CN209725454U - A kind of pepe bridge - Google Patents
A kind of pepe bridge Download PDFInfo
- Publication number
- CN209725454U CN209725454U CN201920023467.6U CN201920023467U CN209725454U CN 209725454 U CN209725454 U CN 209725454U CN 201920023467 U CN201920023467 U CN 201920023467U CN 209725454 U CN209725454 U CN 209725454U
- Authority
- CN
- China
- Prior art keywords
- rod
- hole
- support rod
- link block
- nut
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a kind of pepe bridge, including link block, support rod, supporting block and gag lever post, the both ends of the supporting block pass through two support rods respectively and are connected on the link block that two are oppositely arranged, the link block with mounting surface for connecting, the support rod moves on the link block, the supporting block is equipped with first through hole, opening direction of the support rod perpendicular to the first through hole, the gag lever post includes first body of rod, second body of rod and the third body of rod, first body of rod and the third body of rod are connected to the both ends of second body of rod and are located at the same side of second body of rod, first body of rod and the third body of rod pass through the first through hole, and first body of rod and the third body of rod are equipped with the first nut, the installation site of pipe can be changed, and fixing pipe can be stablized Son, structure is simple, easy to operate, very practical.
Description
Technical field
The utility model relates to field of fixation devices, more particularly to a kind of pepe bridge.
Background technique
Cabin aesthetics is paid attention to by people always, it is generally the case that needs the water spray head of location and installation on the ceiling
Answer loading board plate center or plate stitch center in face cabin in center.But because there is certain journey in the positioning of spray head and interior loading board day slot
The construction error of degree, therefore usually connect water spray head using hose, and need the department of constructing according to the actual situation to water spray
The position of head is adjusted.And traditional pepe bridge be it is fixed, cannot achieve and be adjusted according to the actual situation, such as need to adjust
Whole water spray head position can only then remove the insulation for being coated on cabin top around hanger, cut off former hanger, and after polishing flat again
Cladding insulation, then relocate and new hanger is installed, i.e. waste of manpower wastes material resources again.
Utility model content
Place in view of the deficiency of the prior art, the purpose of the utility model is to provide a kind of adjustment positions, structure
Simply, practical pepe bridge.
In order to solve the above technical problems, pepe bridge provided by the utility model, including link block, support rod, supporting block
And gag lever post, the both ends of the supporting block pass through two support rods respectively and are connected to two link blocks being oppositely arranged
On, the link block with mounting surface for connecting, and the support rod moves on the link block, and the supporting block is equipped with
First through hole, for the support rod perpendicular to the opening direction of the first through hole, the gag lever post includes first body of rod, the second bar
Body and the third body of rod, first body of rod and the third body of rod are connected to the both ends of second body of rod and are located at described
The same side of second body of rod, first body of rod and the third body of rod pass through the first through hole, and first body of rod and
The third body of rod is equipped with the first nut, and the shaft of first body of rod and the third body of rod is equipped with and first spiral shell
The screw thread of parent phase cooperation.
Optionally, the link block is equipped with multiple connecting holes, and the first end of the support rod passes through the connecting hole, and
The first end of the support rod is equipped with the second nut, and the shaft of the support rod is equipped with the spiral shell matched with second nut
Line.
Optionally, the supporting block is equipped with the second through-hole, and the second end of the support rod passes through second through-hole, and
The second end of the support rod is equipped with third nut, and the shaft of the support rod is equipped with the spiral shell matched with the third nut
Line.
Further, second body of rod is arc-shaped.
Further, the link block includes the first connecting plate and the second connecting plate, first connecting plate and described the
Two connecting plates vertically connect, and the support rod is vertical with second connecting plate, and the connecting hole is set to second connecting plate
On.
Further, the first through hole is strip hole.
The utility model has the beneficial effects that:
1, the utility model is connected by the gag lever post and supporting block connected by first body of rod, second body of rod and the third body of rod
It connects, pipe can be fixed in gag lever post, and supporting block is connected on link block by support rod, support rod can on link block
It is mobile, it can adjust pipe in position, and be connected in supporting block on first body of rod and the third body of rod by the first nut, it can
The space of gag lever post is adjusted, to adapt to different size of pipe, structure is simple, very practical.
2, the link block of the utility model is equipped with connecting hole, and support rod is connected from different connecting holes, adjustable support
The position of bar, support rod are connected on link block by the second nut, are easy to install and remove, and the installation of adjustable hanger
Height.The second end of support rod passes through the second through-hole and is equipped with third nut, installs support rod and supporting block, disassembly side
Just, and it is adjustable the position of vertical direction.Second body of rod be it is arc-shaped, can be affixed with pipe, further increase position-limiting action and
Pipe will not be urged to.Link block includes the first connecting plate and the second connecting plate, and the first connecting plate is for installing, the second connecting plate
For being connect with support rod, it is possible to reduce the change to mounting surface protects mounting surface, and can expand fitting limit.In addition, first
Through-hole is strip hole, keeps position of the gag lever post in supporting block adjustable, further can need to adjust the position of pipe according to installation
It sets without changing the connection with mounting surface.
Detailed description of the invention
Fig. 1 is the front view of the pepe bridge of embodiment.
Fig. 2 is the top view of the pepe bridge of embodiment.
Fig. 3 is the front view of the link block of embodiment.
Fig. 4 is the top view of the link block of embodiment.
Wherein, 1, link block;101, connecting hole;102, the first connecting plate;103, the second connecting plate;2, support rod;3, it props up
Bracer;301, first through hole;302, the second through-hole;4, gag lever post;401, first body of rod;402, second body of rod;403, third bar
Body;5, the first nut;6, the second nut;7, third nut;8, pipe.
Specific embodiment
In the description of the present invention, it should be noted that term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower",
The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" is
It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of describing the present invention and simplifying the description, rather than indicate
Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot understand
For limitations of the present invention.In addition, term " first ", " second ", " third " are used for description purposes only, and should not be understood as
Indication or suggestion relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally
Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary,
It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition
The concrete meaning of language in the present invention.
In addition, in the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more.
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without creative efforts
Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig. 1 to Fig. 4, the pepe bridge of the present embodiment includes link block 1, support rod 2, supporting block 3 and gag lever post 4,
The both ends of supporting block 3 pass through two support rods 2 respectively and are connected on two link blocks being oppositely arranged 1, and link block 1 is used for and peace
The connection of dress face, support rod 2 move on link block 1, and supporting block 3 is equipped with first through hole 301, and support rod 2 is perpendicular to first
The opening direction of through-hole 301, gag lever post 4 include first body of rod 401, second body of rod 402 and the third body of rod 403, first body of rod 401
The both ends of second body of rod 402 are connected to the third body of rod 403 and are located at the same side of second body of rod 402, first body of rod 401
First through hole 301 is passed through with the third body of rod 403, and first body of rod 401 and the third body of rod 403 are equipped with the first nut 5, the first bar
The shaft of body 401 and the third body of rod 403 is equipped with the screw thread matched with the first nut 5.The present embodiment passes through by first body of rod
401, the gag lever post 4 that second body of rod 402 and the third body of rod 403 connect is connect with supporting block 3, pipe 8 can be fixed on gag lever post 4
It is interior, and supporting block 3 is connected on link block 1 by support rod 2, support rod 3 moves on link block 1, makes pipe 8 in position
It is upper adjustable, and be connected in supporting block 3 on first body of rod 401 and the third body of rod 403 by the first nut 5, adjustable limit
The space of bar 4, to adapt to different size of pipe 8, structure is simple, very practical.Support rod 2 is perpendicular to first through hole 301
Opening direction, it is ensured that the opening of pipe 8 is face bottom surface.
In this embodiment, link block 1 is equipped with multiple connecting holes 101, and the first end of support rod 2 passes through connecting hole 101, and
The first end of support rod 2 is equipped with the second nut 6, and the shaft of support rod 2 is equipped with the screw thread matched with the second nut 6, passes through
Support rod 2 is connected on different connecting holes 101, moves the position of support rod 2, and can be by the way that support rod 2 to be connected to
The connecting hole 101 of different location, the angle of adjustable support block 3 on two link blocks 1.By nut make support rod 2 with connect
Block 1 connects, and is easy to install and remove, and the height of the installation of adjustable hanger.In addition, supporting block 3 is equipped with the second through-hole
302, the second end of support rod 2 passes through the second through-hole 302, and the second end of support rod 2 is equipped with third nut 7, the bar of support rod 2
It is equipped with the screw thread matched with third nut 7 with it, support rod 2 and supporting block 3 are installed, convenient disassembly, and be adjustable vertical
The position in direction.
In this embodiment, second body of rod 402 is arc-shaped, can be affixed with pipe 8, further increases position-limiting action and will not
It is urged to pipe 8.In addition, link block 1 includes the first connecting plate 102 and the second connecting plate 103, the first connecting plate 102 and second
Connecting plate 103 vertically connects, and support rod 2 is vertical with the second connecting plate 103, and connecting hole 101 is set on the second connecting plate 103, the
One connecting plate 102 is for installing, and the second connecting plate 103 with support rod 2 for connecting, it is possible to reduce the change to mounting surface is protected
Mounting surface is protected, and fitting limit can be expanded.In addition, the first through hole 301 of the present embodiment is strip hole, supporting gag lever post 4
Position on block 3 is adjustable, further can need to adjust the position of pipe 8 without changing the company with mounting surface according to installation
It connects.
To sum up, the present embodiment passes through the gag lever post 4 that is connected by first body of rod 401, second body of rod 402 and the third body of rod 403
It connect, pipe 8 can be fixed in gag lever post 4 with supporting block 3, and supporting block 3 is connected on link block 1 by support rod 2, prop up
Strut 3 moves on link block 1, can adjust pipe 8 in position, and pass through on first body of rod 401 and the third body of rod 403
First nut 5 is connected in supporting block 3, the space of adjustable limit bar 4, and to adapt to different size of pipe 8, structure is simple,
It is very practical.Opening direction of the support rod 2 perpendicular to first through hole 301, it is ensured that the opening of pipe 8 is face bottom surface.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art
For art personnel, without deviating from the technical principle of the utility model, several improvement and replacement can also be made, these change
It also should be regarded as the protection scope of the utility model into replacement.
Claims (6)
1. a kind of pepe bridge, which is characterized in that including link block, support rod, supporting block and gag lever post, the two of the supporting block
End is connected on the link block that two are oppositely arranged respectively by two support rods, and the link block is used for and installation
Face connection, the support rod move on the link block, and the supporting block is equipped with first through hole, and the support rod is vertical
In the opening direction of the first through hole, the gag lever post includes first body of rod, second body of rod and the third body of rod, first bar
Body and the third body of rod are connected to the both ends of second body of rod and are located at the same side of second body of rod, and described the
One body of rod and the third body of rod pass through the first through hole, and first body of rod and the third body of rod are equipped with the first spiral shell
The shaft of mother, first body of rod and the third body of rod is equipped with the screw thread matched with first nut.
2. pepe bridge according to claim 1, which is characterized in that the link block is equipped with multiple connecting holes, described
The first end of support rod passes through the connecting hole, and the first end of the support rod is equipped with the second nut, the bar of the support rod
It is equipped with the screw thread matched with second nut with it.
3. pepe bridge according to claim 1, which is characterized in that the supporting block is equipped with the second through-hole, the branch
The second end of strut passes through second through-hole, and the second end of the support rod is equipped with third nut, the bar of the support rod
It is equipped with the screw thread matched with the third nut with it.
4. pepe bridge according to claim 1, which is characterized in that second body of rod is arc-shaped.
5. pepe bridge according to claim 2, which is characterized in that the link block includes that the first connecting plate and second connect
Fishplate bar, first connecting plate is vertical with second connecting plate to be connect, and the support rod is vertical with second connecting plate, institute
Connecting hole is stated on second connecting plate.
6. pepe bridge according to any one of claims 1 to 5, which is characterized in that the first through hole is strip hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920023467.6U CN209725454U (en) | 2019-01-04 | 2019-01-04 | A kind of pepe bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920023467.6U CN209725454U (en) | 2019-01-04 | 2019-01-04 | A kind of pepe bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209725454U true CN209725454U (en) | 2019-12-03 |
Family
ID=68679235
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920023467.6U Active CN209725454U (en) | 2019-01-04 | 2019-01-04 | A kind of pepe bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209725454U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113175568A (en) * | 2021-05-07 | 2021-07-27 | 广州文冲船厂有限责任公司 | Connecting assembly and connecting method for segmented folding pipe |
-
2019
- 2019-01-04 CN CN201920023467.6U patent/CN209725454U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113175568A (en) * | 2021-05-07 | 2021-07-27 | 广州文冲船厂有限责任公司 | Connecting assembly and connecting method for segmented folding pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201896443U (en) | Curvature adjustable curved-surface template | |
CN209725454U (en) | A kind of pepe bridge | |
CN206753009U (en) | One kind building fabricated scaffold | |
CN205713113U (en) | A kind of PCF board supporting structure | |
CN109140049B (en) | Antidetonation suspension and support and building | |
CN209324062U (en) | A kind of easy-to-dismount steel-structure factory building | |
CN213901212U (en) | A stores pylon for lampblack absorber | |
CN214006636U (en) | Anti-seismic reinforced structure is built in room | |
CN213539408U (en) | Curtain wall mounting structure | |
CN208794346U (en) | The fixed structure of stone curtain wall large size lamps and lanterns | |
CN212002166U (en) | Scaffold supporting structure for large cornice of high-rise building | |
CN209145233U (en) | A kind of aluminium alloy decorating strip system mounting installation | |
CN104912373B (en) | Assembly type supporting switching device for temporary power consumption at construction site | |
CN208235877U (en) | The aerial leveling component in ground | |
CN213753023U (en) | Spotlight antenna mounting device | |
CN211203281U (en) | Anti-seismic bracket connecting piece convenient to install and firm in connection for building | |
CN110425338A (en) | A kind of sliding support of pipelines of antidetonation | |
CN110440060A (en) | A kind of swing antidetonation support of pipelines | |
CN113833962B (en) | Screen support | |
CN220152035U (en) | Bracket for installing comprehensive pipeline | |
CN221348229U (en) | Adjustable pipeline support and hanger | |
CN214468954U (en) | Ancient building tuber pipe machine mounting structure | |
CN204084807U (en) | Air-conditioner outdoor unit | |
CN215522272U (en) | Engineering building installing support easy to operate | |
CN218652839U (en) | Buried fire hydrant box based on trench of exhibition hall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |