen at the historic moment to ensure the safe and stable operation of power system.It is with power system
Relay protection and safety stabilization control system, dispatch automated system are collectively referred to as the three of power system safety and stability operation by people
Big pillar.At present, it is even more the basis of power network schedule automation, the network operation marketization and management modernization;It is to ensure that electrical network
The important means of safe and stable, economical operation;It is the important infrastructure of power system.In order to avoid power telecom network is disturbed
People, power communication cable are typically erected at eminence, and staff needs to climb by ladder and constructed to eminence.Ladder
Upper activity space is limited, affects the efficiency of construction of staff, also there is potential safety hazard.
Utility model content
The purpose of this utility model is to provide a kind of power communication cable aerial platform, so as to overcome it is above-mentioned not
A kind of foot, there is provided more preferable device, it is convenient to use as needed, service efficiency is improved, improves using effect.
To achieve these goals, the technical solution of the utility model is as follows.
A kind of power communication cable aerial platform, including pedestal, pedestal upper left-hand is provided with storage chamber, storage
Chamber is internally provided with multiple first storage chambers, and storage chamber top is provided with showing stand, and showing stand side is provided with Graphic Panel;Pedestal
Upper middle position is provided with hydraulic press, and hydraulic press top is connected with hydraulically extensible post, and hydraulically extensible post top is connected with support
Plate, is connected with baffle plate on the left of gripper shoe, gripper shoe lower left side is provided with ladder stand, and ladder stand is internally provided with multiple cross bars;
Pedestal upper right is provided with storage shelf, and storage shelf is internally provided with multiple dividing plates, and dividing plate top is provided with the second storage chamber;
Cleaner unit is provided with the right side of storage shelf, cleaner unit top is connected with into dirt pipe, is entered and is connected with the left of dirt pipe into dirt chamber, enter dirt chamber left
Side is connected with multiple sweep-up pipes.
Further, the pedestal bottom left and right sides is provided with for mobile movable pulley.
Further, storage chamber right upper portion is provided with support base, and support base side is provided with power interface, and support base is left
Side is provided with heating rod, is provided with power line and is connected with heating rod on power interface.
The beneficial effect of the utility model is:The utility model device can effectively for power communication cable and
Electrical device is stored, and energy ancillary staff is ascended a height, and enables staff preferably to carry out cable high-altitude work
Industry.
Description of the drawings
Fig. 1 is apparatus structure schematic diagram used in this utility model embodiment.
Description of symbols in figure:1st, movable pulley;2nd, ladder stand;3rd, cross bar;4th, hydraulic press;5th, sweep-up pipe;6th, cleaner unit;7th, enter
Dirt pipe;8th, storage chamber;9th, pedestal;10th, heating rod;11st, the first storage chamber;12nd, storage shelf;13rd, enter dirt chamber;14th, Graphic Panel;
15th, power interface;16th, baffle plate;17th, hydraulically extensible post;18th, dividing plate;19th, the second storage chamber;20th, gripper shoe;21st, support base;
22nd, showing stand.
Specific embodiment
Below in conjunction with the accompanying drawings specific embodiment of the present utility model is described, it is new to be better understood from this practicality
Type.
Power communication cable aerial platform as shown in Figure 1, including pedestal 9,9 upper left-hand of pedestal is provided with storage
Chamber 8 is deposited, storage chamber 8 is internally provided with multiple first storage chambers 11, and 8 top of storage chamber is provided with showing stand 22,22 side of showing stand
Face is provided with Graphic Panel 14;9 upper middle position of pedestal is provided with hydraulic press 4, and 4 top of hydraulic press is connected with hydraulically extensible post
17,17 top of hydraulically extensible post is connected with gripper shoe 20, is connected with baffle plate 16 on the left of gripper shoe 20, and 20 lower left side of gripper shoe sets
Ladder stand 2 is equipped with, ladder stand 2 is internally provided with multiple cross bars 3;9 upper right of pedestal is provided with storage shelf 12, in storage shelf 12
Portion is provided with multiple dividing plates 18, and 18 top of dividing plate is provided with the second storage chamber 19;Cleaner unit 6 is provided with the right side of storage shelf 12,
6 top of cleaner unit is connected with into dirt pipe 7, is entered and is connected with the left of dirt pipe 7 into dirt chamber 13, is entered and is connected with multiple dust suctions on the left of dirt chamber 13
Pipe 5.The 9 bottom left and right sides of pedestal is provided with for mobile movable pulley 1.8 right upper portion of storage chamber is provided with support base 21,
21 side of support base is provided with power interface 15, is provided with heating rod 10, is provided with electricity on power interface 15 on the left of support base 21
Source line is connected with heating rod 10.
The utility model device in the specific implementation, power communication cable is put in the first storage chamber 11 and is stored up
Deposit.Power interface 15 connects external power source, and heating rod 10 starts heating, the cable in the first storage chamber of lower section 11 is done
Dry process, the moisture on cable surface is removed, it is to avoid cable moisture damage.Using correlation letter of the Graphic Panel 14 to cable
Breath is shown, and cable is introduced, so as to preferably depositing and installing cable.Depositing in the second storage chamber 19 has
Electrical device, staff easily can be taken when needed.Opening cleaner unit 6 carries out dedusting, by electrical device surface
Dust is sucked in dirt chamber 13 from sweep-up pipe 5, makes electrical device surface keep clean.The dust entered in dirt chamber 13 is from entering dirt pipe 7
It is collected in cleaner unit 6, then unification is processed.Staff divides from the first storage chamber 11 and the second storage chamber 19
Not Qu Chu cable and electrical device, climbed on ladder stand 2 using cross bar 3, reach gripper shoe 20 on.Using hydraulic press
4 control hydraulically extensible posts 17 extend, and hydraulically extensible post 17 drives gripper shoe 20 to move up, and staff is transported to eminence,
The electrical device for enabling staff easily to take in the second storage chamber of higher position 19, while enable staff specified
Position is installed by cable.
The above is preferred implementation of the present utility model, it is noted that for the ordinary skill of the art
For personnel, on the premise of without departing from this utility model principle, some improvements and modifications can also be made, these improve and moisten
Decorations are also considered as protection domain of the present utility model.
Claims (1)
1. a kind of power communication cable aerial platform, it is characterised in that:Including pedestal(9), the pedestal(9)Top is left
Side is provided with storage chamber(8), the storage chamber(8)It is internally provided with multiple first storage chambers(11), the storage chamber(8)Top
It is provided with showing stand(22), the showing stand(22)Side is provided with Graphic Panel(14);The pedestal(9)Upper middle position sets
It is equipped with hydraulic press(4), the hydraulic press(4)Top is connected with hydraulically extensible post(17), the hydraulically extensible post(17)Top connects
It is connected to gripper shoe(20), the gripper shoe(20)Left side is connected with baffle plate(16), the gripper shoe(20)Lower left side is provided with
Ladder stand(2), the ladder stand(2)It is internally provided with multiple cross bars(3);The pedestal(9)Upper right is provided with storage shelf
(12), the storage shelf(12)It is internally provided with multiple dividing plates(18), the dividing plate(18)Top is provided with the second storage chamber
(19);The storage shelf(12)Right side is provided with cleaner unit(6), the cleaner unit(6)Top is connected with into dirt pipe(7), it is described
Enter dirt pipe(7)Left side is connected with into dirt chamber(13), it is described enter dirt chamber(13)Left side is connected with multiple sweep-up pipes(5);The pedestal
(9)The bottom left and right sides is provided with for mobile movable pulley(1);The storage chamber(8)Right upper portion is provided with support base
(21), the support base(21)Side is provided with power interface(15), the support base(21)Left side is provided with heating rod(10),
The power interface(15)On be provided with power line and heating rod(10)It is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620746237.9U CN206041337U (en) | 2016-07-15 | 2016-07-15 | Power communication cable conductor high altitude construction device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620746237.9U CN206041337U (en) | 2016-07-15 | 2016-07-15 | Power communication cable conductor high altitude construction device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206041337U true CN206041337U (en) | 2017-03-22 |
Family
ID=58310957
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620746237.9U Expired - Fee Related CN206041337U (en) | 2016-07-15 | 2016-07-15 | Power communication cable conductor high altitude construction device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206041337U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115108258A (en) * | 2022-07-26 | 2022-09-27 | 国网山东省电力公司海阳市供电公司 | Integral type extra-high voltage test reactor rise to erect and operate device |
-
2016
- 2016-07-15 CN CN201620746237.9U patent/CN206041337U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115108258A (en) * | 2022-07-26 | 2022-09-27 | 国网山东省电力公司海阳市供电公司 | Integral type extra-high voltage test reactor rise to erect and operate device |
CN115108258B (en) * | 2022-07-26 | 2023-09-01 | 国网山东省电力公司海阳市供电公司 | Lifting and transferring device of integrated extra-high voltage test reactor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206279752U (en) | A kind of exterior wall finishing hanging basket of more safety and comfort | |
CN206041337U (en) | Power communication cable conductor high altitude construction device | |
CN103031966B (en) | Main shaft maintenance platform for water turbine and electric generator | |
CN205964749U (en) | Formula of climbing for construction scaffold put up fire extinguishing system | |
CN203312712U (en) | Secondary cable laying corner support | |
CN205687500U (en) | Architectural electricity construction lowering or hoisting gear | |
CN115535864A (en) | Indoor portable hanging wire device of transformer substation | |
CN205438492U (en) | Civil engineering construction article conveyor system | |
CN209620551U (en) | A kind of multi-functional mounting platform of high voltage power cable | |
CN106836823A (en) | A kind of wall aligns installation auxiliary device | |
CN205637595U (en) | Building electrical equipment construction equipment | |
CN212726026U (en) | Outdoor switch cabinet convenient to maintain | |
CN206097093U (en) | System is maintained to computer network safety | |
CN206408948U (en) | A kind of interior architecture decoration construction device for transporting objects | |
CN207211678U (en) | One kind automatically moves type scaffold | |
CN205590252U (en) | Building aerial working platform | |
CN204597419U (en) | Communication ray cable clip device | |
CN205610069U (en) | Novel electric power that improves structure overhauls frame | |
CN205591509U (en) | Construct construction equipment that ascends a height | |
CN211499681U (en) | Movable overhanging working frame | |
CN205654059U (en) | Civilian building electrical facility installation maintenance system | |
CN214034662U (en) | Tunnel engineering is with scaffold frame of being convenient for installation | |
CN216787900U (en) | Dustproof dense mesh net laying device for construction site | |
CN211632470U (en) | Electric power overhauls uses portable work bench | |
CN202444194U (en) | Transportation car special for isolating switch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170322 Termination date: 20170715 |
|
CF01 | Termination of patent right due to non-payment of annual fee |