CN209742418U - A consolidate bearing structure for building engineering - Google Patents
A consolidate bearing structure for building engineering Download PDFInfo
- Publication number
- CN209742418U CN209742418U CN201920463085.5U CN201920463085U CN209742418U CN 209742418 U CN209742418 U CN 209742418U CN 201920463085 U CN201920463085 U CN 201920463085U CN 209742418 U CN209742418 U CN 209742418U
- Authority
- CN
- China
- Prior art keywords
- fixed
- seted
- threaded rod
- universal wheel
- convenient
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a consolidate bearing structure for building engineering, the on-line screen storage device comprises a fixed pedestal, screw thread through-hole and fixed slot have been seted up respectively to unable adjustment base four corners position and intermediate position, the spiral hole has been seted up to the fixed slot position all around, spiral hole lower extreme seted up flutedly, fixed cover is installed to the inside upside of recess, fixed cover internally mounted has the threaded rod, button cap and universal wheel are installed respectively at both ends about the threaded rod, the fixed station is all installed to both ends intermediate position about the recess, the support column is installed to the fixed station upper end, the stationary blade is installed to the support column upper end. The utility model discloses simple structure convenient to use and operation can be fixed and support the bearing post class of construction to the device can be convenient for install and dismantle, and the universal wheel of device is convenient for go up and down, is convenient for remove and can not hinder unable adjustment base's fixed, can adjust the distance increase fixed range between the stationary blade.
Description
Technical Field
The utility model relates to a construction equipment technical field specifically is a reinforced support structure for building engineering.
Background
At present, the effect that the lateral load was resisted mainly through structure lateral rigidity to the architectural engineering structure antidetonation design, to the span big, the high building of floor adopts large cross-section beam column structure to resist outer load, but this structure is complicated, engineering cost is high, be not convenient for arrange in a flexible way and installation, secondly, adopt bearing structure and main part building structure to adopt the rigid connection that the butt joint mode combines in addition, the junction uses the continuous fishplate bar of multi-disc and a large amount of bolts, lead to supporting joint length longer, the structure is complicated, shortcoming such as increase cost, provide a reinforced support structure for building engineering for this.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a consolidate bearing structure for building engineering has solved the problem that proposes in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a consolidate bearing structure for building engineering, includes unable adjustment base, screw thread through-hole and fixed slot have been seted up respectively to unable adjustment base four corners position and intermediate position, the spiral hole has been seted up to fixed slot position all around, the recess has been seted up to spiral hole lower extreme, fixed cover is installed to the inside upside of recess, fixed cover internally mounted has the threaded rod, button cap and universal wheel are installed respectively at both ends about the threaded rod, the fixed station is all installed to both ends intermediate position about the recess, the support column is installed to the fixed station upper end, the stationary blade is installed to the support column upper end.
As a preferred embodiment of the utility model, the fixed pin is installed to the fixed station lower extreme, the pinhole has evenly been seted up to the fixed slot left and right sides, the fixed pin is arranged in inside the pinhole.
As a preferred embodiment of the present invention, the threaded rod passes through the spiral hole, and the button cap and the universal wheel are respectively disposed in the top of the fixing base and the inside of the groove.
As an preferable embodiment of the present invention, the fixing sleeve is fixedly connected to the groove through a connecting frame.
As a preferred embodiment of the present invention, the locking plate and the locking pin are respectively installed on the left and right sides of the front end of the fixing groove, and the locking pin is disposed in the locking plate.
As a preferred embodiment of the utility model, both ends are passed through the axis of rotation and are connected about unable adjustment base.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. The utility model relates to a consolidate bearing structure for building engineering can fix the heel post for building through the fixed slot, then supports through support column and stationary blade and consolidate, is convenient for remove unable adjustment base through the universal wheel to can adjust about the universal wheel through threaded rod and spiral hole, make the universal wheel can arrange inside and unable adjustment base of recess in can stabilize and contact surface laminating, the gim peg of being convenient for fixes.
2. The utility model relates to a consolidate bearing structure for building engineering can fix the fixed station through the pinhole to the fixed pin can be adjusted the fixed station in the pinhole of difference, thereby can be applicable to the support and the fixed of the heel post that the diameter of axle is less than the fixed slot, carries out dual fixed through button cap and fixed cover to the threaded rod, improves stability, fixes unable adjustment base through locking plate and lockpin.
3. The utility model relates to a consolidate bearing structure for building engineering, simple structure convenient to use and operation can fix and support the bearing post class of construction to the device can be convenient for install and dismantle, and the universal wheel of device is convenient for go up and down, is convenient for remove and can not hinder unable adjustment base's fixed, can adjust the distance increase fixed range between the stationary blade.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
Fig. 1 is a schematic view of the overall structure of a reinforced support structure for construction engineering according to the present invention;
Fig. 2 is a top view of a fixing base of a reinforcing support structure for construction engineering according to the present invention;
Fig. 3 is the utility model relates to a fixed station local structure schematic diagram of a reinforced bearing structure for building engineering.
In the figure: 1. fixed baseplate, 2, threaded rod, 3, fixed station, 4, support column, 5, stationary blade, 6, fixed slot, 7, button cap, 8, spiral hole, 9, fixed cover, 10, link, 11, universal wheel, 12, recess, 13, gim peg, 14, screw thread through-hole, 15, axis of rotation, 16, pinhole, 17, locking plate, 18, lockpin, 19, fixed pin.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a consolidate bearing structure for building engineering, includes unable adjustment base 1, threaded through-hole 14 and fixed slot 6 have been seted up respectively to 1 four corners position of unable adjustment base and intermediate position, spiral hole 8 has been seted up to fixed slot 6 position all around, spiral hole 8 lower extreme is seted up flutedly 12, fixed cover 9 is installed to the inside upside of recess 12, fixed cover 9 internally mounted has threaded rod 2, button cap 7 and universal wheel 11 are installed respectively at both ends about threaded rod 2, fixed station 3 is all installed to both ends intermediate position about recess 12, support column 4 is installed to 3 upper ends of fixed station, stationary blade 5 is installed to 4 upper ends of support column.
In this embodiment (please refer to fig. 1-2), the bearing column for a building can be fixed through the fixing groove 6, and then the bearing column is supported and reinforced through the supporting column 4 and the fixing plate 5, the fixing base 1 is convenient to move through the universal wheel 11, and the universal wheel 11 can be adjusted up and down through the threaded rod 2 and the spiral hole 8, so that the universal wheel 11 can be placed in the groove 12, the fixing base 1 can be stably attached to the contact surface, and the fixing bolt 13 is convenient to fix.
Wherein, fixed pin 19 is installed to the fixed station 3 lower extreme, the pinhole 16 has evenly been seted up to the fixed slot 6 left and right sides, fixed pin 19 is arranged in inside the pinhole 16.
In this embodiment (see fig. 1 and 3), the fixing table 3 can be fixed through the pin holes 16, and the fixing pins 19 can adjust the fixing table 3 in different pin holes 16, so that the fixing device can be applied to support and fix a load-bearing column with a smaller shaft diameter than the fixing groove 6.
Wherein, the threaded rod 2 passes through the spiral hole 8, and the button cap 7 and the universal wheel 11 are respectively arranged above the fixed base 1 and inside the groove 12.
In this embodiment (see fig. 1), the threaded rod 2 is doubly fixed by the button cap 7 and the fixing sleeve 9, so as to improve the stability.
Wherein, the fixed sleeve 9 is fixedly connected with the groove 12 through a connecting frame 10.
in this embodiment (see fig. 1), the stability of the fixing sleeve 9 is improved by the connecting frame 10.
wherein, the left and right sides of the front end of the fixing groove 6 are respectively provided with a locking plate 17 and a locking pin 18, and the locking pin 18 is arranged in the locking plate 17.
In this embodiment (see fig. 2), the fixing base 1 is fixed by the locking plate 17 and the locking pin 18.
Wherein, both ends are rotated through axis of rotation 15 and are connected about unable adjustment base 1.
When a consolidate bearing structure for building engineering uses the time with unable adjustment base 1 ring cover in the bearing post class outside, then fix locking plate 17 and lockpin 18, then rotatory threaded rod 2 makes universal wheel 11 rise until the universal wheel 11 arranges in inside recess 12, and the laminating of unable adjustment base 1 bottom and contact surface, then fix unable adjustment base 1 through gim peg 13, adjust the position of fixed pin 19 at pinhole 16, thereby adjust the position of fixed station 3, make stationary blade 5 and cylinder surface contact laminating, and can install damping spring in the support column 4 outside or install the shock-absorbing layer on stationary blade 5 and improve the shock attenuation effect of device, dismantle the device after the construction is accomplished.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (6)
1. A reinforced supporting structure for constructional engineering, comprising a fixed base (1), characterized in that: unable adjustment base (1) four corners position and intermediate position have seted up screw thread through-hole (14) and fixed slot (6) respectively, spiral hole (8) have been seted up to fixed slot (6) position all around, spiral hole (8) lower extreme is seted up flutedly (12), fixed cover (9) are installed to the inside upside of recess (12), fixed cover (9) internally mounted has threaded rod (2), button cap (7) and universal wheel (11) are installed respectively at both ends about threaded rod (2), fixed station (3) are all installed to both ends intermediate position about recess (12), support column (4) are installed to fixed station (3) upper end, stationary blade (5) are installed to support column (4) upper end.
2. A reinforced support structure for construction work according to claim 1, wherein: fixed pin (19) are installed to fixed station (3) lower extreme, pinhole (16) have evenly been seted up to fixed slot (6) left and right sides, pinhole (16) inside are arranged in to fixed pin (19).
3. A reinforced support structure for construction work according to claim 1, wherein: the threaded rod (2) penetrates through the spiral hole (8), and the button cap (7) and the universal wheel (11) are respectively arranged above the fixed base (1) and inside the groove (12).
4. A reinforced support structure for construction work according to claim 1, wherein: the fixed sleeve (9) is fixedly connected with the groove (12) through a connecting frame (10).
5. A reinforced support structure for construction work according to claim 1, wherein: locking plate (17) and lockpin (18) are installed respectively to fixed slot (6) front end left and right sides, lockpin (18) are arranged in locking plate (17).
6. A reinforced support structure for construction work according to claim 1, wherein: the left end and the right end of the fixed base (1) are rotatably connected through a rotating shaft (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920463085.5U CN209742418U (en) | 2019-04-08 | 2019-04-08 | A consolidate bearing structure for building engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920463085.5U CN209742418U (en) | 2019-04-08 | 2019-04-08 | A consolidate bearing structure for building engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209742418U true CN209742418U (en) | 2019-12-06 |
Family
ID=68720126
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920463085.5U Expired - Fee Related CN209742418U (en) | 2019-04-08 | 2019-04-08 | A consolidate bearing structure for building engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209742418U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111411569A (en) * | 2020-04-14 | 2020-07-14 | 刘长东 | Bridge construction method and bridge construction equipment |
-
2019
- 2019-04-08 CN CN201920463085.5U patent/CN209742418U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111411569A (en) * | 2020-04-14 | 2020-07-14 | 刘长东 | Bridge construction method and bridge construction equipment |
CN111411569B (en) * | 2020-04-14 | 2021-07-30 | 中建远南集团有限公司 | Bridge construction method and bridge construction equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209742418U (en) | A consolidate bearing structure for building engineering | |
CN113586663B (en) | Be used for mining machinery installation base | |
CN101831955A (en) | Universal hinge support | |
CN216238556U (en) | Side support fixing mechanism for deep foundation pit | |
CN212556368U (en) | Transfer car (buggy) for assembly type structure | |
CN212689704U (en) | Electronic information engineering communication tower | |
CN107905401A (en) | A kind of assembling type steel structure H profile steel Self-resetting energy dissipation brace device | |
CN211690191U (en) | Protective structure of hydraulic and hydroelectric engineering side slope | |
CN207405763U (en) | A kind of assembling type steel structure combines pedestal | |
CN207646869U (en) | A kind of wall beam fastening device for steel construction | |
CN213654257U (en) | Novel vertical concrete pump pipe tool type reinforcing tool | |
CN218027721U (en) | Foundation ditch subassembly that stabilizes for civil engineering | |
CN213597546U (en) | Anti-seismic support diagonal member | |
CN220827919U (en) | Anti-seismic structure for constructional engineering | |
CN216343671U (en) | Electromechanical device damping device | |
CN212154242U (en) | Building structure roof beam reinforced structure | |
CN211368432U (en) | Anti-seismic support leg for swivel bridge | |
CN220985261U (en) | Temporary power cable supporting assembly | |
CN221321257U (en) | Anti-seismic frame | |
CN218715383U (en) | Reinforced structure of power transmission tower | |
CN111576983B (en) | Auxiliary supporting device for tower mast steel structure | |
CN210530402U (en) | Civil construction is with recoverable bearing diagonal structure | |
CN217000271U (en) | Steel construction antidetonation buffering base for building engineering | |
CN214657176U (en) | Resistance to compression foundation structure | |
CN220954612U (en) | Aluminum template with protective structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191206 Termination date: 20210408 |
|
CF01 | Termination of patent right due to non-payment of annual fee |