CN209758918U - A safe operating means for composite wall panel installation - Google Patents
A safe operating means for composite wall panel installation Download PDFInfo
- Publication number
- CN209758918U CN209758918U CN201920485840.XU CN201920485840U CN209758918U CN 209758918 U CN209758918 U CN 209758918U CN 201920485840 U CN201920485840 U CN 201920485840U CN 209758918 U CN209758918 U CN 209758918U
- Authority
- CN
- China
- Prior art keywords
- wall panel
- composite wall
- steel pipe
- wallboard
- derrick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a safe operating means for composite wall panel installation relates to wallboard installation technical field. This a safe operating means for composite wall panel installation, including the steel pipe derrick, the top of steel pipe derrick is provided with the top tripod, the below of top tripod is provided with top wallboard through the couple and promotes the pulley, the winding is provided with wallboard lifting rope on the wallboard lifting pulley of top, wallboard lifting rope's one end is provided with the wallboard lifting hook. This a safe operating means for composite wall panel installation, through the steel pipe derrick, the cooperation of parts such as top tripod, top assembly pulley and top wallboard promotion pulley use, when composite wall panel installation, can effectual adaptation place inconvenient, installer operation station and the perpendicular transportation scheduling problem of shingle nail, guaranteed the installation quality of shingle nail, repeatedly usable when having reduced operating time to can be done the escape way concurrently, reduced installation engineering's cost.
Description
Technical Field
The utility model relates to a wallboard installation technical field specifically is a safe operating means for composite wall panel installation.
Background
Due to the improvement of the functions and materials of the external enclosure structure of the steel structure workshop, the traditional single-layer metal wall panel or on-site composite metal wall panel is developed into a composite wall panel material, the external shape is more flexible and novel, the new era is rich, and the application range and the scale development are rapid.
In current steel construction shingle nail installation, generally adopt single cat ladder or simple and easy hanging flower basket installation, the operation is inconvenient, and the security is poor, and composite shingle nail mounting means is different and mounting means in the past simultaneously, and composite shingle nail installation is by lower to upper, and the level is fixed. The composite wall panel is heavy, and an operator cannot carry the composite wall panel to install the composite wall panel, so that the composite wall panel is difficult to install.
SUMMERY OF THE UTILITY MODEL
technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a safe operating means for composite wall panel installation has solved in current steel construction shingle nail installation, generally adopts single cat ladder or simple and easy hanging flower basket installation, and the operation is inconvenient, and the security is poor, and composite wall panel mounting means is different and mounting means in the past simultaneously, and composite wall panel installation is by going up, and the level is fixed. The composite shingle nail has large weight, and operators cannot carry the shingle nail to install, so the composite shingle nail is difficult to install.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a safe operating means for composite wall panel installation, includes the steel pipe derrick, the top of steel pipe derrick is provided with the top tripod, the below of top tripod is provided with top wallboard through the couple and promotes the pulley, the winding is provided with wallboard lifting rope on the wallboard lifting pulley of top, the one end of wallboard lifting rope is provided with the wallboard lifting hook, be provided with composite wall panel on the wallboard lifting hook, the bottom of steel pipe derrick is provided with the bottom mounting, the right side of steel pipe derrick bottom is provided with anticollision piece, the below of top tripod is through top fixed cable fixedly connected with steel construction main body, top tripod below is provided with the top assembly pulley, be provided with the operation panel on the steel pipe derrick.
Preferably, the concrete parameters of the steel pipe derrick are as follows: the plane size is 600mm, the vertical spacing is 500mm, the derrick material adopts DN40X3.5 steel pipe, and the total height is 10m to 15 m.
Preferably, the top tripod is made of DN40X3.5 steel pipe and is made into a triangular style.
Preferably, the operating platform is formed by combining steel plates with the width of 30mm and the thickness of 4 mm.
Preferably, the wallboard hoist rope is a polypropylene cable 18mm in diameter.
(III) advantageous effects
The utility model provides a safe operating means for composite wall panel installation. The method has the following beneficial effects: this a safe operating means for composite wall panel installation, through the steel pipe derrick, the cooperation of parts such as top tripod, top assembly pulley and top wallboard promotion pulley use, when composite wall panel installation, can effectual adaptation place inconvenient, installer operation station and the perpendicular transportation scheduling problem of shingle nail, guaranteed the installation quality of shingle nail, repeatedly usable when having reduced operating time to can be done the escape way concurrently, reduced installation engineering's cost.
Drawings
FIG. 1 is a schematic structural view of the present invention;
Fig. 2 is an elevation view of the present invention;
3 fig. 3 3 3 is 3 a 3 partial 3 enlarged 3 view 3 of 3 a 3- 3 a 3 of 3 the 3 present 3 invention 3. 3
In the figure: 1. a steel pipe derrick; 2. a top tripod; 3. a top pulley block; 4. a top wall panel hoist sheave; 5. a wallboard lift cord; 6. a wallboard hook; 7. an anti-collision block; 8. a composite shingle; 9. a steel structural body; 10. an operation table; 11. a bottom fixture; 12. the top is fixed with a cable.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a safe operating means for composite wall panel installation, includes steel pipe derrick 1, and the concrete parameter of steel pipe derrick 1 is as follows: the plane size is 600mm, the vertical spacing is 500mm, the derrick material is DN40X3.5 steel pipe, the total height is 10m to 15m, the top of the steel pipe derrick 1 is provided with a top tripod 2, the top tripod 2 is made of DN40X3.5 steel pipe into a triangular style, the lower part of the top tripod 2 is provided with a top wallboard lifting pulley 4 through a hook, a wallboard lifting rope 5 is wound on the top wallboard lifting pulley 4, the wallboard lifting rope 5 is a polypropylene cable rope with the diameter of 18mm, one end of the wallboard lifting rope 5 is provided with a wallboard lifting hook 6, the wallboard lifting hook 6 is provided with a composite wallboard panel 8, the bottom of the steel pipe derrick 1 is provided with a bottom fixing part 11, the right side of the bottom of the steel pipe derrick 1 is provided with an anti-collision block 7, the lower part of the top tripod 2 is fixedly connected with a steel structure main body 9 through a top fixing rope 12, the lower part of the top tripod 2, the steel pipe derrick 1 is provided with an operating platform 10, and the operating platform 10 is formed by combining steel plates with the width of 30mm and the thickness of 4 mm.
During operation, in the first step, a crane is used for hoisting the steel pipe derrick 1 and vertically approaching the steel structure main body 9, the steel pipe derrick is fixed with the steel structure main body 9 through the top tripod 2 and fixed through the top fixing cable 12, and the bottom of the steel pipe derrick 1 is fixed through the bottom fixing part 11.
And secondly, the operator climbs to the position where the composite wall panel 8 needs to be installed, the operation platform 10 is installed, and the operator is safely hung on the steel pipe derrick 1.
Third, the operator lifts composite shingle 8 to the installation location via top wallboard lifting pulley 4 and wallboard lifting ropes 5 and wallboard hook 6.
Fourthly, the operator mounts the composite wall panel 8 on the operation table 10.
And fifthly, mounting the composite wall panel 8 from bottom to top and circulating the second step and the third step until the composite wall panel 8 at the position is safe.
And sixthly, moving the steel pipe derrick 1, dismantling the top tripod 2, and horizontally moving the steel pipe derrick 1 by the cooperation of the upper operating personnel and the lower operating personnel through the top pulley block 3 so as to work.
To sum up, this a safe operating means for composite wall panel installation, through the cooperation use of parts such as steel pipe derrick 1, top tripod 2, top assembly pulley 3 and top wallboard lifting pulley 4, when composite wall panel installation, can effectually adapt to the inconvenient, installer operation station position and the perpendicular transportation scheduling problem of shingle nail in place, guaranteed the installation quality of shingle nail, repeatedly usable when having reduced operating time to can do the escape way concurrently, reduced installation engineering's cost.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. A safe operating means for composite wall panel installation, includes steel pipe derrick (1), its characterized in that: a top tripod (2) is arranged at the top of the steel pipe derrick (1), a top wallboard lifting pulley (4) is arranged below the top tripod (2) through a hook, the top wallboard lifting pulley (4) is wound with a wallboard lifting rope (5), one end of the wallboard lifting rope (5) is provided with a wallboard lifting hook (6), the wallboard lifting hook (6) is provided with a composite wall panel (8), the bottom of the steel pipe derrick (1) is provided with a bottom fixing part (11), the right side of the bottom of the steel pipe derrick (1) is provided with an anti-collision block (7), a steel structure main body (9) is fixedly connected below the top tripod (2) through a top fixing cable (12), a top pulley block (3) is arranged below the top tripod (2), and an operating platform (10) is arranged on the steel pipe derrick (1).
2. A safe operating device for composite wall panel installation according to claim 1, wherein: the concrete parameters of the steel pipe derrick (1) are as follows: the plane size is 600mm, the vertical spacing is 500mm, the derrick material adopts DN40X3.5 steel pipe, and the total height is 10m to 15 m.
3. A safe operating device for composite wall panel installation according to claim 1, wherein: the top tripod (2) is made of DN40X3.5 steel pipes in a triangular style.
4. a safe operating device for composite wall panel installation according to claim 1, wherein: the operating table (10) is formed by combining steel plates with the width of 30mm and the thickness of 4 mm.
5. A safe operating device for composite wall panel installation according to claim 1, wherein: the wallboard lifting rope (5) is a polypropylene cable with the diameter of 18 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920485840.XU CN209758918U (en) | 2019-04-11 | 2019-04-11 | A safe operating means for composite wall panel installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920485840.XU CN209758918U (en) | 2019-04-11 | 2019-04-11 | A safe operating means for composite wall panel installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209758918U true CN209758918U (en) | 2019-12-10 |
Family
ID=68758900
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920485840.XU Active CN209758918U (en) | 2019-04-11 | 2019-04-11 | A safe operating means for composite wall panel installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209758918U (en) |
-
2019
- 2019-04-11 CN CN201920485840.XU patent/CN209758918U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH07100582B2 (en) | Elevator work platform and elevator installation method | |
CN101177959A (en) | Curtain wall unit hanging equipment and construction method thereof | |
CN203128062U (en) | Roof crane | |
CN203794533U (en) | Light portable mobile lifting equipment | |
CN209758918U (en) | A safe operating means for composite wall panel installation | |
CN205442496U (en) | High -rise building roof curtain lifting device | |
CN102777048A (en) | Vertical transportation device | |
CN210885034U (en) | Lifting device for building engineering | |
CN212450358U (en) | Mechanical equipment that lifts by crane that construction was used | |
CN215052767U (en) | Construction system for installing large-scale deep shaft pressure steel pipe | |
CN210029781U (en) | Anti-shaking device for hoisting | |
CN210855091U (en) | Simple movable heavy object vertical lifting equipment | |
CN210885016U (en) | Combined lifting machine | |
CN214541832U (en) | Transformer stores up oil tank cabinet foot structure | |
CN211081059U (en) | Hoisting device for unit plate of curtain wall with curved outer vertical surface | |
CN209758935U (en) | Suspension type residential building cargo handling machine | |
CN218465352U (en) | Roof hoisting outdoor material machine tool device | |
CN219950214U (en) | Prefabricated building component pulley block lifting appliance | |
CN214359724U (en) | Lifting appliance special for elevator shaft | |
CN215402752U (en) | Finished product flue hoist device for building | |
CN217838191U (en) | Hoisting support for assisting in cleaning water tank | |
CN202729527U (en) | Vertical conveying device | |
CN213707572U (en) | Hanging equipment used outside closed space | |
CN210635150U (en) | Garbage collection device for construction site | |
CN217025102U (en) | Material loading machine for construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |