CN209742344U - High-altitude transverse hanging basket construction system - Google Patents
High-altitude transverse hanging basket construction system Download PDFInfo
- Publication number
- CN209742344U CN209742344U CN201920315368.5U CN201920315368U CN209742344U CN 209742344 U CN209742344 U CN 209742344U CN 201920315368 U CN201920315368 U CN 201920315368U CN 209742344 U CN209742344 U CN 209742344U
- Authority
- CN
- China
- Prior art keywords
- steel wire
- wire rope
- construction
- self
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a high-altitude transverse hanging basket construction system, which comprises a hanging basket, two steel wire ropes and a fixed mounting assembly, wherein the two steel wire ropes provide tracks for the hanging basket to transversely move at high altitude, and the hanging basket is movably connected on the two steel wire ropes; the fixed mounting assembly comprises a first fixed pulley and a first self-locking hand winch, and the first fixed pulley and the first self-locking hand winch are respectively mounted on a steel structure of a construction site; one end of the steel wire rope is connected to a steel structure on a construction site, the other end of the steel wire rope penetrates through the first fixed pulley, and the end part of the steel wire rope is connected with a steel wire rope in the first self-locking hand-operated winch. The utility model discloses simple structure, reasonable in design saves space, time, practices thrift the cost expense, advantages such as easy to assemble, adjustment and environmental protection practicality. The method makes up the blank of high-altitude transverse construction, is safe and reliable, and can be widely applied to top construction places with tight construction period and large area of multi-space combined construction.
Description
Technical Field
The utility model relates to a horizontal construction technical field in high altitude, concretely relates to is a horizontal hanging flower basket construction system in high altitude.
Background
At present, in the high-altitude construction process, construction such as scaffolds, pipe frames and the like is generally adopted, but the construction mode has many defects under the conditions of large space area, tight construction period and simultaneous construction of multiple kinds. The construction safety is difficult to guarantee by setting up the height of the pipe frame more than one hundred meters, and the construction space occupying more than ten thousand square meters of site is set up by setting up the transverse length of the pipe frame more than one hundred meters, so that the construction progress of other various projects in the space is influenced, even the construction can not be carried out at all, the construction period is delayed, and a large amount of construction cost is increased. The overhead transverse construction has the defects of high cost, large manual demand, occupation of more space fields, difficulty in construction of other work types in the space, delay of construction period and the like.
SUMMERY OF THE UTILITY MODEL
The utility model discloses just to prior art exist not enough, provide a horizontal hanging flower basket construction system in high altitude.
The utility model provides a horizontal hanging flower basket construction system in high altitude, includes hanging flower basket, two wire rope, fixed mounting subassembly, two wire rope provide the track for hanging flower basket lateral shifting in high altitude, hanging flower basket swing joint is on two wire rope.
the fixed mounting assembly comprises a first fixed pulley and a first self-locking hand winch, and the first fixed pulley and the first self-locking hand winch are respectively mounted on a steel structure of a construction site. One end of the steel wire rope is connected to a steel structure on a construction site, the other end of the steel wire rope penetrates through the first fixed pulley, and the end part of the steel wire rope is connected with a steel wire rope in the first self-locking hand-operated winch.
As an improvement of the scheme, a chain block is arranged between the first fixed pulley and the first self-locking hand-operated winch, the steel wire rope is connected with an upper hook of the chain block, and a steel wire rope in the first self-locking hand-operated winch is connected with a lower hook of the chain block.
as an improvement of the scheme, the steel wire ropes on the left side and the right side of the hanging basket are provided with the rope tighteners, the top parts of the rope tighteners are provided with steel wire rope sleeves, and the steel wire rope sleeves are sleeved on a steel structure of a construction site.
as an improvement of the scheme, the position, corresponding to the first fixed pulley, of the steel structure of the construction site is provided with an ear plate, a through hole is formed in the ear plate, a clamping ring is connected to the through hole, and the steel wire rope is connected with the clamping ring.
As an improvement of the scheme, steel pipe frames are arranged at the tops of the front side plate and the rear side plate of the hanging basket, second fixed pulleys are symmetrically arranged on the left side and the right side of the top of each steel pipe frame, and a second self-locking type hand winch is arranged in the middle of each steel pipe frame. The steel wire rope passes through the second fixed pulley and is wound on the second self-locking hand winch.
The utility model discloses simple structure, reasonable in design saves space, time, practices thrift the cost expense, advantages such as easy to assemble, adjustment and environmental protection practicality. The method makes up the blank of high-altitude transverse construction, is safe and reliable, and can be widely applied to top construction places with tight construction period and large area of multi-space combined construction.
Drawings
Fig. 1 is a schematic structural view of the present invention;
Fig. 2 is a top view of the present invention;
FIG. 3 is a schematic structural diagram of a high-altitude transverse hanging basket construction system with a chain block and a rope tensioner;
FIG. 4 is a schematic view of the installation of the steel structure and the ear plate in the construction site of the utility model;
Fig. 5 is a schematic structural diagram of the basket of the present invention.
In the figure: the hanging basket comprises a hanging basket 1, a steel pipe frame 11, a second fixed pulley 12, a second self-locking hand winch 13, a steel wire rope 2, a fixed mounting component 3, a first fixed pulley 31, a first self-locking hand winch 32, a construction site steel structure 4, an ear plate 41, a through hole 411, a clamping ring 42, a chain block 5, a rope tightener 6 and a steel wire rope sleeve 61.
Detailed Description
the technical solution of the present invention will be further explained with reference to the accompanying drawings. It is to be understood that the embodiments described are only some embodiments of the invention, and not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, a high altitude horizontal hanging flower basket construction system, including hanging flower basket 1, two wire rope 2, fixed mounting subassembly 3, two wire rope 2 provide the track for hanging flower basket 1 lateral shifting in the high altitude, and hanging flower basket 1 swing joint is on two wire rope 2. The fixed mounting assembly 3 comprises a first fixed pulley 31 and a first self-locking hand winch 32, and the first fixed pulley 31 and the first self-locking hand winch 32 are respectively mounted on the steel structure 4 of the construction site. One end of the steel wire rope 2 is connected to the steel structure 4 of the construction site, the other end of the steel wire rope passes through the first fixed pulley 31, and the end part of the steel wire rope is connected with a steel wire rope in the first self-locking hand-operated winch 32.
Further, referring to fig. 3, a chain block 5 is arranged between the first fixed pulley 31 and the first self-locking hand winch 32, the steel wire rope 2 is connected with an upper hook of the chain block 5, a steel wire rope in the first self-locking hand winch 32 is connected with a lower hook of the chain block 5, and the chain block 5 is used for optimizing the bearing deflection of the steel wire rope 2.
Further, referring to fig. 3, the wire ropes 2 on the left and right sides of the hanging basket 1 are provided with rope tighteners 6, the top of each rope tightener 6 is provided with a wire rope sleeve 61, and the wire rope sleeves 61 are sleeved on the steel structure 4 of the construction site. The euphroe 6 is sleeved on the steel structure 4 of the construction site through the steel wire rope sleeve 61, the euphroe 6 and the steel wire rope sleeve 61 bear part of gravity, and the steel wire rope 2 is guaranteed to be in a structural shape with similar arrangement tracks, so that the operation tracks of the hanging baskets are similar to the original structural shape, and the construction process is simpler and more convenient. When the steel wire rope 2 is obliquely arranged, the angle of the steel wire rope 2 can be changed through the rope tightening device 6, and the construction of workers is facilitated.
Further, referring to fig. 4, an ear plate 41 is disposed at a position corresponding to the first fixed pulley 31 on the steel structure 4 of the construction site, a through hole 411 is disposed on the ear plate 41, a snap ring 42 is connected to the through hole 411, and the steel wire rope 2 is connected to the snap ring 42.
Further, referring to fig. 5, steel pipe frames 11 are arranged at the tops of the front side plate and the rear side plate of the hanging basket 1, second fixed pulleys 12 are symmetrically arranged at the left side and the right side of the top of the steel pipe frame 11, and a second self-locking hand winch 13 is arranged in the middle of the top of the steel pipe frame 11; the steel wire rope 2 passes through the second fixed pulley 12 and is wound on the second self-locking hand winch 13.
The utility model discloses simple structure, reasonable in design saves space, time, practices thrift the cost expense, advantages such as easy to assemble, adjustment and environmental protection practicality. The method makes up the blank of high-altitude transverse construction, is safe and reliable, and can be widely applied to top construction places with tight construction period and large area of multi-space combined construction.
Claims (5)
1. The utility model provides a horizontal hanging flower basket construction system in high altitude which characterized in that: the hanging basket comprises a hanging basket (1), two steel wire ropes (2) and a fixed mounting assembly (3), wherein the two steel wire ropes (2) provide tracks for the hanging basket (1) to transversely move at high altitude, and the hanging basket (1) is movably connected to the two steel wire ropes (2); the fixed mounting assembly (3) comprises a first fixed pulley (31) and a first self-locking hand winch (32), and the first fixed pulley (31) and the first self-locking hand winch (32) are respectively mounted on the steel structure (4) of the construction site; one end of the steel wire rope (2) is connected to the steel structure (4) in the construction site, the other end of the steel wire rope passes through the first fixed pulley (31), and the end part of the steel wire rope is connected with a steel wire rope in the first self-locking hand-operated winch (32).
2. The overhead transverse basket construction system according to claim 1, wherein: a chain block (5) is arranged between the first fixed pulley (31) and the first self-locking hand winch (32), the steel wire rope (2) is connected with an upper hook of the chain block (5), and a steel wire rope in the first self-locking hand winch (32) is connected with a lower hook of the chain block (5).
3. The overhead transverse basket construction system according to claim 1, wherein: the steel wire rope (2) on the left side and the right side of the hanging basket (1) are provided with rope tighteners (6), the top of each rope tightener (6) is provided with a steel wire rope sleeve (61), and the steel wire rope sleeves (61) are sleeved on the steel structure (4) on the construction site.
4. The overhead transverse basket construction system according to claim 1, wherein: the position that corresponds with first fixed pulley (31) on job site steel construction (4) is equipped with otic placode (41), is equipped with on otic placode (41) and perforates (411), is connected with snap ring (42) on perforates (411), and wire rope (2) are connected with snap ring (42).
5. The overhead transverse basket construction system according to claim 1, wherein: the tops of the front side plate and the rear side plate of the hanging basket (1) are respectively provided with a steel pipe frame (11), the left side and the right side of the top of the steel pipe frame (11) are symmetrically provided with second fixed pulleys (12), and the middle position of the steel pipe frame is provided with a second self-locking hand winch (13); the steel wire rope (2) passes through the second fixed pulley (12) and is wound on the second self-locking hand winch (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920315368.5U CN209742344U (en) | 2019-03-13 | 2019-03-13 | High-altitude transverse hanging basket construction system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920315368.5U CN209742344U (en) | 2019-03-13 | 2019-03-13 | High-altitude transverse hanging basket construction system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209742344U true CN209742344U (en) | 2019-12-06 |
Family
ID=68716681
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920315368.5U Active CN209742344U (en) | 2019-03-13 | 2019-03-13 | High-altitude transverse hanging basket construction system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209742344U (en) |
-
2019
- 2019-03-13 CN CN201920315368.5U patent/CN209742344U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201381166Y (en) | Hanging-point adjustable transverse hanging beam | |
CN203439898U (en) | Tube bundle lifting device of large heat exchanger | |
CN209742344U (en) | High-altitude transverse hanging basket construction system | |
CN204737609U (en) | European style hoist girder connection structure | |
CN207346607U (en) | A kind of Weight type tension weight device | |
CN201010459Y (en) | Flexible attaching device used for tower crane body | |
CN205857670U (en) | A kind of external wall construction hanging basket is encorbelmented device | |
CN205976733U (en) | Can have enough to meet need encloses fender temporarily | |
CN204342304U (en) | The color steel of overlength watt compound type balance overhead hoist | |
CN212249129U (en) | Protective net fixing rod for attached lifting scaffold | |
CN204609324U (en) | A kind of lifting device used in steel work purlin is installed | |
CN203333224U (en) | Steel structural beam upward lifting tool | |
CN207312923U (en) | A kind of heavy-duty steel component hanging apparatus | |
CN207920678U (en) | A kind of chassis structure for steam turbine installation | |
CN205088324U (en) | General electrophoresis hanger | |
CN209481048U (en) | A kind of carrying pole device of auxiliary lifting | |
CN205100578U (en) | Last for high altitude construction safety device of marine diesel | |
CN212608991U (en) | Rear-mounted slideway slot hoisting device | |
CN110409790A (en) | A kind of production of attachment type raise scaffold ultra-wide protective plate, application method | |
CN216586191U (en) | Precast beam steel strand wires installation device | |
CN220787790U (en) | Portable lifting device in roof | |
CN211666746U (en) | Small U-shaped steel supporting joist | |
CN212226869U (en) | High-pole lamp structure | |
CN209523495U (en) | A kind of high-altitude safe operation rope connecting device | |
CN212475873U (en) | Fan-shaped purlin quick installation device that arranges |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |